Browse Arkansas Code titles and sections
33 U.S.C. § 2326 — Regional sediment management
Federal law — U.S. Code and appendices · legal_authorities
Page 815
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2326
1 See References in Text note below.
fied principally to chapter 68 (§ 5121 et seq.) of Title 42,
The Public Health and Welfare. For complete classi-
fication of this Act to the Code, see Short Title note
set out under section 5121 of Title 42 and Tables.
The National Environmental Policy Act of 1969, re-
ferred to in subsec. (c), is Pub. L. 91–190, Jan. 1, 1970, 83
Stat. 852, which is classified generally to chapter 55
(§ 4321 et seq.) of Title 42, The Public Health and Wel-
fare. For complete classification of this Act to the
Code, see Short Title note set out under section 4321 of
Title 42 and Tables.
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of div. AA of Pub. L. 116–260, set out as a note
under section 2201 of this title.
§ 2326. Regional sediment management
(a) In general
(1) Sediment use
(A) Sediment from Federal water resources
projects
For sediment obtained through or used in
the construction, operation, or maintenance
of an authorized Federal water resources
project, including a project authorized for
flood control, the Secretary shall develop, at
Federal expense, regional sediment manage-
ment plans and carry out projects at loca-
tions identified in plans developed under this
section, or identified jointly by the non-Fed-
eral interest and the Secretary, for use in
the construction, repair, modification, or re-
habilitation of projects, including projects
for the beneficial use of dredged materials
described in sec
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2326
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 39193033753f74e0e62a2eb37fbaafff2c6aa9a6b88fbba0227a880f0b9cb472. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-be3bf10c1d23d04d5f2b5d06
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2326-regional-sediment-management--a65dfa9b44.md
Pages: Not recorded – Not recorded
Passage SHA-256: e410c986a987afb6cabd419c05459ca2cb9aa0962f0c05b809869c06ff4b2a24
Source location: USCODE-2024-title33-chap36-subchapV-sec2326.pdf
Stored source content
Page 815
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2326
1 See References in Text note below.
fied principally to chapter 68 (§ 5121 et seq.) of Title 42,
The Public Health and Welfare. For complete classi-
fication of this Act to the Code, see Short Title note
set out under section 5121 of Title 42 and Tables.
The National Environmental Policy Act of 1969, re-
ferred to in subsec. (c), is Pub. L. 91–190, Jan. 1, 1970, 83
Stat. 852, which is classified generally to chapter 55
(§ 4321 et seq.) of Title 42, The Public Health and Wel-
fare. For complete classification of this Act to the
Code, see Short Title note set out under section 4321 of
Title 42 and Tables.
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of div. AA of Pub. L. 116–260, set out as a note
under section 2201 of this title.
§ 2326. Regional sediment management
(a) In general
(1) Sediment use
(A) Sediment from Federal water resources
projects
For sediment obtained through or used in
the construction, operation, or maintenance
of an authorized Federal water resources
project, including a project authorized for
flood control, the Secretary shall develop, at
Federal expense, regional sediment manage-
ment plans and carry out projects at loca-
tions identified in plans developed under this
section, or identified jointly by the non-Fed-
eral interest and the Secretary, for use in
the construction, repair, modification, or re-
habilitation of projects, including projects
for the beneficial use of dredged materials
described in section 1122 of the Water Re-
sources Development Act of 2016 (33 U.S.C.
2326 note),1 associated with Federal water re-
sources projects for purposes listed in para-
graph (3).
(B) Sediment from other Federal sources and
non-Federal sources
For purposes of projects carried out under
this section, the Secretary may include sedi-
ment from other Federal sources and non-
Federal sources, subject to the requirement
that any sediment obtained from a non-Fed-
eral source shall not be obtained at Federal
expense.
(2) Cooperation
The Secretary shall develop plans under this
subsection in cooperation with the appropriate
Federal, State, regional, and local agencies.
(3) Purposes for sediment use in projects
The purposes of using sediment for the con-
struction, repair, modification, or rehabilita-
tion of Federal water resources projects are—
(A) to reduce storm damage to property;
(B) to protect, restore, and create aquatic
and ecologically related habitats, including
wetlands; and
(C) to transport and place suitable sedi-
ment for the purposes of improving environ-
mental conditions in marsh and littoral sys-
tems, stabilizing stream channels, enhanc-
ing shorelines, and supporting State and
local risk management adaptation strate-
gies.
