Browse Arkansas Code titles and sections
43 U.S.C. § 1524 — Water furnished from Central Arizona
Federal law — U.S. Code and appendices · legal_authorities
Page 403
TITLE 43—PUBLIC LANDS
§ 1524
cluding participation, operation, or construction
by non-Federal entities, for the purpose of sup-
plying the power requirements of the Central
Arizona Project and augmenting the Lower Col-
orado River Basin Development Fund: Provided,
That nothing in this section or in this chapter
contained shall be construed to authorize the
study or construction of any dams on the main
stream of the Colorado River between Hoover
Dam and Glen Canyon Dam.
(b) Construction of thermal generating power-
plants; agreements for acquisition by United
States of portions of plant capacity
If included as a part of the recommended plan,
the Secretary may enter into agreements with
non-Federal interests proposing to construct
thermal generating powerplants whereby the
United States shall acquire the right to such
portions of their capacity, including delivery of
power and energy over appurtenant trans-
mission facilities to mutually agreed upon deliv-
ery points, as he determines is required in con-
nection with the operation of the Central Ari-
zona Project. When not required for the Central
Arizona Project, the power and energy acquired
by such agreements may be disposed of inter-
mittently by the Secretary for other purposes at
such prices as he may determine, including its
marketing in conjunction with the sale of power
and energy from Federal powerplants in the Col-
orado River system so as to produce the greatest
practicable amount of power and energy that
can be sold at firm power and energy rates. The
agreements shall provide among other things,
that—
(1) the United States shall pay not more
than that portion of the total construction
cost, exclusive of interest during construction,
of the powerplants, and of any switchyar
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1524
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: fd87315f39924e234c1c80ed6e48f866adc32f1abf0dcdfcf4f56ef02bbc8f09. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-bc6ecaa9f849dfd2369bdd56
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-1524-water-furnished-from-central-arizona--c1b913b48f.md
Pages: Not recorded – Not recorded
Passage SHA-256: 1d66abe5cefb160d05ef21e5b0820dca72f107086b9a424418d76590ee3387eb
Source location: USCODE-2024-title43-chap32-subchapIII-sec1524.pdf
Stored source content
Page 403
TITLE 43—PUBLIC LANDS
§ 1524
cluding participation, operation, or construction
by non-Federal entities, for the purpose of sup-
plying the power requirements of the Central
Arizona Project and augmenting the Lower Col-
orado River Basin Development Fund: Provided,
That nothing in this section or in this chapter
contained shall be construed to authorize the
study or construction of any dams on the main
stream of the Colorado River between Hoover
Dam and Glen Canyon Dam.
(b) Construction of thermal generating power-
plants; agreements for acquisition by United
States of portions of plant capacity
If included as a part of the recommended plan,
the Secretary may enter into agreements with
non-Federal interests proposing to construct
thermal generating powerplants whereby the
United States shall acquire the right to such
portions of their capacity, including delivery of
power and energy over appurtenant trans-
mission facilities to mutually agreed upon deliv-
ery points, as he determines is required in con-
nection with the operation of the Central Ari-
zona Project. When not required for the Central
Arizona Project, the power and energy acquired
by such agreements may be disposed of inter-
mittently by the Secretary for other purposes at
such prices as he may determine, including its
marketing in conjunction with the sale of power
and energy from Federal powerplants in the Col-
orado River system so as to produce the greatest
practicable amount of power and energy that
can be sold at firm power and energy rates. The
agreements shall provide among other things,
that—
(1) the United States shall pay not more
than that portion of the total construction
cost, exclusive of interest during construction,
of the powerplants, and of any switchyards
and transmission facilities serving the United
States, as is represented by the ratios of the
respective capacities to be provided for the
United States therein to the total capacities
of such facilities. The Secretary shall make
the Federal portion of such costs available to
the non-Federal interests during the construc-
tion period, including the period of prepara-
tion of designs and specifications, in such in-
stallments as will facilitate a timely construc-
tion schedule, but no funds other than for
preconstruction activities shall be made avail-
able by the Secretary until he determines that
adequate contractual arrangements have been
entered into between all the affected parties
covering land, water, fuel supplies, power (its
availability and use), rights-of-way, trans-
mission facilities and all other necessary mat-
ters for the thermal generating powerplants;
(2) annual operation and maintenance costs
shall be apportioned between the United
States and the non-Federal interests on an eq-
uitable basis taking into account the ratios
determined in accordance with the foregoing
clause (1): Provided, however, That the United
States shall share on the foregoing basis in the
depreciation component of such costs only to
the extent of provision for depreciation on re-
placements financed by the non-Federal inter-
ests;
(3) the United States shall be given appro-
priate credit for any interests in Federal lands
administered by the Department of the Inte-
rior that are made available for the power
plants and appurtenances;
(4) costs to be borne by the United States
under clauses (1) and (2) shall not include (a)
interest and interest during construction, (b)
financing charges, (c) franchise fees, and (d)
such other costs as shall be specified in the
agreement.
