14 U.S.C. § 1133 — Preliminary development and demonstra-
Federal law — U.S. Code and appendices · legal_authorities
Page 100
TITLE 14—COAST GUARD
§ 1133
tended to minimize technical, cost, and sched-
ule risk as early as practicable in the develop-
ment of the project or program.
(2) TEST
AND
EVALUATION
STRATEGY.—The
master plan shall—
(A) set forth an integrated test and evalua-
tion strategy that will verify that capa-
bility-level or asset-level and subsystem-
level design and development, including per-
formance and supportability, have been suf-
ficiently proven before the capability, asset,
or subsystem of the capability or asset is ap-
proved for production; and
(B) require that adequate developmental
tests and evaluations and operational tests
and evaluations established under subpara-
graph (A) are performed to inform produc-
tion decisions.
(3) OTHER
COMPONENTS
OF
THE
MASTER
PLAN.—At a minimum, the master plan shall
identify—
(A) the key performance parameters to be
resolved through the integrated test and
evaluation strategy;
(B) the performance data to be used to de-
termine whether the key performance pa-
rameters have been resolved;
(C) critical operational issues to be as-
sessed in addition to the key performance
parameters;
(D) the results during test and evaluation
that will be required to demonstrate that a
capability, asset, or subsystem meets per-
formance requirements;
(E) specific development test and evalua-
tion phases and the scope of each phase;
(F) modeling and simulation activities to
be performed, if any, and the scope of such
activities;
(G) early operational assessments to be
performed, if any, and the scope of such as-
sessments;
(H) operational test and evaluation phases;
(I) an estimate of the resources, including
funds, that will be required for all test, eval-
uation, assessment, modeling, and simula-
tion activities; and
Source: Supplied 2024 U.S. Code historical extraction · 14 U.S.C. § 1133
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 8f848a891ec07a00299b0d0c1457b60791ce1add269f3c7d50d4068a8ff33953. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-a4862ce8f3362589b896c3e3
Source file: Laws/federal/codes/united-states-code-2024/title-14/section-1133-preliminary-development-and-demonstra--b647f73828.md
Pages: Not recorded – Not recorded
Passage SHA-256: cd9dd00421d3ed4b1cac36349dbb61cb46873898bbaa1c4150570edfb72eb4e4
Source location: USCODE-2024-title14-subtitleI-chap11-subchapII-sec1133.pdf
Stored source content
Page 100
TITLE 14—COAST GUARD
§ 1133
tended to minimize technical, cost, and sched-
ule risk as early as practicable in the develop-
ment of the project or program.
(2) TEST
AND
EVALUATION
STRATEGY.—The
master plan shall—
(A) set forth an integrated test and evalua-
tion strategy that will verify that capa-
bility-level or asset-level and subsystem-
level design and development, including per-
formance and supportability, have been suf-
ficiently proven before the capability, asset,
or subsystem of the capability or asset is ap-
proved for production; and
(B) require that adequate developmental
tests and evaluations and operational tests
and evaluations established under subpara-
graph (A) are performed to inform produc-
tion decisions.
(3) OTHER
COMPONENTS
OF
THE
MASTER
PLAN.—At a minimum, the master plan shall
identify—
(A) the key performance parameters to be
resolved through the integrated test and
evaluation strategy;
(B) the performance data to be used to de-
termine whether the key performance pa-
rameters have been resolved;
(C) critical operational issues to be as-
sessed in addition to the key performance
parameters;
(D) the results during test and evaluation
that will be required to demonstrate that a
capability, asset, or subsystem meets per-
formance requirements;
(E) specific development test and evalua-
tion phases and the scope of each phase;
(F) modeling and simulation activities to
be performed, if any, and the scope of such
activities;
(G) early operational assessments to be
performed, if any, and the scope of such as-
sessments;
(H) operational test and evaluation phases;
(I) an estimate of the resources, including
funds, that will be required for all test, eval-
uation, assessment, modeling, and simula-
tion activities; and
(J) the Government entity or independent
entity that will perform the test, evaluation,
assessment, modeling, and simulation ac-
tivities.
(4) UPDATE.—The Chief Acquisition Officer
must approve an updated master plan when-
ever there is a revision to project or program
test and evaluation strategy, scope, or phas-
ing.
