Browse Arkansas Code titles and sections
33 U.S.C. § 1284 — Limitations and conditions
Federal law — U.S. Code and appendices · legal_authorities
Page 421
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1284
1 So in original. The period probably should be a semicolon.
amended Pub. L. 93–243, § 2, Jan. 2, 1974, 87 Stat.
1069; Pub. L. 95–217, §§ 18, 19, Dec. 27, 1977, 91 Stat.
1571, 1572; Pub. L. 96–483, § 6, Oct. 21, 1980, 94 Stat.
2362; Pub. L. 97–117, § 9, Dec. 29, 1981, 95 Stat. 1626;
Pub. L. 100–4, title II, §§ 203, 204, Feb. 4, 1987, 101
Stat. 16, 17.)
Editorial Notes
AMENDMENTS
1987—Subsec. (a). Pub. L. 100–4, § 203, designated pro-
vision relating to submission of plans, specifications,
and estimates, and provision relating to contractual
nature of approval by Administrator as par. (1), des-
ignated provision relating to requirements for award-
ing single grant for combined Federal share of cost of
preparing plans and specifications, and building and
erection of treatment works as par. (3), and added par.
(2).
Subsec. (f). Pub. L. 100–4, § 204, added subsec. (f).
1981—Subsec.
(a).
Pub.
L.
97–117
substituted
‘‘$8,000,000’’ for ‘‘$4,000,000’’ and struck out provision
that, if any State is found by the Administrator to
have unusually high costs of construction, the Admin-
istrator may authorize a single grant where the esti-
mated total cost of the treatment works does not ex-
ceed $5,000,000.
1980—Subsec.
(a).
Pub.
L.
96–483
substituted
‘‘$4,000,000’’
and
‘‘$5,000,000’’
for
‘‘$2,000,000’’
and
‘‘$3,000,000’’, respectively.
1977—Subsec. (a). Pub. L. 95–217, § 18, provided that, in
the case of a treatment works that has an estimated
total cost of $2,000,000 or less (as determined by the Ad-
ministrator), and the population of the applicant mu-
nicipality is twenty-five thousand or less (according to
the most recent United States census), upon comple-
tion of an approved facilit
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 1284
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: d1c1b4828a2b8e950eb0b2299006e2d2bcf6efe19423e817fef0cd7df942a049. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-9c02d95b4c1411bb0d5181d5
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-1284-limitations-and-conditions--46822cef37.md
Pages: Not recorded – Not recorded
Passage SHA-256: fa7027968e9a2b293688cb978761f90c17974bc39e72e9ca5a3bf7ca277bbaa0
Source location: USCODE-2024-title33-chap26-subchapII-sec1284.pdf
Stored source content
Page 421
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1284
1 So in original. The period probably should be a semicolon.
amended Pub. L. 93–243, § 2, Jan. 2, 1974, 87 Stat.
1069; Pub. L. 95–217, §§ 18, 19, Dec. 27, 1977, 91 Stat.
1571, 1572; Pub. L. 96–483, § 6, Oct. 21, 1980, 94 Stat.
2362; Pub. L. 97–117, § 9, Dec. 29, 1981, 95 Stat. 1626;
Pub. L. 100–4, title II, §§ 203, 204, Feb. 4, 1987, 101
Stat. 16, 17.)
Editorial Notes
AMENDMENTS
1987—Subsec. (a). Pub. L. 100–4, § 203, designated pro-
vision relating to submission of plans, specifications,
and estimates, and provision relating to contractual
nature of approval by Administrator as par. (1), des-
ignated provision relating to requirements for award-
ing single grant for combined Federal share of cost of
preparing plans and specifications, and building and
erection of treatment works as par. (3), and added par.
(2).
Subsec. (f). Pub. L. 100–4, § 204, added subsec. (f).
1981—Subsec.
(a).
Pub.
L.
97–117
substituted
‘‘$8,000,000’’ for ‘‘$4,000,000’’ and struck out provision
that, if any State is found by the Administrator to
have unusually high costs of construction, the Admin-
istrator may authorize a single grant where the esti-
mated total cost of the treatment works does not ex-
ceed $5,000,000.