(4) Reducing costs
To reduce or avoid Federal costs, the Sec-
retary shall consider the beneficial use of
dredged material in a manner that contributes
to the maintenance of sediment resources in
the nearby coastal system.
(b) Secretarial findings
Subject to subsection (c), projects carried out
under subsection (a) may be carried out in any
case in which the Secretary finds that—
(1) the environmental, economic, and social
benefits of the project, both monetary and
nonmonetary, justify the cost of the project;
and
(2) the project will not result in environ-
mental degradation.
(c) Determination of project costs
(1) Costs of construction
(A) In general
Costs associated with construction of a
project under this section or identified in a
regional sediment management plan shall be
limited solely to construction costs that are
in excess of the costs necessary to carry out
the dredging for construction, operation, or
maintenance of an authorized Federal water
resources project in the most cost-effective
way, consistent with economic, engineering,
and environmental criteria.
(B) Cost sharing
(i) In general
Except as provided in clause (ii), the
non-Federal share of the construction cost
of a project under this section shall be de-
termined as provided in subsections (a)
through (d) of section 2213 of this title.
(ii) Special rule
Construction of a project under this sec-
tion for one or more of the purposes of pro-
tection, restoration, or creation of aquatic
and ecologically related habitat, the cost
of which does not exceed $750,000 and which
is located in a disadvantaged community
as determined by the Secretary, may be
carried out at Federal expense.
(C) Total cost
The total Federal costs associated with
construction of a project under this section
may not exceed $15,000,000.
(2) Operation, maintenance, replacement, and
rehabilitation costs
Operation, maintenance, replacement, and
rehabilitation costs associated with a project
under this section are the responsibility of the
non-Federal interest.
Page 816
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2326
2 So in original. Probably should be preceded by ‘‘be’’.
(d) Selection of dredged material disposal meth-
od for purposes related to environmental res-
toration or storm damage and flood reduc-
tion
(1) In general
At the request of the non-Federal interest
for a water resources development project in-
volving the disposal of dredged material, the
Secretary, using funds appropriated for con-
struction or operation and maintenance of the
project, may select a disposal method that is
not the least cost option if the Secretary de-
termines that the incremental costs of the dis-
posal method are reasonable in relation to—
(A) the environmental benefits, including
the benefits to the aquatic environment to
be derived from the creation of wetlands and
control of shoreline erosion; or
(B) the hurricane and storm or flood risk
reduction benefits, including shoreline pro-
tection, protection against loss of life, and
damage to improved property.
(2) Federal share
The Federal share of such incremental costs
shall be determined in accordance with sub-
section (c).
(3) Special rule
Disposal of dredged material under this sub-
section may include a single or periodic appli-
cation of sediment for beneficial use and shall
not require operation and maintenance.
(4) Disposal at non-Federal cost
The Secretary may accept funds from a non-
Federal interest to dispose of dredged material
as provided under section 2213(d)(1) of this
title.
(5) Selection of dredged material disposal
method for certain purposes
Activities
carried
out
under
this
sub-
section—
(A) shall be carried out using amounts ap-
propriated for construction or operation and
maintenance of the project involving the
disposal of the dredged material; and
(B) shall not carried 2 out using amounts
made available under subsection (g).
(e) State and regional plans
The Secretary may—
(1) cooperate with any State or group of
States in the preparation of a comprehensive
State or regional sediment management plan
within the boundaries of the State or among
States;
(2) encourage State participation in the im-
plementation of the plan; and
(3) submit to Congress reports and rec-
ommendations with respect to appropriate
Federal participation in carrying out the plan.
(f) Priority areas
In carrying out this section, the Secretary
shall give priority to a regional sediment man-
agement project in the vicinity of each of the
following:
(1) Little Rock Slackwater Harbor, Arkan-
sas.
(2) Fletcher Cove, California.
(3) Egmont Key, Florida.
(4) Calcasieu Ship Channel, Louisiana.
(5) Delaware River Estuary, New Jersey and
Pennsylvania.
(6) Fire Island Inlet, Suffolk County, New
York.
(7) Smith Point Park Pavilion and the TWA
Flight 800 Memorial, Brookhaven, New York.
(8) Morehead City, North Carolina.
(9) Toledo Harbor, Lucas County, Ohio.
(10) Galveston Bay, Texas.
(11) Benson Beach, Washington.
