22 U.S.C. § 305 — Growth projections for new embassies and
Federal law — U.S. Code and appendices · legal_authorities
Page 292
TITLE 22—FOREIGN RELATIONS AND INTERCOURSE
§ 305
for ‘‘Annual report on embassy construction costs’’ in
section catchline.
Subsec. (a). Pub. L. 117–81, § 5203(a)(2), added subsec.
(a) and struck out former subsec. (a). Prior to amend-
ment, text read as follows: ‘‘Not later than 180 days
after December 16, 2016, and annually thereafter, the
Secretary shall submit to the appropriate congres-
sional committees and the Committees on Appropria-
tions of the Senate and the House of Representatives a
comprehensive report regarding all ongoing embassy
construction projects and major embassy security up-
grade projects.’’
Subsec. (b). Pub. L. 117–81, § 5203(a)(2), added subsec.
(b) and struck out former subsec. (b). Prior to amend-
ment, text read as follows: ‘‘Each report required under
subsection (a) shall include the following with respect
to each ongoing embassy construction projects and
major embassy security upgrade projects:
‘‘(1) The initial cost estimate.
‘‘(2) The amount expended on the project to date.
‘‘(3) The projected timeline for completing the
project.
‘‘(4) Any cost overruns incurred by the project.’’
2017—Subsec. (a). Pub. L. 115–94 inserted ‘‘and the
Committees on Appropriations of the Senate and the
House of Representatives’’ after ‘‘appropriate congres-
sional committees’’.
Statutory Notes and Related Subsidiaries
DEFINITIONS
For definitions of ‘‘Secretary’’ and ‘‘appropriate con-
gressional committees’’ as used in this section, see sec-
tion 2 of Pub. L. 114–323, set out as a note under section
2651 of this title.
§ 305. Growth projections for new embassies and
consulates
(a) In general
For each new United States embassy com-
pound (NEC) and new consulate compound
project (NCC) in or not yet in the design phase
as of De
Source: Supplied 2024 U.S. Code historical extraction · 22 U.S.C. § 305
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 1e8e646ba1dd41d2b5f5d3581b77ab9e0dec1854b3e1e2bdbd8723629ccf8a7c. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-8cd205a2999caf94b814e0cd
Source file: Laws/federal/codes/united-states-code-2024/title-22/section-305-growth-projections-for-new-embassies-and--0561017eb8.md
Pages: Not recorded – Not recorded
Passage SHA-256: f4886f452d0842448ab1f1d4f3e26f2d08e8fafe224ce161f62e3971face3d82
Source location: USCODE-2024-title22-chap8-sec305.pdf
Stored source content
Page 292
TITLE 22—FOREIGN RELATIONS AND INTERCOURSE
§ 305
for ‘‘Annual report on embassy construction costs’’ in
section catchline.
Subsec. (a). Pub. L. 117–81, § 5203(a)(2), added subsec.
(a) and struck out former subsec. (a). Prior to amend-
ment, text read as follows: ‘‘Not later than 180 days
after December 16, 2016, and annually thereafter, the
Secretary shall submit to the appropriate congres-
sional committees and the Committees on Appropria-
tions of the Senate and the House of Representatives a
comprehensive report regarding all ongoing embassy
construction projects and major embassy security up-
grade projects.’’
Subsec. (b). Pub. L. 117–81, § 5203(a)(2), added subsec.
(b) and struck out former subsec. (b). Prior to amend-
ment, text read as follows: ‘‘Each report required under
subsection (a) shall include the following with respect
to each ongoing embassy construction projects and
major embassy security upgrade projects:
‘‘(1) The initial cost estimate.
‘‘(2) The amount expended on the project to date.
‘‘(3) The projected timeline for completing the
project.
‘‘(4) Any cost overruns incurred by the project.’’
2017—Subsec. (a). Pub. L. 115–94 inserted ‘‘and the
Committees on Appropriations of the Senate and the
House of Representatives’’ after ‘‘appropriate congres-
sional committees’’.
Statutory Notes and Related Subsidiaries
DEFINITIONS
For definitions of ‘‘Secretary’’ and ‘‘appropriate con-
gressional committees’’ as used in this section, see sec-
tion 2 of Pub. L. 114–323, set out as a note under section
2651 of this title.
