Arkansas Legal Resource Navigator

23 U.S.C. § 322 — Magnetic levitation transportation tech-

Federal law — U.S. Code and appendices · legal_authorities

23 U.S.C. § 322 — Magnetic levitation transportation tech-

Page 358 TITLE 23—HIGHWAYS § 321 Statutory Notes and Related Subsidiaries APPROPRIATION OUT OF HIGHWAY TRUST FUND OF SUMS APPROPRIATED UNDER AUTHORITY OF INCREASED AU- THORIZATION Pub. L. 95–599, title I, § 128(b), Nov. 6, 1978, 92 Stat. 2707, provided that: ‘‘Sums appropriated or expended under authority of the increased authorization estab- lished by the amendment made by subsection (a) of this section [amending subsec. (d) of this section] shall be appropriated out of the Highway Trust Fund for the fis- cal year ending September 30, 1978, and for subsequent fiscal years.’’ APPROPRIATION OF INCREASED AUTHORIZATION Pub. L. 94–280, title I, § 137(b), May 5, 1976, 90 Stat. 443, provided that: ‘‘Sums appropriated or expended under authority of the increased authorization established by the amendment made by subsection (a) of this section [to subsec. (d) of this section] shall be appropriated out of the Highway Trust Fund for the fiscal year ending September 30, 1977, and for subsequent fiscal years.’’ RESTRICTION ON INCREASED AUTHORIZATION OF APPROPRIATIONS Pub. L. 93–643, § 123(b), Jan. 4, 1975, 88 Stat. 2290, pro- vided that: ‘‘All sums appropriated under authority of the increased authorization established by the amend- ment made by subsection (a) of this section shall be available for expenditure in the same manner and for the same purpose as provided for in subsection (b) of section 116 of the Federal-Aid Highway Act of 1970 (Public Law 91–605).’’ Pub. L. 93–87, title I, § 128(b), Aug. 13, 1973, 87 Stat. 265, provided that: ‘‘All sums appropriated under authority of the increased authorization of $8,500,000 established by the amendment made by subsection (a) of this sec- tion [to subsec. (d) of this section] shall be available for expenditur

Source: Supplied 2024 U.S. Code historical extraction · 23 U.S.C. § 322

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 3efe6a870b85c17af8c8aac4a4eeae82651bfaee153f3531f1a45453f2ee2c1b. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-a76bc633c6a9a9422857d40f
Source file: Laws/federal/codes/united-states-code-2024/title-23/section-322-magnetic-levitation-transportation-tech--b24cb988cb.md
Pages: Not recorded – Not recorded
Passage SHA-256: 9f7e56f2ee6c61ac606256e17d606fc3477de59029763f35d09853e9b87c0ad7

