Browse Arkansas Code titles and sections
42 U.S.C. § 18771 — Definitions
Federal law — U.S. Code and appendices · legal_authorities
Page 9228
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 18771
project finalists in consultation with the Sec-
retary of the Interior, the Administrator of
the Environmental Protection Agency, and
the Secretary of Labor.
(5) Compatibility with existing operations
Prior to selecting a clean energy project for
participation in the program under paragraph
(1), the Secretary shall consult with, as appli-
cable, mining claimholders or operators or the
relevant Office of Surface Mining Reclamation
and Enforcement Abandoned Mine Land pro-
gram office to confirm—
(A) that the proposed project is compatible
with any current mining, exploration, or
reclamation activities; and
(B) the valid existing rights of any mining
claimholders or operators.
(d) Consultation
The Secretary shall consult with the Director
of the Office of Surface Mining Reclamation and
Enforcement and the Administrator of the Envi-
ronmental Protection Agency, acting through
the Office of Brownfields and Land Revitaliza-
tion, to determine whether it is necessary to
promulgate regulations or issue guidance in
order to prioritize and expedite the siting of
clean energy projects on current and former
mine land sites.
(e) Technical assistance
The Secretary shall provide technical assist-
ance to project applicants selected for participa-
tion in the program under subsection (c) to as-
sess the needed interconnection, transmission,
and other grid components and permitting and
siting necessary to interconnect, on current and
former mine land where the project will be sited,
any generation or storage with the electric grid.
(f) Authorization of appropriations
There is authorized to be appropriated to the
Secretary to carry out this section $500,000,000
for the period of fiscal years 2022 thro
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 18771
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 61773ba85de5ffae4a65bebd0dd06888f8c2beecca7760f230bf903a4b6a4e9d. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-acbaa54fd0e923c6507a10bc
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-18771-definitions--be5b5b3430.md
Pages: Not recorded – Not recorded
Passage SHA-256: f645210a46c3ba2bc94d7888d03c4d75f1f382e4f1e79126c2e61587ca51b148
Source location: USCODE-2024-title42-chap162-subchapIV-sec18771.pdf
Stored source content
Page 9228
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 18771
project finalists in consultation with the Sec-
retary of the Interior, the Administrator of
the Environmental Protection Agency, and
the Secretary of Labor.
(5) Compatibility with existing operations
Prior to selecting a clean energy project for
participation in the program under paragraph
(1), the Secretary shall consult with, as appli-
cable, mining claimholders or operators or the
relevant Office of Surface Mining Reclamation
and Enforcement Abandoned Mine Land pro-
gram office to confirm—
(A) that the proposed project is compatible
with any current mining, exploration, or
reclamation activities; and
(B) the valid existing rights of any mining
claimholders or operators.
(d) Consultation
The Secretary shall consult with the Director
of the Office of Surface Mining Reclamation and
Enforcement and the Administrator of the Envi-
ronmental Protection Agency, acting through
the Office of Brownfields and Land Revitaliza-
tion, to determine whether it is necessary to
promulgate regulations or issue guidance in
order to prioritize and expedite the siting of
clean energy projects on current and former
mine land sites.
(e) Technical assistance
The Secretary shall provide technical assist-
ance to project applicants selected for participa-
tion in the program under subsection (c) to as-
sess the needed interconnection, transmission,
and other grid components and permitting and
siting necessary to interconnect, on current and
former mine land where the project will be sited,
any generation or storage with the electric grid.
(f) Authorization of appropriations
There is authorized to be appropriated to the
Secretary to carry out this section $500,000,000
for the period of fiscal years 2022 through 2026.
(Pub. L. 117–58, div. D, title III, § 40342, Nov. 15,
2021, 135 Stat. 1031.)
Editorial Notes
REFERENCES IN TEXT
The Surface Mining Control and Reclamation Act of
1977, referred to in subsec. (a)(3)(A), is Pub. L. 95–87,
Aug. 3, 1977, 91 Stat. 445. Titles IV and V of the Act are
classsified to subchapters IV (§ 1231 et seq.) and V (§ 1251
et seq.), respectively, of Chapter 25 of Title 30, Mineral
Lands and Mining. For complete classification of this
Act to the Code, see Short Title note set out under sec-
tion 1201 of Title 30 and Tables.
