Browse Arkansas Code titles and sections
33 U.S.C. § 1343 — Ocean discharge criteria
Federal law — U.S. Code and appendices · legal_authorities
Page 570
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1343
eral
Water
Pollution
Control
Act
[33
U.S.C.
1342(p)(2)(A), (E)].
‘‘(f) REGULATIONS.—The Administrator shall issue
final regulations with respect to general permits for
stormwater discharges associated with industrial activ-
ity on or before February 1, 1992.’’
PHOSPHATE FERTILIZER EFFLUENT LIMITATION
Pub. L. 100–4, title III, § 306(c), Feb. 4, 1987, 101 Stat.
36, provided that:
‘‘(1) ISSUANCE OF PERMIT.—As soon as possible after
the date of the enactment of this Act [Feb. 4, 1987], but
not later than 180 days after such date of enactment,
the Administrator shall issue permits under section
402(a)(1)(B) of the Federal Water Pollution Control Act
[33 U.S.C. 1342(a)(1)(B)] with respect to facilities—
‘‘(A) which were under construction on or before
April 8, 1974, and
‘‘(B) for which the Administrator is proposing to re-
vise the applicability of the effluent limitation estab-
lished under section 301(b) of such Act [33 U.S.C.
1311(b)] for phosphate subcategory of the fertilizer
manufacturing point source category to exclude such
facilities.
‘‘(2) LIMITATIONS ON STATUTORY CONSTRUCTION.—Noth-
ing in this section [amending section 1311 of this title
and enacting this note] shall be construed—
‘‘(A) to require the Administrator to permit the dis-
charge of gypsum or gypsum waste into the navigable
waters,
‘‘(B) to affect the procedures and standards applica-
ble to the Administrator in issuing permits under
section 402(a)(1)(B) of the Federal Water Pollution
Control Act [33 U.S.C. 1342(a)(1)(B)], and
‘‘(C) to affect the authority of any State to deny or
condition certification under section 401 of such Act
[33 U.S.C. 1341] with respect to the issuance of per-
mits under section 402(a)(1)(B
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 1343
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 27585a0d2cef34bb237ab08fd76868e609b0c9769abef7c0b463d8d25dfc7fc1. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-9dbab14b59f10396661cd058
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-1343-ocean-discharge-criteria--acf6ab7108.md
Pages: Not recorded – Not recorded
Passage SHA-256: 464d37b4686f4390cdf553ae4799f9220b84f26c33d85a49a1f5fd8146243459
Source location: USCODE-2024-title33-chap26-subchapIV-sec1343.pdf
Stored source content
Page 570
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1343
eral
Water
Pollution
Control
Act
[33
U.S.C.
1342(p)(2)(A), (E)].
‘‘(f) REGULATIONS.—The Administrator shall issue
final regulations with respect to general permits for
stormwater discharges associated with industrial activ-
ity on or before February 1, 1992.’’
PHOSPHATE FERTILIZER EFFLUENT LIMITATION
Pub. L. 100–4, title III, § 306(c), Feb. 4, 1987, 101 Stat.
36, provided that:
‘‘(1) ISSUANCE OF PERMIT.—As soon as possible after
the date of the enactment of this Act [Feb. 4, 1987], but
not later than 180 days after such date of enactment,
the Administrator shall issue permits under section
402(a)(1)(B) of the Federal Water Pollution Control Act
[33 U.S.C. 1342(a)(1)(B)] with respect to facilities—
‘‘(A) which were under construction on or before
April 8, 1974, and
‘‘(B) for which the Administrator is proposing to re-
vise the applicability of the effluent limitation estab-
lished under section 301(b) of such Act [33 U.S.C.
1311(b)] for phosphate subcategory of the fertilizer
manufacturing point source category to exclude such
facilities.