Source location: USCODE-2024-title23-chap3-sec322.pdf

Stored source content

Page 358 TITLE 23—HIGHWAYS § 321 Statutory Notes and Related Subsidiaries APPROPRIATION OUT OF HIGHWAY TRUST FUND OF SUMS APPROPRIATED UNDER AUTHORITY OF INCREASED AU- THORIZATION Pub. L. 95–599, title I, § 128(b), Nov. 6, 1978, 92 Stat. 2707, provided that: ‘‘Sums appropriated or expended under authority of the increased authorization estab- lished by the amendment made by subsection (a) of this section [amending subsec. (d) of this section] shall be appropriated out of the Highway Trust Fund for the fis- cal year ending September 30, 1978, and for subsequent fiscal years.’’ APPROPRIATION OF INCREASED AUTHORIZATION Pub. L. 94–280, title I, § 137(b), May 5, 1976, 90 Stat. 443, provided that: ‘‘Sums appropriated or expended under authority of the increased authorization established by the amendment made by subsection (a) of this section [to subsec. (d) of this section] shall be appropriated out of the Highway Trust Fund for the fiscal year ending September 30, 1977, and for subsequent fiscal years.’’ RESTRICTION ON INCREASED AUTHORIZATION OF APPROPRIATIONS Pub. L. 93–643, § 123(b), Jan. 4, 1975, 88 Stat. 2290, pro- vided that: ‘‘All sums appropriated under authority of the increased authorization established by the amend- ment made by subsection (a) of this section shall be available for expenditure in the same manner and for the same purpose as provided for in subsection (b) of section 116 of the Federal-Aid Highway Act of 1970 (Public Law 91–605).’’ Pub. L. 93–87, title I, § 128(b), Aug. 13, 1973, 87 Stat. 265, provided that: ‘‘All sums appropriated under authority of the increased authorization of $8,500,000 established by the amendment made by subsection (a) of this sec- tion [to subsec. (d) of this section] shall be available for expenditure only in connection with the construction of a bridge across lock and dam numbered 13 on the Ar- kansas River near Fort Smith, Arkansas, in the amount of $2,100,000 and in connection with reconstruc- tion of a bridge across the Chickamauga Dam on the Tennessee River near Chattanooga, Tennessee, in the amount of $6,400,000. No such sums shall be appro- priated until all applicable requirements of section 320 of title 23 of the United States Code have been complied with by the appropriate Federal agency, the Secretary of Transportation, and the State of Arkansas for the Fort Smith project, and the State of Tennessee for the Chattanooga project.’’ Pub. L. 91–605, title I, § 116(b), Dec. 31, 1970, 84 Stat. 1724, provided that: ‘‘All sums appropriated under au- thority of the increased authorization of $3,761,000 es- tablished by the amendment made by subsection (a) of this section [amending subsec. (d) of this section] shall be available for expenditure only in connection with the construction of a bridge across Markland Dam on the Ohio River near Markland, Indiana, and Warsaw, Kentucky. No such sums shall be appropriated until all applicable requirements of section 320 of title 23 of the United States Code have been complied with by the ap- propriate Federal agency, the Secretary of Transpor- tation, and the States of Kentucky and Indiana.’’ § 321. Signs identifying funding sources If a State has a practice of erecting on projects under actual construction without Fed- eral-aid highway assistance signs which indicate the source or sources of any funds used to carry out such projects, such State shall erect on all projects under actual construction with any funds made available out of the Highway Trust Fund (other than the Mass Transit Account) signs which are visible to highway users and which indicate each governmental source of funds being used to carry out such federally as- sisted projects and the amount of funds being made available by each such source. (Added Pub. L. 109–59, title I, § 1901(a), Aug. 10, 2005, 119 Stat. 1464.) Editorial Notes CODIFICATION Section, as added by Pub. L. 109–59, consists of text of Pub. L. 100–17, title I, § 154, Apr. 2, 1987, 101 Stat. 209, which was formerly set out as a note under section 101 of this title, and was repealed by Pub. L. 109–59, title I, § 1901(c), Aug. 10, 2005, 119 Stat. 1464. PRIOR PROVISIONS A prior section 321, added Pub. L. 91–605, title I, § 115(a), Dec. 31, 1970, 84 Stat. 1723; amended Pub. L. 96–106, § 11, Nov. 9, 1979, 93 Stat. 798; Pub. L. 100–17, title I, § 131, Apr. 2, 1987, 101 Stat. 170; Pub. L. 102–240, title VI, § 6002, Dec. 18, 1991, 105 Stat. 2166; Pub. L. 105–130, § 5(e)(3), Dec. 1, 1997, 111 Stat. 2557, related to National Highway Institute, prior to repeal by Pub. L. 105–178, title V, § 5119(b), June 9, 1998, 112 Stat. 452. § 322. Magnetic levitation transportation tech- nology deployment program (a) DEFINITIONS.—In this section, the following definitions apply: (1) ELIGIBLE PROJECT COSTS.—The term ‘‘eli- gible project costs’’— (A) means the capital cost of the fixed guideway infrastructure of a MAGLEV project, including land, piers, guideways, propulsion equipment and other components attached to guideways, power distribution facilities (including substations), control and communications facilities, access roads, and storage, repair, and maintenance facili- ties, but not including costs incurred for a new station; and (B) includes the costs of preconstruction planning activities. (2) FULL PROJECT COSTS.