(12) Osceola County, Florida.
(g) Authorization of appropriations
There is authorized to be appropriated to
carry out this section $62,500,000 per fiscal year,
of which not more than $5,000,000 per fiscal year
may be used for the development of regional
sediment management plans authorized by sub-
section (e) and of which not more than $3,000,000
per fiscal year may be used for construction of
projects to which subsection (c)(1)(B)(ii) applies.
Such funds shall remain available until ex-
pended.
(Pub. L. 102–580, title II, § 204, Oct. 31, 1992, 106
Stat. 4826; Pub. L. 104–303, title II, § 207, Oct. 12,
1996, 110 Stat. 3680; Pub. L. 106–53, title II, § 209,
Aug. 17, 1999, 113 Stat. 287; Pub. L. 110–114, title
II, § 2037(a), Nov. 8, 2007, 121 Stat. 1094; Pub. L.
113–121, title I, §§ 1030(d)(1), 1038, June 10, 2014, 128
Stat. 1232, 1236; Pub. L. 114–322, title I, § 1122(i),
Dec. 16, 2016, 130 Stat. 1647; Pub. L. 115–270, title
I, §§ 1150, 1157(d), Oct. 23, 2018, 132 Stat. 3787, 3794;
Pub. L. 116–260, div. AA, title I, § 125(a)(2)(C),
Dec. 27, 2020, 134 Stat. 2637; Pub. L. 118–272, div.
A, title I, §§ 1107(i), 1130(b), Jan. 4, 2025, 138 Stat.
3005, 3019.)
Editorial Notes
REFERENCES IN TEXT
Section 1122 of the Water Resources Development Act
of 2016, referred to in subsec. (a)(1)(A), is section 1122 of
Pub. L. 114–322, title I, § 1122, Dec. 16, 2016, 130 Stat. 1645.
Subsecs. (a) to (h) of section 1122, which was formerly
set out as a note below, was transferred to section 2326i
of this title. Subsec. (i) of section 1122 amended this
section. Subsec. (j) of section 1122 amended section
1962d–5f of Title 42, The Public Health and Welfare.
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 1992, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2025—Subsec. (a)(1). Pub. L. 118–272, § 1130(b)(1), sub-
stituted ‘‘rehabilitation of projects, including projects
for the beneficial use of dredged materials described in
section 1122 of the Water Resources Development Act of
2016 (33 U.S.C. 2326 note),’’ for ‘‘rehabilitation of
projects’’.
Subsec. (c)(1)(C). Pub. L. 118–272, § 1107(i), substituted
‘‘$15,000,000’’ for ‘‘$10,000,000’’.
Subsec. (f)(12). Pub. L. 118–272, § 1130(b)(2), added par.
(12).
2020—Subsec. (d)(1). Pub. L. 116–260, § 125(a)(2)(C)(i)(I),
in introductory provisions, substituted ‘‘At the request
of the non-Federal interest for a water resources devel-
opment project involving the disposal of dredged mate-
rial, the Secretary, using funds appropriated for con-
Page 817
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2326
struction or operation and maintenance of the project,
may select’’ for ‘‘In developing and carrying out a Fed-
eral water resources project involving the disposal of
dredged material, the Secretary may select, with the
consent of the non-Federal interest,’’.
Subsec. (d)(1)(B). Pub. L. 116–260, § 125(a)(2)(C)(i)(II),
substituted ‘‘hurricane and storm or flood risk reduc-
tion benefits’’ for ‘‘flood and storm damage and flood
reduction benefits’’.
Subsec. (d)(5). Pub. L. 116–260, § 125(a)(2)(C)(ii), added
par. (5).
2018—Subsec. (a)(1)(A). Pub. L. 115–270, § 1150, inserted
‘‘including a project authorized for flood control,’’ after
‘‘an authorized Federal water resources project,’’.
Subsec. (g). Pub. L. 115–270, § 1157(d), substituted
‘‘$62,500,000’’ for ‘‘$50,000,000’’.
2016—Subsec. (a)(1). Pub. L. 114–322, § 1122(i)(1), des-
ignated existing provisions as subpar. (A), inserted
heading, and added subpar. (B).
Subsec. (d)(3), (4). Pub. L. 114–322, § 1122(i)(2), added
pars. (3) and (4).
2014—Subsec. (a)(1). Pub. L. 113–121, § 1038(1)(A), in-
serted ‘‘or used in’’ after ‘‘obtained through’’.
