Arkansas Legal Resource Navigator

42 U.S.C. § 10151 — Findings and purposes

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 10151 — Findings and purposes

Page 7993 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 10151 study to provide, by not later than December 31, 1993, findings and recommendations on reasonable stand- ards for protection of the public health and safety, in- cluding— ‘‘(A) whether a health-based standard based upon doses to individual members of the public from re- leases to the accessible environment (as that term is defined in the regulations contained in subpart B of part 191 of title 40, Code of Federal Regulations, as in effect on November 18, 1985) will provide a rea- sonable standard for protection of the health and safety of the general public; ‘‘(B) whether it is reasonable to assume that a system for post-closure oversight of the repository can be developed, based upon active institutional controls, that will prevent an unreasonable risk of breaching the repository’s engineered or geologic barriers or increasing the exposure of individual members of the public to radiation beyond allow- able limits; and ‘‘(C) whether it is possible to make scientifically supportable predictions of the probability that the repository’s engineered or geologic barriers will be breached as a result of human intrusion over a pe- riod of 10,000 years. ‘‘(3) APPLICABILITY.—The provisions of this section shall apply to the Yucca Mountain site, rather than any other authority of the Administrator to set gen- erally applicable standards for radiation protection. ‘‘(b) NUCLEAR REGULATORY COMMISSION REQUIREMENTS AND CRITERIA.— ‘‘(1) MODIFICATIONS.—Not later than 1 year after the Administrator promulgates standards under sub- section (a), the Nuclear Regulatory Commission shall, by rule, modify its technical requirements and criteria under section 121(b) of the Nuclear Waste Policy Act of 1982 (42 U.S.C

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 10151

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: b5c2b19676ae3d8e71715117c07c73f7ada6e81a4c34428714c45029705e5bef. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-9273af4908c3746bc9226bd7
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-10151-findings-and-purposes--0377df2185.md
Pages: Not recorded – Not recorded
Passage SHA-256: 41e4823643fb9276afe48c183466c0b9ab0ef4a9bb0fbe0f4669cd75255a6a0e

