10 U.S.C. § 4328 — Weapon system design: sustainment fac-

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 4328 — Weapon system design: sustainment fac-

Page 2740 TITLE 10—ARMED FORCES § 4328 § 4328. Weapon system design: sustainment fac- tors (a) IN GENERAL.—The Secretary of Defense shall ensure that the defense acquisition system gives ample emphasis to sustainment factors, particularly those factors that are affected prin- cipally by the design of a weapon system, in the development of a weapon system. (b) REQUIREMENTS PROCESS.—The Secretary shall ensure that reliability and maintainability are included in the performance attributes of the key performance parameter on sustainment during the development of capabilities require- ments. (c) SOLICITATION AND AWARD OF CONTRACTS.— (1) REQUIREMENT.—The program manager of a weapon system shall include in the solicita- tion for and terms of a covered contract for the weapon system clearly defined and meas- urable requirements for engineering activities and design specifications for reliability and maintainability. (2) EXCEPTION.—If the program manager de- termines that engineering activities and de- sign specifications for reliability or maintain- ability should not be a requirement in a cov- ered contract or a solicitation for such a con- tract, the program manager shall document in writing the justification for the decision. (3) SOURCE SELECTION CRITERIA.—The Sec- retary shall ensure that sustainment factors, including reliability and maintainability, are given ample emphasis in the process for source selection. The Secretary shall encourage the use of objective reliability and maintain- ability criteria in the evaluation of competi- tive proposals. (d) CONTRACT PERFORMANCE.— (1) IN GENERAL.—The Secretary shall ensure that the Department of Defense uses best practices for responding to the positive or neg- ative performance of a contractor in meeting

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 4328

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: ee0a63b29cd7a70a090ab4587be46a5a46b285ff3ec5ebe250de80a80043fa55. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-9f55d070707d498280a5b99e
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-4328-weapon-system-design-sustainment-fac--da80d68486.md
Pages: Not recorded – Not recorded
Passage SHA-256: 9c3aecb973b5e9ed2a34d51625d5dfc56faac6b3b4361df9bb3b4a5db4d6a8dc

Source location: USCODE-2024-title10-subtitleA-partV-subpartF-chap323-sec4328.pdf