(c) Recommended plan; submission to Congress
No later than one year from September 30,
1968, the Secretary shall submit his rec-
ommended plan to the Congress. Except as au-
thorized by subsection (b) of this section, such
plan shall not become effective until approved
by the Congress.
(d) Apportionment of water for Arizona plants
diverted above Lee Ferry
If any thermal generating plant referred to in
subsection (b) of this section is located in Ari-
zona, and if it is served by water diverted from
the drainage area of the Colorado River system
above Lee Ferry, other provisions of existing
law to the contrary notwithstanding, such con-
sumptive use of water shall be a part of the fifty
thousand acre-feet per annum apportioned to
the State of Arizona by article III(a) of the
Upper Colorado River Basin Compact (63 Stat.
31).
(Pub. L. 90–537, title III, § 303, Sept. 30, 1968, 82
Stat. 889.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in subsec. (a), was in the
original ‘‘this Act’’, meaning Pub. L. 90–537, Sept. 30,
1968, 82 Stat. 885, known as the Colorado River Basin
Project Act, which enacted this chapter and sections
616aa–1, 620a–1, 620a–2, 620c–1, and 620d–1 of this title,
amended sections 616hh, 620, and 620a of this title, and
enacted provisions set out as notes under sections 620,
620k, and 1501 of this title. For complete classification
of this Act to the Code, see Short Title note set out
under section 1501 of this title and Tables.
§ 1524. Water furnished from Central Arizona
Project
(a) Restriction on use of water for irrigation
Unless and until otherwise provided by Con-
gress, water from the Central Arizona Project
shall not be made available directly or indi-
rectly for the irrigation of lands not having a re-
cent irrigation history as determined by the
Secretary, except in the case of Indian lands, na-
tional wildlife refuges, and, with the approval of
the Secretary, State-administered wildlife man-
agement areas.
(b) Contracts with municipal and industrial
users
(1) Irrigation and municipal and industrial
water supply under the Central Arizona Project
within the State of Arizona may, in the event
the Secretary determines that it is necessary to
effect repayment, be pursuant to master con-
tracts with organizations which have power to
levy assessments against all taxable real prop-
erty within their boundaries. The terms and
conditions of contracts or other arrangements
Page 404
TITLE 43—PUBLIC LANDS
§ 1524
1 So in original.
whereby each such organization makes water
from the Central Arizona Project available to
users within its boundaries shall be subject to
the Secretary’s approval, and the United States
shall, if the Secretary determines such action is
desirable to facilitate carrying out the provi-
sions of this chapter, have the right to require
that it be a party to such contracts or that con-
tracts subsidiary to the master contracts be en-
tered into between the United States and any
user. The provisions of this clause (1) shall not
apply to the supplying of water to an Indian
tribe for use within the boundaries of an Indian
reservation.
