10 U.S.C. § 2914 — Military construction projects for energy
Federal law — U.S. Code and appendices · legal_authorities
Page 2345
TITLE 10—ARMED FORCES
§ 2914
decision is made to award an energy savings perform-
ance contract that contains a clause setting forth a
cancellation ceiling in excess of $7,000,000, the Sec-
retary of Defense shall submit to the appropriate com-
mittees of Congress written notification of the pro-
posed contract and of the proposed cancellation ceiling
for the contract. The notification shall include the jus-
tification for the proposed cancellation ceiling. The
contract may then be awarded only after the end of the
30-day period beginning on the date the notification is
received by such committees or, if earlier, the end of
the 15-day period beginning on the date on which a
copy of the notification is provided in an electronic me-
dium pursuant to section 480 of this title.’’
2006—Subsec. (e). Pub. L. 109–364, § 2853, added subsec.
(e).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2007 AMENDMENT
Amendment by Pub. L. 110–140 effective on the date
that is 1 day after Dec. 19, 2007, see section 1601 of Pub.
L. 110–140, set out as an Effective Date note under sec-
tion 1824 of Title 2, The Congress.
§ 2914. Military construction projects for energy
resilience, energy security, and energy con-
servation
(a) PROJECT
AUTHORIZATION
REQUIRED.—The
Secretary of Defense may carry out such mili-
tary construction projects for energy resilience,
energy security, and energy conservation as are
authorized by law, using funds appropriated or
otherwise made available for that purpose.
(b) SUBMISSION OF PROJECT PROPOSALS.—(1) As
part of the Department of Defense Form 1391
submitted to the appropriate committees of
Congress for a military construction project
covered by subsection (a), the Secretary of De-
fense shall include the following in
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 2914
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 3effff07e89c108976409aca7da5b694dc54f80a9c5bd243779eea4e54f2fec3. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-bd6dfceb368c7c88956c8479
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-2914-military-construction-projects-for-energy--bc27f72162.md
Pages: Not recorded – Not recorded
Passage SHA-256: 84b0a93b1f2b8ff1caeeb77a2d3171d0110e54563958d353d28c41f71a3ff934
Source location: USCODE-2024-title10-subtitleA-partIV-chap173-subchapI-sec2914.pdf
Stored source content
Page 2345
TITLE 10—ARMED FORCES
§ 2914
decision is made to award an energy savings perform-
ance contract that contains a clause setting forth a
cancellation ceiling in excess of $7,000,000, the Sec-
retary of Defense shall submit to the appropriate com-
mittees of Congress written notification of the pro-
posed contract and of the proposed cancellation ceiling
for the contract. The notification shall include the jus-
tification for the proposed cancellation ceiling. The
contract may then be awarded only after the end of the
30-day period beginning on the date the notification is
received by such committees or, if earlier, the end of
the 15-day period beginning on the date on which a
copy of the notification is provided in an electronic me-
dium pursuant to section 480 of this title.’’
2006—Subsec. (e). Pub. L. 109–364, § 2853, added subsec.
(e).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2007 AMENDMENT
Amendment by Pub. L. 110–140 effective on the date
that is 1 day after Dec. 19, 2007, see section 1601 of Pub.
L. 110–140, set out as an Effective Date note under sec-
tion 1824 of Title 2, The Congress.
§ 2914. Military construction projects for energy
resilience, energy security, and energy con-
servation
(a) PROJECT
AUTHORIZATION
REQUIRED.—The
Secretary of Defense may carry out such mili-
tary construction projects for energy resilience,
energy security, and energy conservation as are
authorized by law, using funds appropriated or
otherwise made available for that purpose.
(b) SUBMISSION OF PROJECT PROPOSALS.—(1) As
part of the Department of Defense Form 1391
submitted to the appropriate committees of
Congress for a military construction project
covered by subsection (a), the Secretary of De-
fense shall include the following information:
(A) The project title.
(B) The location of the project.
(C) A brief description of the scope of work.
(D) The original project cost estimate and
the current working cost estimate, if dif-
ferent.
(E) Such other information as the Secretary
considers appropriate.
