Browse Arkansas Code titles and sections
43 U.S.C. § 617e — Uses to be made of dam and reservoir;
Federal law — U.S. Code and appendices · legal_authorities
Page 213
TITLE 43—PUBLIC LANDS
§ 617g
defined in section 617k of this title. For further details,
see note set out under section 617k of this title.
§ 617e. Uses to be made of dam and reservoir;
title in whom; leases, regulations; limitation
on authority
The dam and reservoir provided for by section
617 of this title shall be used: First, for river reg-
ulation, improvement of navigation, and flood
control; second, for irrigation and domestic uses
and satisfaction of present perfected rights in
pursuance of Article VIII of said Colorado River
compact; and third, for power. The title to said
dam, reservoir, plant, and incidental works shall
forever remain in the United States, and the
United States shall, until otherwise provided by
Congress, control, manage, and operate the
same, except as herein otherwise provided: Pro-
vided, however, That the Secretary of the Inte-
rior may, in his discretion, enter into contracts
of lease of a unit or units of any Government-
built plant, with right to generate electrical en-
ergy, or alternatively, to enter into contracts of
lease for the use of water for the generation of
electrical energy as herein provided, in either of
which events the provisions of section 617d of
this title relating to revenue, term, renewals,
determination of conflicting applications, and
joint use of transmission lines under contracts
for the sale of electrical energy, shall apply.
The Secretary of the Interior shall prescribe
and enforce rules and regulations conforming
with the requirements of the Federal Power Act
[16 U.S.C. 791a et seq.], so far as applicable, re-
specting maintenance of works in condition of
repair adequate for their efficient operation,
maintenance of a system of accounting, control
of rates and service
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 617e
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 9d63993b4a44163252041079ef79cf90767883634d100431ae5cc9f04c68cfb0. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-aec097f517f8248f8199276f
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-617e-uses-to-be-made-of-dam-and-reservoir--68eba781da.md
Pages: Not recorded – Not recorded
Passage SHA-256: adab18fd5547f0a839735393c9d42b6c5597125950f215d0a5289f6196d0f2af
Source location: USCODE-2024-title43-chap12A-subchapI-sec617e.pdf
Stored source content
Page 213
TITLE 43—PUBLIC LANDS
§ 617g
defined in section 617k of this title. For further details,
see note set out under section 617k of this title.
§ 617e. Uses to be made of dam and reservoir;
title in whom; leases, regulations; limitation
on authority
The dam and reservoir provided for by section
617 of this title shall be used: First, for river reg-
ulation, improvement of navigation, and flood
control; second, for irrigation and domestic uses
and satisfaction of present perfected rights in
pursuance of Article VIII of said Colorado River
compact; and third, for power. The title to said
dam, reservoir, plant, and incidental works shall
forever remain in the United States, and the
United States shall, until otherwise provided by
Congress, control, manage, and operate the
same, except as herein otherwise provided: Pro-
vided, however, That the Secretary of the Inte-
rior may, in his discretion, enter into contracts
of lease of a unit or units of any Government-
built plant, with right to generate electrical en-
ergy, or alternatively, to enter into contracts of
lease for the use of water for the generation of
electrical energy as herein provided, in either of
which events the provisions of section 617d of
this title relating to revenue, term, renewals,
determination of conflicting applications, and
joint use of transmission lines under contracts
for the sale of electrical energy, shall apply.
The Secretary of the Interior shall prescribe
and enforce rules and regulations conforming
with the requirements of the Federal Power Act
[16 U.S.C. 791a et seq.], so far as applicable, re-
specting maintenance of works in condition of
repair adequate for their efficient operation,
maintenance of a system of accounting, control
of rates and service in the absence of State regu-
lation or interstate agreement, valuation for
rate-making purposes, transfers of contracts,
contracts extending beyond the lease period, ex-
propriation of excessive profits, recapture and/or
emergency use by the United States of property
of lessees, and penalties for enforcing regula-
tions made under this subchapter or penalizing
failure to comply with such regulations or with
the provisions of this subchapter. He shall also
conform with other provisions of the Federal
Power Act and of the rules and regulations of
the Federal Power Commission, which have been
devised or which may be hereafter devised, for
the protection of the investor and consumer.
The Federal Power Commission is directed not
to issue or approve any permits or licenses
under said Federal Power Act [16 U.S.C. 791a et
seq.] upon or affecting the Colorado River or any
of its tributaries, except the Gila River, in the
States of Colorado, Wyoming, Utah, New Mex-
ico, Nevada, Arizona, and California until this
subchapter shall become effective as provided in
sections 617c of this title.
(Dec. 21, 1928, ch. 42, § 6, 45 Stat. 1061.)
Editorial Notes
REFERENCES IN TEXT
The Federal Power Act, referred to in text, which was
in the original the ‘‘Federal Water Power Act’’, is de-
fined in section 617k of this title. For further details,
see note set out under section 617k of this title.
Statutory Notes and Related Subsidiaries
TRANSFER OF FUNCTIONS
The Federal Power Commission was terminated, and
its functions, personnel, property, funds, etc., were
transferred to the Secretary of Energy (except for cer-
tain functions which were transferred to the Federal
Energy Regulatory Commission) by sections 7151(b),
7171(a), 7172(a), 7291, and 7293 of Title 42, The Public
Health and Welfare.