Subsec. (a)(3)(C). Pub. L. 113–121, § 1038(1)(B), inserted
‘‘for the purposes of improving environmental condi-
tions in marsh and littoral systems, stabilizing stream
channels, enhancing shorelines, and supporting State
and local risk management adaptation strategies’’ be-
fore period at end.
Subsec. (a)(4). Pub. L. 113–121, § 1038(1)(C), added par.
(4).
Subsec. (c)(1)(C). Pub. L. 113–121, § 1030(d)(1)(A), sub-
stituted ‘‘$10,000,000’’ for ‘‘$5,000,000’’.
Subsec. (d). Pub. L. 113–121, § 1038(2)(A), substituted
‘‘Selection of dredged material disposal method for pur-
poses related to environmental restoration or storm
damage and flood reduction’’ for ‘‘Selection of dredged
material disposal method for environmental purposes’’
in heading.
Subsec. (d)(1). Pub. L. 113–121, § 1038(2)(B), substituted
‘‘in relation to—’’ for ‘‘in relation to the environmental
benefits, including the benefits to the aquatic environ-
ment to be derived from the creation of wetlands and
control of shoreline erosion.’’ and added subpars. (A)
and (B).
Subsec. (e)(1). Pub. L. 113–121, § 1038(3), added par. (1)
and struck out former par. (1) which read as follows:
‘‘cooperate with any State in the preparation of a com-
prehensive State or regional sediment management
plan within the boundaries of the State;’’.
Subsec. (g). Pub. L. 113–121, § 1030(d)(1)(B), substituted
‘‘$50,000,000’’ for ‘‘$30,000,000’’.
2007—Pub. L. 110–114 amended section generally. Prior
to amendment, section related to beneficial uses of
dredged material.
1999—Subsec. (c). Pub. L. 106–53, § 209(1), in introduc-
tory provisions, substituted ‘‘binding agreement with
the Secretary’’ for ‘‘cooperative agreement in accord-
ance with the requirements of section 1962d–5b of title
42’’.
Subsec. (g). Pub. L. 106–53, § 209(2), added subsec. (g).
1996—Subsecs. (e), (f). Pub. L. 104–303 added subsec. (e)
and redesignated former subsec. (e) as (f).
Statutory Notes and Related Subsidiaries
APPLICABILITY
Pub. L. 110–114, title II, § 2037(c), as added by Pub. L.
113–121, title I, § 1030(d)(2), June 10, 2014, 128 Stat. 1232,
provided that: ‘‘The amendment made by subsection (a)
[amending this section] shall not apply to any project
authorized under this Act [see Tables for classification]
if a report of the Chief of Engineers for the project was
completed prior to the date of enactment of this Act
[Nov. 8, 2007].’’
MAXIMIZATION OF BENEFICIAL USE IN DREDGED
MATERIAL MANAGEMENT PLANS
Pub. L. 118–272, div. A, title I, § 1130(d), Jan. 4, 2025, 138
Stat. 3019, provided that: ‘‘Each dredged material man-
agement plan for a federally authorized water resources
development project, and each regional sediment plan
developed under section 204 of the Water Resources De-
velopment Act of 1992 (33 U.S.C. 2326), including any
such plan under development on the date of enactment
of this Act [Jan. 4, 2025], shall—
‘‘(1) maximize the beneficial use of suitable dredged
material; and
‘‘(2) to the maximum extent practicable, prioritize
the use of such dredged material in water resources
development projects in areas vulnerable to coastal
land loss or shoreline erosion.’’
PROJECT SELECTION
Pub. L. 116–260, div. AA, title I, § 125(b)(3), Dec. 27,
2020, 134 Stat. 2638, provided that: ‘‘In selecting projects
for the beneficial use of dredged materials under sec-
tion 1122 of the Water Resources Development Act of
2016 (33 U.S.C. 2326 note) [set out as a note below], the
Secretary [of the Army] shall prioritize the selection of
at least one project for the utilization of thin layer
placement of dredged fine and coarse grain sediment
and at least one project for recovering lost storage ca-
pacity in reservoirs due to sediment accumulation au-
thorized by subsection (a)(8) of such section, to the ex-
tent that a non-Federal interest has submitted an ap-
plication for such project purposes that otherwise
meets the requirements of such section.’’
