Browse Arkansas Code titles and sections
33 U.S.C. § 2214 — General credit for flood control
Federal law — U.S. Code and appendices · legal_authorities
Page 711
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2215
(Pub. L. 116–260, div. AA, title I, § 152, Dec. 27,
2020, 134 Stat. 2658; Pub. L. 117–263, div. H, title
LXXXI, § 8380, Dec. 23, 2022, 136 Stat. 3828.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2022—Subsec. (a). Pub. L. 117–263 substituted ‘‘a flood
risk management or coastal storm risk management
project in a region’’ for ‘‘flood risk management
project that incidentally generates seismic safety bene-
fits in regions’’.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of div. AA of Pub. L. 116–260, set out as a note
under section 2201 of this title.
§ 2214. General credit for flood control
(a) Guidelines
Within one year after November 17, 1986, the
Secretary shall issue guidelines to carry out
this section, consistent with the principles and
guidelines on project formulation. The guide-
lines shall include criteria for determining
whether work carried out by non-Federal inter-
ests is compatible with a project for flood con-
trol and procedures for making such determina-
tions. The guidelines under this section shall be
promulgated after notice in the Federal Register
and opportunity for comment.
(b) Analysis of costs and benefits
The guidelines established under subsection
(a) shall provide for the Secretary to consider,
in analyzing the costs and benefits of a proposed
project for flood control, the costs and benefits
produced by any flood control work carried out
by non-Federal interests that the Secretary de-
termines to be compatible with the
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2214
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: b3d39f3e1087ab5d20e97346cd3d6ab5d50d66f4361350d9b0c1a8b329f75c48. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-a207f014fcb4dc9bcd814ebc
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2214-general-credit-for-flood-control--2dc126d8d1.md
Pages: Not recorded – Not recorded
Passage SHA-256: f0b7229dd04a1574d5241f3e7f4b71ecdf95d88753695ae08fba517b0dbea2b8
Source location: USCODE-2024-title33-chap36-subchapI-sec2214.pdf
Stored source content
Page 711
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2215
(Pub. L. 116–260, div. AA, title I, § 152, Dec. 27,
2020, 134 Stat. 2658; Pub. L. 117–263, div. H, title
LXXXI, § 8380, Dec. 23, 2022, 136 Stat. 3828.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2022—Subsec. (a). Pub. L. 117–263 substituted ‘‘a flood
risk management or coastal storm risk management
project in a region’’ for ‘‘flood risk management
project that incidentally generates seismic safety bene-
fits in regions’’.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of div. AA of Pub. L. 116–260, set out as a note
under section 2201 of this title.
§ 2214. General credit for flood control
(a) Guidelines
Within one year after November 17, 1986, the
Secretary shall issue guidelines to carry out
this section, consistent with the principles and
guidelines on project formulation. The guide-
lines shall include criteria for determining
whether work carried out by non-Federal inter-
ests is compatible with a project for flood con-
trol and procedures for making such determina-
tions. The guidelines under this section shall be
promulgated after notice in the Federal Register
and opportunity for comment.
(b) Analysis of costs and benefits
The guidelines established under subsection
(a) shall provide for the Secretary to consider,
in analyzing the costs and benefits of a proposed
project for flood control, the costs and benefits
produced by any flood control work carried out
by non-Federal interests that the Secretary de-
termines to be compatible with the project. For
purposes of the preceding sentence the Sec-
retary may consider only work carried out after
the date which is 5 years before the first obliga-
tion of funds for the reconnaissance study for
such project. In no case may work which was
carried out more than 5 years before November
17, 1986, be considered under this subsection, un-
less otherwise provided in this Act.
(c) Crediting of non-Federal share
The guidelines established under subsection
(a) shall provide for crediting the cost of work
carried out by the non-Federal interests against
the non-Federal share of the cost of an author-
ized project for flood control as follows:
(1) Work which is carried out after the end of
the reconnaissance study and before the sub-
mission to Congress of the final report of the
Chief of Engineers on the project and which is
determined by the Secretary to be compatible
with the project shall be included as part of
the project and shall be recommended by the
Secretary in the final report for credit against
the non-Federal share of the cost of the
project.
