Arkansas Legal Resource Navigator

43 U.S.C. § 485h — New projects; sale of water and electric

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 485h — New projects; sale of water and electric

Page 165 TITLE 43—PUBLIC LANDS § 485h 1 See References in Text note below. EXTENSION OF SECRETARY’S AUTHORITY TO ENTER INTO AMENDATORY CONTRACTS Secretary’s authority extended through Dec. 31, 1960, see section 485b–1 of this title. § 485g. Classification of lands (a) Generally The Secretary is authorized and directed in the manner hereinafter provided to classify or to reclassify, from time to time but not more often than at five-year intervals, as to irrigability and productivity those lands which have been, are, or may be included within any project. (b) Necessity for request No classification or reclassification pursuant to the authority of this subchapter shall be un- dertaken unless a request therefor, by an organi- zation or duly authorized representatives of the water users, in the form required by subsection (c) of this section has been made of the Sec- retary. The Secretary shall plan the classifica- tion work, undertaken pursuant to the author- ity of this section, in such manner as in his judgment will result in the most expeditious completion of the work. (c) Furnishing data In any request made to the Secretary for a land classification or reclassification under this section, the organization or representatives of the water users shall furnish a list of those lands which are considered to be of comparatively low productivity or to be nonproductive, and of those lands which are considered to be of greater or lesser productivity than indicated by existing classifications, if any, made pursuant to the Federal reclamation laws, and shall furnish also such data relating thereto as the Secretary by regulation may require. (d) Primary determination Upon receipt of any such request the Sec- retary shall make a preliminary d

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 485h

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: be7460eae96b3d25c3b15e1756ae9f7cb3631831bb3c52f02dd50a83906f8e95. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-8acf4471b6614f27bc9c7fac
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-485h-new-projects-sale-of-water-and-electric--2edf6f7cf3.md
Pages: Not recorded – Not recorded
Passage SHA-256: f6512d6ca24cdc386872059efd90f4240bccc734912a45483f57944373ffa111