—The term ‘‘full project costs’’ means the total capital costs of a MAGLEV project, including eligible project costs and the costs of stations, vehicles, and equipment. (3) MAGLEV.—The term ‘‘MAGLEV’’ means transportation systems employing magnetic levitation that would be capable of safe use by the public at a speed in excess of 240 miles per hour. (4) PARTNERSHIP POTENTIAL.—The term ‘‘partnership potential’’ has the meaning given the term in the commercial feasibility study of high-speed ground transportation conducted under section 1036 of the Intermodal Surface Transportation Efficiency Act of 1991 (105 Stat. 1978). (b) FINANCIAL ASSISTANCE.— (1) IN GENERAL.—The Secretary shall make available financial assistance to pay the Fed- eral share of full project costs of eligible projects selected under this section. Financial assistance made available under this section and projects assisted with the assistance shall be subject to section 5333(a) of title 49, United States Code. (2) FEDERAL SHARE.—The Federal share of full project costs under paragraph (1) shall be not more than 2⁄3. Page 359 TITLE 23—HIGHWAYS § 322 (3) USE OF ASSISTANCE.—Financial assistance provided under paragraph (1) shall be used only to pay eligible project costs of projects selected under this section. (c) SOLICITATION OF APPLICATIONS FOR ASSIST- ANCE.—Not later than 180 days after the date of enactment of this subsection, the Secretary shall solicit applications from States, or au- thorities designated by 1 or more States, for fi- nancial assistance authorized by subsection (b) for planning, design, and construction of eligible MAGLEV projects. (d) PROJECT ELIGIBILITY.—To be eligible to re- ceive financial assistance under subsection (b), a project shall— (1) involve a segment or segments of a high- speed ground transportation corridor that ex- hibit partnership potential; (2) require an amount of Federal funds for project financing that will not exceed the sum of— (A) the amounts made available under sub- section (h)(1); and (B) the amounts made available by States under subsection (h)(3); (3) result in an operating transportation fa- cility that provides a revenue producing serv- ice; (4) be undertaken through a public and pri- vate partnership, with at least 1⁄3 of full project costs paid using non-Federal funds; (5) satisfy applicable statewide and metro- politan planning requirements; (6) be approved by the Secretary based on an application submitted to the Secretary by a State or authority designated by 1 or more States; (7) to the extent that non-United States MAGLEV technology is used within the United States, be carried out as a technology transfer project; and (8) be carried out using materials at least 70 percent of which are manufactured in the United States. (e) PROJECT SELECTION CRITERIA.—Prior to so- liciting applications, the Secretary shall estab- lish criteria for selecting which eligible projects under subsection (d) will receive financial as- sistance under subsection (b). The criteria shall include the extent to which— (1) a project is nationally significant, includ- ing the extent to which the project will dem- onstrate the feasibility of deployment of MAGLEV technology throughout the United States; (2) timely implementation of the project will reduce congestion in other modes of transpor- tation and reduce the need for additional high- way or airport construction; (3) States, regions, and localities financially contribute to the project; (4) implementation of the project will create new jobs in traditional and emerging indus- tries; (5) the project will augment MAGLEV net- works identified as having partnership poten- tial; (6) financial assistance would foster public and private partnerships for infrastructure de- velopment and attract private debt or equity investment; (7) financial assistance would foster the timely implementation of a project; and (8) life-cycle costs in design and engineering are considered and enhanced. (f) PROJECT SELECTION.— (1) PRECONSTRUCTION PLANNING ACTIVITIES.— Not later than 90 days after a deadline estab- lished by the Secretary for the receipt of ap- plications, the Secretary shall evaluate the el- igible projects in accordance with the selec- tion criteria and select 1 or more eligible projects to receive financial assistance for preconstruction planning activities, includ- ing— (A) preparation of such feasibility studies, major investment studies, and environ- mental impact statements and assessments as are required under State law; (B) pricing of the final design, engineering, and construction activities proposed to be assisted under paragraph (2); and (C) such other activities as are necessary to provide the Secretary with sufficient in- formation to evaluate whether a project should receive financial assistance for final design, engineering, and construction activi- ties under paragraph (2). (2) FINAL DESIGN, ENGINEERING, AND CON- STRUCTION ACTIVITIES.