Browse Arkansas Code titles and sections
42 U.S.C. § 18323 — Multi-purpose crew vehicle
Federal law — U.S. Code and appendices · legal_authorities
Page 9150
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 18323
ment of a Space Launch System meeting the
minimum capabilities requirements specified
in subsection (c).
(2) Modification of current contracts
In order to limit NASA’s termination liabil-
ity costs and support critical capabilities, the
Administrator shall, to the extent practicable,
extend or modify existing vehicle development
and associated contracts necessary to meet
the requirements in paragraph (1), including
contracts for ground testing of solid rocket
motors, if necessary, to ensure their avail-
ability for development of the Space Launch
System.
(c) Minimum capability requirements
(1) IN GENERAL.—The Space Launch System
developed pursuant to subsection (b) shall be
designed to have, at a minimum, the fol-
lowing:
(A) The initial capability of the core ele-
ments, without an upper stage, of lifting
payloads weighing between 70 tons and 100
tons into low-Earth orbit in preparation for
transit for missions beyond low-Earth orbit.
(B) The capability to carry an integrated
upper Earth departure stage bringing the
total lift capability of the Space Launch
System to 130 tons or more.
(C) The capability to lift the multipurpose
crew vehicle.
(D) The capability to serve as a backup
system for supplying and supporting ISS
cargo requirements or crew delivery require-
ments not otherwise met by available com-
mercial or partner-supplied vehicles.
(2) FLEXIBILITY.—The Space Launch System
shall be designed from inception as a fully-in-
tegrated vehicle capable of carrying a total
payload of 130 tons or more into low-Earth
orbit in preparation for transit for missions
beyond low-Earth orbit. The Space Launch
System shall, to the extent practicable, incor-
porate capabilities for evolutio
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 18323
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: fd6ae0150c547339c1f46a74b48f7fba195d612ff761e2a6f0d716ec4e3342ee. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-b380fa4eed02915892ec854a
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-18323-multi-purpose-crew-vehicle--804951e27b.md
Pages: Not recorded – Not recorded
Passage SHA-256: 0d3984f30135dd824d517e4e371c6d70e66d02ce9e17ff54fd0cd4cccab04096
Source location: USCODE-2024-title42-chap159-subchapII-sec18323.pdf
Stored source content
Page 9150
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 18323
ment of a Space Launch System meeting the
minimum capabilities requirements specified
in subsection (c).
(2) Modification of current contracts
In order to limit NASA’s termination liabil-
ity costs and support critical capabilities, the
Administrator shall, to the extent practicable,
extend or modify existing vehicle development
and associated contracts necessary to meet
the requirements in paragraph (1), including
contracts for ground testing of solid rocket
motors, if necessary, to ensure their avail-
ability for development of the Space Launch
System.
(c) Minimum capability requirements
(1) IN GENERAL.—The Space Launch System
developed pursuant to subsection (b) shall be
designed to have, at a minimum, the fol-
lowing:
(A) The initial capability of the core ele-
ments, without an upper stage, of lifting
payloads weighing between 70 tons and 100
tons into low-Earth orbit in preparation for
transit for missions beyond low-Earth orbit.
(B) The capability to carry an integrated
upper Earth departure stage bringing the
total lift capability of the Space Launch
System to 130 tons or more.
(C) The capability to lift the multipurpose
crew vehicle.
(D) The capability to serve as a backup
system for supplying and supporting ISS
cargo requirements or crew delivery require-
ments not otherwise met by available com-
mercial or partner-supplied vehicles.
(2) FLEXIBILITY.—The Space Launch System
shall be designed from inception as a fully-in-
tegrated vehicle capable of carrying a total
payload of 130 tons or more into low-Earth
orbit in preparation for transit for missions
beyond low-Earth orbit. The Space Launch
System shall, to the extent practicable, incor-
porate capabilities for evolutionary growth to
carry heavier payloads. Developmental work
and testing of the core elements and the upper
stage should proceed in parallel subject to ap-
propriations. Priority should be placed on the
core elements with the goal for operational ca-
pability for the core elements not later than
December 31, 2016.
(3) TRANSITION
NEEDS.—The Administrator
shall ensure critical skills and capabilities are
retained, modified, and developed, as appro-
priate, in areas related to solid and liquid en-
gines, large diameter fuel tanks, rocket pro-
pulsion, and other ground test capabilities for
an effective transition to the follow-on Space
Launch System.