Executive Documents
TRANSFER OF FUNCTIONS
Executive and administrative functions of Federal
Power Commission, with certain reservations, trans-
ferred to Chairman of Commission, with authority
vested in him to authorize their performance by any of-
ficer, employee, or administrative unit under his juris-
diction, by Reorg. Plan No. 9 of 1950, §§ 1, 2, eff. May 24,
1950, 15 F.R. 3175, 64 Stat. 1265, set out in the Appendix
to Title 5, Government Organization and Employees.
§ 617f. Canals and appurtenant structures; trans-
fer of title; power development
The Secretary of the Interior may, in his dis-
cretion, when repayments to the United States
of all money advanced, with interest, reimburs-
able hereunder, shall have been made, transfer
the title to said canal and appurtenant struc-
tures, except the Laguna Dam and the main
canal and appurtenant structures down to and
including Syphon Drop, to the districts or other
agencies of the United States having a beneficial
interest therein in proportion to their respective
capital investments under such form of organi-
zation as may be acceptable to him. The said
districts or other agencies shall have the privi-
lege at any time of utilizing by contract or oth-
erwise such power possibilities as may exist
upon said canal, in proportion to their respec-
tive contributions or obligations toward the
capital cost of said canal and appurtenant struc-
tures from and including the diversion works to
the point where each respective power plant
may be located. The net proceeds from any
power development on said canal shall be paid
into the fund and credited to said districts or
other agencies on their said contracts, in pro-
portion to their rights to develop power, until
the districts or other agencies using said canal
shall have paid thereby and under any contract
or otherwise an amount of money equivalent to
the operation and maintenance expense and cost
of construction thereof.
(Dec. 21, 1928, ch. 42, § 7, 45 Stat. 1062.)
§ 617g. Colorado River compact as controlling au-
thority in construction and maintenance of
dam, reservoir, canals, and other works
(a) The United States, its permittees, licens-
ees, and contractees, and all users and appropri-
ators of water stored, diverted, carried, and/or
distributed by the reservoir, canals, and other
works herein, authorized shall observe and be
subject to and controlled by said Colorado River
compact in the construction, management, and
operation of said reservoir, canals, and other
works and the storage, diversion, delivery, and
use of water for the generation of power, irriga-
tion, and other purposes, anything in this sub-
chapter to the contrary notwithstanding, and all
permits, licenses, and contracts shall so provide.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
This chapter may be cited as the “Federal Power Act”.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 791a
Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 1364
TITLE 16—CONSERVATION
§ 791
Sec.
Statutory Notes and Related Subsidiaries
FINDINGS
Pub. L. 113–23, § 2, Aug. 9, 2013, 127 Stat. 493, provided
that: ‘‘Congress finds that—
‘‘(1) the hydropower industry currently employs ap-
proximately 300,000 workers across the United States;
‘‘(2) hydropower is the largest source of clean, re-
newable electricity in the United States;
‘‘(3) as of the date of enactment of this Act [Aug. 9,
2013], hydropower resources, including pumped stor-
age facilities, provide—
‘‘(A) nearly 7 percent of the electricity generated
in the United States; and
‘‘(B) approximately 100,000 megawatts of electric
capacity in the United States;
‘‘(4) only 3 percent of the 80,000 dams in the United
States generate electricity, so there is substantial
potential for adding hydropower generation to non-
powered dams; and
‘‘(5) according to one study, by utilizing currently
untapped resources, the United States could add ap-
proximately 60,000 megawatts of new hydropower ca-
pacity by 2025, which could create 700,000 new jobs
over the next 13 years.’’
SUBCHAPTER I—REGULATION OF THE DE-
VELOPMENT OF WATER POWER AND RE-
SOURCES
Statutory Notes and Related Subsidiaries
CODIFICATION; CONSTRUCTION
Act Aug. 26, 1935, ch. 687, title II, § 212, 49 Stat. 847,
provided that sections 1 to 29 of the Federal Water
Power Act, as amended (sections 792, 793, 794 to 797, 798
to 818, 819, and 820 to 823 of this title) shall constitute
part I of the act. Said section 212 also repealed sections
25 and 30 of the act (sections 819, 791 of this title). It
also contained a proviso as follows: ‘‘That nothing in
that Act, as amended, shall be construed to repeal or
amend the provisions of the amendment to the Federal
Water Power Act approved March 3, 192
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 791a
Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
The dam and reservoir provided for by [section 617 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617&num=0&edition=prelim) shall be used: First, for river regulation, improvement of navigation, and flood control; second, for irrigation and domestic uses and satisfaction of present perfected rights in pursuance of Article VIII of said Colorado River compact; and third, for power. The title to said dam, reservoir, plant, and incidental works shall forever remain in the United States, and the United States shall, until otherwise provided by Congress, control, manage, and operate the same, except as herein otherwise provided: Provided, however, That the Secretary of the Interior may, in his discretion, enter into contracts of lease of a unit or units of any Government-built plant, with right to generate electrical energy, or alternatively, to enter into contracts of lease for the use of water for the generation of electrical energy as herein provided, in either of which events the provisions of [section 617d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617d&num=0&edition=prelim) relating to revenue, term, renewals, determination of conflicting applications, and joint use of transmission lines under contracts for the sale of electrical energy, shall apply.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 617e
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.