1980—Subsec.
(a).
Pub.
L.
96–483
substituted
‘‘$4,000,000’’
and
‘‘$5,000,000’’
for
‘‘$2,000,000’’
and
‘‘$3,000,000’’, respectively.
1977—Subsec. (a). Pub. L. 95–217, § 18, provided that, in
the case of a treatment works that has an estimated
total cost of $2,000,000 or less (as determined by the Ad-
ministrator), and the population of the applicant mu-
nicipality is twenty-five thousand or less (according to
the most recent United States census), upon comple-
tion of an approved facility plan, a single grant may be
awarded for the combined Federal share of the cost of
preparing construction plans and specifications, and
the building and erection of the treatment works, and
that, if any State is found by the Administrator to
have unusually high costs of construction, the Admin-
istrator may authorize a single grant where the esti-
mated total cost of the treatment works does not ex-
ceed $3,000,000.
Subsec. (e). Pub. L. 95–217, § 19, added subsec. (e).
1974—Subsec. (d). Pub. L. 93–243 added subsec. (d).
§ 1284. Limitations and conditions
(a) Determinations by Administrator
Before approving grants for any project for
any treatment works under section 1281(g)(1) of
this title the Administrator shall determine—
(1) that any required areawide waste treat-
ment management plan under section 1288 of
this title (A) is being implemented for such
area and the proposed treatment works are in-
cluded in such plan, or (B) is being developed
for such area and reasonable progress is being
made toward its implementation and the pro-
posed treatment works will be included in
such plan;
(2) that (A) the State in which the project is
to be located (i) is implementing any required
plan under section 1313(e) of this title and the
proposed treatment works are in conformity
with such plan, or (ii) is developing such a
plan and the proposed treatment works will be
in conformity with such plan, and (B) such
State is in compliance with section 1315(b) of
this title;
(3) that such works have been certified by
the appropriate State water pollution control
agency as entitled to priority over such other
works in the State in accordance with any ap-
plicable State plan under section 1313(e) of
this title, except that any priority list devel-
oped pursuant to section 1313(e)(3)(H) of this
title may be modified by such State in accord-
ance with regulations promulgated by the Ad-
ministrator to give higher priority for grants
for the Federal share of the cost of preparing
construction drawings and specifications for
any treatment works utilizing processes and
techniques meeting the guidelines promul-
gated under section 1314(d)(3) of this title and
for grants for the combined Federal share of
the cost of preparing construction drawings
and specifications and the building and erec-
tion of any treatment works meeting the re-
quirements of the next to the last sentence of
section 1283(a) of this title which utilizes proc-
esses and techniques meeting the guidelines
promulgated under section 1314(d)(3) of this
title.1
(4) that the applicant proposing to construct
such works agrees to pay the non-Federal
costs of such works and has made adequate
provisions satisfactory to the Administrator
for assuring proper and efficient operation, in-
cluding the employment of trained manage-
ment and operations personnel, and the main-
tenance of such works in accordance with a
plan of operation approved by the State water
pollution control agency or, as appropriate,
the interstate agency, after construction
thereof;
(5) that the size and capacity of such works
relate directly to the needs to be served by
such works, including sufficient reserve capac-
ity. The amount of reserve capacity provided
shall be approved by the Administrator on the
basis of a comparison of the cost of con-
structing such reserves as a part of the works
to be funded and the anticipated cost of pro-
viding expanded capacity at a date when such
capacity will be required, after taking into ac-
count, in accordance with regulations promul-
gated by the Administrator, efforts to reduce
total flow of sewage and unnecessary water
consumption. The amount of reserve capacity
eligible for a grant under this subchapter shall
be determined by the Administrator taking
into account the projected population and as-
sociated commercial and industrial establish-
ments within the jurisdiction of the applicant
to be served by such treatment works as iden-
tified in an approved facilities plan, an
areawide plan under section 1288 of this title,
or an applicable municipal master plan of de-
velopment. For the purpose of this paragraph,
section 1288 of this title, and any such plan,
projected population shall be determined on
the basis of the latest information available
from the United States Department of Com-
merce or from the States as the Adminis-
trator, by regulation, determines appropriate.