(2) Any obligation assumed pursuant to sec-
tion 485h(d) of this title with respect to any
project contract unit or irrigation block shall be
repaid over a basic period of not more than fifty
years; any water service provided pursuant to
section 485h(e) of this title may be on the basis
of delivery of water for a period of fifty years
and for the delivery of such water at an iden-
tical price per acre-foot for water of the same
class at the several points of delivery from the
main canals and conduits and from such other
points of delivery as the Secretary may des-
ignate; and long-term contracts relating to irri-
gation water supply shall provide that water
made available thereunder may be made avail-
able by the Secretary for municipal or indus-
trial purposes if and to the extent that such
water is not required by the contractor for irri-
gation purposes.
(3) Contracts relating to municipal and indus-
trial water supply under the Central Arizona
Project may be made without regard to the limi-
tations of the last sentence of section 485h(c) of
this title; may provide for the delivery of such
water at an identical price per acre-foot for
water of the same class at the several points of
delivery from the main canals and conduits; and
may provide for repayment over a period of fifty
years if made pursuant to clause (1) of said sec-
tion and for the delivery of water over a period
of fifty years if made pursuant to clause (2)
thereof.
(c) Water conservation
Each contract under which water is provided
under the Central Arizona Project shall require
that (1) there be in effect measures, adequate in
the judgment of the Secretary, to control expan-
sion of irrigation from aquifers affected by the
irrigation in the contract service area; (2) the
canals and distribution systems through which
water is conveyed after its delivery by the
United States to the contractors shall be pro-
vided and maintained with linings adequate in
his judgment to prevent excessive conveyance
losses; and (3) [Repealed. Pub. L. 102–575, title
XXXVII, § 3710(k), Oct. 30, 1992, 106 Stat. 4751].
Such contracts shall be subordinate at all times
to the satisfaction of all existing contracts be-
tween the Secretary and users in Arizona here-
tofore made pursuant to the Boulder Canyon
Project Act (45 Stat. 1057)
[43 U.S.C. 617 et
seq.].
(d) Water exchanges
The Secretary may require in any contract
under which water is provided from the Central
Arizona Project that the contractor agree to ac-
cept main stream water in exchange for or in re-
placement of existing supplies from sources
other than the main stream. The Secretary shall
so require in the case of users in Arizona who
also use water from the Gila River system to the
extent necessary to make available to users of
water from the Gila River system in New Mexico
additional quantities of water as provided in and
under the conditions specified in subsection (f)
of this section: Provided, That such exchanges
and replacements shall be accomplished without
economic injury or cost to such Arizona con-
tractors.
(e) Water shortage priorities
In times of shortage or reduction of main
stream Colorado River water for the Central Ar-
izona Project, as determined by the Secretary,
users which have yielded water from other
sources in exchange for main stream water sup-
plied by that project shall have a first priority
to receive main stream water, as against other
users supplied by that project which have not so
yielded water from other sources, but only in
quantities adequate to replace the water so
yielded.
(f) New Mexico users; water exchange contracts
(1) In the operation of the Central Arizona
Project, the Secretary shall offer to contract
with water users in the State of New Mexico,
with the approval of its Interstate Stream Com-
mission, or with the State of New Mexico,
through its Interstate Stream Commission, for
water from the Gila River, its tributaries and
underground water sources in amounts that will
permit consumptive use of water in New Mexico
of not to exceed an annual average in any period
of 10 consecutive years of 14,000 acre-feet, in-
cluding reservoir evaporation, over and above
the consumptive uses provided for by article IV
of the decree of the Supreme Court of the United
States in Arizona v. California (376 U.S. 340).
Such increased consumptive uses shall continue
only so long as delivery of Colorado River water
to downstream Gila River users in Arizona is
being accomplished in accordance with this
chapter, in quantities sufficient to replace any
diminution of their supply resulting from such
diversion from the Gila River, its tributaries
and underground water sources. In determining
the amount required for this purpose, full con-
sideration shall be given to any differences in
the quality of the water involved.
(2) All additional consumptive uses provided
for in clauses (1) and (2) 1 of this subsection shall
be subject to all rights in New Mexico and Ari-
zona as established by the decree entered by the
United States District Court for the District of
Arizona on June 29, 1935, in United States
against Gila Valley Irrigation District and oth-
ers (Globe Equity Numbered 59) and to all other
rights existing on September 30, 1968, in New
Mexico and Arizona to water from the Gila
River, its tributaries, and underground water
sources, and shall be junior thereto and shall be
made only to the extent possible without eco-
nomic injury or cost to the holders of such
rights.