Source location: USCODE-2024-title42-chap108-subchapI-partB-sec10151.pdf

Stored source content

Page 7993 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 10151 study to provide, by not later than December 31, 1993, findings and recommendations on reasonable stand- ards for protection of the public health and safety, in- cluding— ‘‘(A) whether a health-based standard based upon doses to individual members of the public from re- leases to the accessible environment (as that term is defined in the regulations contained in subpart B of part 191 of title 40, Code of Federal Regulations, as in effect on November 18, 1985) will provide a rea- sonable standard for protection of the health and safety of the general public; ‘‘(B) whether it is reasonable to assume that a system for post-closure oversight of the repository can be developed, based upon active institutional controls, that will prevent an unreasonable risk of breaching the repository’s engineered or geologic barriers or increasing the exposure of individual members of the public to radiation beyond allow- able limits; and ‘‘(C) whether it is possible to make scientifically supportable predictions of the probability that the repository’s engineered or geologic barriers will be breached as a result of human intrusion over a pe- riod of 10,000 years. ‘‘(3) APPLICABILITY.—The provisions of this section shall apply to the Yucca Mountain site, rather than any other authority of the Administrator to set gen- erally applicable standards for radiation protection. ‘‘(b) NUCLEAR REGULATORY COMMISSION REQUIREMENTS AND CRITERIA.— ‘‘(1) MODIFICATIONS.—Not later than 1 year after the Administrator promulgates standards under sub- section (a), the Nuclear Regulatory Commission shall, by rule, modify its technical requirements and criteria under section 121(b) of the Nuclear Waste Policy Act of 1982 (42 U.S.C. 10141(b)), as necessary, to be consistent with the Administrator’s standards pro- mulgated under subsection (a). ‘‘(2) REQUIRED ASSUMPTIONS.—The Commission’s re- quirements and criteria shall assume, to the extent consistent with the findings and recommendations of the National Academy of Sciences, that, following re- pository closure, the inclusion of engineered barriers and the Secretary’s post-closure oversight of the Yucca Mountain site, in accordance with subsection (c), shall be sufficient to— ‘‘(A) prevent any activity at the site that poses an unreasonable risk of breaching the repository’s engineered or geologic barriers; and ‘‘(B) prevent any increase in the exposure of indi- vidual members of the public to radiation beyond allowable limits. ‘‘(c) POST-CLOSURE OVERSIGHT.—Following repository closure, the Secretary of Energy shall continue to over- see the Yucca Mountain site to prevent any activity at the site that poses an unreasonable risk of— ‘‘(1) breaching the repository’s engineered or geo- logic barriers; or ‘‘(2) increasing the exposure of individual members of the public to radiation beyond allowable limits.’’ § 10142. Disposal of spent nuclear fuel Notwithstanding any other provision of this part, any repository constructed on a site ap- proved under this part shall be designed and constructed to permit the retrieval of any spent nuclear fuel placed in such repository, during an appropriate period of operation of the facility, for any reason pertaining to the public health and safety, or the environment, or for the pur- pose of permitting the recovery of the economi- cally valuable contents of such spent fuel. The Secretary shall specify the appropriate period of retrievability with respect to any repository at the time of design of such repository, and such aspect of such repository shall be subject to ap- proval or disapproval by the Commission as part of the construction authorization process under subsections (b) through (d) of section 10134 of this title. (Pub. L. 97–425, title I, § 122, Jan. 7, 1983, 96 Stat. 2228.) § 10143. Title to material Delivery, and acceptance by the Secretary, of any high-level radioactive waste or spent nu- clear fuel for a repository constructed under this part shall constitute a transfer to the Sec- retary of title to such waste or spent fuel. (Pub. L. 97–425, title I, § 123, Jan. 7, 1983, 96 Stat. 2229.) § 10144. Consideration of effect of acquisition of water rights The Secretary shall give full consideration to whether the development, construction, and op- eration of a repository may require any pur- chase or other acquisition of water rights that will have a significant adverse effect on the present or future development of the area in which such repository is located. The Secretary shall mitigate any such adverse effects to the maximum extent practicable. (Pub. L. 97–425, title I, § 124, Jan. 7, 1983, 96 Stat. 2229.) § 10145. Termination of certain provisions Sections 10139 and 10140 of this title shall cease to have effect at such time as a repository devel- oped under this part is licensed to receive and possess high-level radioactive waste and spent nuclear fuel. (Pub. L. 97–425, title I, § 125, Jan. 7, 1983, 96 Stat. 2229.) PART B—INTERIM STORAGE PROGRAM § 10151. Findings and purposes (a) The Congress finds that— (1) the persons owning and operating civilian nuclear power reactors have the primary re- sponsibility for providing interim storage of spent nuclear fuel from such reactors, by maximizing, to the extent practical, the effec- tive use of existing storage facilities at the site of each civilian nuclear power reactor, and by adding new onsite storage capacity in a timely manner where practical; (2) the Federal Government has the responsi- bility to encourage and expedite the effective use of existing storage facilities and the addi- tion of needed new storage capacity at the site of each civilian nuclear power reactor; and (3) the Federal Government has the responsi- bility to provide, in accordance with the provi- sions of this part, not more than 1,900 metric tons of capacity for interim storage of spent nuclear fuel for civilian nuclear power reac- tors that cannot reasonably provide adequate