(2) In the case of a military construction
project for energy conservation, the Secretary
also shall include the following information:
(A) The original expected savings-to-invest-
ment ratio and simple payback estimates and
measurement and verification cost estimate.
(B) The most current expected savings-to-in-
vestment ratio and simple payback estimates
and measurement and verification plan and
costs.
(C) A brief description of the measurement
and verification plan and planned funding
source.
(3) In the case of a military construction
project for energy resilience or energy security,
the Secretary also shall include the rationale
for how the project would enhance mission as-
surance, support mission critical functions, and
address known vulnerabilities.
(c) ALTERNATIVE FUNDING SOURCE.—(1) In addi-
tion to the authority under section 2805(c) of
this title, in carrying out a military construc-
tion project for energy resilience, energy secu-
rity, or energy conservation under this section,
the Secretary concerned may use amounts avail-
able for operation and maintenance for the mili-
tary department concerned if the Secretary con-
cerned submits to the congressional defense
committees a notification of the decision to
carry out the project using such amounts and
includes in the notification—
(A) the current estimate of the cost of the
project;
(B) the source of funds for the project; and
(C) a certification that deferring the project
pending the availability of funds appropriated
for or otherwise made available for military
construction would be inconsistent with the
timely assurance of energy resilience, energy
security, or energy conservation for one or
more critical national security functions.
(2) A project carried out under this section
using amounts under paragraph (1) may be car-
ried out only after the end of the seven-day pe-
riod beginning on the date on which a copy of
the notification described in paragraph (1) is
provided in an electronic medium pursuant to
section 480 of this title.
(3) The maximum aggregate amount that the
Secretary concerned may obligate from amounts
available to the military department concerned
for operation and maintenance in any fiscal year
for projects under the authority of this sub-
section is $100,000,000.
(d) RELATION
TO
CERTAIN
OTHER
AUTHORI-
TIES.—A project under this section may in-
clude—
(1) activities related to a utility system au-
thorized under subsections (h), (j), and (k) of
section 2688 or section 2913 of this title, not-
withstanding that the United States does not
own the utility system covered by the project;
and
(2) energy-related activities included as a
separate requirement in an energy savings
performance contract (as defined in section
804(3) of the National Energy Conservation
Policy Act (42 U.S.C. 8287c(3))).
(e) INCORPORATION OF CYBERSECURITY SUPPLY
CHAIN RISK MANAGEMENT TOOLS AND METHODS.—
(1) The Secretary of Defense shall incorporate
into covered projects cybersecurity supply chain
risk management tools and solutions to provide
continuous analysis, monitoring, and mitigation
of cyber vulnerabilities.
(2) In carrying out the requirements of para-
graph (1), the Secretary of Defense shall con-
sider, to the maximum extent practicable, the
following:
(A) The adoption of commercially available
cybersecurity supply chain risk management
tools and solutions.
(B) The inclusion of existing databases on
cyber vulnerabilities when selecting such tools
and solutions.
(C) The need for such tools and methods to
provide continuous analysis, monitoring, and
mitigation of cyber vulnerabilities in covered
projects.
(D) Beginning with fiscal year 2026, docu-
mentation for any new requirements for
cybersecurity supply chain risk management
in annual guidance for covered projects that is
submitted along with the annual budget re-
Page 2346
TITLE 10—ARMED FORCES
§ 2915
quest of the President submitted pursuant to
section 1105 of title 31.
(3) In this subsection, the term ‘‘covered
project’’ means a project connected to a Depart-
ment of Defense Information Network for which
funds are made available under this section.
(f) APPLICATION
TO
MILITARY
CONSTRUCTION
PROJECTS.—This section shall apply to military
construction projects covered by subsection (a)
for which a Department of Defense Form 1391 is
submitted to the appropriate committees of
Congress in connection with the budget of the
Department of Defense for fiscal year 2023 and
thereafter.
(Added Pub. L. 109–364, div. B, title XXVIII,
§ 2851(a)(1), Oct. 17, 2006, 120 Stat. 2493; amended
Pub. L. 114–328, div. B, title XXVIII, § 2805(a)(1),
(b)(1)(A), (2), Dec. 23, 2016, 130 Stat. 2713, 2714;
Pub. L. 115–91, div. B, title XXVIII, §§ 2801(e)(1),
2831(c)(1), Dec. 12, 2017, 131 Stat. 1845, 1857; Pub.