Stored source content

Page 2740 TITLE 10—ARMED FORCES § 4328 § 4328. Weapon system design: sustainment fac- tors (a) IN GENERAL.—The Secretary of Defense shall ensure that the defense acquisition system gives ample emphasis to sustainment factors, particularly those factors that are affected prin- cipally by the design of a weapon system, in the development of a weapon system. (b) REQUIREMENTS PROCESS.—The Secretary shall ensure that reliability and maintainability are included in the performance attributes of the key performance parameter on sustainment during the development of capabilities require- ments. (c) SOLICITATION AND AWARD OF CONTRACTS.— (1) REQUIREMENT.—The program manager of a weapon system shall include in the solicita- tion for and terms of a covered contract for the weapon system clearly defined and meas- urable requirements for engineering activities and design specifications for reliability and maintainability. (2) EXCEPTION.—If the program manager de- termines that engineering activities and de- sign specifications for reliability or maintain- ability should not be a requirement in a cov- ered contract or a solicitation for such a con- tract, the program manager shall document in writing the justification for the decision. (3) SOURCE SELECTION CRITERIA.—The Sec- retary shall ensure that sustainment factors, including reliability and maintainability, are given ample emphasis in the process for source selection. The Secretary shall encourage the use of objective reliability and maintain- ability criteria in the evaluation of competi- tive proposals. (d) CONTRACT PERFORMANCE.— (1) IN GENERAL.—The Secretary shall ensure that the Department of Defense uses best practices for responding to the positive or neg- ative performance of a contractor in meeting the sustainment requirements of a covered contract for a weapon system. The Secretary shall encourage the use of incentive fees and penalties as appropriate and authorized in paragraph (2) in all covered contracts for weapons systems. (2) AUTHORITY FOR INCENTIVE FEES AND PEN- ALTIES.—The Secretary of Defense is author- ized to include in any covered contract provi- sions for the payment of incentive fees to the contractor based on achievement of design specification requirements for reliability and maintainability of weapons systems under the contract, or the imposition of penalties to be paid by the contractor to the Government for failure to achieve such design specification re- quirements. Information about such fees or penalties shall be included in the solicitation for any covered contract that includes such fees or penalties. (3) MEASUREMENT OF RELIABILITY AND MAIN- TAINABILITY.—In carrying out paragraph (2), the program manager shall base determina- tions of a contractor’s performance on reli- ability and maintainability data collected dur- ing the program. Such data collection and as- sociated evaluation metrics shall be described in detail in the covered contract. To the max- imum extent practicable, such data shall be shared with appropriate contractor and gov- ernment organizations. (4) NOTIFICATION.—The Secretary of Defense shall notify the congressional defense commit- tees upon entering into a covered contract that includes incentive fees or penalties au- thorized in paragraph (2). (e) COVERED CONTRACT DEFINED.—In this sec- tion, the term ‘‘covered contract’’, with respect to a weapon system, means a contract— (1) for the engineering and manufacturing development of a weapon system, including embedded software; or (2) for the production of a weapon system, including embedded software. (Added Pub. L. 115–91, div. A, title VIII, § 834(a)(1), Dec. 12, 2017, 131 Stat. 1469, § 2443; re- numbered § 4328 and amended Pub. L. 116–283, div. A, title XVIII, § 1848(e), Jan. 1, 2021, 134 Stat. 4259.) Editorial Notes PRIOR PROVISIONS Prior sections 4331 to 4338 were renumbered sections 7431 to 7438 of this title, respectively. A prior section 4339, act Aug. 10, 1956, ch. 1041, 70A Stat. 240, authorized public quarters and fuel and light therefor for the organist and choirmaster of the Acad- emy and for civilian instructors in the departments of foreign languages and tactics, prior to repeal by Pub. L. 89–716, § 1, Nov. 2, 1966, 80 Stat. 1114. Prior sections 4340 to 4343 were renumbered sections 7440 to 7443 of this title, respectively. Prior sections 4344 to 4345a were repealed by Pub. L. 114–328, div. A, title XII, § 1248(b)(1), Dec. 23, 2016, 130 Stat. 2525. Section 4344, act Aug. 10, 1956, ch. 1041, 70A Stat. 242; Pub. L. 98–94, title X, § 1004(a)(1), Sept. 24, 1983, 97 Stat. 657; Pub. L. 105–85, div. A, title V, § 543(a), Nov. 18, 1997, 111 Stat. 1743; Pub. L. 106–65, div. A, title V, § 534(a), Oct. 5, 1999, 113 Stat. 605; Pub. L. 106–398, § 1 [[div. A], title V, § 532(a)], Oct. 30, 2000, 114 Stat. 1654, 1654A-110; Pub. L. 107–107, div. A, title V, § 533(a)(1), (2), Dec. 28, 2001, 115 Stat. 1105, related to selection of persons from foreign countries to receive instruction at the United States Military Academy. See section 347 of this title. Section 4345, added Pub. L. 105–85, div. A, title V, § 542(a)(1), Nov. 18, 1997, 111 Stat. 1740; amended Pub. L. 106–65, div. A, title V, § 535(a), Oct. 5, 1999, 113 Stat. 605; Pub. L. 109–364, div. A, title V, § 531(a), Oct. 17, 2006, 120 Stat. 2198, related to an exchange program with foreign military academies. A prior section 4345, act Aug. 10, 1956, ch. 1041, 70A Stat. 242, related to selection of Filipinos for instruc- tion at the Military Academy, prior to repeal by Pub. L. 98–94, title X, § 1004(a)(2), (d), Sept. 24, 1983, 97 Stat. 658, 660, effective one year after Sept. 24, 1983. Section 4345a, added Pub. L. 110–417, [div. A], title V, § 541(a)(1), Oct. 14, 2008, 122 Stat. 4454; amended Pub. L. 113–291, div. A, title V, § 553(a), Dec. 19, 2014, 128 Stat. 3377, related to foreign and cultural exchange activi- ties. Prior sections 4346 to 4349 were renumbered sections 7446 to 7449 of this title, respectively. AMENDMENTS 2021—Pub. L. 116–283, § 1848(e)(2), amended section catchline generally. Prior to amendment, section catchline read as follows: ‘‘Sustainment factors in weapon system design’’. Pub. L. 116–283, § 1848(e)(1), renumbered section 2443 of this title as this section. Section was inserted after sec- tion 4325 of this title to reflect the probable intent of Page 2741 TITLE 10—ARMED FORCES § 4351 Congress, notwithstanding directory language inserting it after section ‘‘4235’’. Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 2021 AMENDMENT Amendment by Pub. L. 116–283 effective Jan. 1, 2022, with additional provisions for delayed implementation and applicability of existing law, see section 1801(d) of Pub. L. 116–283, set out as a note preceding section 3001 of this title. EFFECTIVE DATE Pub. L. 115–91, div. A, title VIII, § 834(b), Dec. 12, 2017, 131 Stat. 1470, provided that: ‘‘Subsections (c) and (d) of section 2443 of title 10, United States Code [now 10 U.S.C. 4328], as added by subsection (a), shall apply with respect to any covered contract (as defined in that section) for which the contract solicitation is issued on or after the date occurring one year after the date of the enactment of this Act [Dec. 12, 2017].’’ IMPLEMENTATION OF RECOMMENDATIONS OF THE INDE- PENDENT STUDY ON CONSIDERATION OF SUSTAINMENT IN WEAPONS SYSTEMS LIFE CYCLE Pub. L. 115–232, div. A, title VIII, § 832, Aug. 13, 2018, 132 Stat. 1857, provided that: ‘‘(a) IMPLEMENTATION REQUIRED.—Not later than 18 months after the date of the enactment of this Act [Aug. 13, 2018], the Secretary of Defense shall, except as provided under subsection (b), commence implementa- tion of each recommendation submitted as part of the independent assessment produced under section 844 of the National Defense Authorization Act for Fiscal Year 2017 (Public Law 114–328; 130 Stat. 2290). ‘‘(b) EXCEPTIONS.— ‘‘(1) DELAYED IMPLEMENTATION.—The Secretary of Defense may commence implementation of a rec- ommendation described under subsection (a) later than the date required under such subsection if the Secretary provides the congressional defense commit- tees [Committees on Armed Services and Appropria- tions of the Senate and the House of Representatives] with a specific justification for the delay in imple- mentation of such recommendation. ‘‘(2) NONIMPLEMENTATION.—The Secretary of De- fense may opt not to implement a recommendation described under subsection (a) if the Secretary pro- vides to the congressional defense committees— ‘‘(A) the reasons for the decision not to imple- ment the recommendation; and ‘‘(B) a summary of the alternative actions the Secretary plans to take to address the purposes un- derlying the recommendation. ‘‘(c) IMPLEMENTATION PLANS.—For each recommenda- tion that the Secretary is implementing, or that the Secretary plans to implement, the Secretary shall sub- mit to the congressional defense committees— ‘‘(1) a summary of actions that have been taken to implement the recommendation; and ‘‘(2) a schedule, with specific milestones, for com- pleting the implementation of the recommendation.’’ ENGINEERING CHANGE AUTHORIZED Pub. L. 115–91, div. A, title VIII, § 834(c), Dec. 12, 2017, 131 Stat. 1470, provided that: ‘‘Subject to the avail- ability of appropriations, the Secretary of Defense may fund engineering changes to the design of a weapon sys- tem in the engineering and manufacturing development phase or in the production phase of an acquisition pro- gram to improve reliability or maintainability of the weapon system and reduce projected operating and sup- port costs.’’ CHAPTER 324—SELECTED ACQUISITION REPORTS Sec. 4351. Selected Acquisition Reports. Sec. Editorial Notes AMENDMENTS 2021—Pub. L. 117–81, div. A, title XVII, § 1701(o)(1)(A), (2)(B), Dec. 27, 2021, 135 Stat. 2146, amended Pub. L. 116–283, div. A, title XVIII, § 1849(a), Jan. 1, 2021, 134 Stat. 4259, which added this analysis, by substituting ‘‘SELECTED ACQUISITION REPORTS’’ for ‘‘PRO- GRAM STATUS–SELECTED ACQUISITION RE- PORTS’’ in chapter heading, adding item 4351, and striking out what would have been items 4350 to 4358. Amendment by section 1701(o)(2)(B) of Pub. L. 117–81, which directed amendment of the text inserted by sec- tion 1849 of Pub. L. 116–283, was executed as if it had re- ferred to the text inserted by section 1849(a) of that Act to reflect the probable intent of Congress. [§ 4350. Omitted] Editorial Notes CODIFICATION See Codification note set out under section 4351 of this title. § 4351. Selected Acquisition Reports (a) In this section: (1) The term ‘‘program acquisition unit cost’’, with respect to a major defense acquisi- tion program, means the amount equal to (A) the total cost for development and procure- ment of, and system-specific military con- struction for, the acquisition program, divided by (B) the number of fully-configured end items to be produced for the acquisition pro- gram. (2) The term ‘‘procurement unit cost’’, with respect to a major defense acquisition pro- gram, means the amount equal to (A) the total of all funds programmed to be available for ob- ligation for procurement for the program, di- vided by (B) the number of fully-configured end items to be procured. (3) The term ‘‘major contract’’, with respect to a major defense acquisition program, means each of the six largest prime, associate, or Government-furnished equipment contracts under the program that is in excess of $40,000,000 and that is not a firm, fixed price contract. (4) The term ‘‘full life-cycle cost’’, with re- spect to a major defense acquisition program, means all costs of development, procurement, military construction, and operations and sup- port, without regard to funding source or man- agement control. (b)(1) The Secretary of Defense shall submit to Congress at the end of each fiscal-year quarter a report on current major defense acquisition pro- grams and any program that is estimated by the Secretary of Defense to require an eventual total expenditure for research, development, test, and evaluation of more than $300,000,000 (based on fiscal year 1990 constant dollars) or an eventual total expenditure for procurement, in- cluding all planned increments or spirals, of more than $1,800,000,000 (based on fiscal year 1990 constant dollars). Except as provided in para- graphs (2) and (3), each such report shall include a status report on each defense acquisition pro- gram that at the end of such quarter is a major