—After completion of preconstruction planning activities for all projects assisted under paragraph (1), the Sec- retary shall select 1 of the projects to receive financial assistance for final design, engineer- ing, and construction activities. (g) JOINT VENTURES.—A project undertaken by a joint venture of United States and non-United States persons (including a project involving the deployment of non-United States MAGLEV technology in the United States) shall be eligi- ble for financial assistance under this section if the project is eligible under subsection (d) and selected under subsection (f). (h) FUNDING.— (1) IN GENERAL.— (A) CONTRACT AUTHORITY; AUTHORIZATION OF APPROPRIATIONS.— (i) IN GENERAL.—There is authorized to be appropriated from the Highway Trust Fund (other than the Mass Transit Ac- count) to carry out this section $15,000,000 for fiscal year 1999, $20,000,000 for fiscal year 2000, and $25,000,000 for fiscal year 2001. (ii) CONTRACT AUTHORITY.—Funds author- ized by this subparagraph shall be avail- able for obligation in the same manner as if the funds were apportioned under chap- ter 1, except that— (I) the Federal share of the cost of a project carried out under this section shall be determined in accordance with subsection (b); and (II) the availability of the funds shall be determined in accordance with para- graph (2). (B) NONCONTRACT AUTHORITY AUTHORIZA- TION OF APPROPRIATIONS.— (i) IN GENERAL.—There are authorized to be appropriated from the Highway Trust Page 360 TITLE 23—HIGHWAYS § 322 Fund (other than the Mass Transit Ac- count) to carry out this section (other than subsection (i)) $200,000,000 for each of fiscal years 2000 and 2001, $250,000,000 for fiscal year 2002, and $300,000,000 for fiscal year 2003. (ii) AVAILABILITY.—Notwithstanding sec- tion 118(a), funds made available under clause (i) shall not be available in advance of an annual appropriation. (2) AVAILABILITY OF FUNDS.—Funds made available under paragraph (1) shall remain available until expended. (3) OTHER FEDERAL FUNDS.—Notwithstanding any other provision of law, funds made avail- able to a State to carry out the surface trans- portation block grant program under section 133 and the congestion mitigation and air quality improvement program under section 149 may be used by the State to pay a portion of the full project costs of an eligible project selected under this section, without require- ment for non-Federal funds. (4) OTHER ASSISTANCE.—Notwithstanding any other provision of law, an eligible project se- lected under this section shall be eligible for other forms of financial assistance provided under this title and the Transportation Equity Act for the 21st Century, including loans, loan guarantees, and lines of credit. (i) LOW-SPEED PROJECT.— (1) IN GENERAL.—Notwithstanding any other provision of this section, of the funds made available by subsection (h)(1)(A) to carry out this section, $5,000,000 shall be made available to the Secretary to make grants for the re- search and development of low-speed super- conductivity magnetic levitation technology for public transportation purposes in urban areas to demonstrate energy efficiency, con- gestion mitigation, and safety benefits. (2) NONCONTRACT AUTHORITY AUTHORIZATION OF APPROPRIATIONS.— (A) IN GENERAL.—There are authorized to be appropriated from the Highway Trust Fund (other than the Mass Transit Account) to carry out this subsection such sums as are necessary for each of fiscal years 2000 through 2003. (B) AVAILABILITY.—Notwithstanding sec- tion 118(a), funds made available under sub- paragraph (A)— (i) shall not be available in advance of an annual appropriation; and (ii) shall remain available until ex- pended. (Added and amended Pub. L. 105–178, title I, § 1218(a), (c), June 9, 1998, 112 Stat. 216; Pub. L. 105–206, title IX, § 9003(i), July 22, 1998, 112 Stat. 841; Pub. L. 114–94, div. A, title I, § 1109(c)(3), Dec. 4, 2015, 129 Stat. 1343.) Editorial Notes REFERENCES IN TEXT Section 1036 of the Intermodal Surface Transpor- tation Efficiency Act of 1991, referred to in subsec. (a)(4), is section 1036 of Pub. L. 102–240, title I, Dec. 18, 1991, 105 Stat. 1978, which enacted section 309 of Title 49, Transportation, amended section 831 of Title 45, Railroads, and section 302 of Title 49, and enacted pro- visions set out as notes under section 831 of Title 45 and section 309 of Title 49. The date of enactment of this subsection, referred to in subsec. (c), is the date of enactment of Pub. L. 105–178, which was approved June 9, 1998. The Transportation Equity Act for the 21st Century, referred to in subsec. (h)(4), is Pub. L. 105–178, June 9, 1998, 112 Stat. 107. For complete classification of this Act to the Code, see section 1(a) of Pub. L. 105–178, set out as a Short Title of 1998 Amendment note under sec- tion 101 of this title and Tables. PRIOR PROVISIONS A prior section 322, added Pub. L. 91–605, title II, § 205(a), Dec. 31, 1970, 84 Stat. 1742; amended Pub. L. 93–643, § 117, Jan. 4, 1975, 88 Stat. 2288; Pub. L. 97–449, § 5(d)(3), Jan. 12, 1983, 96 Stat. 2442, related to dem- onstration projects for elimination or protection of cer- tain ground-level rail-highway crossings and required study of problem of providing increased highway safety at public and private ground-level rail-highway cross- ings on nationwide basis through elimination of such crossings or otherwise, and report to Congress on such study not later than July 1, 1972, prior to repeal by Pub. L. 100–17, title I, § 133(e)(1), Apr. 2, 1987, 101 Stat. 173. AMENDMENTS 2015—Subsec. (h)(3). Pub. L. 114–94 substituted ‘‘sur- face transportation block grant program’’ for ‘‘surface transportation program’’. 