§ 305. Growth projections for new embassies and
consulates
(a) In general
For each new United States embassy com-
pound (NEC) and new consulate compound
project (NCC) in or not yet in the design phase
as of December 27, 2021, the Department shall
project growth over the estimated life of the fa-
cility using all available and relevant data, in-
cluding the following:
(1) Relevant historical trends for Depart-
ment personnel and personnel from other
agencies represented at the NEC or NCC that
is to be constructed.
(2) An analysis of the tradeoffs between risk
and the needs of United States Government
policy conducted as part of the most recent
Vital Presence Validation Process, if applica-
ble.
(3) Reasonable assumptions about the stra-
tegic importance of the NEC or NCC, as the
case may be, over the life of the building at
issue.
(4) Any other data that would be helpful in
projecting the future growth of NEC or NCC.
(b) Other Federal agencies
The head of each Federal agency represented
at a United States embassy or consulate shall
provide to the Secretary, upon request, growth
projections for the personnel of each such agen-
cy over the estimated life of each embassy or
consulate, as the case may be.
(c) Basis for estimates
The Department shall base its growth assump-
tion for all NECs and NCCs on the estimates re-
quired under subsections (a) and (b).
(d) Congressional notification
Any congressional notification of site selec-
tion for a NEC or NCC submitted after December
27, 2021 shall include the growth assumption
used pursuant to subsection (c).
(Pub. L. 117–81, div. E, title LII, § 5205, Dec. 27,
2021, 135 Stat. 2355.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Department of
State Authorization Act of 2021 and also as part of the
National Defense Authorization Act for Fiscal Year
2022, and not as part of the Foreign Service Buildings
Act, 1926, which comprises this chapter.
Statutory Notes and Related Subsidiaries
DEFINITIONS
For definitions of ‘‘Department’’ and ‘‘Secretary’’ as
used in this section, see section 5002 of Pub. L. 117–81,
set out as a note under section 263c of this title.
§ 306. Contracting methods in capital construc-
tion
(a) Delivery
Unless the Secretary of State notifies the ap-
propriate congressional committees that the use
of the design-build project delivery method
would not be appropriate, the Secretary shall
make use of such method at United States diplo-
matic posts that have not yet received design or
capital construction contracts as of December
27, 2021.
(b) Notification
Before executing a contract for a delivery
method other than design-build in accordance
with subsection (a), the Secretary of State shall
notify the appropriate congressional committees
in writing of the decision, including the reasons
therefor. The notification required by this sub-
section may be included in any other report re-
garding a new United States diplomatic post
that is required to be submitted to the appro-
priate congressional committees.
(c) Performance evaluation
Not later than 180 days after December 27,
2021, the Secretary of State shall report to the
appropriate congressional committees regarding
performance evaluation measures in accordance
with GAO’s ‘‘Standards for Internal Control in
the Federal Government’’ that will be applicable
to design and construction, lifecycle cost, and
building maintenance programs of the Bureau of
Overseas Building Operations of the Depart-
ment.
(Pub. L. 117–81, div. E, title LII, § 5211, Dec. 27,
2021, 135 Stat. 2358.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Department of
State Authorization Act of 2021 and also as part of the
National Defense Authorization Act for Fiscal Year
2022, and not as part of the Foreign Service Buildings
Act, 1926, which comprises this chapter.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** For each new United States embassy compound (NEC) and new consulate compound project (NCC) in or not yet in the design phase as of December 27, 2021, the Department shall project growth over the estimated life of the facility using all available and relevant data, including the following:
(1) Relevant historical trends for Department personnel and personnel from other agencies represented at the NEC or NCC that is to be constructed.
(2) An analysis of the tradeoffs between risk and the needs of United States Government policy conducted as part of the most recent Vital Presence Validation Process, if applicable.
(3) Reasonable assumptions about the strategic importance of the NEC or NCC, as the case may be, over the life of the building at issue.
(4) Any other data that would be helpful in projecting the future growth of NEC or NCC.
**(b) Other Federal agencies** The head of each Federal agency represented at a United States embassy or consulate shall provide to the Secretary, upon request, growth projections for the personnel of each such agency over the estimated life of each embassy or consulate, as the case may be.
**(c) Basis for estimates** The Department shall base its growth assumption for all NECs and NCCs on the estimates required under subsections (a) and (b).
**(d) Congressional notification** Any congressional notification of site selection for a NEC or NCC submitted after December 27, 2021 shall include the growth assumption used pursuant to subsection (c).
Source: Supplied U.S. Code snapshot — release unconfirmed · 22 U.S.C. § 305
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.