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 4328 — Weapon system design: sustainment factors

**(a) In General.—** The Secretary of Defense shall ensure that the defense acquisition system gives ample emphasis to sustainment factors, particularly those factors that are affected principally by the design of a weapon system, in the development of a weapon system. **(b) Requirements Process.—** The Secretary shall ensure that reliability and maintainability are included in the performance attributes of the key performance parameter on sustainment during the development of capabilities requirements. **(c) Solicitation and Award of Contracts.—** (1) **Requirement.—** — The program manager of a weapon system shall include in the solicitation for and terms of a covered contract for the weapon system clearly defined and measurable requirements for engineering activities and design specifications for reliability and maintainability. (2) **Exception.—** — If the program manager determines that engineering activities and design specifications for reliability or maintainability should not be a requirement in a covered contract or a solicitation for such a contract, the program manager shall document in writing the justification for the decision. (3) **Source selection criteria.—** — The Secretary shall ensure that sustainment factors, including reliability and maintainability, are given ample emphasis in the process for source selection. The Secretary shall encourage the use of objective reliability and maintainability criteria in the evaluation of competitive proposals. **(d) Contract Performance.—** (1) **In general.—** — The Secretary shall ensure that the Department of Defense uses best practices for responding to the positive or negative performance of a contractor in meeting the sustainment requirements of a covered contract for a weapon system. The Secretary s

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 4328

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.