Beginning October 1, 1984, no grant shall be
made under this subchapter to construct that
portion of any treatment works providing re-
serve capacity in excess of existing needs (in-
cluding existing needs of residential, commer-
cial, industrial, and other users) on the date of
Page 422
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1284
approval of a grant for the erection, building,
acquisition, alteration, remodeling, improve-
ment, or extension of a project for secondary
treatment or more stringent treatment or new
interceptors and appurtenances, except that in
no event shall reserve capacity of a facility
and its related interceptors to which this sub-
section applies be in excess of existing needs
on October 1, 1990. In any case in which an ap-
plicant proposes to provide reserve capacity
greater than that eligible for Federal financial
assistance under this subchapter, the incre-
mental costs of the additional reserve capac-
ity shall be paid by the applicant;
(6) that no specification for bids in connec-
tion with such works shall be written in such
a manner as to contain proprietary, exclu-
sionary, or discriminatory requirements other
than those based upon performance, unless
such requirements are necessary to test or
demonstrate a specific thing or to provide for
necessary interchangeability of parts and
equipment. When in the judgment of the
grantee, it is impractical or uneconomical to
make a clear and accurate description of the
technical requirements, a ‘‘brand name or
equal’’ description may be used as a means to
define the performance or other salient re-
quirements of a procurement, and in doing so
the grantee need not establish the existence of
any source other than the brand or source so
named.
(b) Additional determinations; issuance of guide-
lines; approval by Administrator; system of
charges
(1) Notwithstanding any other provision of
this subchapter, the Administrator shall not ap-
prove any grant for any treatment works under
section 1281(g)(1) of this title after March 1, 1973,
unless he shall first have determined that the
applicant (A) has adopted or will adopt a system
of charges to assure that each recipient of waste
treatment services within the applicant’s juris-
diction, as determined by the Administrator,
will pay its proportionate share (except as oth-
erwise provided in this paragraph) of the costs of
operation and maintenance (including replace-
ment) of any waste treatment services provided
by the applicant; and (B) has legal, institu-
tional, managerial, and financial capability to
insure adequate construction, operation, and
maintenance of treatment works throughout the
applicant’s jurisdiction, as determined by the
Administrator. In any case where an applicant
which, as of December 27, 1977, uses a system of
dedicated ad valorem taxes and the Adminis-
trator determines that the applicant has a sys-
tem of charges which results in the distribution
of operation and maintenance costs for treat-
ment works within the applicant’s jurisdiction,
to each user class, in proportion to the contribu-
tion to the total cost of operation and mainte-
nance of such works by each user class (taking
into account total waste water loading of such
works, the constituent elements of the wastes,
and other appropriate factors), and such appli-
cant is otherwise in compliance with clause (A)
of this paragraph with respect to each industrial
user, then such dedicated ad valorem tax system
shall be deemed to be the user charge system
meeting the requirements of clause (A) of this
paragraph for the residential user class and such
small non-residential user classes as defined by
the Administrator. In defining small non-resi-
dential users, the Administrator shall consider
the volume of wastes discharged into the treat-
ment works by such users and the constituent
elements of such wastes as well as such other
factors as he deems appropriate. A system of
user charges which imposes a lower charge for
low-income residential users (as defined by the
Administrator) shall be deemed to be a user
charge system meeting the requirements of
clause (A) of this paragraph if the Administrator
determines that such system was adopted after
public notice and hearing.
(2) The Administrator shall, within one hun-
dred and eighty days after October 18, 1972, and
after consultation with appropriate State, inter-
state, municipal, and intermunicipal agencies,
issue guidelines applicable to payment of waste
treatment costs by industrial and nonindustrial
recipients of waste treatment services which
shall establish (A) classes of users of such serv-
ices, including categories of industrial users; (B)
criteria against which to determine the ade-
quacy of charges imposed on classes and cat-
egories of users reflecting all factors that influ-
ence the cost of waste treatment, including
strength, volume, and delivery flow rate charac-
teristics of waste; and (C) model systems and
rates of user charges typical of various treat-
ment works serving municipal-industrial com-
munities.