(5) LIMITATION.—The Coast Guard may not—
(A) proceed beyond that phase of the ac-
quisition process that entails approving the
supporting acquisition of a capability or
asset before the master plan is approved by
the Chief Acquisition Officer; or
(B) award any production contract for a
capability, asset, or subsystem for which a
master plan is required under this sub-
section before the master plan is approved
by the Chief Acquisition Officer.
(e) LIFE-CYCLE COST ESTIMATES.—
(1) IN GENERAL.—The Commandant shall im-
plement mechanisms to ensure the develop-
ment and regular updating of life-cycle cost
estimates for each acquisition with a total ac-
quisition cost that equals or exceeds $10,000,000
and an expected service life of 10 or more
years, and to ensure that these estimates are
considered in decisions to develop or produce
new or enhanced capabilities and assets.
(2) TYPES OF ESTIMATES.—For each Level 1 or
Level 2 acquisition project or program, in ad-
dition to life-cycle cost estimates developed
under paragraph (1), the Commandant shall re-
quire that—
(A) life-cycle cost estimates developed
under paragraph (1) be updated before—
(i) each milestone decision is concluded;
and
(ii) the project or program enters a new
acquisition phase; and
(B) an independent cost estimate or inde-
pendent cost assessment, as appropriate, be
developed to validate life-cycle cost esti-
mates developed under paragraph (1).
(Added Pub. L. 111–281, title IV, § 402(a), Oct. 15,
2010, 124 Stat. 2942, § 572; amended Pub. L.
114–120, title II, § 204(a), Feb. 8, 2016, 130 Stat. 34;
renumbered § 1132, Pub. L. 115–282, title I, § 108(b),
Dec. 4, 2018, 132 Stat. 4208; Pub. L. 117–263, div. K,
title CXII, § 11210, Dec. 23, 2022, 136 Stat. 4012.)
Editorial Notes
AMENDMENTS
2022—Subsec. (e)(2), (3). Pub. L. 117–263 added par. (2)
and struck out former pars. (2) and (3) which read as
follows:
‘‘(2) TYPES OF ESTIMATES.—In addition to life-cycle
cost estimates that may be developed by acquisition
program offices, the Commandant shall require that an
independent life-cycle cost estimate be developed for
each Level 1 or Level 2 acquisition project or program.
‘‘(3) REQUIRED UPDATES.—For each Level 1 or Level 2
acquisition project or program the Commandant shall
require that life-cycle cost estimates shall be updated
before each milestone decision is concluded and the
project or program enters a new acquisition phase.’’
2018—Pub. L. 115–282 renumbered section 572 of this
title as this section.
2016—Subsec. (d)(3)(B) to (J). Pub. L. 114–120 added
subpars. (B) and (D) and redesignated former subpar.
(B) as (C) and former subpars. (C) to (H) as (E) to (J),
respectively.
§ 1133. Preliminary development and demonstra-
tion
(a) IN GENERAL.—The Commandant shall en-
sure that developmental test and evaluation,
operational test and evaluation, life-cycle cost
estimates, and the development and demonstra-
tion requirements applied by this chapter to ac-
quisition projects and programs are met to con-
firm that the projects or programs meet the re-
quirements identified in the mission-analysis
and affordability assessment prepared under sec-
tion 1131(a)(2), the operational requirements de-
veloped under section 1132(a)(1) and the fol-
lowing development and demonstration objec-
tives:
(1) To demonstrate that the design, manu-
facturing, and production solution is based
upon a stable, producible, and cost-effective
product design.
(2) To ensure that the product capabilities
meet contract specifications, acceptable oper-
Page 101
TITLE 14—COAST GUARD
§ 1133
1 See References in Text note below.
ational performance requirements, and system
security requirements.
(3) To ensure that the product design is ma-
ture enough to commit to full production and
deployment.
(b) TESTS AND EVALUATIONS.—
(1) IN GENERAL.—The Commandant shall en-
sure that the Coast Guard conducts develop-
mental tests and evaluations and operational
tests and evaluations of a capability or asset
and the subsystems of the capability or asset
in accordance with the master plan prepared
for the capability or asset under section
1132(d)(1).1
(2) USE OF THIRD PARTIES.—The Commandant
shall ensure that the Coast Guard uses inde-
pendent third parties with expertise in testing
and evaluating the capabilities or assets and
the subsystems of the capabilities or assets
being acquired to conduct developmental tests
and evaluations and operational tests and
evaluations whenever the Coast Guard lacks
the capability to conduct the tests and evalua-
tions required by a master plan.