L. 115–232, div. A, title X, § 1081(a)(29), Aug. 13,
2018, 132 Stat. 1985; Pub. L. 116–283, div. B, title
XXVIII, §§ 2805(a), 2823(b), Jan. 1, 2021, 134 Stat.
4321, 4333; Pub. L. 117–81, div. B, title XXVIII,
§ 2804, Dec. 27, 2021, 135 Stat. 2188; Pub. L. 118–31,
div. B, title XXVIII, § 2809, Dec. 22, 2023, 137 Stat.
746.)
Editorial Notes
AMENDMENTS
2023—Subsecs. (e), (f). Pub. L. 118–31 added subsec. (e)
and redesignated former subsec. (e) as (f).
2021—Pub. L. 116–283, § 2805(a), amended section gen-
erally. Prior to amendment, section related to energy
resilience and conservation construction projects.
Subsecs. (c), (d). Pub. L. 117–81 added subsec. (c) and
redesignated former subsec. (c) as (d). Former subsec.
(d) redesignated (e).
Pub. L. 116–283, § 2823(b), added subsec. (c) and redesig-
nated former subsec. (c) as (d).
Subsec. (e). Pub. L. 117–81, § 2804(1), redesignated sub-
sec. (d) as (e).
2018—Pub. L. 115–232 substituted ‘‘resilience’’ for ‘‘re-
siliency’’ in section catchline.
2017—Pub. L. 115–91, § 2831(c)(1), substituted ‘‘energy
resilience’’ for ‘‘energy resiliency’’ wherever appearing
in text.
Subsec. (b)(1). Pub. L. 115–91, § 2801(e)(1), struck out
‘‘in writing’’ after ‘‘shall notify’’ and ‘‘or, if earlier, the
end of the 14-day period beginning on the date on which
a copy of the notification is provided’’ after ‘‘received
by such committees’’ and substituted ‘‘14-day period’’
for ‘‘21-day period’’.
2016—Pub. L. 114–328, § 2805(a)(1)(A), inserted ‘‘resil-
iency and’’ before ‘‘conservation construction projects’’
in section catchline. Text quoted in directory language
of amendment was editorially conformed to the style of
the catchline.
Subsec. (a). Pub. L. 114–328, § 2805(a)(1)(B), substituted
‘‘military construction project for energy resiliency,
energy security, or energy conservation’’ for ‘‘military
construction project for energy conservation’’.
Subsec. (b). Pub. L. 114–328, § 2805(b)(1)(A), designated
existing provisions as par. (1) and added par. (2).
Subsec. (c). Pub. L. 114–328, § 2805(b)(2), added subsec.
(c).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2016 AMENDMENT
Pub. L. 114–328, div. B, title XXVIII, § 2805(b)(1)(B),
Dec. 23, 2016, 130 Stat. 2714, provided that: ‘‘The amend-
ment made by subparagraph (A) [amending this sec-
tion] shall apply with respect to notifications provided
during fiscal year 2017 or any succeeding fiscal year.’’
§ 2915. Facilities: use of renewable forms of en-
ergy and energy efficient products
(a) USE OF RENEWABLE FORMS OF ENERGY EN-
COURAGED.—The Secretary of Defense shall en-
courage the use of energy systems using solar
energy or other renewable forms of energy as a
source of energy for military construction
projects (including military family housing
projects) and facility repairs and renovations
where use of such form of energy is consistent
with the energy performance goals and energy
performance master plan for the Department of
Defense developed under section 2911 of this title
and supported by the special considerations
specified in subsection (e) of such section.
(b) CONSIDERATION DURING DESIGN PHASE
OF
PROJECTS.—(1) The Secretary concerned shall re-
quire that the design for the construction, re-
pair, or renovation of facilities (including fam-
ily housing and back-up power generation facili-
ties) requires consideration of energy systems
using solar energy or other renewable forms of
energy when use of a renewable form of energy—
(A) is consistent with the energy perform-
ance goals and energy performance master
plan for the Department of Defense developed
under section 2911 of this title; and
(B) supported by the special considerations
specified in subsection (e) of such section.