(3) Approval by the Administrator of a grant
to an interstate agency established by inter-
state compact for any treatment works shall
satisfy any other requirement that such works
be authorized by Act of Congress.
(4) A system of charges which meets the re-
quirement of clause (A) of paragraph (1) of this
subsection may be based on something other
than metering the sewage or water supply flow
of residential recipients of waste treatment
services, including ad valorem taxes. If the sys-
tem of charges is based on something other than
metering the Administrator shall require (A)
the applicant to establish a system by which the
necessary funds will be available for the proper
operation and maintenance of the treatment
works; and (B) the applicant to establish a pro-
cedure under which the residential user will be
notified as to that portion of his total payment
which will be allocated to the cost of the waste
treatment services.
(c) Applicability of reserve capacity restrictions
to primary, secondary, or advanced waste
treatment facilities or related interceptors
The next to the last sentence of paragraph (5)
of subsection (a) of this section shall not apply
in any case where a primary, secondary, or ad-
vanced waste treatment facility or its related
interceptors has received a grant for erection,
building, acquisition, alteration, remodeling,
improvement, or extension before October 1,
1984, and all segments and phases of such facil-
ity and interceptors shall be funded based on a
20-year reserve capacity in the case of such fa-
cility and a 20-year reserve capacity in the case
of such interceptors, except that, if a grant for
Page 423
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1284
such interceptors has been approved prior to De-
cember 29, 1981, such interceptors shall be fund-
ed based on the approved reserve capacity not to
exceed 40 years.
(d) Engineering requirements; certification by
owner and operator; contractual assurances,
etc.
(1) A grant for the construction of treatment
works under this subchapter shall provide that
the engineer or engineering firm supervising
construction or providing architect engineering
services during construction shall continue its
relationship to the grant applicant for a period
of one year after the completion of construction
and initial operation of such treatment works.
During such period such engineer or engineering
firm shall supervise operation of the treatment
works, train operating personnel, and prepare
curricula and training material for operating
personnel. Costs associated with the implemen-
tation of this paragraph shall be eligible for
Federal assistance in accordance with this sub-
chapter.
(2) On the date one year after the completion
of construction and initial operation of such
treatment works, the owner and operator of
such treatment works shall certify to the Ad-
ministrator whether or not such treatment
works meet the design specifications and efflu-
ent limitations contained in the grant agree-
ment and permit pursuant to section 1342 of this
title for such works. If the owner and operator
of such treatment works cannot certify that
such treatment works meet such design speci-
fications and effluent limitations, any failure to
meet such design specifications and effluent
limitations shall be corrected in a timely man-
ner, to allow such affirmative certification, at
other than Federal expense.
(3) Nothing in this section shall be construed
to prohibit a grantee under this subchapter from
requiring more assurances, guarantees, or in-
demnity or other contractual requirements from
any party to a contract pertaining to a project
assisted under this subchapter, than those pro-
vided under this subsection.
(June 30, 1948, ch. 758, title II, § 204, as added
Pub. L. 92–500, § 2, Oct. 18, 1972, 86 Stat. 835;
amended Pub. L. 95–217, §§ 20–24, Dec. 27, 1977, 91
Stat. 1572, 1573; Pub. L. 96–483, § 2(a), (b), Oct. 21,
1980, 94 Stat. 2360, 2361; Pub. L. 97–117, §§ 10(a),
(b), 11, 12, Dec. 29, 1981, 95 Stat. 1626, 1627; Pub.
L. 100–4, title II, § 205(a)–(c), Feb. 4, 1987, 101 Stat.
18.)
Editorial Notes
AMENDMENTS
1987—Subsec. (a)(1). Pub. L. 100–4, § 205(a), amended
par. (1) generally. Prior to amendment, par. (1) read as
follows: ‘‘that such works are included in any applica-
ble areawide waste treatment management plan devel-
oped under section 1288 of this title;’’.
