30 U.S.C. § 1259 — Performance bonds
Federal law — U.S. Code and appendices · legal_authorities
Page 281
TITLE 30—MINERAL LANDS AND MINING
§ 1259
(4) a detailed description of how the pro-
posed postmining land use is to be achieved
and the necessary support activities which
may be needed to achieve the proposed land
use;
(5) the engineering techniques proposed to be
used in mining and reclamation and a descrip-
tion of the major equipment; a plan for the
control of surface water drainage and of water
accumulation; a plan, where appropriate, for
backfilling, soil stabilization, and compacting,
grading, and appropriate revegetation; a plan
for soil reconstruction, replacement, and sta-
bilization, pursuant to the performance stand-
ards in section 1265(b)(7)(A), (B), (C), and (D) of
this title, for those food, forage, and forest
lands identified in section 1265(b)(7) of this
title; an estimate of the cost per acre of the
reclamation, including a statement as to how
the permittee plans to comply with each of
the requirements set out in section 1265 of this
title;
(6) the consideration which has been given to
maximize the utilization and conservation of
the solid fuel resource being recovered so that
reaffecting the land in the future can be mini-
mized;
(7) a detailed estimated timetable for the ac-
complishment of each major step in the rec-
lamation plan;
(8) the consideration which has been given to
making the surface mining and reclamation
operations consistent with surface owner
plans, and applicable State and local land use
plans and programs;
(9) the steps to be taken to comply with ap-
plicable air and water quality laws and regula-
tions and any applicable health and safety
standards;
(10) the consideration which has been given
to developing the reclamation plan in a man-
ner consistent with local physical environ-
mental, and
Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 1259
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 44148d1d28831924e917b38584785a678a67295a8a62a8ba00a03f8b3552b002. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-987ff7b06bd25dd90d27a323
Source file: Laws/federal/codes/united-states-code-2024/title-30/section-1259-performance-bonds--c70c61477c.md
Pages: Not recorded – Not recorded
Passage SHA-256: c57acc1c6c4040704678606fb8f9c0987dc3da515e2e62ef0d4ca8ad9d76d4ea
Source location: USCODE-2024-title30-chap25-subchapV-sec1259.pdf
Stored source content
Page 281
TITLE 30—MINERAL LANDS AND MINING
§ 1259
(4) a detailed description of how the pro-
posed postmining land use is to be achieved
and the necessary support activities which
may be needed to achieve the proposed land
use;
(5) the engineering techniques proposed to be
used in mining and reclamation and a descrip-
tion of the major equipment; a plan for the
control of surface water drainage and of water
accumulation; a plan, where appropriate, for
backfilling, soil stabilization, and compacting,
grading, and appropriate revegetation; a plan
for soil reconstruction, replacement, and sta-
bilization, pursuant to the performance stand-
ards in section 1265(b)(7)(A), (B), (C), and (D) of
this title, for those food, forage, and forest
lands identified in section 1265(b)(7) of this
title; an estimate of the cost per acre of the
reclamation, including a statement as to how
the permittee plans to comply with each of
the requirements set out in section 1265 of this
title;
(6) the consideration which has been given to
maximize the utilization and conservation of
the solid fuel resource being recovered so that
reaffecting the land in the future can be mini-
mized;
(7) a detailed estimated timetable for the ac-
complishment of each major step in the rec-
lamation plan;
(8) the consideration which has been given to
making the surface mining and reclamation
operations consistent with surface owner
plans, and applicable State and local land use
plans and programs;
(9) the steps to be taken to comply with ap-
plicable air and water quality laws and regula-
tions and any applicable health and safety
standards;
(10) the consideration which has been given
to developing the reclamation plan in a man-
ner consistent with local physical environ-
mental, and climatological conditions;
(11) all lands, interests in lands, or options
on such interests held by the applicant or
pending bids on interests in lands by the appli-
cant, which lands are contiguous to the area
to be covered by the permit;
(12) the results of test boring which the ap-
plicant has made at the area to be covered by
the permit, or other equivalent information
and data in a form satisfactory to the regu-
latory authority, including the location of
subsurface water, and an analysis of the chem-
ical properties including acid forming prop-
erties of the mineral and overburden: Provided,
That information which pertains only to the
analysis of the chemical and physical prop-
erties of the coal (excepting information re-
garding such mineral or elemental contents
which is potentially toxic in the environment)
shall be kept confidential and not made a mat-
ter of public record;
(13) a detailed description of the measures to
be taken during the mining and reclamation
process to assure the protection of:
(A) the quality of surface and ground
water systems, both on- and off-site, from
adverse effects of the mining and reclama-
tion process;
(B) the rights of present users to such
water; and
(C) the quantity of surface and ground
water systems, both on- and off-site, from
adverse effects of the mining and reclama-
tion
process
or
to
provide
alternative
sources of water where such protection of
quantity cannot be assured;
(14) such other requirements as the regu-
latory authority shall prescribe by regula-
tions.
