Page 1376 TITLE 38—VETERANS’ BENEFITS § 8172 (6) The term ‘‘business owner’’ means, with respect to an information technology project, the program manager, project manager, or other supervisory official of the Department responsible for the project. (Added Pub. L. 117–328, div. U, title IV, § 403(a), Dec. 29, 2022, 136 Stat. 5486.) § 8172. Management of major information tech- nology projects (a) COST, SCHEDULE, AND PERFORMANCE INFOR- MATION.—(1) The Secretary shall, acting through the Chief Information Officer of the Depart- ment, submit to the appropriate congressional committees a report containing information on the cost, schedule, and performance of each major information technology project that be- gins after the date of the enactment of the Jo- seph Maxwell Cleland and Robert Joseph Dole Memorial Veterans Benefits and Health Care Improvement Act of 2022, as generated by the business owner of the project, prior to the com- mencement of such project. (2) Each report submitted under paragraph (1) for a project shall include, with respect to such project, the following: (A) An estimate of acquisition costs, imple- mentation costs, and life cycle costs. (B) An intended implementation schedule in- dicating significant milestones, initial oper- ating capability, and full operating capability or completion. (C) Key business, functional, and perform- ance objectives. (b) BASELINE.—(1) The Secretary shall use the information on the cost, schedule, and perform- ance of a major information technology project included in the report under subsection (a) as the baseline against which changes or variances are measured during the life cycle of such project. (2) The Secretary shall— (A) annually update the baseline of a major information technology pro

Source: Supplied 2024 U.S. Code historical extraction · 38 U.S.C. § 8172

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 6d7fbaa5e11f556061217474d78d29e0d091cec3e0864fbf016f075cf0fd7536. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-b788bf0153fd1aa5e276980c
Source file: Laws/federal/codes/united-states-code-2024/title-38/section-8172-management-of-major-information-tech--26c6400571.md
Pages: Not recorded – Not recorded
Passage SHA-256: 64e77ce0209e570afc924b96465de27ea36fb1b68f4ab806712e24dfd55074b9