Subsec. (a)(2). Pub. L. 100–4, § 205(b), amended par. (2)
generally. Prior to amendment, par. (2) read as follows:
‘‘that such works are in conformity with any applicable
State plan under section 1313(e) of this title;’’.
Subsec. (b)(1). Pub. L. 100–4, § 205(c), inserted at end
‘‘A system of user charges which imposes a lower
charge for low-income residential users (as defined by
the Administrator) shall be deemed to be a user charge
system meeting the requirements of clause (A) of this
paragraph if the Administrator determines that such
system was adopted after public notice and hearing.’’
1981—Subsec. (a)(5). Pub. L. 97–117, § 10(a), inserted
provision that beginning Oct. 1, 1984, no grant be made
under this subchapter to construct that portion of any
treatment works providing reserve capacity in excess
of existing needs on the date of approval of a grant for
the erection, building, etc., of a project for secondary
treatment or more stringent treatment or new inter-
ceptors and appurtenances, except that in no event
shall reserve capacity of a facility and its related inter-
ceptors to which this subsection applies be in excess of
existing needs on Oct. 1, 1990, and that in any case in
which an applicant proposes to provide reserve capac-
ity greater than that eligible for Federal financial as-
sistance under this subchapter, the incremental costs
of the additional reserve capacity be paid by the appli-
cant.
Subsec. (a)(6). Pub. L. 97–117, § 11, struck out ‘‘, or at
least two brand names or trade names of comparable
quality or utility are listed and are followed by the
words ‘or equal’ ’’ after ‘‘parts and equipment’’ and in-
serted provision that when in the judgment of the
grantee, it is impractical or uneconomical to make a
clear and accurate description of the technical require-
ments, a ‘‘brand name or equal’’ description be used as
a means to define performance or other salient require-
ments of a procurement, and in doing so the grantee
need not establish the existence of any source other
than the brand or source so named.
Subsec. (c). Pub. L. 97–117, § 10(b), added subsec. (c).
Subsec. (d). Pub. L. 97–117, § 12, added subsec. (d).
1980—Subsec. (b)(1). Pub. L. 96–483, § 2(a), redesignated
cl. (C) as (B). Former cl. (B) relating to payment, as a
condition of approval of a grant, to an applicant by in-
dustrial users of that portion of cost of construction al-
locable to the treatment of such industrial waste to the
extent attributable to the Federal share of the cost of
construction, was struck out.
Subsec. (b)(3) to (6). Pub. L. 96–483, § 2(b), redesignated
pars. (4) and (5) as (3) and (4), respectively. Former par.
(3) relating to a formula determining the amount the
grantee shall retain of the revenues derived from the
payment of costs by industrial users of waste treat-
ment services, to the extent costs are attributable to
the Federal share of eligible project costs, and former
par. (6) relating to the exemption from the require-
ments of par. (1)(B) of industrial users with a flow of
twenty-five thousand gallons or less per day, were
struck out.
1977—Subsec. (a)(3). Pub. L. 95–217, § 20, provided that
any
priority
list
developed
pursuant
to
section
1313(e)(3)(H) of this title may be modified by such State
in accordance with regulations promulgated by the Ad-
ministrator to give higher priority for grants for the
Federal share of the cost of preparing construction
drawings and specifications for any treatment works
utilizing processes and techniques meeting the guide-
lines promulgated under section 1314(d)(3) of this title
and for grants for the combined Federal share of the
cost of preparing construction drawings and specifica-
tions and the building and erection of any treatment
works meeting the requirements of the next to the last
sentence of section 1283(a) of this title which utilizes
processes and techniques meeting the guidelines pro-
mulgated under section 1314(d)(3) of this title.
Subsec. (a)(5). Pub. L. 95–217, § 21, provided that ef-
forts to reduce total flow of sewage and unnecessary
water consumption be taken into account, in accord-
ance with regulations promulgated by the Adminis-
trator, that the amount of reserve capacity eligible for
a grant under this subchapter be determined by the Ad-
ministrator taking into account the projected popu-
lation and associated commercial and industrial estab-
lishments within the jurisdiction of the applicant to be
served by such treatment works as identified in an ap-
proved facilities plan, an areawide plan under section
1288 of this title, or an applicable municipal master
plan of development, and that, for the purpose of this
Page 424
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1285
paragraph, section 1288 of this title, and any such plan,
projected population be determined on the basis of the
latest information available from the United States
Department of Commerce or from the States as the Ad-
ministrator, by regulation, determines appropriate.