(2) The Secretary concerned shall require that
contracts for construction resulting from such
design include a requirement that energy sys-
tems using solar energy or other renewable
forms of energy be installed if such systems can
be shown to be cost effective.
(c) DETERMINATION OF COST EFFECTIVENESS.—
(1) For the purposes of this section, an energy
system using solar energy or other renewable
forms of energy for a facility shall be considered
to be cost effective if the difference between (A)
the original investment cost of the energy sys-
tem for the facility with such a system, and (B)
the original investment cost of the energy sys-
tem for the facility without such a system can
be recovered over the expected life of the facil-
ity.
(2) A determination under paragraph (1) con-
cerning whether a cost-differential can be recov-
ered over the expected life of a facility shall be
made using the life-cycle cost methods and pro-
cedures established pursuant to section 544(a) of
the National Energy Conservation Policy Act (42
U.S.C. 8254(a)).
(d) EXCEPTION TO SQUARE FEET AND COST PER
SQUARE FOOT LIMITATIONS.—In order to equip a
military construction project (including a mili-
tary family housing project) with heating equip-
ment, cooling equipment, or both heating and
cooling equipment using solar energy or other
renewable forms of energy or with a passive en-
ergy system using solar energy or other renew-
able forms of energy, the Secretary concerned
may authorize an increase in any otherwise ap-
plicable limitation with respect to the number
of square feet or the cost per square foot of the
project by such amount as may be necessary for
such purpose. Any such increase under this sub-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Project Authorization Required.—** The Secretary of Defense may carry out such military construction projects for energy resilience, energy security, and energy conservation as are authorized by law, using funds appropriated or otherwise made available for that purpose.
**(b) Submission of Project Proposals.—**
(1) As part of the Department of Defense Form 1391 submitted to the appropriate committees of Congress for a military construction project covered by subsection (a), the Secretary of Defense shall include the following information:
(A) The project title.
(B) The location of the project.
(C) A brief description of the scope of work.
(D) The original project cost estimate and the current working cost estimate, if different.
(E) Such other information as the Secretary considers appropriate.
(2) In the case of a military construction project for energy conservation, the Secretary also shall include the following information:
(A) The original expected savings-to-investment ratio and simple payback estimates and measurement and verification cost estimate.
(B) The most current expected savings-to-investment ratio and simple payback estimates and measurement and verification plan and costs.
(C) A brief description of the measurement and verification plan and planned funding source.
(3) In the case of a military construction project for energy resilience or energy security, the Secretary also shall include the rationale for how the project would enhance mission assurance, support mission critical functions, and address known vulnerabilities.
**(c) Alternative Funding Source.—**
(1) In addition to the authority under [section 2805(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2805/c&num=0&e
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2914
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Establishment of life cycle cost methods and procedures** The Secretary, in consultation with the Director of the Office of Management and Budget, the Secretary of Defense, the Director of the National Institute of Standards and Technology, and the Administrator of the General Services Administration, shall—
(1) establish practical and effective present value methods for estimating and comparing life cycle costs for Federal buildings, using the sum of all capital and operating expenses associated with the energy system of the building involved over the expected life of such system or during a period of 40 years, whichever is shorter, and using average fuel costs and a discount rate determined by the Secretary; and
(2) develop and prescribe the procedures to be followed in applying and implementing the methods so established.
**(b) Use of life cycle cost methods and procedures**
(1) The design of new Federal buildings, and the application of energy conservation measures to existing Federal buildings, shall be made using life cycle cost methods and procedures established under subsection (a).
(2) In leasing buildings for its own use or that of another agency, each agency shall, after January 1, 1994, fully consider the efficiency of all potential building space at the time of renewing or entering into a new lease.
**(c) Use in non-Federal structures** The Secretary shall make available information to the public on the use of life cycle cost methods in the construction of buildings, structures, and facilities in all segments of the economy.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 8254
Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 8254. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 7559
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 8255
energy savings in federally used buildings and rec-
ommend cost effective energy efficiency and renewable
energy improvements in those buildings, devise a plan
for implementing such survey, and report its findings
and conclusions to Congress, was repealed by Pub. L.