‘‘(2) LIMITATIONS ON STATUTORY CONSTRUCTION.—Noth-
ing in this section [amending section 1311 of this title
and enacting this note] shall be construed—
‘‘(A) to require the Administrator to permit the dis-
charge of gypsum or gypsum waste into the navigable
waters,
‘‘(B) to affect the procedures and standards applica-
ble to the Administrator in issuing permits under
section 402(a)(1)(B) of the Federal Water Pollution
Control Act [33 U.S.C. 1342(a)(1)(B)], and
‘‘(C) to affect the authority of any State to deny or
condition certification under section 401 of such Act
[33 U.S.C. 1341] with respect to the issuance of per-
mits under section 402(a)(1)(B) of such Act.’’
LOG TRANSFER FACILITIES
Pub. L. 100–4, title IV, § 407, Feb. 4, 1987, 101 Stat. 74,
provided that:
‘‘(a) AGREEMENT.—The Administrator and Secretary
of the Army shall enter into an agreement regarding
coordination of permitting for log transfer facilities to
designate a lead agency and to process permits required
under sections 402 and 404 of the Federal Water Pollu-
tion Control Act [33 U.S.C. 1342, 1344], where both such
sections apply, for discharges associated with the con-
struction and operation of log transfer facilities. The
Administrator and Secretary are authorized to act in
accordance with the terms of such agreement to assure
that, to the maximum extent practicable, duplication,
needless paperwork and delay in the issuance of per-
mits, and inequitable enforcement between and among
facilities in different States, shall be eliminated.
‘‘(b) APPLICATIONS AND PERMITS BEFORE OCTOBER 22,
1985.—Where both of sections 402 and 404 of the Federal
Water Pollution Control Act [33 U.S.C. 1342, 1344] apply,
log transfer facilities which have received a permit
under section 404 of such Act before October 22, 1985,
shall not be required to submit a new application for a
permit under section 402 of such Act. If the Adminis-
trator determines that the terms of a permit issued on
or before October 22, 1985, under section 404 of such Act
satisfies the applicable requirements of sections 301,
302, 306, 307, 308, and 403 of such Act [33 U.S.C. 1311, 1312,
1316, 1317, 1318, and 1343], a separate application for a
permit under section 402 of such Act shall not there-
after be required. In any case where the Administrator
demonstrates, after an opportunity for a hearing, that
the terms of a permit issued on or before October 22,
1985, under section 404 of such Act do not satisfy the ap-
plicable requirements of sections 301, 302, 306, 307, 308,
and 403 of such Act, modifications to the existing per-
mit under section 404 of such Act to incorporate such
applicable requirements shall be issued by the Adminis-
trator as an alternative to issuance of a separate new
permit under section 402 of such Act.
‘‘(c) LOG TRANSFER FACILITY DEFINED.—For the pur-
poses of this section, the term ‘log transfer facility’
means a facility which is constructed in whole or in
part in waters of the United States and which is uti-
lized for the purpose of transferring commercially har-
vested logs to or from a vessel or log raft, including the
formation of a log raft.’’
ALLOWABLE DELAY
IN MODIFYING EXISTING APPROVED
STATE
PERMIT
PROGRAMS
TO
CONFORM
TO
1977
AMENDMENT
Pub. L. 95–217, § 54(c)(2), Dec. 27, 1977, 91 Stat. 1591,
provided that any State permit program approved
under this section before Dec. 27, 1977, which required
modification to conform to the amendment made by
section 54(c)(1) of Pub. L. 95–217, which amended subsec.
(b)(8) of this section, not be required to be modified be-
fore the end of the one year period which began on Dec.
27, 1977, unless in order to make the required modifica-
tion a State must amend or enact a law in which case
such modification not be required for such State before
the end of the two year period which began on Dec. 27,
1977.
Executive Documents
TRANSFER OF FUNCTIONS
Enforcement functions of Administrator or other offi-
cial of the Environmental Protection Agency under
this section relating to compliance with national pol-
lutant discharge elimination system permits with re-
spect to pre-construction, construction, and initial op-
eration of transportation system for Canadian and
Alaskan natural gas were transferred to the Federal In-
spector, Office of Federal Inspector for the Alaska Nat-
ural Gas Transportation System, until the first anni-
versary of the date of initial operation of the Alaska
Natural Gas Transportation System, see Reorg. Plan
No. 1 of 1979, §§ 102(a), 203(a), 44 F.R. 33663, 33666, 93 Stat.