COORDINATION WITH EXISTING AUTHORITIES
Pub. L. 116–260, div. AA, title I, § 125(d)(2), Dec. 27,
2020, 134 Stat. 2640, provided that: ‘‘The Secretary [of
the Army] may carry out the dredge pilot program au-
thorized by section 1111 of the Water Resources Devel-
opment Act of 2018 (33 U.S.C. 2326 note) in coordination
with Federal regional dredge demonstration programs
in effect on the date of enactment of this Act [Dec. 27,
2020].’’
DREDGE PILOT PROGRAM
Pub. L. 115–270, title I, § 1111, Oct. 23, 2018, 132 Stat.
3774, as amended by Pub. L. 116–260, div. AA, title I,
§ 125(d)(1), Dec. 27, 2020, 134 Stat. 2640, provided that:
‘‘(a) IN GENERAL.—The Secretary [of the Army] is au-
thorized to carry out a pilot program to award con-
tracts with a duration of up to 5 years for the operation
and maintenance of—
‘‘(1) harbors and inland harbors referred to in sec-
tion 210(a)(2) of the Water Resources Development
Act of 1986 (33 U.S.C. 2238(a)(2)); or
‘‘(2) inland and intracoastal waterways of the
United States described in section 206 of the Inland
Waterways Revenue Act of 1978 (33 U.S.C. 1804).
‘‘(b) SCOPE.—In carrying out the pilot program under
subsection (a), the Secretary may award a contract de-
scribed in such subsection, which may address one or
more harbors, inland harbors, or inland or intracoastal
waterways in a geographical region, if the Secretary
determines that the contract provides cost savings
compared to the awarding of such work on an annual
basis or on a project-by-project basis.
‘‘(c) REPORT
TO CONGRESS.—Not later than 1 year
after the date on which the first contract is awarded
pursuant to the pilot program carried out under sub-
section (a), the Secretary shall submit to Congress a re-
port evaluating, with respect to the pilot program and
any contracts awarded under the pilot program—
‘‘(1) cost effectiveness;
‘‘(2) reliability and performance;
‘‘(3) cost savings attributable to mobilization and
demobilization of dredge equipment; and
‘‘(4) response times to address navigational impedi-
ments.
‘‘(d) SUNSET.—The authority of the Secretary to
enter into contracts pursuant to the pilot program car-
ried out under subsection (a), shall expire on the date
that is 10 years after the date of enactment of this Act
[Oct. 23, 2018].’’
BENEFICIAL USE OF DREDGED SEDIMENT
Pub. L. 115–270, title I, § 1148, Oct. 23, 2018, 132 Stat.
3787, provided that:
Page 818
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2326a
‘‘(a) IN GENERAL.—In carrying out a project for the
beneficial reuse of sediment to reduce storm damage to
property under section 204 of the Water Resources De-
velopment Act of 1992 (33 U.S.C. 2326) that involves only
a single application of sediment, the Secretary [of the
Army] may grant a temporary easement necessary to
facilitate the placement of sediment, if the Secretary
determines that granting a temporary easement is in
the interest of the United States.
‘‘(b) LIMITATION.—If the Secretary grants a tem-
porary easement under subsection (a) with respect to a
project, that project shall no longer be eligible for fu-
ture placement of sediment under section 204 of the
Water Resources Development Act of 1992 (33 U.S.C.
2326).’’
BENEFICIAL USE OF DREDGED MATERIAL
Pub. L. 114–322, title I, § 1122(a)–(h), Dec. 16, 2016, 130
Stat. 1645, 1646, as amended by Pub. L. 115–270, title I,
§ 1130, Oct. 23, 2018, 132 Stat. 3780; Pub. L. 116–260, div.
AA, title I, § 125(b)(1), Dec. 27, 2020, 134 Stat. 2638; Pub.
L. 118–272, div. A, title I, § 1130(a), Jan. 4, 2025, 138 Stat.
3018, which established a pilot program to carry out
projects for various beneficial uses of dredged material
and was formerly set out as a note under this section,
was transferred to section 2326i of this title.
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 3 of Pub. L. 102–580, set out as a note under section
2201 of this title.
