Browse Arkansas Code titles and sections
42 U.S.C. § 18325 — NASA launch support and infrastructure
Federal law — U.S. Code and appendices · legal_authorities
Page 9151
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 18326
(2) associated testing facilities, either in
being or under construction as of October 11,
2010.
(b) Discharge of requirements
In meeting the requirements of subsection (a),
the Administrator—
(1) shall, to the extent practicable, utilize
ground-based
manufacturing
capability,
ground testing activities, launch and oper-
ations infrastructure, and workforce expertise;
(2) shall, to the extent practicable, minimize
the modification and development of ground
infrastructure and maximize the utilization of
existing software, vehicle, and mission oper-
ations processes;
(3) shall complete construction and activa-
tion of the A–3 test stand with a completion
goal of September 30, 2013;
(4) may procure, develop, and flight test ap-
plicable components; and
(5) shall take appropriate actions to ensure
timely and cost-effective development of the
Space Launch System and the multi-purpose
crew vehicle, including the use of a procure-
ment approach that incorporates adequate and
effective oversight, the facilitation of con-
tractor efficiencies, and the stream-lining of
contract and procurement requirements.
(Pub. L. 111–267, title III, § 304, Oct. 11, 2010, 124
Stat. 2816.)
§ 18325. NASA launch support and infrastructure
modernization program
(a) In general
The Administrator shall carry out a program
the primary purpose of which is to prepare infra-
structure at the Kennedy Space Center that is
needed to enable processing and launch of the
Space Launch System. Vehicle interfaces and
other ground processing and payload integration
areas should be simplified to minimize overall
costs, enhance safety, and complement the pur-
pose of this section.
(b) Elements
The program required by this sect
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 18325
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 75fdd27730fb9b2e89009307c60525347841ab38bd3defca34b5605c128aa193. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-99252aa0afa3b7815c2e3423
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-18325-nasa-launch-support-and-infrastructure--d05be861da.md
Pages: Not recorded – Not recorded
Passage SHA-256: 6b22b93df7770e7920f8638f38e1a52d324f435adfedc2e165e2a9d61d658cc7
Source location: USCODE-2024-title42-chap159-subchapII-sec18325.pdf
Stored source content
Page 9151
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 18326
(2) associated testing facilities, either in
being or under construction as of October 11,
2010.
(b) Discharge of requirements
In meeting the requirements of subsection (a),
the Administrator—
(1) shall, to the extent practicable, utilize
ground-based
manufacturing
capability,
ground testing activities, launch and oper-
ations infrastructure, and workforce expertise;
(2) shall, to the extent practicable, minimize
the modification and development of ground
infrastructure and maximize the utilization of
existing software, vehicle, and mission oper-
ations processes;
(3) shall complete construction and activa-
tion of the A–3 test stand with a completion
goal of September 30, 2013;
(4) may procure, develop, and flight test ap-
plicable components; and
(5) shall take appropriate actions to ensure
timely and cost-effective development of the
Space Launch System and the multi-purpose
crew vehicle, including the use of a procure-
ment approach that incorporates adequate and
effective oversight, the facilitation of con-
tractor efficiencies, and the stream-lining of
contract and procurement requirements.
(Pub. L. 111–267, title III, § 304, Oct. 11, 2010, 124
Stat. 2816.)
§ 18325. NASA launch support and infrastructure
modernization program
(a) In general
The Administrator shall carry out a program
the primary purpose of which is to prepare infra-
structure at the Kennedy Space Center that is
needed to enable processing and launch of the
Space Launch System. Vehicle interfaces and
other ground processing and payload integration
areas should be simplified to minimize overall
costs, enhance safety, and complement the pur-
pose of this section.
(b) Elements
The program required by this section shall in-
clude—
(1) investments to improve civil and na-
tional security operations at the Kennedy
Space Center, to enhance the overall capabili-
ties of the Center, and to reduce the long term
cost of operations and maintenance;
(2) measures to provide multi-vehicle sup-
port, improvements in payload processing, and
partnering at the Kennedy Space Center; and
(3) such other measures, including invest-
ments to improve launch infrastructure at
NASA flight facilities scheduled to launch
cargo to the ISS under the commercial orbital
transportation services program as the Ad-
ministrator may consider appropriate.