(b) Any information required by this section
which is not on public file pursuant to State law
shall be held in confidence by the regulatory au-
thority.
(Pub. L. 95–87, title V, § 508, Aug. 3, 1977, 91 Stat.
478.)
§ 1259. Performance bonds
(a) Filing with regulatory authority; scope; num-
ber and amount
After a surface coal mining and reclamation
permit application has been approved but before
such a permit is issued, the applicant shall file
with the regulatory authority, on a form pre-
scribed and furnished by the regulatory author-
ity, a bond for performance payable, as appro-
priate, to the United States or to the State, and
conditional upon faithful performance of all the
requirements of this chapter and the permit.
The bond shall cover that area of land within
the permit area upon which the operator will
initiate and conduct surface coal mining and
reclamation operations within the initial term
of the permit. As succeeding increments of sur-
face coal mining and reclamation operations are
to be initiated and conducted within the permit
area, the permittee shall file with the regu-
latory authority an additional bond or bonds to
cover such increments in accordance with this
section. The amount of the bond required for
each bonded area shall depend upon the reclama-
tion requirements of the approved permit; shall
reflect the probable difficulty of reclamation
giving consideration to such factors as topog-
raphy, geology of the site, hydrology, and re-
vegetation potential, and shall be determined by
the regulatory authority. The amount of the
bond shall be sufficient to assure the completion
of the reclamation plan if the work had to be
performed by the regulatory authority in the
event of forfeiture and in no case shall the bond
for the entire area under one permit be less than
$10,000.
(b) Liability period; execution
Liability under the bond shall be for the dura-
tion of the surface coal mining and reclamation
operation and for a period coincident with oper-
ator’s responsibility for revegetation require-
ments in section 1265 of this title. The bond
shall be executed by the operator and a cor-
porate surety licensed to do business in the
State where such operation is located, except
that the operator may elect to deposit cash, ne-
gotiable bonds of the United States Government
or such State, or negotiable certificates of de-
posit of any bank organized or transacting busi-
ness in the United States. The cash deposit or
market value of such securities shall be equal to
or greater than the amount of the bond required
for the bonded area.
Page 282
TITLE 30—MINERAL LANDS AND MINING
§ 1260
(c) Bond of applicant without separate surety; al-
ternate system
The regulatory authority may accept the bond
of the applicant itself without separate surety
when the applicant demonstrates to the satis-
faction of the regulatory authority the exist-
ence of a suitable agent to receive service of
process and a history of financial solvency and
continuous operation sufficient for authoriza-
tion to self-insure or bond such amount or in
lieu of the establishment of a bonding program,
as set forth in this section, the Secretary may
approve as part of a State or Federal program
an alternative system that will achieve the ob-
jectives and purposes of the bonding program
pursuant to this section.
(d) Deposit of cash or securities
Cash or securities so deposited shall be depos-
ited upon the same terms as the terms upon
which surety bonds may be deposited. Such se-
curities shall be security for the repayment of
such negotiable certificate of deposit.
(e) Adjustments
The amount of the bond or deposit required
and the terms of each acceptance of the appli-
cant’s bond shall be adjusted by the regulatory
authority from time to time as affected land
acreages are increased or decreased or where the
cost of future reclamation changes.
(Pub. L. 95–87, title V, § 509, Aug. 3, 1977, 91 Stat.
479.)
§ 1260. Permit approval or denial
(a) Basis for decision; notification of applicant
and local government officials; burden of
proof
Upon the basis of a complete mining applica-
tion and reclamation plan or a revision or re-
newal thereof, as required by this chapter and
pursuant to an approved State program or Fed-
eral program under the provisions of this chap-
ter, including public notification and an oppor-
tunity for a public hearing as required by sec-
tion 1263 of this title, the regulatory authority
shall grant, require modification of, or deny the
application for a permit in a reasonable time set
by the regulatory authority and notify the ap-
plicant in writing. The applicant for a permit, or
revision of a permit, shall have the burden of es-
tablishing that his application is in compliance
with all the requirements of the applicable
State or Federal program. Within ten days after
the granting of a permit, the regulatory author-
ity shall notify the local governmental officials
in the local political subdivision in which the
area of land to be affected is located that a per-
mit has been issued and shall describe the loca-
tion of the land.