§ 2326a. Dredged material disposal facility part-
nerships
(a) Additional capacity or replacement capacity
(1) Provided by Secretary
(A) In general
Subject to subparagraph (B), at the re-
quest of a non-Federal interest with respect
to a project, the Secretary may—
(i) provide additional capacity at a
dredged material disposal facility con-
structed by the Secretary beyond the ca-
pacity that would be required for project
purposes; or
(ii) permit the use of dredged material
disposal facility capacity required for
project purposes by the non-Federal inter-
est if the Secretary determines that re-
placement capacity can be constructed at
the facility or another facility or site be-
fore such capacity is needed for project
purposes.
(B) Agreement
Before the Secretary takes an action
under subparagraph (A), the non-Federal in-
terest shall agree to pay—
(i) all costs associated with the construc-
tion of the additional capacity or replace-
ment capacity in advance of construction
of such capacity; and
(ii) in the case of use by a non-Federal
interest of dredged material disposal ca-
pacity required for project purposes under
subparagraph (A)(ii), any increase in the
cost of operation and maintenance of the
project that the Secretary determines re-
sults from the use of the project capacity
by the non-Federal interest in advance of
each cycle of dredging.
(C) Credit
In the event the Secretary determines that
the cost to operate or maintain the project
decreases as a result of use by the non-Fed-
eral interest of dredged material disposal ca-
pacity required for project purposes under
subparagraph (A)(ii), the Secretary, at the
request of the non-Federal interest, shall
credit the amount of the decrease toward
any cash contribution of the non-Federal in-
terest required thereafter for construction,
operation, or maintenance of the project, or
of another navigation project.
(2) Cost recovery authority
The non-Federal interest may recover the
costs assigned to the additional capacity
under paragraph (1)(A)(i) through fees assessed
on third parties whose dredged material is de-
posited at the facility and who enter into
agreements with the non-Federal interest for
the use of the facility. The amount of such
fees may be determined by the non-Federal in-
terest.
(3) Special rule for designation of replacement
capacity facility or site
(A) In general
Subject to such terms and conditions as
the Secretary determines to be necessary or
advisable, an agreement under paragraph
(1)(B) for use permitted under paragraph
(1)(A)(ii) shall reserve to the non-Federal in-
terest—
(i) the right to submit to the Secretary
for approval at a later date an alternative
to the facility or site designated in the
agreement for construction of replacement
capacity; and
(ii) the right to construct the replace-
ment capacity at the alternative facility
or site at the expense of the non-Federal
interest.
(B) Requirement
The Secretary shall not reject a site for
the construction of replacement capacity
under paragraph (1)(A)(ii) that is submitted
by the non-Federal interest for approval by
the Secretary before the date of execution of
the agreement under paragraph (1)(B), or
thereafter, unless the Secretary—
(i) determines that the site is environ-
mentally unacceptable, geographically un-
acceptable, or technically unsound; and
(ii) provides a written basis for the de-
termination under clause (i) to the non-
Federal interest.
(4) Public comment
The Secretary shall afford the public an op-
portunity to comment on the determinations
required under this subsection for a use per-
mitted under paragraph (1)(A)(ii).
(b) Non-Federal use of disposal facilities
(1) In general
(A) Non-Federal use
The Secretary—
(i) at the request of a non-Federal enti-
ty, may permit the use of any dredged ma-
terial disposal facility under the jurisdic-
tion of, or managed by, the Secretary by
the non-Federal entity if the Secretary de-
termines that such use will not reduce the
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
For purposes of [section 4042 of title 26](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title26-section4042&num=0&edition=prelim) (relating to tax on fuel used in commercial transportation on inland waterways) and for purposes of section 1802 11 See References in Text note below. of this title, the following inland and intracoastal waterways of the United States are described in this section:
(1) Alabama-Coosa Rivers: From junction with the Tombigbee River at river mile (hereinafter referred to as RM) 0 to junction with Coosa River at RM 314.
(2) Allegheny River: From confluence with the Monongahela River to form the Ohio River at RM 0 to the head of the existing project at East Brady, Pennsylvania, RM 72.
(3) Apalachicola-Chattahoochee and Flint Rivers: Apalachicola River from mouth at Apalachicola Bay (intersection with the Gulf Intracoastal Waterway) RM 0 to junction with Chattachoochee 22 So in original. Probably should be “Chattahoochee”. and Flint Rivers at RM 107.8. Chattachoochee 2 River from junction with Apalachicola and Flint Rivers at RM 0 to Columbus, Georgia, at RM 155 and Flint River, from junction with Apalachicola and Chattahoochee Rivers at RM 0 to Bainbridge, Georgia, at RM 28.