The Mining Law of 1872, referred to in subsec.
(a)(3)(B), is act May 10, 1872, ch. 152, 17 Stat. 91, which
was incorporated into the Revised Statutes of 1878 as
R.S. §§ 2319 to 2328, 2331, 2333 to 2337, and 2344, which are
classified to sections 22 to 24, 26 to 28, 29, 30, 33 to 35,
37, 39 to 42, and 47 of Title 30, Mineral Lands and Min-
ing. For complete classification of such Revised Stat-
utes sections to the Code, see Tables.
Statutory Notes and Related Subsidiaries
WAGE RATE REQUIREMENTS
For provisions relating to rates of wages to be paid to
laborers and mechanics on projects for construction,
alteration, or repair work funded under div. D or an
amendment by div. D of Pub. L. 117–58, including au-
thority of Secretary of Labor, see section 18851 of this
title.
SUBCHAPTER IV—ENERGY INFORMATION
ADMINISTRATION
§ 18771. Definitions
In this subchapter:
(1) Administrator
The term ‘‘Administrator’’ means the Ad-
ministrator of the Energy Information Admin-
istration.
(2) Annual Critical Minerals Outlook
The term ‘‘Annual Critical Minerals Out-
look’’ means the Annual Critical Minerals
Outlook prepared under section 1606(j)(1)(B) of
title 30.
(3) Critical mineral
The term ‘‘critical mineral’’ has the mean-
ing given the term in section 1606(a) of title 30.
(4) Household energy burden
The term ‘‘household energy burden’’ means
the quotient obtained by dividing—
(A) the residential energy expenditures (as
defined in section 440.3 of title 10, Code of
Federal Regulations (as in effect on Novem-
ber 15, 2021)) of the applicable household; by
(B) the annual income of that household.
(5) Household with a high energy burden
The term ‘‘household with a high energy
burden’’ has the meaning given the term in
section 440.3 of title 10, Code of Federal Regu-
lations (as in effect on November 15, 2021).
(6) Large manufacturing facility
The term ‘‘large manufacturing facility’’
means a manufacturing facility that—
(A) annually consumes more than 35,000
megawatt-hours of electricity; or
(B) has a peak power demand of more than
10 megawatts.
(7) Load-serving entity
The term ‘‘load-serving entity’’ has the
meaning given the term in section 824q(a) of
title 16.
(8) Miscellaneous electric load
The term ‘‘miscellaneous electric load’’
means electricity that—
(A) is used by an appliance or device—
(i) within a building; or
(ii) to serve a building; and
(B) is not used for heating, ventilation, air
conditioning, lighting, water heating, or re-
frigeration.
(9) Regional Transmission Organization
The term ‘‘Regional Transmission Organiza-
tion’’ has the meaning given the term in sec-
tion 796 of title 16.
(10) Rural area
The term ‘‘rural area’’ has the meaning
given the term in section 918c(a) of title 7.
(Pub. L. 117–58, div. D, title IV, § 40411, Nov. 15,
2021, 135 Stat. 1038.)
Page 9229
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 18772
Statutory Notes and Related Subsidiaries
WAGE RATE REQUIREMENTS
For provisions relating to rates of wages to be paid to
laborers and mechanics on projects for construction,
alteration, or repair work funded under div. D or an
amendment by div. D of Pub. L. 117–58, including au-
thority of Secretary of Labor, see section 18851 of this
title.
§ 18772. Data collection in the electricity sector
(a) Dashboard
(1) Establishment
(A) In general
Not later than 90 days after November 15,
2021, the Administrator shall establish an
online database to track the operation of the
bulk power system in the contiguous 48
States (referred to in this section as the
‘‘Dashboard’’).
(B) Improvement of existing dashboard
The Dashboard may be established through
the improvement, in accordance with this
subsection, of an existing dashboard of the
Energy Information Administration, such
as—
(i) the U.S. Electric System Operating
Data dashboard; or
(ii) the Hourly Electric Grid Monitor.
(2) Expansion
(A) In general
Not later than 1 year after November 15,
2021, the Administrator shall expand the
Dashboard to include, to the maximum ex-
tent practicable, hourly operating data col-
lected from the electricity balancing au-
thorities that operate the bulk power system
in all of the several States, each territory of
the United States, and the District of Co-
lumbia.