Subsec. (b)(1). Pub. L. 95–217, §§ 22(a)(1), (2), 24(c), in-
serted ‘‘(except as otherwise provided in this para-
graph)’’ after ‘‘proportionate share’’ in cl. (A) and
‘‘(which such portion, in the discretion of the appli-
cant, may be recovered from industrial users of the
total waste treatment system as distinguished from the
treatment works for which the grant is made)’’ in cl.
(B) and, at end of existing provisions, inserted sen-
tences under which a dedicated ad valorem tax system
is to be deemed the user charge system meeting the re-
quirements of cl. (A) for the residential user class and
such small non-residential user classes as defined by
the Administrator in cases where an applicant, as of
Dec. 27, 1977, uses a system of dedicated ad valorem
taxes and the Administrator determines that the appli-
cant has a system of charges which results in the dis-
tribution of operation and maintenance costs for treat-
ment works within the applicant’s jurisdiction, to each
user class, in proportion to the contribution to the
total cost of operation and maintenance of such works
by each user class (taking into account total waste
water loading of such works, the constituent elements
of the wastes, and other appropriate factors), and such
applicant is otherwise in compliance with cl. (A) of this
paragraph with respect to each industrial user.
Subsec. (b)(3). Pub. L. 95–217, §§ 23, 24(a), substituted
‘‘necessary for the administrative costs associated with
the requirement of paragraph (1)(B) of this subsection
and future expansion’’ for ‘‘necessary for future expan-
sion’’ in cl. (B) and, at end of existing provisions, in-
serted sentence under which, subject to the approval of
the Administrator, the following: ‘‘Not a grantee that
received a grant prior to Dec. 27, 1977, may reduce the
amounts required to be paid to such grantee by any in-
dustrial user of waste treatment services under such
paragraph, if such grantee requires such industrial user
to adopt other means of reducing the demand for waste
treatment services through reduction in the total flow
of sewage or unnecessary water consumption, in pro-
portion to such reduction as determined in accordance
with regulations promulgated by the Administrator’’.
Subsec. (b)(5), (6). Pub. L. 95–217, §§ 22(b), 24(b), added
pars. (5) and (6).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1987 AMENDMENT
Pub. L. 100–4, title II, § 205(d), Feb. 4, 1987, 101 Stat. 18,
provided that: ‘‘This section [amending this section]
shall take effect on the date of the enactment of this
Act [Feb. 4, 1987], except that the amendments made by
subsections (a) and (b) [amending this section] shall
take effect on the last day of the two-year period begin-
ning on such date of enactment.’’
EFFECTIVE DATE OF 1980 AMENDMENT
Amendment by Pub. L. 96–483 effective Dec. 27, 1977,
see section 2(g) of Pub. L. 96–483, set out as a note under
section 1281 of this title.
ELIMINATION OF INAPPLICABLE CONDITIONS OR
REQUIREMENTS FROM CERTAIN GRANTS
Pub. L. 96–483, § 2(c), Oct. 21, 1980, 94 Stat. 2361, pro-
vided that: ‘‘The Administrator of the Environmental
Protection Agency shall take such action as may be
necessary to remove from any grant made under sec-
tion 201(g)(1) of the Federal Water Pollution Control
Act [section 1281(g)(1) of this title] after March 1, 1973,
and prior to the date of enactment of this Act [Oct. 21,
1980], any condition or requirement no longer applica-
ble as a result of the repeals made by subsections (a)
and (b) of this section [amending subsec. (b) of this sec-
tion] or release any grant recipient of the obligations
established by such conditions or other requirement.’’