(4) The capacity for efficient and timely evo-
lution, including the incorporation of new
technologies, competition of sub-elements,
and commercial operations.
(Pub. L. 111–267, title III, § 302, Oct. 11, 2010, 124
Stat. 2814.)
§ 18323. Multi-purpose crew vehicle
(a) Initiation of development
(1) In general
The Administrator shall continue the devel-
opment of a multi-purpose crew vehicle to be
available as soon as practicable, and no later
than for use with the Space Launch System.
The vehicle shall continue to advance develop-
ment of the human safety features, designs,
and systems in the Orion project.
(2) Goal for operational capability
It shall be the goal to achieve full oper-
ational capability for the transportation vehi-
cle developed pursuant to this subsection by
not later than December 31, 2016. For purposes
of meeting such goal, the Administrator may
undertake a test of the transportation vehicle
at the ISS before that date.
(b) Minimum capability requirements
The multi-purpose crew vehicle developed pur-
suant to subsection (a) shall be designed to
have, at a minimum, the following:
(1) The capability to serve as the primary
crew vehicle for missions beyond low-Earth
orbit.
(2) The capability to conduct regular in-
space operations, such as rendezvous, docking,
and extra-vehicular activities, in conjunction
with payloads delivered by the Space Launch
System developed pursuant to section 18322 of
this title, or other vehicles, in preparation for
missions beyond low-Earth orbit or servicing
of assets described in section 18383 of this
title, or other assets in cis-lunar space.
(3) The capability to provide an alternative
means of delivery of crew and cargo to the
ISS, in the event other vehicles, whether com-
mercial vehicles or partner-supplied vehicles,
are unable to perform that function.
(4) The capacity for efficient and timely evo-
lution, including the incorporation of new
technologies, competition of sub-elements,
and commercial operations.
(Pub. L. 111–267, title III, § 303, Oct. 11, 2010, 124
Stat. 2815.)
§ 18324. Utilization of existing workforce and as-
sets in development of Space Launch System
and multi-purpose crew vehicle
(a) In general
In developing the Space Launch System pursu-
ant to section 18322 of this title and the multi-
purpose crew vehicle pursuant to section 18323 of
this title, the Administrator shall, to the extent
practicable utilize—
(1) existing contracts, investments, work-
force, industrial base, and capabilities from
the Space Shuttle and Orion and Ares 1
projects, including—
(A) space-suit development activities for
application to, and coordinated development
of, a multi-purpose crew vehicle suit and as-
sociated life-support requirements with po-
tential development of standard NASA-cer-
tified suit and life support systems for use in
alternative
commercially-developed
crew
transportation systems; and
(B) Space Shuttle-derived components and
Ares 1 components that use existing United
States propulsion systems, including liquid
fuel engines, external tank or tank-related
capability, and solid rocket motor engines;
and
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Findings** Congress makes the following findings:
(1) The extension of the human presence from low-Earth orbit to other regions of space beyond low-Earth orbit will enable missions to the surface of the Moon and missions to deep space destinations such as near-Earth asteroids and Mars.
(2) The regions of cis-lunar space are accessible to other national and commercial launch capabilities, and such access raises a host of national security concerns and economic implications that international human space endeavors can help to address.
(3) The ability to support human missions in regions beyond low-Earth orbit and on the surface of the Moon can also drive developments in emerging areas of space infrastructure and technology.
(4) Developments in space infrastructure and technology can stimulate and enable increased space applications, such as in-space servicing, propellant resupply and transfer, and in situ resource utilization, and open opportunities for additional users of space, whether national, commercial, or international.
(5) A long term objective for human exploration of space should be the eventual international exploration of Mars.
(6) Future international missions beyond low-Earth orbit should be designed to incorporate capability development and availability, affordability, and international contributions.
(7) Human space flight and future exploration beyond low-Earth orbit should be based around a pay-as-you-go approach. Requirements in new launch and crew systems authorized in this chapter should be scaled to the minimum necessary to meet the core national mission capability needed to conduct cis-lunar missions. These initial missions, along with the development of new technologies and in-space capabilities can form the foundation for missions to
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 18323
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.