(3) COMMUNICATION
OF
SAFETY
CONCERNS.—
The Commandant shall ensure that inde-
pendent third parties and Government em-
ployees that identify safety concerns during
developmental or operational tests and eval-
uations or through independent or Govern-
ment-conducted design assessments of capa-
bilities or assets and subsystems of capabili-
ties or assets to be acquired by the Coast
Guard communicate such concerns as soon as
practicable, but not later than 30 days after
the completion of the test or assessment event
or activity that identified the safety concern,
to the program manager for the capability or
asset and the subsystems concerned and to the
Chief Acquisition Officer.
(4) REPORTING
OF
SAFETY
CONCERNS.—The
Commandant shall ensure that any safety con-
cerns that have been communicated under
paragraph (3) for an acquisition program or
project are reported to the appropriate con-
gressional committees at least 90 days before
the award of any contract or issuance of any
delivery order or task order for low, initial, or
full-rate production of the capability or asset
concerned if they will remain uncorrected or
unmitigated at the time such a contract is
awarded or delivery order or task order is
issued. The report shall include a justification
for the approval of that level of production of
the capability or asset before the safety con-
cerns are corrected or mitigated. The report
shall also include an explanation of the ac-
tions that will be taken to correct or mitigate
the safety concerns, the date by which those
actions will be taken, and the adequacy of cur-
rent funding to correct or mitigate the safety
concerns.
(5) ASSET ALREADY IN LOW, INITIAL, OR FULL-
RATE PRODUCTION.—The Commandant shall en-
sure that if an independent third party or a
Government employee identifies a safety con-
cern with a capability or asset or any sub-
systems of a capability or asset not previously
identified during operational test and evalua-
tion of a capability or asset already in low,
initial, or full-rate production—
(A) the Commandant, through the Assist-
ant Commandant for Capability, shall notify
the program manager and the Chief Acquisi-
tion Officer of the safety concern as soon as
practicable, but not later than 30 days after
the completion of the test and evaluation
event or activity that identified the safety
concern; and
(B) the Deputy Commandant for Mission
Support shall notify the Commandant and
the Deputy Commandant for Operations of
the safety concern within 50 days after the
notification required under subparagraph
(A), and include in such notification—
(i) an explanation of the actions that
will be taken to correct or mitigate the
safety concern in all capabilities or assets
and subsystems of the capabilities or as-
sets yet to be produced, and the date by
which those actions will be taken;
(ii) an explanation of the actions that
will be taken to correct or mitigate the
safety concern in previously produced ca-
pabilities or assets and subsystems of the
capabilities or assets, and the date by
which those actions will be taken; and
(iii) an assessment of the adequacy of
current funding to correct or mitigate the
safety concern in capabilities or assets and
subsystems of the capabilities or assets
and in previously produced capabilities or
assets and subsystems.
(c) TECHNICAL CERTIFICATION.—
(1) IN GENERAL.—The Commandant shall en-
sure that any Level 1 or Level 2 acquisition
project or program is certified by the tech-
nical authority of the Coast Guard after re-
view by an independent third party with capa-
bilities in the mission area, asset, or par-
ticular asset component.
(2) TEMPEST TESTING.—The Commandant
shall—
(A) cause all electronics on all aircraft,
surface, and shore capabilities and assets
that require TEMPEST certification to be
tested in accordance with TEMPEST stand-
ards and communications security (comsec)
standards by an independent third party
that is authorized by the Federal Govern-
ment to perform such testing; and
(B) certify that the assets meet all appli-
cable TEMPEST requirements.
(3) CUTTER CLASSIFICATION.—
(A) IN
GENERAL.—The Commandant shall
cause each cutter, other than a National Se-
curity Cutter, acquired by the Coast Guard
and delivered after the date of enactment of
the Coast Guard Authorization Act of 2010 to
be classed by the American Bureau of Ship-
ping before final acceptance.
[(B) Repealed. Pub. L. 112–213, title II,
§ 210(c)(2)(B), Dec. 20, 2012, 126 Stat. 1551.]
(4) OTHER VESSELS.—The Commandant shall
cause the design and construction of each Na-
tional Security Cutter, other than National
Security Cutters 1, 2, and 3, to be assessed by
an independent third party with expertise in
vessel design and construction certification.