1998—Subsec. (a)(3). Pub. L. 105–178, § 1218(c)(1), as added by Pub. L. 105–206, § 9003(i), struck out ‘‘or under 50 miles per hour’’ before period at end. Subsec. (d)(1). Pub. L. 105–178, § 1218(c)(2)(A), as added by Pub. L. 105–206, § 9003(i), struck out ‘‘or low-speed’’ after ‘‘high-speed’’. Subsec. (d)(2)(A). Pub. L. 105–178, § 1218(c)(2)(B)(i), as added by Pub. L. 105–206, § 9003(i), substituted ‘‘(h)(1)’’ for ‘‘(h)(1)(A)’’. Subsec. (d)(2)(B). Pub. L. 105–178, § 1218(c)(2)(B)(ii), as added by Pub. L. 105–206, § 9003(i), substituted ‘‘(h)(3)’’ for ‘‘(h)(4)’’. Subsec. (h)(1)(B)(i). Pub. L. 105–178, § 1218(c)(3), as added by Pub. L. 105–206, § 9003(i), inserted ‘‘(other than subsection (i))’’ after ‘‘this section’’. Subsec. (i). Pub. L. 105–178, § 1218(c)(4), as added by Pub. L. 105–206, § 9003(i), added subsec. (i). Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 2015 AMENDMENT Amendment by Pub. L. 114–94 effective Oct. 1, 2015, see section 1003 of Pub. L. 114–94, set out as a note under section 5313 of Title 5, Government Organization and Employees. EFFECTIVE DATE OF 1998 AMENDMENT Title IX of Pub. L. 105–206 effective simultaneously with enactment of Pub. L. 105–178 and to be treated as included in Pub. L. 105–178 at time of enactment, and provisions of Pub. L. 105–178, as in effect on day before July 22, 1998, that are amended by title IX of Pub. L. 105–206 to be treated as not enacted, see section 9016 of Pub. L. 105–206, set out as a note under section 101 of this title. DEPLOYMENT OF MAGNETIC LEVITATION TRANSPORTATION PROJECTS Pub. L. 114–94, div. A, title XI, § 11315(c), Dec. 4, 2015, 129 Stat. 1675, as amended by Pub. L. 117–58, div. B, title I, § 21301(j)(2), Nov. 15, 2021, 135 Stat. 691, provided that: ‘‘A project described in 1307(a)(3) of SAFETEA–LU (Public Law 109–59) [set out below] may be eligible for the Railroad Rehabilitation and Improvement Financ- ing program if the Secretary [of Transportation] deter- mines such project meets the requirements of sections 22402 and 22403 of title 49, United States Code.’’ Page 361 TITLE 23—HIGHWAYS § 323 Pub. L. 109–59, title I, § 1307, Aug. 10, 2005, 119 Stat. 1217, as amended by Pub. L. 110–244, title I, § 102(b), (c), June 6, 2008, 122 Stat. 1577, provided that: ‘‘(a) DEFINITIONS.—In this section, the following defi- nitions apply: ‘‘(1) ELIGIBLE PROJECT COSTS.—The term ‘eligible project costs’— ‘‘(A) means the capital cost of the fixed guideway infrastructure of a MAGLEV project, including land, piers, guideways, propulsion equipment and other components attached to guideways, power distribution facilities (including substations), con- trol and communications facilities, access roads, and storage, repair, and maintenance facilities, but not including costs incurred for a new station; and ‘‘(B) includes the costs of preconstruction plan- ning activities. ‘‘(2) FULL PROJECT COSTS.—The term ‘full project costs’ means the total capital costs of a MAGLEV project, including eligible project costs and the costs of stations, vehicles, and equipment. ‘‘(3) MAGLEV.—The term ‘MAGLEV’ means trans- portation systems employing magnetic levitation that would be capable of safe use by the public at a speed in excess of 240 miles per hour. ‘‘(4) STATE.—The term ‘State’ has the meaning such term has under section 101(a) of title 23, United States Code. ‘‘(b) IN GENERAL.— ‘‘(1) ASSISTANCE FOR ELIGIBLE PROJECTS.—The Sec- retary [of Transportation] shall make available fi- nancial assistance to pay the Federal share of full project costs of eligible projects authorized by this section. ‘‘(2) USE OF ASSISTANCE.—Financial assistance pro- vided under paragraph (1) shall be used only to pay el- igible project costs of projects authorized by this sec- tion. ‘‘(3) APPLICABILITY OF OTHER LAWS.—Financial as- sistance made available under this section, and projects assisted with such assistance, shall be sub- ject to section 5333(a) of title 49, United States Code. ‘‘(c) PROJECT ELIGIBILITY.—To be eligible to receive financial assistance under subsection (b), a project shall— ‘‘(1) involve a segment or segments of a high-speed ground transportation corridor; ‘‘(2) result in an operating transportation facility that provides a revenue producing service; and ‘‘(3) be approved by the Secretary [of Transpor- tation] based on an application submitted to the Sec- retary by a State or authority designated by one or more States. ‘‘(d) ALLOCATION.