Source location: USCODE-2024-title38-partVI-chap81-subchapVI-sec8172.pdf

Stored source content

Page 1376 TITLE 38—VETERANS’ BENEFITS § 8172 (6) The term ‘‘business owner’’ means, with respect to an information technology project, the program manager, project manager, or other supervisory official of the Department responsible for the project. (Added Pub. L. 117–328, div. U, title IV, § 403(a), Dec. 29, 2022, 136 Stat. 5486.) § 8172. Management of major information tech- nology projects (a) COST, SCHEDULE, AND PERFORMANCE INFOR- MATION.—(1) The Secretary shall, acting through the Chief Information Officer of the Depart- ment, submit to the appropriate congressional committees a report containing information on the cost, schedule, and performance of each major information technology project that be- gins after the date of the enactment of the Jo- seph Maxwell Cleland and Robert Joseph Dole Memorial Veterans Benefits and Health Care Improvement Act of 2022, as generated by the business owner of the project, prior to the com- mencement of such project. (2) Each report submitted under paragraph (1) for a project shall include, with respect to such project, the following: (A) An estimate of acquisition costs, imple- mentation costs, and life cycle costs. (B) An intended implementation schedule in- dicating significant milestones, initial oper- ating capability, and full operating capability or completion. (C) Key business, functional, and perform- ance objectives. (b) BASELINE.—(1) The Secretary shall use the information on the cost, schedule, and perform- ance of a major information technology project included in the report under subsection (a) as the baseline against which changes or variances are measured during the life cycle of such project. (2) The Secretary shall— (A) annually update the baseline of a major information technology project pursuant to subsection (c); and (B) include such updated baseline in the doc- uments providing detailed information on the budget for the Department that the Secretary submits to Congress in conjunction with the President’s budget submission pursuant to sec- tion 1105 of title 31. (c) CHANGES AND VARIANCES.—(1) Not later than 60 days after the date on which the Sec- retary identifies a change or variance described in paragraph (2) in the cost, schedule, or per- formance of a major information technology project, the Secretary, acting through the Chief Information Officer, shall submit to the appro- priate congressional committees a notification of such change or variance, including a descrip- tion and explanation for such change or vari- ance. (2) A change or variance in the cost, schedule, or performance of a major information tech- nology project described in this paragraph is— (A) with respect to the acquisition, imple- mentation, or life cycle cost of the project, or development increment therein, a change or variance that is 10 percent or greater com- pared to the baseline; (B) with respect to the schedule for a devel- opment increment or for achieving a signifi- cant milestone, initial operating capability, or full operating capability, or for the final com- pletion of the project, a change or variance that is 180 days or greater compared to the baseline; or (C) with respect to the performance, an in- stance where a key business, functional, or performance objective is not attained, or is not anticipated to be attained, in whole or in part. (d) MANAGEMENT.—The Secretary shall ensure that each major information technology project is managed by an interdisciplinary team con- sisting of the following: (1) A project manager who— (A)(i) is certified in project management at level three by— (I) the Department; (II) the Federal Acquisition Institute pursuant to section 1201 of title 41; or (III) the Department of Defense pursuant to section 1701a of title 10; or (ii) holds an equivalent certification by a private sector project management certifi- cation organization, as determined appro- priate by the Secretary; and (B) is an employee of the Office of Informa- tion and Technology of the Department or an employee of an element of the Depart- ment at which the project originates. (2) A functional lead who is an employee of the element of the Department at which the project originates. (3) A technical lead who is an employee of the Office of Information and Technology of the Department. (4) A contracting officer. (5) Sufficient other project management, functional, technical, and procurement per- sonnel as the Secretary determines appro- priate. (Added Pub. L. 117–328, div. U, title IV, § 403(a), Dec. 29, 2022, 136 Stat. 5486.) Editorial Notes REFERENCES IN TEXT The date of the enactment of the Joseph Maxwell Cleland and Robert Joseph Dole Memorial Veterans Benefits and Health Care Improvement Act of 2022, re- ferred to in subsec. (a)(1), is the date of enactment of div. U of Pub. L. 117–328, which was approved Dec. 29, 2022. Statutory Notes and Related Subsidiaries EFFECTIVE DATE Pub. L. 117–328, div. U, title IV, § 403(c)(1), (3), Dec. 29, 2022, 136 Stat. 5490, provided that: ‘‘(1) CURRENT AND NEW MAJOR PROJECTS.—Except as specifically provided in subsection (a) of section 8172 of title 38, United States Code, as added by subsection (a) of this section, such section 8172 shall apply with re- spect to major information technology projects that begin before, on, or after the date of the enactment of this Act [Dec. 29, 2022]. ‘‘(3) DEFINITIONS.—In this subsection [enacting this note and provisions not set out in the Code], the terms ‘appropriate congressional committees’ and ‘major in- Page 1377 TITLE 38—VETERANS’ BENEFITS § 8175 formation technology project’ have the meanings given those terms in section 8171 of title 38, United States Code, as added by subsection (a) of this section.’’ § 8173. Information technology activities of the Financial Services Center (a) MANAGEMENT.—Consistent with sections 11302 and 11319 of title 40— (1) the Chief Information Officer of the De- partment shall— (A) exercise authority over the manage- ment, governance, and oversight processes relating to existing or proposed information technology of the Financial Services Center of the Department, or such successor office; and (B) supervise the information technology employees and contractors of the Financial Services Center; and (2) the Director of the Financial Services Center of the Department, or the head of such successor office, may not enter into a contract or other agreement for information tech- nology or information technology services un- less the contract or other agreement has been reviewed and approved by the Chief Informa- tion Officer. (b) OVERSIGHT.—The Chief Information Officer shall have oversight and operational authority over all information security practices of the Fi- nancial Services Center of the Department. (Added Pub. L. 117–328, div. U, title IV, § 403(a), Dec. 29, 2022, 136 Stat. 5488.) Statutory Notes and Related Subsidiaries EFFECTIVE DATE Pub. L. 117–328, div. U, title IV, § 403(d), Dec. 29, 2022, 136 Stat. 5490, provided that: ‘‘(1) EFFECTIVE DATE.—Section 8173 of such title, as added by subsection (a), shall take effect on the date of the enactment of this Act [Dec. 29, 2022]. ‘‘(2) APPLICABILITY.—Subsection (a)(2) of such section shall apply with respect to contracts and agreements entered into on or after the date of the enactment of this Act.’’ § 8174. Submission of annual reviews of informa- tion technology (a) IN GENERAL.—The Secretary, acting through the Chief Information Officer of the De- partment, shall submit to the appropriate con- gressional committees each annual review of the information technology portfolio of the Depart- ment conducted pursuant to section 11319(d)(3) of title 40. (b) FIRST SUBMISSION.—The first annual review submitted under subsection (a) shall include a copy of each previous annual review conducted under section 11319(d)(3) of title 40. (Added Pub. L. 117–328, div. U, title IV, § 403(a), Dec. 29, 2022, 136 Stat. 5488.) § 8175. Information technology matters to be in- cluded in budget justification materials for the Department (a) LIST OF INFORMATION TECHNOLOGY PROJECTS IN EFFECT.—The Secretary shall en- sure that whenever the budget justification ma- terials are submitted to Congress in support of the Department budget for a fiscal year (as sub- mitted with the budget of the President for such fiscal year under section 1105(a) of title 31), such budget justification materials include a list of every information technology project currently in effect at the Department (including not only congressional projects and subprojects as deter- mined by the Director of the Office of Manage- ment and Budget or the Secretary). (b) PRIORITIZED LIST OF UNFUNDED PROJECTS.— (1) In addition to the list included in the budget justification materials required by subsection (a), the Secretary shall ensure that the budget justification materials described in such sub- section also include summary descriptions and a prioritized list, in rank order, of every informa- tion technology project of the Department, pro- posed or intended to be proposed for the fol- lowing one, two, or three fiscal years, that is un- funded as of the time of the inclusion of the list under this paragraph. (2) In producing the list required by paragraph (1), the Secretary shall— (A) ensure such list represents a ranking of all proposed information technology projects that reflects the needs of all elements of the Department; (B) produce one unified list for the entire Department demonstrating how the various proposed information technology projects of each of the elements of the Department rank in priority with the information technology projects of the other elements of the Depart- ment; and (C) ensure that the list— (i) does not disaggregate and rank infor- mation technology projects based on ele- ment of the Department; and (ii) does identify the element of the De- partment requesting the information tech- nology project. (3)(A) In producing each list under paragraph (1), the Secretary shall prioritize and rank each information technology project based on an as- sessment of each of the following factors: (i) Degree of collaboration between business owners and the Chief Information Officer with respect to joint functional-technical planning, requirements, and management. (ii) Operational or efficiency benefits to em- ployees of the Department created or produced by the information technology project. (iii) The life cycle cost of the information technology project. (iv) The cost savings or cost avoidance yield- ed by the information technology project. (v) Time to completion of the information technology project. (vi) The difficulty of the information tech- nology project, the likelihood the information technology project will be completed, or the risks associated with undertaking the infor- mation technology project. (vii) Tangible benefits to veterans created or produced by the information technology project. (viii) Such other factors as the Secretary considers appropriate. (B) The Secretary shall ensure that each list produced under paragraph (1) includes, for each