102–486, title I, § 152(i)(3), Oct. 24, 1992, 106 Stat. 2851.
§ 8254. Establishment and use of life cycle cost
methods and procedures
(a) Establishment of life cycle cost methods and
procedures
The Secretary, in consultation with the Direc-
tor of the Office of Management and Budget, the
Secretary of Defense, the Director of the Na-
tional Institute of Standards and Technology,
and the Administrator of the General Services
Administration, shall—
(1) establish practical and effective present
value methods for estimating and comparing
life cycle costs for Federal buildings, using the
sum of all capital and operating expenses asso-
ciated with the energy system of the building
involved over the expected life of such system
or during a period of 40 years, whichever is
shorter, and using average fuel costs and a dis-
count rate determined by the Secretary; and
(2) develop and prescribe the procedures to
be followed in applying and implementing the
methods so established.
(b) Use of life cycle cost methods and procedures
(1) The design of new Federal buildings, and
the application of energy conservation measures
to existing Federal buildings, shall be made
using life cycle cost methods and procedures es-
tablished under subsection (a).
(2) In leasing buildings for its own use or that
of another agency, each agency shall, after Jan-
uary 1, 1994, fully consider the efficiency of all
potential building space at the time of renewing
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 8254
Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 8254. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
For purposes of this subchapter, the following definitions apply:
(1) The term “Federal agency” means each authority of the Government of the United States, whether or not it is within or subject to review by another agency.
(2) The term “energy savings” means—
(A) a reduction in the cost of energy, water, or wastewater treatment, from a base cost established through a methodology set forth in the contract, used in an existing Federal building (as defined in [section 8259 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8259&num=0&edition=prelim)) as a result of—
(i) the lease or purchase of operating equipment, improvements, altered operation and maintenance, or technical services;
(ii) the increased efficient use of existing energy sources by cogeneration or heat recovery, excluding any cogeneration process for other than a Federal building (as defined in [section 8259 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8259&num=0&edition=prelim)); or
(iii) the increased efficient use of existing water sources in either interior or exterior applications;
(B) the increased efficient use of an existing energy source by cogeneration or heat recovery;
(C) if otherwise authorized by Federal or State law (including regulations), the sale or transfer of electrical or thermal energy generated on-site from renewable energy sources or cogeneration, but in excess of Federal needs, to utilities or non-Federal energy users;
(D) the increased efficient use of existing water sources in interior or exterior applications;
(E) the use, sale, or transfer of any energy and water incentive, rebate, grid services revenue, or credit (including a renewable energy certificate); and
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 8287c
Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 8287c. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 7581
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 8287c
1 See References in Text note below.
National Energy Conservation Policy Act (42 U.S.C.
8287) after October 1, 2003, and before the date of enact-
ment of this Act [Oct. 28, 2004], shall be deemed to have
been entered into pursuant to such section 801 as
amended by subsection (a) of this section.’’
ENERGY EFFICIENCY INCENTIVE
Pub. L. 100–456, div. A, title VII, § 736, Sept. 29, 1988,
102 Stat. 2006, as amended by Pub. L. 101–189, div. A,
title III, § 331, Nov. 29, 1989, 103 Stat. 1417, provided that:
‘‘(a) ENERGY CONSERVATION INCENTIVE.—In order to
provide additional incentive for the Secretary of a mili-
tary department to enter into contracts under title
VIII of the National Energy Conservation Policy Act
(42 U.S.C. 8287 et seq.), the Secretary may use the en-
ergy cost savings realized by the United States during
the first five years under any such contract in the man-
ner provided in subsection (b). The amount of savings
available for use under subsection (b) shall be deter-
mined as provided in subsection (c) and shall remain
available for obligation until expended.
‘‘(b) AUTHORIZED USES OF SAVINGS.—The energy cost
savings realized by the United States in each of the
first five years under a contract may be used as follows:
‘‘(1) One-half of the amount of such savings may be
used for the acquisition of energy conserving meas-
ures for military installations, and such measures
may be in addition to any such energy conserving
measures acquired for military installations under
contracts entered into under title VIII of the Na-
tional Energy Conservation Policy Act.
‘‘(2) One-half of the amount of such savings may be
used for any morale, welfare, or recreation facility or
service that is