(c) Report on NASA launch support and infra-
structure modernization program
(1) Report required
Not later than 120 days after October 11, 2010,
the Administrator shall submit to the appro-
priate committees of Congress a report on the
plan for the implementation of the NASA
launch support and infrastructure moderniza-
tion program.
(2) Elements
The report required by this subsection shall
include—
(A) a description of the ground infrastruc-
ture plan tied to the Space Launch System
and potential ground investment activities
at other NASA centers related to supporting
the development of the Space Launch Sys-
tem;
(B) a description of proposed initiatives in-
tended to be conducted jointly or in coopera-
tion with Cape Canaveral Air Force Station,
Florida, or other installations or compo-
nents of the United States Government; and
(C) a description of plans to use funds au-
thorized to be appropriated by this chapter
to improve non-NASA facilities, which plans
shall include a business plan outlining the
nature and scope of investments planned by
other parties.
(Pub. L. 111–267, title III, § 305, Oct. 11, 2010, 124
Stat. 2817.)
§ 18326. Development of technologies and in-
space capabilities for beyond near-Earth
space missions
(a) Development authorized
The Administrator may initiate activities to
develop the following:
(1) Technologies identified as necessary ele-
ments of missions beyond low-Earth orbit.
(2) In-space capabilities such as refueling
and
storage
technology,
orbital
transfer
stages, innovative in-space propulsion tech-
nology, communications, and data manage-
ment that facilitate a broad range of users (in-
cluding military and commercial) and applica-
tions defining the architecture and design of
such missions.
(3) Spacesuit development and associated
life support technology.
(4) Flagship missions.
(b) Investments
In developing technologies and capabilities
under subsection (a), the Administrator may
make investments—
(1) in space technologies such as advanced
propulsion, propellant depots, in situ resource
utilization, and robotic payloads or capabili-
ties that enable human missions beyond low-
Earth orbit ultimately leading to Mars;
(2) in a space-based transfer vehicle includ-
ing these technologies with an ability to con-
duct space-based operations that provide capa-
bilities—
(A) to integrate with the Space Launch
System and other space-based systems;
(B) to provide opportunities for in-space
servicing of and delivery to multiple space-
based platforms; and
(C) to facilitate international efforts to ex-
pand human presence to deep space destina-
tions;
(3) in advanced life support technologies and
capabilities;
(4) in technologies and capabilities relating
to in-space power, propulsion, and energy sys-
tems;
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Initiation of development**
(1) **In general** — The Administrator shall continue the development of a multi-purpose crew vehicle to be available as soon as practicable, and no later than for use with the Space Launch System. The vehicle shall continue to advance development of the human safety features, designs, and systems in the Orion project.
(2) **Goal for operational capability** — It shall be the goal to achieve full operational capability for the transportation vehicle developed pursuant to this subsection by not later than December 31, 2016. For purposes of meeting such goal, the Administrator may undertake a test of the transportation vehicle at the ISS before that date.
**(b) Minimum capability requirements** The multi-purpose crew vehicle developed pursuant to subsection (a) shall be designed to have, at a minimum, the following:
(1) The capability to serve as the primary crew vehicle for missions beyond low-Earth orbit.
(2) The capability to conduct regular in-space operations, such as rendezvous, docking, and extra-vehicular activities, in conjunction with payloads delivered by the Space Launch System developed pursuant to [section 18322 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section18322&num=0&edition=prelim), or other vehicles, in preparation for missions beyond low-Earth orbit or servicing of assets described in [section 18383 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section18383&num=0&edition=prelim), or other assets in cis-lunar space.
(3) The capability to provide an alternative means of delivery of crew and cargo to the ISS, in the event other vehicles, whether commercial vehicles or partner-supplied vehicles, are unable to perform that function.
(4)
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 18325
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.