storage capacity at the sites of such reactors when needed to assure the continued, orderly operation of such reactors. (b) The purposes of this part are— (1) to provide for the utilization of available spent nuclear fuel pools at the site of each ci- Page 7994 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 10152 1 See References in Text note below. vilian nuclear power reactor to the extent practical and the addition of new spent nu- clear fuel storage capacity where practical at the site of such reactor; and (2) to provide, in accordance with the provi- sions of this part, for the establishment of a federally owned and operated system for the interim storage of spent nuclear fuel at one or more facilities owned by the Federal Govern- ment with not more than 1,900 metric tons of capacity to prevent disruptions in the orderly operation of any civilian nuclear power reac- tor that cannot reasonably provide adequate spent nuclear fuel storage capacity at the site of such reactor when needed. (Pub. L. 97–425, title I, § 131, Jan. 7, 1983, 96 Stat. 2229.) § 10152. Available capacity for interim storage of spent nuclear fuel The Secretary, the Commission, and other au- thorized Federal officials shall each take such actions as such official considers necessary to encourage and expedite the effective use of available storage, and necessary additional stor- age, at the site of each civilian nuclear power reactor consistent with— (1) the protection of the public health and safety, and the environment; (2) economic considerations; (3) continued operation of such reactor; (4) any applicable provisions of law; and (5) the views of the population surrounding such reactor. (Pub. L. 97–425, title I, § 132, Jan. 7, 1983, 96 Stat. 2230.) § 10153. Interim at-reactor storage The Commission shall, by rule, establish pro- cedures for the licensing of any technology ap- proved by the Commission under section 10198(a) 1 of this title for use at the site of any ci- vilian nuclear power reactor. The establishment of such procedures shall not preclude the licens- ing, under any applicable procedures or rules of the Commission in effect prior to such establish- ment, of any technology for the storage of civil- ian spent nuclear fuel at the site of any civilian nuclear power reactor. (Pub. L. 97–425, title I, § 133, Jan. 7, 1983, 96 Stat. 2230.) Editorial Notes REFERENCES IN TEXT Section 10198(a) of this title, referred to in text, was in the original a reference to section 219(a) of Pub. L. 97–425, which is classified to section 10199(a) of this title, and has been translated as section 10198(a) of this title as the probable intent of Congress in view of the subject matter of section 10198(a) which relates to de- velopment of technologies for storage of spent nuclear fuel, and the subject matter of section 10199(a) which relates to payments to States and Indian tribes. § 10154. Licensing of facility expansions and transshipments (a) Oral argument In any Commission hearing under section 189 of the Atomic Energy Act of 1954 (42 U.S.C. 2239) on an application for a license, or for an amend- ment to an existing license, filed after January 7, 1983, to expand the spent nuclear fuel storage capacity at the site of a civilian nuclear power reactor, through the use of high-density fuel storage racks, fuel rod compaction, the trans- shipment of spent nuclear fuel to another civil- ian nuclear power reactor within the same util- ity system, the construction of additional spent nuclear fuel pool capacity or dry storage capac- ity, or by other means, the Commission shall, at the request of any party, provide an opportunity for oral argument with respect to any matter which the Commission determines to be in con- troversy among the parties. The oral argument shall be preceded by such discovery procedures as the rules of the Commission shall provide. The Commission shall require each party, in- cluding the Commission staff, to submit in writ- ten form, at the time of the oral argument, a summary of the facts, data, and arguments upon which such party proposes to rely that are known at such time to such party. Only facts and data in the form of sworn testimony or writ- ten submission may be relied upon by the par- ties during oral argument. Of the materials that may be submitted by the parties during oral ar- gument, the Commission shall only consider those facts and data that are submitted in the form of sworn testimony or written submission. (b) Adjudicatory hearing (1) At the conclusion of any oral argument under subsection (a), the Commission shall des- ignate any disputed question of fact, together with any remaining questions of law, for resolu- tion in an adjudicatory hearing only if it deter- mines that— (A) there is a genuine and substantial dis- pute of fact which can only be resolved with sufficient accuracy by the introduction of evi- dence in an adjudicatory hearing; and (B) the decision of the Commission is likely to depend in whole or in part on the resolution of such dispute. (2) In making a determination under this sub- section, the Commission— (A) shall designate in writing the specific facts that are in genuine and substantial dis- pute, the reason why the decision of the agen- cy is likely to depend on the resolution of such facts, and the reason why an adjudicatory hearing is likely to resolve the dispute; and (B) shall not consider— (i) any issue relating to the design, con- struction, or operation of any civilian nu- clear power reactor already licensed to oper- ate at such site, or any civilian nuclear power reactor for which a construction per- mit has been granted at such site, unless the Commission determines that any such issue substantially affects the design, construc- tion, or operation of the facility or activity for which such license application, author- ization, or amendment is being considered; or (ii) any siting or design issue fully consid- ered and decided by the Commission in con- nection with the issuance of a construction permit or operating license for a civilian nu- clear power reactor at such site, unless (I)