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

38 U.S.C. § 8172 — Management of major information technology projects

**(a) Cost, Schedule, and Performance Information.—** (1) The Secretary shall, acting through the Chief Information Officer of the Department, submit to the appropriate congressional committees a report containing information on the cost, schedule, and performance of each major information technology project that begins after the date of the enactment of the Joseph Maxwell Cleland and Robert Joseph Dole Memorial Veterans Benefits and Health Care Improvement Act of 2022, as generated by the business owner of the project, prior to the commencement of such project. (2) Each report submitted under paragraph (1) for a project shall include, with respect to such project, the following: (A) An estimate of acquisition costs, implementation costs, and life cycle costs. (B) An intended implementation schedule indicating significant milestones, initial operating capability, and full operating capability or completion. (C) Key business, functional, and performance objectives. **(b) Baseline.—** (1) The Secretary shall use the information on the cost, schedule, and performance of a major information technology project included in the report under subsection (a) as the baseline against which changes or variances are measured during the life cycle of such project. (2) The Secretary shall— (A) annually update the baseline of a major information technology project pursuant to subsection (c); and (B) include such updated baseline in the documents providing detailed information on the budget for the Department that the Secretary submits to Congress in conjunction with the President’s budget submission pursuant to [section 1105 of title 31](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section1105&num=0&edition=prelim). **(c) Changes and Variance