—Of the amounts made available to carry out this section for a fiscal year, the Secretary [of Transportation] shall allocate— ‘‘(1) 50 percent to the Nevada department of trans- portation who shall cooperate with the California-Ne- vada Super Speed Train Commission for the MAGLEV project between Las Vegas and Primm, Ne- vada, as a segment of the high-speed MAGLEV sys- tem between Las Vegas, Nevada, and Anaheim, Cali- fornia; and ‘‘(2) 50 percent for existing MAGLEV projects lo- cated east of the Mississippi River using such criteria as the Secretary deems appropriate. ‘‘(e) CONTRACT AUTHORITY.—Funds authorized under section 1101(a)(18) [119 Stat. 1155] shall be available for obligation in the same manner as if the funds were ap- portioned under chapter 1 of title 23, United States Code; except that the funds shall not be transferable and shall remain available until expended, and the Fed- eral share of the cost of a project to be carried out with such funds shall be 80 percent.’’ [Pub. L. 110–244, title I, § 102(d), June 6, 2008, 122 Stat. 1578, provided that: ‘‘The amendments made by this section [amending section 1307 of Pub. L. 109–59, set out above] take effect on October 1, 2007.’’] ADVANCED TECHNOLOGY PILOT PROJECT Pub. L. 105–178, title III, § 3015(c), June 9, 1998, 112 Stat. 361, as amended by Pub. L. 105–206, title IX, § 9009(k)(1), July 22, 1998, 112 Stat. 857; Pub. L. 108–88, § 8(q), Sept. 30, 2003, 117 Stat. 1125; Pub. L. 108–202, § 9(q), Feb. 29, 2004, 118 Stat. 489; Pub. L. 108–224, § 7(q), Apr. 30, 2004, 118 Stat. 637; Pub. L. 108–263, § 7(q), June 30, 2004, 118 Stat. 708; Pub. L. 108–280, § 7(q), July 30, 2004, 118 Stat. 885; Pub. L. 108–310, § 8(q), Sept. 30, 2004, 118 Stat. 1158; Pub. L. 109–14, § 7(p), May 31, 2005, 119 Stat. 334; Pub. L. 109–20, § 7(p), July 1, 2005, 119 Stat. 356; Pub. L. 109–35, § 7(p), July 20, 2005, 119 Stat. 389; Pub. L. 109–37, § 7(p), July 22, 2005, 119 Stat. 404; Pub. L. 109–40, § 7(p), July 28, 2005, 119 Stat. 420, provided that: ‘‘(1) IN GENERAL.—The Secretary shall make grants for the development of low speed magnetic levitation technology for public transportation purposes in urban areas to demonstrate energy efficiency, congestion mitigation, and safety benefits. ‘‘(2) FUNDING.—Of the amounts made available under section 5001(a)(2) of this Act [112 Stat. 419] for each of fiscal years 1998 through 2004, and for the period of Oc- tober 1, 2004, through July 30, 2005,, [sic] $5,000,000 per fiscal year and $4,150,685 for such period shall be avail- able to carry out this subsection. Financial assistance made available under this subsection and projects as- sisted with the assistance shall be subject to section 5333(a) of title 49, United States Code. ‘‘(3) FEDERAL SHARE.—The Federal share payable on account of activities carried out using a grant made under this subsection shall be 80 percent of the cost of such activities.’’ [Pub. L. 109–35, § 7(p)(1), which directed amendment of Pub. L. 105–178, § 3015(c)(2), set out above, by sub- stituting ‘‘July 21, 2005’’ for ‘‘July 19, 2005,’’ was exe- cuted by making the substitution for ‘‘July 19, 2005’’, to reflect the probable intent of Congress.] [Pub. L. 109–20, § 7(p)(1), which directed amendment of Pub. L. 105–178, § 3015(c)(2), set out above, by sub- stituting ‘‘July 19, 2005’’ for ‘‘June 30, 2005,’’ was exe- cuted by making the substitution for ‘‘June 30, 2005’’, to reflect the probable intent of Congress.] [Pub. L. 108–280, § 7(q), which directed amendment of Pub. L. 105–178, § 3015(c)(2), set out above, by sub- stituting ‘‘2004, $5,000,000 per fiscal year’’ for ‘‘2003, and for the period of October 1, 2003, through July 31, 2004 $5,000,000 per fiscal year and $4,142,083 for such period’’, was executed by making the substitution for ‘‘2003, and for the period of October 1, 2003, through July 31, 2004, $5,000,000 per fiscal year and $4,142,083 for such period’’, to reflect the probable intent of Congress.] [Pub. L. 108–224, § 7(q)(1), which directed amendment of Pub. L. 105–178, § 3015(c)(2), set out above, by sub- stituting ‘‘June 30, 2004’’ for ‘‘April 30, 2004,’’ was exe- cuted by making the substitution for ‘‘April 30, 2004’’, to reflect the probable intent of Congress.] § 323. Donations and credits (a) DONATIONS OF PROPERTY BEING ACQUIRED.— Nothing in this title, or in any other provision of law, shall be construed to prevent a person whose real property is being acquired in connec- tion with a project under this title, after he has been fully informed of his right to receive just compensation for the acquisition of his prop- erty, from making a gift or donation of such property, or any part thereof, or of any of the compensation paid therefor, to a Federal agen- cy, a State or a State agency, or a political sub- division of a State, as said person shall deter- mine. (b) CREDIT FOR ACQUIRED LANDS.— (1) IN GENERAL.—Notwithstanding any other provision of this title, the State share of the cost of a project with respect to which Federal assistance is provided from the Highway Trust Fund (other than the Mass Transit Account) may be credited in an amount equal to the fair market value of any land that— (A) is lawfully obtained by the State or a unit of local government in the State;