1373, 1376, effective July 1, 1979, set out in the Appendix
to Title 5, Government Organization and Employees.
Office of Federal Inspector for the Alaska Natural Gas
Transportation System abolished and functions and au-
thority vested in Inspector transferred to Secretary of
Energy by section 3012(b) of Pub. L. 102–486, set out as
an Abolition of Office of Federal Inspector note under
section 719e of Title 15, Commerce and Trade. Func-
tions and authority vested in Secretary of Energy sub-
sequently transferred to Federal Coordinator for Alas-
ka Natural Gas Transportation Projects by section
720d(f) of Title 15.
§ 1343. Ocean discharge criteria
(a) Issuance of permits
No permit under section 1342 of this title for a
discharge into the territorial sea, the waters of
the contiguous zone, or the oceans shall be
issued, after promulgation of guidelines estab-
lished under subsection (c) of this section, ex-
cept in compliance with such guidelines. Prior
to the promulgation of such guidelines, a permit
may be issued under such section 1342 of this
title if the Administrator determines it to be in
the public interest.
(b) Waiver
The requirements of subsection (d) of section
1342 of this title may not be waived in the case
of permits for discharges into the territorial sea.
(c) Guidelines for determining degradation of
waters
(1) The Administrator shall, within one hun-
dred and eighty days after October 18, 1972 (and
from time to time thereafter), promulgate
guidelines for determining the degradation of
Page 571
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1344
the waters of the territorial seas, the contiguous
zone, and the oceans, which shall include:
(A) the effect of disposal of pollutants on
human health or welfare, including but not
limited to plankton, fish, shellfish, wildlife,
shorelines, and beaches;
(B) the effect of disposal of pollutants on
marine life including the transfer, concentra-
tion, and dispersal of pollutants or their by-
products through biological, physical, and
chemical processes; changes in marine eco-
system diversity, productivity, and stability;
and
species
and
community
population
changes;
(C) the effect of disposal, of pollutants on es-
thetic, recreation, and economic values;
(D) the persistence and permanence of the
effects of disposal of pollutants;
(E) the effect of the disposal of varying
rates, of particular volumes and concentra-
tions of pollutants;
(F) other possible locations and methods of
disposal or recycling of pollutants including
land-based alternatives; and
(G) the effect on alternate uses of the
oceans, such as mineral exploitation and sci-
entific study.
(2) In any event where insufficient information
exists on any proposed discharge to make a rea-
sonable judgment on any of the guidelines estab-
lished pursuant to this subsection no permit
shall be issued under section 1342 of this title.
(June 30, 1948, ch. 758, title IV, § 403, as added
Pub. L. 92–500, § 2, Oct. 18, 1972, 86 Stat. 883.)
Statutory Notes and Related Subsidiaries
DISCHARGES FROM POINT SOURCES
IN UNITED STATES
VIRGIN ISLANDS ATTRIBUTABLE
TO MANUFACTURE
OF
RUM; EXEMPTION; CONDITIONS
Discharges from point sources in the United States
Virgin Islands in existence on Aug. 5, 1983, attributable
to the manufacture of rum not to be subject to the re-
quirements of this section under certain conditions, see
section 214(g) of Pub. L. 98–67, set out as a note under
section 1311 of this title.
Executive Documents
TERRITORIAL SEA AND CONTIGUOUS ZONE OF UNITED
STATES
For extension of territorial sea and contiguous zone
of United States, see Proc. No. 5928 and Proc. No. 7219,
respectively, set out as notes under section 1331 of Title
43, Public Lands.
§ 1344. Permits for dredged or fill material
(a) Discharge into navigable waters at specified
disposal sites
The Secretary may issue permits, after notice
and opportunity for public hearings for the dis-
charge of dredged or fill material into the navi-
gable waters at specified disposal sites. Not
later than the fifteenth day after the date an ap-
plicant submits all the information required to
complete an application for a permit under this
subsection, the Secretary shall publish the no-
tice required by this subsection.