Page 405
TITLE 43—PUBLIC LANDS
§ 1527
(Pub. L. 90–537, title III, § 304, Sept. 30, 1968, 82
Stat. 891; Pub. L. 102–575, title XXXVII, § 3710(k),
Oct. 30, 1992, 106 Stat. 4751; Pub. L. 108–451, title
II, § 212(d), Dec. 10, 2004, 118 Stat. 3528.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in subsecs. (b)(1), (f)(1), was
in the original ‘‘this Act’’, meaning Pub. L. 90–537,
Sept. 30, 1968, 82 Stat. 885, known as the Colorado River
Basin Project Act, which enacted this chapter and sec-
tions 616aa–1, 620a–1, 620a–2, 620c–1, and 620d–1 of this
title, amended sections 616hh, 620, and 620a of this title,
and enacted provisions set out as notes under sections
620, 620k, and 1501 of this title. For complete classifica-
tion of this Act to the Code, see Short Title note set
out under section 1501 of this title and Tables.
The Boulder Canyon Project Act, referred to in sub-
sec. (c), is act Dec. 21, 1928, ch. 42, 45 Stat. 1057, which
is classified generally to subchapter I (§ 617 et seq.) of
chapter 12A of this title. For complete classification of
this Act to the Code, see section 617t of this title and
Tables.
CODIFICATION
Subsec. (g) of this section, which restricted the use of
water from the projects authorized by this chapter for
the production of basic agricultural commodities on
newly irrigated lands for a period of ten years from
Sept. 30, 1968, was omitted.
AMENDMENTS
2004—Subsec. (f)(1). Pub. L. 108–451, § 212(d)(1), added
par. (1) and struck out former par. (1) which read as fol-
lows: ‘‘In the operation of the Central Arizona Project,
the Secretary shall offer to contract with water users
in New Mexico for water from the Gila River, its tribu-
taries and underground water sources in amounts that
will permit consumptive use of water in New Mexico of
not to exceed an annual average in any period of ten
consecutive years of eighteen thousand acre-feet, in-
cluding reservoir evaporation, over and above the con-
sumptive uses provided for by article IV of the decree
of the Supreme Court of the United States in Arizona
against California (376 U.S. 340). Such increased con-
sumptive uses shall not begin until, and shall continue
only so long as, delivery of Colorado River water to
downstream Gila River users in Arizona is being ac-
complished in accordance with this chapter, in quan-
tities sufficient to replace any diminution of their sup-
ply resulting from such diversion from the Gila River,
its tributaries and underground water sources. In deter-
mining the amount required for this purpose full con-
sideration shall be given to any differences in the qual-
ity of the waters involved.’’
Subsec. (f)(2), (3). Pub. L. 108–451, § 212(d)(2), (3), redes-
ignated par. (3) as (2) and struck out former par. (2)
which read as follows: ‘‘The Secretary shall further
offer to contract with water users in New Mexico for
water from the Gila River, its tributaries, and under-
ground water sources in amounts that will permit con-
sumptive uses of water in New Mexico of not to exceed
an annual average in any period of ten consecutive
years of an additional thirty thousand acre-feet, in-
cluding reservoir evaporation. Such further increases
in consumptive use shall not begin until, and shall con-
tinue only so long as, works capable of augmenting the
water supply of the Colorado River system have been
completed and water sufficiently in excess of two mil-
lion eight hundred thousand acre-feet per annum is
available from the main stream of the Colorado River
for consumptive use in Arizona to provide water for the
exchanges herein authorized and provided. In deter-
mining the amount required for this purpose full con-
sideration shall be given to any differences in the qual-
ity of the waters involved.’’