(2) Work which is carried out after submis-
sion of the final report of the Chief of Engi-
neers to Congress and which is determined by
the Secretary to be compatible with the
project shall be considered as part of the
project and shall be credited by the Secretary
against the non-Federal share of the cost of
the project in accordance with the guidelines
promulgated pursuant to subsection (a).
In no event may work which was carried out
more than 5 years before November 17, 1986, be
considered under this subsection, unless other-
wise provided in this Act.
(d) Procedure for work done before November
17, 1986
The Secretary shall consider, under sub-
sections (b) and (c), work carried out before No-
vember 17, 1986, by non-Federal interests on a
project for flood control, if the non-Federal in-
terests apply to the Secretary for consideration
of such work not later than March 31, 1987. The
Secretary shall make determinations under sub-
sections (b) and (c) with respect to such work
not later than 6 months after guidelines are
issued under subsection (a).
(e) Procedure for work done after November 17,
1986
The Secretary shall consider work carried out
after November 17, 1986, by non-Federal interests
on a project for flood control under subsections
(b) and (c) in accordance with the guidelines
issued under subsection (a). The guidelines shall
require prior approval by the Secretary of any
flood control work carried out after November
17, 1986, in order to be considered under this sec-
tion, taking into account the economic and en-
vironmental feasibility of the project.
(f) Limitation not applicable
Any flood control work included as part of the
non-Federal share of the cost of a project under
this section shall not be subject to the limita-
tion contained in the last sentence of section
1962d–5a(a) of title 42.
(g) Cash contribution not affected
Nothing in this section affects the require-
ment of section 2213(a)(1)(A) of this title.
(Pub. L. 99–662, title I, § 104, Nov. 17, 1986, 100
Stat. 4087.)
Editorial Notes
REFERENCES IN TEXT
This Act, referred to in subsecs. (b) and (c), is Pub. L.
99–662, Nov. 17, 1986, 100 Stat. 4082, known as the Water
Resources Development Act of 1986. For complete clas-
sification of this Act to the Code, see Short Title note
set out under section 2201 of this title and Tables.
§ 2215. Feasibility studies; planning, engineering,
and design
(a) Feasibility studies
(1) Cost sharing
(A) In general
The Secretary shall not initiate any feasi-
bility study for a water resources project
after November 17, 1986, until appropriate
non-Federal interests agree, by contract, to
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Construction** 75 percent of the costs of construction—
(1) of each project authorized by title III of this Act,
(2) of the project authorized by [section 652(j) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section652/j&num=0&edition=prelim), and
(3) allocated to inland navigation for the project authorized by section 844 of this Act,
shall be paid only from amounts appropriated from the general fund of the Treasury. 25 percent of such costs shall be paid only from amounts appropriated from the Inland Waterways Trust Fund. For purposes of this subsection, the term “construction” shall include planning, designing, engineering, surveying, the acquisition of all lands, easements, and rights-of-way necessary for the project, including lands for disposal of dredged material, and relocations necessary for the project.
**(b) Operation and maintenance** The Federal share of the cost of operation and maintenance of any project for navigation on the inland waterways is 100 percent.
**(c) Floodgates on the Inland Waterways**
(1) **Operation and maintenance carried out by the Secretary** — Notwithstanding any other provision of law, the Secretary shall be responsible for the operation and maintenance, including repair, of any flood gate, as well as any pumping station constructed within the channel as a single unit with that flood gate, that—
(A) was constructed as of June 10, 2014, as a feature of an authorized hurricane and storm damage reduction project; and
(B) crosses an inland or intracoastal waterway described in [section 1804 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1804&num=0&edition=prelim).
(2) **Non-Federal cost share** — The non-Federal share of the cost of opera
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2214
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.