(b) Specification for disposal sites
Subject to subsection (c) of this section, each
such disposal site shall be specified for each
such permit by the Secretary (1) through the ap-
plication of guidelines developed by the Admin-
istrator, in conjunction with the Secretary,
which guidelines shall be based upon criteria
comparable to the criteria applicable to the ter-
ritorial seas, the contiguous zone, and the ocean
under section 1343(c) of this title, and (2) in any
case where such guidelines under clause (1)
alone would prohibit the specification of a site,
through the application additionally of the eco-
nomic impact of the site on navigation and an-
chorage.
(c) Denial or restriction of use of defined areas
as disposal sites
The Administrator is authorized to prohibit
the specification (including the withdrawal of
specification) of any defined area as a disposal
site, and he is authorized to deny or restrict the
use of any defined area for specification (includ-
ing the withdrawal of specification) as a disposal
site, whenever he determines, after notice and
opportunity for public hearings, that the dis-
charge of such materials into such area will
have an unacceptable adverse effect on munic-
ipal water supplies, shellfish beds and fishery
areas (including spawning and breeding areas),
wildlife, or recreational areas. Before making
such determination, the Administrator shall
consult with the Secretary. The Administrator
shall set forth in writing and make public his
findings and his reasons for making any deter-
mination under this subsection.
(d) ‘‘Secretary’’ defined
The term ‘‘Secretary’’ as used in this section
means the Secretary of the Army, acting
through the Chief of Engineers.
(e) General permits on State, regional, or nation-
wide basis
(1) In carrying out his functions relating to
the discharge of dredged or fill material under
this section, the Secretary may, after notice and
opportunity for public hearing, issue general
permits on a State, regional, or nationwide basis
for any category of activities involving dis-
charges of dredged or fill material if the Sec-
retary determines that the activities in such
category are similar in nature, will cause only
minimal adverse environmental effects when
performed separately, and will have only mini-
mal cumulative adverse effect on the environ-
ment. Any general permit issued under this sub-
section shall (A) be based on the guidelines de-
scribed in subsection (b)(1) of this section, and
(B) set forth the requirements and standards
which shall apply to any activity authorized by
such general permit.
(2) No general permit issued under this sub-
section shall be for a period of more than five
years after the date of its issuance and such gen-
eral permit may be revoked or modified by the
Secretary if, after opportunity for public hear-
ing, the Secretary determines that the activities
authorized by such general permit have an ad-
verse impact on the environment or such activi-
ties are more appropriately authorized by indi-
vidual permits.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Illegality of pollutant discharges except in compliance with law** Except as in compliance with this section and sections 1312, 1316, 1317, 1328, 1342, and 1344 of this title, the discharge of any pollutant by any person shall be unlawful.
**(b) Timetable for achievement of objectives** In order to carry out the objective of this chapter there shall be achieved—
(1)
(A) not later than July 1, 1977, effluent limitations for point sources, other than publicly owned treatment works, (i) which shall require the application of the best practicable control technology currently available as defined by the Administrator pursuant to [section 1314(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1314/b&num=0&edition=prelim), or (ii) in the case of a discharge into a publicly owned treatment works which meets the requirements of subparagraph (B) of this paragraph, which shall require compliance with any applicable pretreatment requirements and any requirements under [section 1317 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1317&num=0&edition=prelim); and
(B) for publicly owned treatment works in existence on July 1, 1977, or approved pursuant to [section 1283 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1283&num=0&edition=prelim) prior to June 30, 1974 (for which construction must be completed within four years of approval), effluent limitations based upon secondary treatment as defined by the Administrator pursuant to [section 1314(d)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1314/d/1&num=0&edition=prelim); or,
(C) not later than July 1, 1977, any more stringent limitation, in
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1311
Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 1311. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 452
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1311
(ii) Aggregate amount
The total amount of all implementation
grants provided under this subsection for a
fiscal year shall be not more than 2⁄3 of the
total amount made available to carry out
this subsection.