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 10141 — Findings and purposes

**(a)** The Congress finds that— (1) radioactive waste creates potential risks and requires safe and environmentally acceptable methods of disposal; (2) a national problem has been created by the accumulation of (A) spent nuclear fuel from nuclear reactors; and (B) radioactive waste from (i) reprocessing of spent nuclear fuel; (ii) activities related to medical research, diagnosis, and treatment; and (iii) other sources; (3) Federal efforts during the past 30 years to devise a permanent solution to the problems of civilian radioactive waste disposal have not been adequate; (4) while the Federal Government has the responsibility to provide for the permanent disposal of high-level radioactive waste and such spent nuclear fuel as may be disposed of in order to protect the public health and safety and the environment, the costs of such disposal should be the responsibility of the generators and owners of such waste and spent fuel; (5) the generators and owners of high-level radioactive waste and spent nuclear fuel have the primary responsibility to provide for, and the responsibility to pay the costs of, the interim storage of such waste and spent fuel until such waste and spent fuel is accepted by the Secretary of Energy in accordance with the provisions of this chapter; (6) State and public participation in the planning and development of repositories is essential in order to promote public confidence in the safety of disposal of such waste and spent fuel; and (7) high-level radioactive waste and spent nuclear fuel have become major subjects of public concern, and appropriate precautions must be taken to ensure that such waste and spent fuel do not adversely affect the public health and safety and the environment for this or future generations. **(b)** The purpose

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 10141

Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 10141. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 10141 — Certain standards and criteria

Page 7992 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 10140 § 10140. Expedited authorizations (a) Issuance of authorizations (1) To the extent that the taking of any action related to the site characterization of a site or the construction or initial operation of a reposi- tory under this part requires a certificate, right- of-way, permit, lease, or other authorization from a Federal agency or officer, such agency or officer shall issue or grant any such authoriza- tion at the earliest practicable date, to the ex- tent permitted by the applicable provisions of law administered by such agency or officer. All actions of a Federal agency or officer with re- spect to consideration of applications or re- quests for the issuance or grant of any such au- thorization shall be expedited, and any such ap- plication or request shall take precedence over any similar applications or requests not related to such repositories. (2) The provisions of paragraph (1) shall not apply to any certificate, right-of-way, permit, lease, or other authorization issued or granted by, or requested from, the Commission. (b) Terms of authorizations Any authorization issued or granted pursuant to subsection (a) shall include such terms and conditions as may be required by law, and may include terms and conditions permitted by law. (Pub. L. 97–425, title I, § 120, Jan. 7, 1983, 96 Stat. 2227.) § 10141. Certain standards and criteria (a) Environmental Protection Agency standards Not later than 1 year after January 7, 1983, the Administrator, pursuant to authority under other provisions of law, shall, by rule, promul- gate generally applicable standards for protec- tion of the general environment from offsite re- leases from radioactive material in repositories. (b) Commission requ

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 10141

Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 10141. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 10151 — Participation of States