Section 2(c) of Pub. L. 96–483, set out above, effective
Dec. 27, 1977, see section 2(g) of Pub. L. 96–483, set out
as an Effective Date of 1980 Amendment note under sec-
tion 1281 of this title.
COST RECOVERY; SUSPENSION OF GRANT REQUIREMENTS
THAT INDUSTRIAL USERS MAKE PAYMENTS
Pub. L. 95–217, § 75, Dec. 27, 1977, 91 Stat. 1609, as
amended by Pub. L. 96–148, § 1, Dec. 16, 1979, 93 Stat.
1088; Pub. L. 96–483, § 2(f), Oct. 21, 1980, 94 Stat. 2361, di-
rected Administrator of Environmental Protection
Agency to study and report to Congress not later than
last day of twelfth month which begins after Dec. 27,
1977, cost recovery procedures from industrial users of
treatment works to the extent construction costs are
attributable to the Federal share of the cost of con-
struction.
§ 1285. Allotment of grant funds
(a) Funds for fiscal years during period June 30,
1972, and September 30, 1977; determination
of amount
Sums authorized to be appropriated pursuant
to section 1287 of this title for each fiscal year
beginning after June 30, 1972, and before Sep-
tember 30, 1977, shall be allotted by the Adminis-
trator not later than the January 1st imme-
diately preceding the beginning of the fiscal
year for which authorized, except that the allot-
ment for fiscal year 1973 shall be made not later
than 30 days after October 18, 1972. Such sums
shall be allotted among the States by the Ad-
ministrator in accordance with regulations pro-
mulgated by him, in the ratio that the esti-
mated cost of constructing all needed publicly
owned treatment works in each State bears to
the estimated cost of construction of all needed
publicly owned treatment works in all of the
States. For the fiscal years ending June 30, 1973,
and June 30, 1974, such ratio shall be determined
on the basis of table III of House Public Works
Committee Print No. 92–50. For the fiscal year
ending June 30, 1975, such ratio shall be deter-
mined one-half on the basis of table I of House
Public Works Committee Print Numbered 93–28
and one-half on the basis of table II of such
print, except that no State shall receive an al-
lotment less than that which it received for the
fiscal year ending June 30, 1972, as set forth in
table III of such print. Allotments for fiscal
years which begin after the fiscal year ending
June 30, 1975, shall be made only in accordance
with a revised cost estimate made and sub-
mitted to Congress in accordance with section
1375(b) of this title and only after such revised
cost estimate shall have been approved by law
specifically enacted after October 18, 1972.
(b) Availability and use of funds allotted for fis-
cal years during period June 30, 1972, and
September 30, 1977; reallotment
(1) Any sums allotted to a State under sub-
section (a) shall be available for obligation
under section 1283 of this title on and after the
date of such allotment. Such sums shall con-
tinue available for obligation in such State for
a period of one year after the close of the fiscal
year for which such sums are authorized. Any
amounts so allotted which are not obligated by
the end of such one-year period shall be imme-
diately reallotted by the Administrator, in ac-
cordance with regulations promulgated by him,
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Determinations by Administrator** Before approving grants for any project for any treatment works under [section 1281(g)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1281/g/1&num=0&edition=prelim) the Administrator shall determine—
(1) that any required areawide waste treatment management plan under [section 1288 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1288&num=0&edition=prelim) (A) is being implemented for such area and the proposed treatment works are included in such plan, or (B) is being developed for such area and reasonable progress is being made toward its implementation and the proposed treatment works will be included in such plan;
(2) that (A) the State in which the project is to be located (i) is implementing any required plan under [section 1313(e) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1313/e&num=0&edition=prelim) and the proposed treatment works are in conformity with such plan, or (ii) is developing such a plan and the proposed treatment works will be in conformity with such plan, and (B) such State is in compliance with [section 1315(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1315/b&num=0&edition=prelim);
(3) that such works have been certified by the appropriate State water pollution control agency as entitled to priority over such other works in the State in accordance with any applicable State plan under [section 1313(e) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1313/e&num=0&edition=prelim), except that any priority list developed pursuant to [section 1313(e)(3)(H) of this title](https://uscode.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1284
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.