(6) Federal share
(A) In general
Except as provided in subparagraph (C),
the Federal share of a grant provided under
this subsection shall not exceed 80 percent of
the total project cost.
(B) Credit for implementation grants
The Administrator shall credit toward the
non-Federal share of the cost of an imple-
mentation project carried out under this
subsection the cost of planning, design, and
construction work completed for the project
using funds other than funds provided under
this section.
(C) Exception
The Administrator may waive the Federal
share limitation under subparagraph (A) for
an eligible entity that has adequately dem-
onstrated financial need.
(d) Report to Congress
Not later than 2 years after the date on which
the Administrator first awards a grant under
this section, the Administrator shall submit to
Congress a report that includes, with respect to
the period covered by the report—
(1) a description of all grants provided under
this section;
(2) a detailed description of—
(A) the projects supported by those grants;
and
(B) the outcomes of those projects;
(3) a description of the improvements in
technology, environmental benefits, resources
conserved, efficiencies, and other benefits of
the projects funded under this section;
(4) recommendations for improvements to
promote and support new and emerging, but
proven, stormwater control infrastructure, in-
cluding research into new and emerging tech-
nologies, for the centers, grants, and activities
under thi
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 1311
Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 1311. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Compliance with applicable requirements; application; procedures; license suspension**
(1) Any applicant for a Federal license or permit to conduct any activity including, but not limited to, the construction or operation of facilities, which may result in any discharge into the navigable waters, shall provide the licensing or permitting agency a certification from the State in which the discharge originates or will originate, or, if appropriate, from the interstate water pollution control agency having jurisdiction over the navigable waters at the point where the discharge originates or will originate, that any such discharge will comply with the applicable provisions of sections 1311, 1312, 1313, 1316, and 1317 of this title. In the case of any such activity for which there is not an applicable effluent limitation or other limitation under sections 1311(b) and 1312 of this title, and there is not an applicable standard under sections 1316 and 1317 of this title, the State shall so certify, except that any such certification shall not be deemed to satisfy [section 1371(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1371/c&num=0&edition=prelim). Such State or interstate agency shall establish procedures for public notice in the case of all applications for certification by it and, to the extent it deems appropriate, procedures for public hearings in connection with specific applications. In any case where a State or interstate agency has no authority to give such a certification, such certification shall be from the Administrator. If the State, interstate agency, or Administrator, as the case may be, fails or refuses to act on a request for certification, within a reasonable period of time (which shall not exceed one
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1341
Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 1341. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 561
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1341
PURPOSES AND POLICIES OF NATIONAL ESTUARY
PROGRAM
Pub. L. 100–4, title III, § 317(a), Feb. 4, 1987, 101 Stat.
61, provided that:
‘‘(1) FINDINGS.—Congress finds and declares that—
‘‘(A) the Nation’s estuaries are of great importance
for fish and wildlife resources and recreation and eco-
nomic opportunity;
‘‘(B) maintaining the health and ecological integ-
rity of these estuaries is in the national interest;
‘‘(C) increasing coastal population, development,
and other direct and indirect uses of these estuaries
threaten their health and ecological integrity;
‘‘(D) long-term planning and management will con-
tribute to the continued productivity of these areas,
and will maximize their utility to the Nation; and
‘‘(E) better coordination among Federal and State
programs affecting estuaries will increase the effec-
tiveness and efficiency of the national effort to pro-
tect, preserve, and restore these areas.
‘‘(2) PURPOSES.—The purposes of this section [enact-
ing this section] are to—
‘‘(A) identify nationally significant estuaries that
are threatened by pollution, development, or overuse;
‘‘(B) promote comprehensive planning for, and con-
servation and management of, nationally significant
estuaries;
‘‘(C) encourage the preparation of management
plans for estuaries of national significance; and
‘‘(D) enhance the coordination of estuarine re-
search.’’