Page 102
TITLE 14—COAST GUARD
§ 1134
(5)
AIRCRAFT
AIRWORTHINESS.—The
Com-
mandant shall cause all aircraft and aircraft
engines acquired by the Coast Guard to be as-
sessed for airworthiness by an independent
third party with expertise in aircraft and air-
craft engine certification before final accept-
ance.
(Added Pub. L. 111–281, title IV, § 402(a), Oct. 15,
2010, 124 Stat. 2944, § 573; amended Pub. L.
112–213, title II, § 210(c)(2)(B), Dec. 20, 2012, 126
Stat. 1551; Pub. L. 115–232, div. C, title XXXV,
§ 3522, Aug. 13, 2018, 132 Stat. 2314; renumbered
§ 1133 and amended Pub. L. 115–282, title I,
§§ 108(b), 123(b)(2), Dec. 4, 2018, 132 Stat. 4208,
4240.)
Editorial Notes
REFERENCES IN TEXT
Section 1132(d)(1), referred to in subsec. (b)(1), was,
prior to amendment of this section by Pub. L. 115–282,
a reference to section 572(d)(1) of this title, which was
redesignated section 572(f)(1) of this title by Pub. L.
114–120, title II, § 204(a)(1), Feb. 8, 2016, 130 Stat. 34. Sec-
tion 572 of this title was renumbered section 1132 of this
title by Pub. L. 115–282, title I, § 108(b)(2), Dec. 4, 2018,
132 Stat. 4208.
The date of enactment of the Coast Guard Authoriza-
tion Act of 2010, referred to in subsec. (c)(3)(A), is the
date of enactment of Pub. L. 111–281, which was ap-
proved Oct. 15, 2010.
AMENDMENTS
2018—Pub. L. 115–282, § 108(b), renumbered section 573
of this title as this section.
Subsec. (a). Pub. L. 115–282, § 123(b)(2), in introductory
provisions, substituted ‘‘section 1131(a)(2)’’ for ‘‘section
571(a)(2)’’
and
‘‘section
1132(a)(1)’’
for
‘‘section
572(a)(1)’’.
Subsec. (b)(1). Pub. L. 115–282, § 123(b)(2), substituted
‘‘section 1132(d)(1)’’ for ‘‘section 572(d)(1)’’.
Subsec. (b)(3). Pub. L. 115–232, § 3522(1), substituted
‘‘ensure that independent third parties and Govern-
ment employees that identify safety concerns’’ for ‘‘re-
quire that safety concerns identified’’ and ‘‘Coast
Guard communicate such concerns as’’ for ‘‘Coast
Guard shall be communicated as’’.
Subsec. (b)(4). Pub. L. 115–232, § 3522(2), substituted
‘‘The Commandant shall ensure that any safety con-
cerns that have been communicated under paragraph
(3) for an acquisition program or project are reported’’
for ‘‘Any safety concerns that have been reported to
the Chief Acquisition Officer for an acquisition pro-
gram or project shall be reported by the Commandant’’.
Subsec. (b)(5). Pub. L. 115–232, § 3522(3)(A), added in-
troductory provisions and struck out former introduc-
tory provisions which read as follows: ‘‘If operational
test and evaluation of a capability or asset already in
low, initial, or full-rate production identifies a safety
concern with the capability or asset or any subsystems
of the capability or asset not previously identified dur-
ing developmental or operational test and evaluation,
the Commandant shall—’’.
Subsec. (b)(5)(A). Pub. L. 115–232, § 3522(3)(B), inserted
‘‘the Commandant, through the Assistant Commandant
for Capability, shall’’ before ‘‘notify’’.
Subsec. (b)(5)(B). Pub. L. 115–232, § 3522(3)(C), sub-
stituted ‘‘the Deputy Commandant for Mission Support
shall notify the Commandant and the Deputy Com-
mandant for Operations of the safety concern within 50
days after the notification required under subparagraph
(A), and include in such notification’’ for ‘‘notify the
Chief Acquisition Officer and include in such notifica-
tion’’ in introductory provisions.
Subsec. (c)(2)(A). Pub. L. 115–232, § 3522(4)(A), struck
out ‘‘and that are delivered after the date of enactment
of the Coast Guard Authorization Act of 2010’’ after
‘‘TEMPEST certification’’.
Subsec. (c)(5). Pub. L. 115–232, § 3522(4)(B), struck out
‘‘and delivered after the date of enactment of the Coast
Guard Authorization Act of 2010’’ after ‘‘acquired by
the Coast Guard’’.