1992—Subsec. (c)(3). Pub. L. 102–575 repealed cl. (3)
which read as follows: ‘‘neither the contractor nor the
Secretary shall pump or permit others to pump ground
water from within the exterior boundaries of the serv-
ice area of a contractor receiving water from the Cen-
tral Arizona Project for any use outside said contrac-
tor’s service area unless the Secretary and such con-
tractor shall agree, or shall have previously agreed,
that a surplus of ground water exists and that drainage
is or was required.’’
Statutory Notes and Related Subsidiaries
TRANSPORTATION OF WATER PUMPED WITHIN BOUNDARY
Pub. L. 102–575, title XXXVII, § 3710(k), Oct. 30, 1992,
106 Stat. 4751, provided in part that: ‘‘This subsection
[amending this section] does not authorize transpor-
tation of water pumped within the exterior boundary of
a Federal reclamation project established prior to Sep-
tember 30, 1968, pursuant to the Act of June 17, 1902 (32
Stat. 388; 43 U.S.C. 391) [see Short Title note set out
under section 371 of this title], as amended and supple-
mented, across project boundaries.’’
§ 1525. Cost of main stream water of Colorado
River
To the extent that the flow of the main stream
of the Colorado River is augmented in order to
make sufficient water available for release, as
determined by the Secretary pursuant to article
II(b)(1) of the decree of the Supreme Court of the
United States in Arizona against California (376
U.S. 340), to satisfy annual consumptive use of
two million eight hundred thousand acre-feet in
Arizona, four million four hundred thousand
acre-feet in California, and three hundred thou-
sand acre-feet in Nevada, respectively, the Sec-
retary shall make such water available to users
of main stream water in those States at the
same costs (to the extent that such costs can be
made comparable through the nonreimbursable
allocation to the replenishment of the defi-
ciencies occasioned by satisfaction of the Mexi-
can Treaty burden as herein provided and finan-
cial assistance from the development fund estab-
lished by section 1543 of this title) and on the
same terms as would be applicable if main
stream water were available for release in the
quantities required to supply such consumptive
use.
(Pub. L. 90–537, title III, § 305, Sept. 30, 1968, 82
Stat. 893.)
§ 1526. Water salvage programs
The Secretary shall undertake programs for
water salvage and ground water recovery along
and adjacent to the main stream of the Colorado
River. Such programs shall be consistent with
maintenance of a reasonable degree of undistrib-
uted habitat for fish and wildlife in the area, as
determined by the Secretary.
(Pub. L. 90–537, title III, § 306, Sept. 30, 1968, 82
Stat. 893.)
§ 1527. Fish and wildlife conservation and devel-
opment
The conservation and development of the fish
and wildlife resources and the enhancement of
recreation opportunities in connection with the
project works authorized pursuant to this sub-
chapter shall be in accordance with the provi-
sions of the Federal Water Project Recreation
Act (79 Stat. 213) [16 U.S.C. 460l–12 et seq.], ex-
cept as provided in section 1522 of this title.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
Section, Pub. L. 88–29, § 1, May 28, 1963, 77 Stat. 49, related to congressional findings and declaration of policy. See [section 200101 of Title 54](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title54-section200101&num=0&edition=prelim), National Park Service and Related Programs.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 460l
Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 460l. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 629
TITLE 16—CONSERVATION
§ 460l–3
(4) carrying out two or more of the purposes
set forth in paragraphs (1) through (3) of this
section, and are adjacent to, or within, the
said conservation areas, except that the acqui-
sition of any land or interest therein pursuant
to this section shall be accomplished only
with such funds as may be appropriated there-
for by the Congress or donated for such pur-
poses, but such property shall not be acquired
with funds obtained from the sale of Federal
migratory bird hunting stamps.
Lands acquired pursuant to this section shall be-
come a part of the particular conservation area
to which they are adjacent.
(Pub. L. 87–714, § 2, Sept. 28, 1962, 76 Stat. 653;
Pub. L. 92–534, Oct. 23, 1972, 86 Stat. 1063; Pub. L.
93–205, § 13(d), Dec. 28, 1973, 87 Stat. 902.)