(4) Arkansas River (McClellan-Kerr Arkansas River Navigation System): From junction with Mississippi River at RM 0 to port of Catoosa, Oklahoma, at RM 448.2.
(5) Atchafalaya River: From RM 0 at its intersection with the Gulf Intracoastal Waterway at Morgan City, Louisiana, upstream to junction with Red River at RM 116.8.
(6) Atlantic Intracoastal Waterway: Two inland water routes approximately paralleling the Atlantic coast between Norfolk, Virginia, and Miami, Florida, for 1,192 miles via both the Albermarle 33 So in original. Probably should be “Albemarl
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1804
Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 1804. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 657
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1804
1 See References in Text note below.
(6) Balance of payments
On the balance of payments of the United
States based on our international trade.
(d) Considerations relating to economic feasi-
bility of waterway improvement projects;
level of benefits from waterway expenditures
(1) The effects of inland waterway user taxes
and charges on the economic feasibility of in-
land waterway improvement projects.
(2) The comparative levels of benefits re-
ceived from Federal expenditures on inland
waterways for—
(A) commercial uses, and
(B) other uses, including (but not limited
to) recreation, reclamation, water supply,
low-flow augmentation, fish and wildlife en-
hancement, hydroelectric power, flood con-
trol, and irrigation uses.
(e) Considerations relating to Federal assistance
(1) The extent of past, present, and expected
future Federal assistance to the several modes
of freight transportation. Such consideration
shall include an evaluation and comparison of
the public benefits resulting from such assist-
ance to each of the several transportation
modes in terms of adequacy, efficiency, and
economy of service, safety, technological
progress, and energy conservation. The Fed-
eral assistance considered under this para-
graph shall include all forms of such assist-
ance, such as tax advantages, direct grants,
rate adjustments for improvement purposes,
assumption of pension fund liabilities, loans,
guarantees, capital participation, revenues
from land grants, and provision of right-of-
way operation, maintenance, and improve-
ment.
(2) The competitive effects of past, present,
and expected future Federal expenditures on
inland waterways on competitive modes of
transportation.
(3) The need for
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 1804
Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 1804. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Any navigation project for a harbor or inland harbor authorized by this subchapter or any other provision of law enacted before, on, or after November 17, 1986, may be constructed in usable increments.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2238
Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2238. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 727
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2238
ed on board a vessel while the vessel is in a
harbor in which the vessel may be subject to
the levy of port or harbor dues under this
section shall, within forty-eight hours before
departure of that vessel, deliver to the ap-
propriate
authorized
representative
ap-
pointed under subsection (a)(6)(C) of this sec-
tion an export declaration specifying the
cargo to be loaded on board that vessel.
(d) Enforcement
At the request of an authorized representative
referred to in subsection (a)(6)(C) of this section,
the Secretary of the Treasury may:
(1) withhold the clearance required by sec-
tion 60105 of title 46 for a vessel if the master,
owner, or operator of a vessel subject to port
or harbor dues under this section fails to com-
ply with the provisions of this section includ-
ing any non-Federal law, regulation or ordi-
nance issued hereunder; and
(2) assess a penalty or initiate a forfeiture of
the cargo in the same manner and under the
same procedures as are applicable for failure
to pay customs duties under the Tariff Act of
1930 (19 U.S.C. 1202 et seq.) if the shipper, con-
signor, consignee, or terminal operator having
title to or custody of cargo subject to port or
harbor dues under this section fails to comply
with the provisions of this section including
any non-Federal law, regulation, or ordinance
issued hereunder.
(e) Maritime Lien
Port or harbor dues levied under this section
against a vessel constitute a maritime lien
against the vessel and port or harbor dues levied
against cargo constitute a lien against the cargo
that may be recovered in an action in the dis-
trict court of the United States for the district
in which the vessel or cargo is found.
(Pub. L. 99–662, tit
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2238
Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 2238. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Acceptance** In connection with carrying out a water resources project for environmental protection and restoration or a water resources project for recreation, the Secretary is authorized to accept contributions of cash, funds, materials, and services from persons, including governmental entities but excluding the project sponsor.
**(b) Deposit** Any cash or funds received by the Secretary under subsection (a) shall be deposited into the account in the Treasury of the United States entitled “Contributions and Advances, Rivers and Harbors, Corps of Engineers (8862)” and shall be available until expended to carry out water resources projects described in subsection (a).
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2326
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.