2012—Subsec. (c)(3)(B). Pub. L. 112–213 struck out sub-
par. (B). Text read as follows: ‘‘Not later than Decem-
ber 31, 2011, and biennially thereafter, the Commandant
shall provide a report to the Committee on Transpor-
tation and Infrastructure of the House of Representa-
tives and the Committee on Commerce, Science, and
Transportation of the Senate identifying which, if any,
Coast Guard cutters that have been issued a certificate
of classification by the American Bureau of Shipping
have not been maintained in class and detailing the
reasons why they have not been maintained in class.’’
Statutory Notes and Related Subsidiaries
NATIONAL SECURITY CUTTERS
Pub. L. 115–282, title III, § 311(f), Dec. 4, 2018, 132 Stat.
4249, provided that: ‘‘The Secretary of the department
in which the Coast Guard is operating is authorized to
enter into a multiyear contract for the procurement of
a tenth, eleventh, and twelfth National Security Cutter
and associated government-furnished equipment.’’
Pub. L. 115–282, title VIII, § 818(a), Dec. 4, 2018, 132
Stat. 4307, provided that: ‘‘The Commandant of the
Coast Guard may not certify an eighth National Secu-
rity Cutter as Ready for Operations before the date on
which the Commandant provides to the Committee on
Transportation and Infrastructure of the House of Rep-
resentatives and the Committee on Commerce, Science,
and Transportation of the Senate—
‘‘(1) a notification of a new standard method for
tracking operational employment of Coast Guard
major cutters that does not include time during
which such a cutter is away from its homeport for
maintenance or repair; and
‘‘(2) a report analyzing cost and performance for
different approaches to achieving varied levels of
operational employment using the standard method
required by paragraph (1) that, at a minimum—
‘‘(A) compares over a 30-year period the average
annualized baseline cost and performances for a
certified National Security Cutter that operated for
185 days away from homeport or an equivalent al-
ternative measure of operational tempo—
‘‘(i) against the cost of a 15 percent increase in
days away from homeport or an equivalent alter-
native measure of operational tempo for a Na-
tional Security Cutter; and
‘‘(ii) against the cost of the acquisition and op-
eration of an additional National Security Cutter;
and
‘‘(B) examines the optimal level of operational
employment of National Security Cutters to bal-
ance National Security Cutter cost and mission
performance.’’
§ 1134. Acquisition, production, deployment, and
support
(a) IN GENERAL.—The Commandant shall—
(1) ensure there is a stable and efficient pro-
duction and support capability to develop an
asset or capability for the Coast Guard;
(2) conduct follow-on testing to confirm and
monitor performance and correct deficiencies;
and
(3) conduct acceptance tests and trials prior
to the delivery of each asset or system to en-
sure the delivered asset or system achieves
full operational capability.
(b) ELEMENTS.—The Commandant shall—
(1) execute production contracts;
(2) ensure that delivered assets and capabili-
ties meet operational cost and schedules re-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In General.—** The Commandant shall ensure that developmental test and evaluation, operational test and evaluation, life-cycle cost estimates, and the development and demonstration requirements applied by this chapter to acquisition projects and programs are met to confirm that the projects or programs meet the requirements identified in the mission-analysis and affordability assessment prepared under section 1131(a)(2), the operational requirements developed under section 1132(a)(1) and the following development and demonstration objectives:
(1) To demonstrate that the design, manufacturing, and production solution is based upon a stable, producible, and cost-effective product design.
(2) To ensure that the product capabilities meet contract specifications, acceptable operational performance requirements, and system security requirements.
(3) To ensure that the product design is mature enough to commit to full production and deployment.
**(b) Tests and Evaluations.—**
(1) **In general.—** — The Commandant shall ensure that the Coast Guard conducts developmental tests and evaluations and operational tests and evaluations of a capability or asset and the subsystems of the capability or asset in accordance with the master plan prepared for the capability or asset under section 1132(d)(1).11 See References in Text note below.
(2) **Use of third parties.—** — The Commandant shall ensure that the Coast Guard uses independent third parties with expertise in testing and evaluating the capabilities or assets and the subsystems of the capabilities or assets being acquired to conduct developmental tests and evaluations and operational tests and evaluations whenever the Coast Guard lacks the capability to conduct the tests and evaluations required by a master plan.
(3
Source: Supplied U.S. Code snapshot — release unconfirmed · 14 U.S.C. § 1133
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.