Editorial Notes
AMENDMENTS
1973—Pub. L. 93–205 inserted references to the acquisi-
tion of interest in land the conservation of endangered
species or threatened species listed by the Secretary
pursuant to section 1533 of this title.
1972—Pub. L. 92–534 substituted provisions author-
izing the Secretary to acquire lands suitable for fish
and wildlife oriented recreational development, or for
the protection of natural resources and adjacent to
conservation areas, for provisions authorizing the Sec-
retary to acquire limited areas of land for recreational
development adjacent to conservation areas in exist-
ence or approved by the Migratory Bird Conservation
Commission as of September 28, 1962.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1973 AMENDMENT
Amendment by Pub. L. 93–205 effective Dec. 28, 1973,
see section 16 of Pub. L. 93–205, set out as a note under
section 1531 of this title.
§ 460k–2. Cooperation with agencies, organiza-
tio
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 460l
Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 460l. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Restriction on use of water for irrigation** Unless and until otherwise provided by Congress, water from the Central Arizona Project shall not be made available directly or indirectly for the irrigation of lands not having a recent irrigation history as determined by the Secretary, except in the case of Indian lands, national wildlife refuges, and, with the approval of the Secretary, State-administered wildlife management areas.
**(b) Contracts with municipal and industrial users**
(1) Irrigation and municipal and industrial water supply under the Central Arizona Project within the State of Arizona may, in the event the Secretary determines that it is necessary to effect repayment, be pursuant to master contracts with organizations which have power to levy assessments against all taxable real property within their boundaries. The terms and conditions of contracts or other arrangements whereby each such organization makes water from the Central Arizona Project available to users within its boundaries shall be subject to the Secretary’s approval, and the United States shall, if the Secretary determines such action is desirable to facilitate carrying out the provisions of this chapter, have the right to require that it be a party to such contracts or that contracts subsidiary to the master contracts be entered into between the United States and any user. The provisions of this clause (1) shall not apply to the supplying of water to an Indian tribe for use within the boundaries of an Indian reservation.
(2) Any obligation assumed pursuant to [section 485h(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section485h/d&num=0&edition=prelim) with respect to any project contract unit or irrigation block shall be repaid over a basic
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1524
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
All moneys received from the sale and disposal of public lands in Arizona, California, Colorado, Idaho, Kansas, Montana, Nebraska, Nevada, New Mexico, North Dakota, Oklahoma, Oregon, South Dakota, Utah, Washington, and Wyoming, beginning with the fiscal year ending June 30, 1901, including the surplus of fees and commissions in excess of allowances to officers designated by the Secretary of the Interior, and excepting the 5 per centum of the proceeds of the sales of public lands in the above States set aside by law for educational and other purposes, shall be, and the same are, reserved, set aside, and appropriated as a special fund in the Treasury to be known as the “reclamation fund”, to be used in the examination and survey for and the construction and maintenance of irrigation works for the storage, diversion, and development of waters for the reclamation of arid and semiarid lands in the said States and Territories, and for the payment of all other expenditures provided for in this Act.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 391
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 391. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 127
TITLE 43—PUBLIC LANDS
§ 391
1 So in original.
1987—Subsecs. (g) to (i). Pub. L. 100–203 added subsecs.
(g) to (i).
§ 390xx. Validation of contracts entered into
prior to October 1, 1981
The provisions of any contract entered into
prior to October 1, 1981, by the Secretary with a
district, which define project or nonproject
water, or describe the delivery of project water
through nonproject facilities or nonproject
water through project facilities to lands within
the district, are hereby authorized and validated
on the part of the United States.
(Pub. L. 97–293, title II, § 225, Oct. 12, 1982, 96
Stat. 1273.)
§ 390yy. Leasing requirements
Notwithstanding any other provision of Fed-
eral reclamation law, including this subchapter,
lands which receive irrigation water may be
leased only if the lease instrument is—
(1) written; and
(2) for a term not to exceed ten years, in-
cluding any exercisable options: Provided, how-
ever, That leases of lands for the production of
perennial crops having an average life of more
than ten years may be for periods of time
equal to the average life of the perennial crop
but in any event not to exceed twenty-five
years.