SUBCHAPTER IV—PERMITS AND LICENSES
§ 1341. Certification
(a) Compliance with applicable requirements;
application; procedures; license suspension
(1) Any applicant for a Federal license or per-
mit to conduct any activity including, but not
limited to, the construction or operation of fa-
cilities, which may result in any discharge into
the na
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 1341
Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 1341. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Permits for discharge of pollutants**
(1) Except as provided in sections 1328 and 1344 of this title, the Administrator may, after opportunity for public hearing issue a permit for the discharge of any pollutant, or combination of pollutants, notwithstanding [section 1311(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1311/a&num=0&edition=prelim), upon condition that such discharge will meet either (A) all applicable requirements under sections 1311, 1312, 1316, 1317, 1318, and 1343 of this title, or (B) prior to the taking of necessary implementing actions relating to all such requirements, such conditions as the Administrator determines are necessary to carry out the provisions of this chapter.
(2) The Administrator shall prescribe conditions for such permits to assure compliance with the requirements of paragraph (1) of this subsection, including conditions on data and information collection, reporting, and such other requirements as he deems appropriate.
(3) The permit program of the Administrator under paragraph (1) of this subsection, and permits issued thereunder, shall be subject to the same terms, conditions, and requirements as apply to a State permit program and permits issued thereunder under subsection (b) of this section.
(4) All permits for discharges into the navigable waters issued pursuant to [section 407 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section407&num=0&edition=prelim) shall be deemed to be permits issued under this subchapter, and permits issued under this subchapter shall be deemed to be permits issued under [section 407 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section407&num=0&edition=prelim), and sh
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1342
Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 1342. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 562
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1342
tion license or permit has been granted, which
changes may result in violation of section 1311,
1312, 1313, 1316, or 1317 of this title.
(4) Prior to the initial operation of any feder-
ally licensed or permitted facility or activity
which may result in any discharge into the navi-
gable waters and with respect to which a certifi-
cation has been obtained pursuant to paragraph
(1) of this subsection, which facility or activity
is not subject to a Federal operating license or
permit, the licensee or permittee shall provide
an opportunity for such certifying State, or, if
appropriate, the interstate agency or the Ad-
ministrator to review the manner in which the
facility or activity shall be operated or con-
ducted for the purposes of assuring that applica-
ble effluent limitations or other limitations or
other applicable water quality requirements will
not be violated. Upon notification by the certi-
fying State, or if appropriate, the interstate
agency or the Administrator that the operation
of any such federally licensed or permitted facil-
ity or activity will violate applicable effluent
limitations or other limitations or other water
quality requirements such Federal agency may,
after public hearing, suspend such license or per-
mit. If such license or permit is suspended, it
shall remain suspended until notification is re-
ceived from the certifying State, agency, or Ad-
ministrator, as the case may be, that there is
reasonable assurance that such facility or activ-
ity will not violate the applicable provisions of
section 1311, 1312, 1313, 1316, or 1317 of this title.
(5) Any Federal license or permit with respect
to which a certification has been obtained under
paragraph (1) of this su
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 1342
Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 1342. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Issuance of permits** No permit under [section 1342 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1342&num=0&edition=prelim) for a discharge into the territorial sea, the waters of the contiguous zone, or the oceans shall be issued, after promulgation of guidelines established under subsection (c) of this section, except in compliance with such guidelines. Prior to the promulgation of such guidelines, a permit may be issued under such [section 1342 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1342&num=0&edition=prelim) if the Administrator determines it to be in the public interest.
**(b) Waiver** The requirements of subsection (d) of [section 1342 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1342&num=0&edition=prelim) may not be waived in the case of permits for discharges into the territorial sea.
**(c) Guidelines for determining degradation of waters**
(1) The Administrator shall, within one hundred and eighty days after October 18, 1972 (and from time to time thereafter), promulgate guidelines for determining the degradation of the waters of the territorial seas, the contiguous zone, and the oceans, which shall include:
(A) the effect of disposal of pollutants on human health or welfare, including but not limited to plankton, fish, shellfish, wildlife, shorelines, and beaches;
(B) the effect of disposal of pollutants on marine life including the transfer, concentration, and dispersal of pollutants or their byproducts through biological, physical, and chemical processes; changes in marine ecosystem diversity, productivity, and stability; and species and community population changes;
(C) the effect of disposal, of p
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1343
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.