Arkansas Legal Resource Navigator

33 U.S.C. § 2214 — General credit for flood control

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2214 — General credit for flood control

Page 711 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2215 (Pub. L. 116–260, div. AA, title I, § 152, Dec. 27, 2020, 134 Stat. 2658; Pub. L. 117–263, div. H, title LXXXI, § 8380, Dec. 23, 2022, 136 Stat. 3828.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resources Development Act of 2020, and not as part of the Water Resources Development Act of 1986 which comprises this chapter. AMENDMENTS 2022—Subsec. (a). Pub. L. 117–263 substituted ‘‘a flood risk management or coastal storm risk management project in a region’’ for ‘‘flood risk management project that incidentally generates seismic safety bene- fits in regions’’. Statutory Notes and Related Subsidiaries ‘‘SECRETARY’’ DEFINED Secretary means the Secretary of the Army, see sec- tion 2 of div. AA of Pub. L. 116–260, set out as a note under section 2201 of this title. § 2214. General credit for flood control (a) Guidelines Within one year after November 17, 1986, the Secretary shall issue guidelines to carry out this section, consistent with the principles and guidelines on project formulation. The guide- lines shall include criteria for determining whether work carried out by non-Federal inter- ests is compatible with a project for flood con- trol and procedures for making such determina- tions. The guidelines under this section shall be promulgated after notice in the Federal Register and opportunity for comment. (b) Analysis of costs and benefits The guidelines established under subsection (a) shall provide for the Secretary to consider, in analyzing the costs and benefits of a proposed project for flood control, the costs and benefits produced by any flood control work carried out by non-Federal interests that the Secretary de- termines to be compatible with the

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2214

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: b3d39f3e1087ab5d20e97346cd3d6ab5d50d66f4361350d9b0c1a8b329f75c48. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-a207f014fcb4dc9bcd814ebc
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2214-general-credit-for-flood-control--2dc126d8d1.md
Pages: Not recorded – Not recorded
Passage SHA-256: f0b7229dd04a1574d5241f3e7f4b71ecdf95d88753695ae08fba517b0dbea2b8