(Pub. L. 97–293, title II, § 227, Oct. 12, 1982, 96
Stat. 1273.)
Editorial Notes
REFERENCES IN TEXT
Federal reclamation law, referred to in text, is de-
fined in section 390aa of this title.
§ 390zz. Reporting
Any contracting entity subject to the owner-
ship or pricing limitations of Federal reclama-
tion law shall compile and maintain such
records and information as the Secretary deems
reasonably necessary to implement this sub-
chapter and Federal reclamation law. On a date
set by the Secretary following October 12, 1982,
and annually thereafter, every such contracting
entity sha
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 391
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 391. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
For the purpose of controlling the floods, improving navigation, and regulating the flow of the Colorado River, providing for storage and for the delivery of the stored waters thereof for reclamation of public lands and other beneficial uses exclusively within the United States, and for the generation of electrical energy as a means of making the project herein authorized a self-supporting and financially solvent undertaking, the Secretary of the Interior subject to the terms of the Colorado River compact hereinafter mentioned in this chapter, is authorized to construct, operate, and maintain a dam and incidental works in the main stream of the Colorado River at Black Canyon or Boulder Canyon adequate to create a storage reservoir of a capacity of not less than twenty million acre-feet of water and a main canal and appurtenant structures located entirely within the United States connecting the Laguna Dam, or other suitable diversion dam, which the Secretary of the Interior is authorized to construct if deemed necessary or advisable by him upon engineering or economic considerations, with the Imperial and Coachella Valleys in California, the expenditures for said main canal and appurtenant structures to be reimbursable, as provided in the reclamation law, and shall not be paid out of revenues derived from the sale or disposal of water power or electric energy at the dam authorized to be constructed at said Black Canyon or Boulder Canyon, or for water for potable purposes outside of the Imperial and Coachella Valleys: Provided, however, That no charge shall be made for water for the use, storage, or delivery of water for irrigation or water for potable purposes in the Imperial or Coachella Valleys; also to construct and equip, operate, and maintain at or near said dam, or
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 617
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 617. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 209
TITLE 43—PUBLIC LANDS
§ 617
Sec.
618i.
Effective date.
618j.
Effect of refusal to modify existing contracts.
618k.
Definitions.
618l.
Repealed.
618m.
Effect on existing laws and States’ rights.
618n.
Wages of employees.
618o.
Short title.
618p.
Omitted.
SUBCHAPTER III—HOOVER DAM CONTRACTS AND
FACILITIES
619.
Increase in capacity of existing generating
equipment at Hoover Powerplant; construc-
tion of Colorado River bridge crossing.
619a.
Renewal contracts for power.
619b.
Reimbursement of funds advanced by non-
Federal purchasers; uprating program; re-
payment requirement; visitor facilities pro-
gram.
Statutory Notes and Related Subsidiaries
CONSOLIDATION OF CERTAIN PROJECTS; EFFECT ON THIS
CHAPTER
Act May 28, 1954, ch. 241, 68 Stat. 143, provided that:
‘‘For the purposes of effecting economies and in-
creased efficiency in the construction, operation, and
maintenance thereof and of accounting for the return
of reimbursable costs, the Secretary of the Interior is
authorized and directed to consolidate and administer
as a single project to be known as the Parker-Davis
project, Arizona-California-Nevada, the projects known
as the Parker Dam power project, Arizona-California,
and the Davis Dam project, Arizona-Nevada: Provided,
That nothing in this Act shall be construed to alter or
affect in any way the Boulder Canyon Project Act (45
Stat. 1057) [subchapter I of this chapter], the Boulder
Canyon Project Adjustment Act (54 Stat. 774) [sub-
chapter II of this chapter], or the treaty between the
United States of America and the United Mexican
States, signed at Washington on February 3, 1944, relat-
ing to the utilization of the waters of the Colorado and
Tijuana Rivers and of the Rio Grande from Fort
Quitman, Texas, to th
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 617
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 617. This identifies an authority to review, not proof of applicability.