(b) Requirements for approval
No permit or revision application shall be ap-
proved unless the application affirmatively dem-
onstrates and the regulatory authority finds in
writing on the basis of the information set forth
in the application or from information other-
wise available which will be documented in the
approval, and made available to the applicant,
that—
(1) the permit application is accurate and
complete and that all the requirements of this
chapter and the State or Federal program
have been complied with;
(2) the applicant has demonstrated that rec-
lamation as required by this chapter and the
State or Federal program can be accomplished
under the reclamation plan contained in the
permit application;
(3) the assessment of the probable cumu-
lative impact of all anticipated mining in the
area on the hydrologic balance specified in
section 1257(b) of this title has been made by
the regulatory authority and the proposed op-
eration thereof has been designed to prevent
material damage to hydrologic balance out-
side permit area;
(4) the area proposed to be mined is not in-
cluded within an area designated unsuitable
for surface coal mining pursuant to section
1272 of this title or is not within an area under
study for such designation in an administra-
tive proceeding commenced pursuant to sec-
tion 1272(a)(4)(D) or section 1272(c) of this title
(unless in such an area as to which an admin-
istrative proceeding has commenced pursuant
to section 1272(a)(4)(D) of this title, the oper-
ator making the permit application dem-
onstrates that, prior to January 1, 1977, he has
made substantial legal and financial commit-
ments in relation to the operation for which
he is applying for a permit);
(5) the proposed surface coal mining oper-
ation, if located west of the one hundredth me-
ridian west longitude, would—
(A) not interrupt, discontinue, or preclude
farming on alluvial valley floors that are ir-
rigated or naturally subirrigated, but, ex-
cluding undeveloped range lands which are
not significant to farming on said alluvial
valley floors and those lands as to which the
regulatory authority finds that if the farm-
ing that will be interrupted, discontinued, or
precluded is of such small acreage as to be of
negligible impact on the farm’s agricultural
production, or
(B) not materially damage the quantity or
quality of water in surface or underground
water systems that supply these valley
floors in (A) of subsection (b)(5):
Provided, That this paragraph (5) shall not af-
fect those surface coal mining operations
which in the year preceding August 3, 1977, (I)
produced coal in commercial quantities, and
were located within or adjacent to alluvial
valley floors or (II) had obtained specific per-
mit approval by the State regulatory author-
ity to conduct surface coal mining operations
within said alluvial valley floors.
With respect to such surface mining operations
which would have been within the purview of the
foregoing proviso but for the fact that no coal
was so produced in commercial quantities and
no such specific permit approval was so re-
ceived, the Secretary, if he determines that sub-
stantial financial and legal commitments were
made by an operator prior to January 1, 1977, in
connection with any such operation, is author-
ized, in accordance with such regulations as the
Secretary may prescribe, to enter into an agree-
ment with that operator pursuant to which the
Secretary may, notwithstanding any other pro-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Filing with regulatory authority; scope; number and amount** After a surface coal mining and reclamation permit application has been approved but before such a permit is issued, the applicant shall file with the regulatory authority, on a form prescribed and furnished by the regulatory authority, a bond for performance payable, as appropriate, to the United States or to the State, and conditional upon faithful performance of all the requirements of this chapter and the permit. The bond shall cover that area of land within the permit area upon which the operator will initiate and conduct surface coal mining and reclamation operations within the initial term of the permit. As succeeding increments of surface coal mining and reclamation operations are to be initiated and conducted within the permit area, the permittee shall file with the regulatory authority an additional bond or bonds to cover such increments in accordance with this section. The amount of the bond required for each bonded area shall depend upon the reclamation requirements of the approved permit; shall reflect the probable difficulty of reclamation giving consideration to such factors as topography, geology of the site, hydrology, and revegetation potential, and shall be determined by the regulatory authority. The amount of the bond shall be sufficient to assure the completion of the reclamation plan if the work had to be performed by the regulatory authority in the event of forfeiture and in no case shall the bond for the entire area under one permit be less than $10,000.
**(b) Liability period; execution** Liability under the bond shall be for the duration of the surface coal mining and reclamation operation and for a period coincident with operator’s responsibility for revegetation requirements