Source location: USCODE-2024-title33-chap36-subchapI-sec2214.pdf

Stored source content

Page 711 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2215 (Pub. L. 116–260, div. AA, title I, § 152, Dec. 27, 2020, 134 Stat. 2658; Pub. L. 117–263, div. H, title LXXXI, § 8380, Dec. 23, 2022, 136 Stat. 3828.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resources Development Act of 2020, and not as part of the Water Resources Development Act of 1986 which comprises this chapter. AMENDMENTS 2022—Subsec. (a). Pub. L. 117–263 substituted ‘‘a flood risk management or coastal storm risk management project in a region’’ for ‘‘flood risk management project that incidentally generates seismic safety bene- fits in regions’’. Statutory Notes and Related Subsidiaries ‘‘SECRETARY’’ DEFINED Secretary means the Secretary of the Army, see sec- tion 2 of div. AA of Pub. L. 116–260, set out as a note under section 2201 of this title. § 2214. General credit for flood control (a) Guidelines Within one year after November 17, 1986, the Secretary shall issue guidelines to carry out this section, consistent with the principles and guidelines on project formulation. The guide- lines shall include criteria for determining whether work carried out by non-Federal inter- ests is compatible with a project for flood con- trol and procedures for making such determina- tions. The guidelines under this section shall be promulgated after notice in the Federal Register and opportunity for comment. (b) Analysis of costs and benefits The guidelines established under subsection (a) shall provide for the Secretary to consider, in analyzing the costs and benefits of a proposed project for flood control, the costs and benefits produced by any flood control work carried out by non-Federal interests that the Secretary de- termines to be compatible with the project. For purposes of the preceding sentence the Sec- retary may consider only work carried out after the date which is 5 years before the first obliga- tion of funds for the reconnaissance study for such project. In no case may work which was carried out more than 5 years before November 17, 1986, be considered under this subsection, un- less otherwise provided in this Act. (c) Crediting of non-Federal share The guidelines established under subsection (a) shall provide for crediting the cost of work carried out by the non-Federal interests against the non-Federal share of the cost of an author- ized project for flood control as follows: (1) Work which is carried out after the end of the reconnaissance study and before the sub- mission to Congress of the final report of the Chief of Engineers on the project and which is determined by the Secretary to be compatible with the project shall be included as part of the project and shall be recommended by the Secretary in the final report for credit against the non-Federal share of the cost of the project. (2) Work which is carried out after submis- sion of the final report of the Chief of Engi- neers to Congress and which is determined by the Secretary to be compatible with the project shall be considered as part of the project and shall be credited by the Secretary against the non-Federal share of the cost of the project in accordance with the guidelines promulgated pursuant to subsection (a). In no event may work which was carried out more than 5 years before November 17, 1986, be considered under this subsection, unless other- wise provided in this Act. (d) Procedure for work done before November 17, 1986 The Secretary shall consider, under sub- sections (b) and (c), work carried out before No- vember 17, 1986, by non-Federal interests on a project for flood control, if the non-Federal in- terests apply to the Secretary for consideration of such work not later than March 31, 1987. The Secretary shall make determinations under sub- sections (b) and (c) with respect to such work not later than 6 months after guidelines are issued under subsection (a). (e) Procedure for work done after November 17, 1986 The Secretary shall consider work carried out after November 17, 1986, by non-Federal interests on a project for flood control under subsections (b) and (c) in accordance with the guidelines issued under subsection (a). The guidelines shall require prior approval by the Secretary of any flood control work carried out after November 17, 1986, in order to be considered under this sec- tion, taking into account the economic and en- vironmental feasibility of the project. (f) Limitation not applicable Any flood control work included as part of the non-Federal share of the cost of a project under this section shall not be subject to the limita- tion contained in the last sentence of section 1962d–5a(a) of title 42. (g) Cash contribution not affected Nothing in this section affects the require- ment of section 2213(a)(1)(A) of this title. (Pub. L. 99–662, title I, § 104, Nov. 17, 1986, 100 Stat. 4087.) Editorial Notes REFERENCES IN TEXT This Act, referred to in subsecs. (b) and (c), is Pub. L. 99–662, Nov. 17, 1986, 100 Stat. 4082, known as the Water Resources Development Act of 1986. For complete clas- sification of this Act to the Code, see Short Title note set out under section 2201 of this title and Tables. § 2215. Feasibility studies; planning, engineering, and design (a) Feasibility studies (1) Cost sharing (A) In general The Secretary shall not initiate any feasi- bility study for a water resources project after November 17, 1986, until appropriate non-Federal interests agree, by contract, to

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2214 — Inland waterway transportation

**(a) Construction** 75 percent of the costs of construction— (1) of each project authorized by title III of this Act, (2) of the project authorized by [section 652(j) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section652/j&num=0&edition=prelim), and (3) allocated to inland navigation for the project authorized by section 844 of this Act, shall be paid only from amounts appropriated from the general fund of the Treasury. 25 percent of such costs shall be paid only from amounts appropriated from the Inland Waterways Trust Fund. For purposes of this subsection, the term “construction” shall include planning, designing, engineering, surveying, the acquisition of all lands, easements, and rights-of-way necessary for the project, including lands for disposal of dredged material, and relocations necessary for the project. **(b) Operation and maintenance** The Federal share of the cost of operation and maintenance of any project for navigation on the inland waterways is 100 percent. **(c) Floodgates on the Inland Waterways** (1) **Operation and maintenance carried out by the Secretary** — Notwithstanding any other provision of law, the Secretary shall be responsible for the operation and maintenance, including repair, of any flood gate, as well as any pumping station constructed within the channel as a single unit with that flood gate, that— (A) was constructed as of June 10, 2014, as a feature of an authorized hurricane and storm damage reduction project; and (B) crosses an inland or intracoastal waterway described in [section 1804 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1804&num=0&edition=prelim). (2) **Non-Federal cost share** — The non-Federal share of the cost of opera

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2214

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.