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

23 U.S.C. § 322 — Magnetic levitation transportation technology deployment program

**(a) Definitions.—** In this section, the following definitions apply: (1) **Eligible project costs.—** — The term “eligible project costs”— (A) means the capital cost of the fixed guideway infrastructure of a MAGLEV project, including land, piers, guideways, propulsion equipment and other components attached to guideways, power distribution facilities (including substations), control and communications facilities, access roads, and storage, repair, and maintenance facilities, but not including costs incurred for a new station; and (B) includes the costs of preconstruction planning activities. (2) **Full project costs.—** — The term “full project costs” means the total capital costs of a MAGLEV project, including eligible project costs and the costs of stations, vehicles, and equipment. (3) **MAGLEV.—** — The term “MAGLEV” means transportation systems employing magnetic levitation that would be capable of safe use by the public at a speed in excess of 240 miles per hour. (4) **Partnership potential.—** — The term “partnership potential” has the meaning given the term in the commercial feasibility study of high-speed ground transportation conducted under section 1036 of the Intermodal Surface Transportation Efficiency Act of 1991 (105 Stat. 1978). **(b) Financial Assistance.—** (1) **In general.—** — The Secretary shall make available financial assistance to pay the Federal share of full project costs of eligible projects selected under this section. Financial assistance made available under this section and projects assisted with the assistance shall be subject to [section 5333(a) of title 49](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title49-section5333/a&num=0&edition=prelim), United States Code. (2) **Federal share.—** — The Federal s

Source: Supplied U.S. Code snapshot — release unconfirmed · 23 U.S.C. § 322

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.