(B) Types of data
The hourly operating data collected under
subparagraph (A) may include data relating
to—
(i) total electricity demand;
(ii) electricity demand by subregion;
(iii) short-term electricity demand fore-
casts;
(iv) total electricity generation;
(v) net electricity generation by fuel
type, including renewables;
(vi) electricity stored and discharged;
(vii) total net electricity interchange;
(viii) electricity interchange with di-
rectly interconnected balancing authori-
ties; and
(ix) where available, the estimated mar-
ginal greenhouse gas emissions per mega-
watt hour of electricity generated—
(I) within the metered boundaries of
each balancing authority; and
(II) for each pricing node.
(b) Mix of energy sources
(1) In general
Not later than 1 year after November 15,
2021, the Administrator shall establish, in ac-
cordance with section 18777 of this title and
this subsection and to the extent the Adminis-
trator determines to be appropriate, a system
to harmonize the operating data on electricity
generation collected under subsection (a)
with—
(A) measurements of greenhouse gas and
other pollutant emissions collected by the
Environmental Protection Agency;
(B) other data collected by the Environ-
mental Protection Agency or other relevant
Federal agencies, as the Administrator de-
termines to be appropriate; and
(C) data collected by State or regional en-
ergy credit registries.
(2) Outcomes
The system established under paragraph (1)
shall result in an integrated dataset that in-
cludes, for any given time—
(A) the net generation of electricity by
megawatt hour within the metered bound-
aries of each balancing authority; and
(B) where available, the average and mar-
ginal greenhouse gas emissions by megawatt
hour of electricity generated within the me-
tered boundaries of each balancing author-
ity.
(3) Real-time data dissemination
To the maximum extent practicable, the
system established under paragraph (1) shall
disseminate data—
(A) on a real-time basis; and
(B) through an application programming
interface that is publicly accessible.
(4) Complementary efforts
The system established under paragraph (1)
shall complement any existing data dissemi-
nation efforts of the Administrator that make
use of electricity generation data, such as
electricity demand by subregion and elec-
tricity
interchange
with
directly
inter-
connected balancing authorities.
(c) Observed characteristics of bulk power sys-
tem resource integration
(1) In general
Not later than 1 year after November 15,
2021, the Administrator shall establish a sys-
tem to provide to the public timely data on
the integration of energy resources into the
bulk power system and the electric distribu-
tion grids in the United States, and the ob-
served effects of that integration.
(2) Requirements
In carrying out paragraph (1), the Adminis-
trator shall seek to improve the temporal and
spatial resolution of data relating to how grid
operations are changing, such as through—
(A) thermal generator cycling to accom-
modate intermittent generation;
(B) generation unit self-scheduling prac-
tices;
(C) renewable source curtailment;
(D) utility-scale storage;
(E) load response;
(F) aggregations of distributed energy re-
sources at the distribution system level;
(G) power interchange between directly
connected balancing authorities;
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definitions** In this section:
(1) **Clean energy project** — The term “clean energy project” means a project that demonstrates 1 or more of the following technologies:
(A) Solar.
(B) Micro-grids.
(C) Geothermal.
(D) Direct air capture.
(E) Fossil-fueled electricity generation with carbon capture, utilization, and sequestration.
(F) Energy storage, including pumped storage hydropower and compressed air storage.
(G) Advanced nuclear technologies.
(2) **Economically distressed area** — The term “economically distressed area” means an area described in [section 3161(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section3161/a&num=0&edition=prelim).
(3) **Mine land** — The term “mine land” means—
(A) land subject to titles IV and V of the Surface Mining Control and Reclamation Act of 1977 ([30 U.S.C. 1231](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1231&num=0&edition=prelim) et seq.; [30 U.S.C. 1251](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1251&num=0&edition=prelim) et seq.); and
(B) land that has been claimed or patented subject to sections 2319 through 2344 of the Revised Statutes (commonly known as the “Mining Law of 1872”) ([30 U.S.C. 22](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section22&num=0&edition=prelim) et seq.).
(4) **Program** — The term “program” means the demonstration program established under subsection (b).
**(b) Establishment** The Secretary shall establish a program to demonstrate the technical and economic viability of carrying out clean energy projects on current and former mine land.
**(c) Selection of demonstration projects**
(1) **In general** — In carrying out the program, t
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 18771
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.