**(a) Notification of States and affected tribes** The Secretary shall identify the States with one or more potentially acceptable sites for a repository within 90 days after January 7, 1983. Within 90 days of such identification, the Secretary shall notify the Governor, the State legislature, and the tribal council of any affected Indian tribe in any State of the potentially acceptable sites within such State. For the purposes of this subchapter, the term “potentially acceptable site” means any site at which, after geologic studies and field mapping but before detailed geologic data gathering, the Department undertakes preliminary drilling and geophysical testing for the definition of site location. **(b) State participation in repository siting decisions** (1) Unless otherwise provided by State law, the Governor or legislature of each State shall have authority to submit a notice of disapproval to the Congress under paragraph (2). In any case in which State law provides for submission of any such notice of disapproval by any other person or entity, any reference in this part to the Governor or legislature of such State shall be considered to refer instead to such other person or entity. (2) Upon the submission by the President to the Congress of a recommendation of a site for a repository, the Governor or legislature of the State in which such site is located may disapprove the site designation and submit to the Congress a notice of disapproval. Such Governor or legislature may submit such a notice of disapproval to the Congress not later than the 60 days after the date that the President recommends such site to the Congress under [section 10134 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section10134&num=0&edition=prelim). A

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 10151

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 2239 — Hearings and judicial review

**(a)** (1) (A) In any proceeding under this chapter, for the granting, suspending, revoking, or amending of any license or construction permit, or application to transfer control, and in any proceeding for the issuance or modification of rules and regulations dealing with the activities of licensees, and in any proceeding for the payment of compensation, an award or royalties under sections 11 So in original. Probably should be “section”. 2183, 2187, 2236(c) or 2238 of this title, the Commission shall grant a hearing upon the request of any person whose interest may be affected by the proceeding, and shall admit any such person as a party to such proceeding. The Commission shall hold a hearing after thirty days’ notice and publication once in the Federal Register, on each application under section 2133 or 2134(b) of this title for a construction permit for a facility, and on any application under [section 2134(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section2134/c&num=0&edition=prelim) for a construction permit for a testing facility. In cases where such a construction permit has been issued following the holding of such a hearing, the Commission may, in the absence of a request therefor by any person whose interest may be affected, issue an operating license or an amendment to a construction permit or an amendment to an operating license without a hearing, but upon thirty days’ notice and publication once in the Federal Register of its intent to do so. The Commission may dispense with such thirty days’ notice and publication with respect to any application for an amendment to a construction permit or an amendment to an operating license upon a determination by the Commission that the amendment involves no significant h

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 2239

Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 2239. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 2239 — Hearings and judicial review

Page 5530 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 2237 1 So in original. Probably should be ‘‘section’’. observe any of the terms and provisions of this chapter or of any regulation of the Commission. (b) Procedure The Commission shall follow the provisions of section 558(c) of title 5 in revoking any license. (c) Repossession of material Upon revocation of the license, the Commis- sion may immediately retake possession of all special nuclear material held by the licensee. In cases found by the Commission to be of extreme importance to the national defense and security or to the health and safety of the public, the Commission may recapture any special nuclear material held by the licensee or may enter upon and operate the facility prior to any of the pro- cedures provided under subchapter II of chapter 5 and chapter 7 of title 5. Just compensation shall be paid for the use of the facility. (Aug. 1, 1946, ch. 724, title I, § 186, as added Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 955; renumbered title I, Pub. L. 102–486, title IX, § 902(a)(8), Oct. 24, 1992, 106 Stat. 2944.) Editorial Notes REFERENCES IN TEXT This chapter, referred to in subsec. (a), was in the original ‘‘this Act’’, meaning act Aug. 1, 1946, ch. 724, as added by act Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 919, known as the Atomic Energy Act of 1954, which is clas- sified principally to this chapter. For complete classi- fication of this Act to the Code, see Short Title note set out under section 2011 of this title and Tables. CODIFICATION In subsecs. (b) and (c), ‘‘section 558(c) of title 5’’ and ‘‘subchapter II of chapter 5 and chapter 7 of title 5’’ substituted for ‘‘section 9(b) of the Administrative Pro- cedure Act [5 U.S.C. 1008(b)]’’ and ‘‘the Administration Procedure A

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 2239

Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 2239. This identifies an authority to review, not proof of applicability.