Source location: USCODE-2024-title43-chap12-subchapX-sec485h.pdf

Stored source content

Page 165 TITLE 43—PUBLIC LANDS § 485h 1 See References in Text note below. EXTENSION OF SECRETARY’S AUTHORITY TO ENTER INTO AMENDATORY CONTRACTS Secretary’s authority extended through Dec. 31, 1960, see section 485b–1 of this title. § 485g. Classification of lands (a) Generally The Secretary is authorized and directed in the manner hereinafter provided to classify or to reclassify, from time to time but not more often than at five-year intervals, as to irrigability and productivity those lands which have been, are, or may be included within any project. (b) Necessity for request No classification or reclassification pursuant to the authority of this subchapter shall be un- dertaken unless a request therefor, by an organi- zation or duly authorized representatives of the water users, in the form required by subsection (c) of this section has been made of the Sec- retary. The Secretary shall plan the classifica- tion work, undertaken pursuant to the author- ity of this section, in such manner as in his judgment will result in the most expeditious completion of the work. (c) Furnishing data In any request made to the Secretary for a land classification or reclassification under this section, the organization or representatives of the water users shall furnish a list of those lands which are considered to be of comparatively low productivity or to be nonproductive, and of those lands which are considered to be of greater or lesser productivity than indicated by existing classifications, if any, made pursuant to the Federal reclamation laws, and shall furnish also such data relating thereto as the Secretary by regulation may require. (d) Primary determination Upon receipt of any such request the Sec- retary shall make a preliminary determination whether the requested land classification or re- classification probably is justified by reason of the conditions of the lands involved and other pertinent conditions of the project, including its contractual relations with the United States. (e) Probable justification If the Secretary finds probable justification and if the advance to the United States herein- after required is made, he shall undertake as soon as practicable the classification or reclassi- fication of the lands listed in the request, and of any other lands which have been, are, or may be included within the project involved and which in his judgment should be classified or reclassi- fied. (f) Expenses One-half of the expense involved in any classi- fication work undertaken pursuant to this sec- tion shall be charged to operation and mainte- nance administration nonreimbursable; and one- half shall be paid in advance by the organization involved. On determining probable justification for the requested classification or reclassifica- tion as provided in this section, the Secretary shall estimate the cost of the work involved and shall submit a statement of the estimated cost to said organization. Said organization, before commencement of the work, shall advance to the United States one-half of the amount set forth in said statement and also shall advance one-half of the amount of supplementary esti- mates of costs which the Secretary may find it necessary to make from time to time during the progress of the work; and said amounts shall be and remain available for expenditure by the Sec- retary for the purposes for which they are ad- vanced, until the work is completed or aban- doned. After completion or abandonment of the work, the Secretary, shall determine the actual costs thereof; and said organization shall pay any additional amount required to make its total payments hereunder equal to one-half of the actual cost or shall be credited with any amount by which advances made by it exceed one-half of said actual cost, as the case may be. (g) Classification as prerequisite to contract If in the judgment of the Secretary a classi- fication or reclassification pursuant to the pro- visions of this section is a necessary preliminary to entering into a contract under section 485b or 485c 1 of this title, he may require the same as a condition precedent to entering into such a con- tract. (h) Modification of existing obligations No modification of any existing obligation to pay construction charges on any project shall be made by reason of any classification or reclassi- fication undertaken pursuant to this section without express authority therefor granted by Congress upon recommendations of the Sec- retary made in a report under subsection (f) of this section. (Aug. 4, 1939, ch. 418, § 8, 53 Stat. 1192; Pub. L. 93–608, § 1(18), Jan. 2, 1975, 88 Stat. 1970.) Editorial Notes REFERENCES IN TEXT The Federal reclamation laws, referred to in subsec. (c), are defined in section 485a of this title. Section 485c of this title, referred to in subsec. (g), was repealed by Pub. L. 85–611, § 3, Aug. 8, 1958, 72 Stat. 543. AMENDMENTS 1975—Subsecs. (f) to (i). Pub. L. 93–608 redesignated subsecs. (g) to (i) as (f) to (h), respectively. Former sub- sec. (f), which required a report to Congress by the Sec- retary on classifications and reclassifications or project lands, was struck out. § 485h. New projects; sale of water and electric power; lease of power privileges (a) Findings of Secretary No expenditures for the construction of any new project, new division of a project, or new supplemental works on a project shall be made, nor shall estimates be submitted therefor, by the Secretary until after he has made an inves- tigation thereof and has submitted to the Presi- dent and to the Congress his report and findings on— (1) the engineering feasibility of the pro- posed construction; Page 166 TITLE 43—PUBLIC LANDS § 485h 1 So in original. Probably should be preceded by ‘‘to’’. (2) the estimated cost of the proposed con- struction; (3) the part of the estimated cost which can properly be allocated to irrigation and prob- ably be repaid by the water users; (4) the part of the estimated cost which can properly be allocated to power and probably be returned to the United States in net power revenues; (5) the part of the estimated cost which can properly be allocated to municipal water sup- ply or other miscellaneous purposes and prob- ably be returned to the United States. If the proposed construction is found by the Sec- retary to have engineering feasibility and if the repayable and returnable allocations to irriga- tion, power, and municipal water supply or other miscellaneous purposes found by the Sec- retary to be proper, together with any alloca- tion to flood control or navigation made under subsection (b) of this section, equal the total es- timated cost of construction as determined by the Secretary, then the new project, new divi- sion of a project, or supplemental works on a project, covered by his findings, shall be deemed authorized and may be undertaken by the Sec- retary. If all such allocations do not equal said total estimated cost, then said new project, new division, or new supplemental works may be un- dertaken by the Secretary only after provision therefor has been made by Act of Congress en- acted after the Secretary has submitted to the President and the Congress the report and find- ings involved. (b) Allocation of part of cost to flood control or navigation In connection with any new project, new divi- sion of a project, or supplemental works on a project there may be allocated to flood control or navigation the part of said total estimated cost which the Secretary may find to be proper. Items for any such allocations made in connec- tion with projects which may be undertaken pursuant to subsection (a) of this section shall be included in the estimates of appropriations submitted by the Secretary for said projects, and funds for such portions of the projects shall not become available except as directly appro- priated or allotted to the Department of the In- terior. In connection with the making of such an allocation, the Secretary shall consult with the Chief of Engineers and the Secretary of the Army, and may perform any of the necessary in- vestigations or studies under a cooperative agreement with the Secretary of the Army. In the event of such an allocation the Secretary of the Interior shall operate the project for pur- poses of flood control or navigation, to the ex- tent justified by said allocation therefor. (c) Furnishing water to municipalities; sale of electric power; lease of power privileges (1) The Secretary is authorized to enter into contracts to furnish water for municipal water supply or miscellaneous purposes: Provided, That any such contract either (A) shall require repay- ment to the United States, over a period of not to exceed forty years from the year in which water is first delivered for the use of the con- tracting party, with interest not exceeding the rate of 31⁄2 per centum per annum if the Sec- retary determines an interest charge to be prop- er, of an appropriate share as determined by the Secretary of that part of the construction costs allocated by him to municipal water supply or other miscellaneous purposes; or (B) shall be for such periods, not to exceed forty years, and at such rates as in the Secretary’s judgment will produce revenues at least sufficient to cover an appropriate share of the annual operation and maintenance cost and an appropriate share of such fixed charges as the Secretary deems prop- er, and shall require the payment of said rates each year in advance of delivery of water for said year. Any sale of electric power or lease of power privileges, made by the Secretary in con- nection with the operation of any project or di- vision of a project, shall be for such periods, not to exceed forty years, and at such rates as in his judgment will produce power revenues at least sufficient to cover an appropriate share of the annual operation and maintenance cost, interest on an appropriate share of the construction in- vestment at not less than 3 per centum per annum, and such other fixed charges as the Sec- retary deems proper: Provided further, That in said sales or leases preference shall be given to municipalities and other public corporations or agencies; and also to cooperatives and other nonprofit organizations financed in whole or in part by loans made pursuant to the Rural Elec- trification Act of 1936 [7 U.S.C. 901 et seq.]. Nothing in this subsection shall be applicable to provisions in existing contracts, made pursuant to law, for the use of power and miscellaneous revenues of a project for the benefit of users of water from such project. The provisions of this subsection respecting the sales of electric power and leases of power privileges shall be an au- thorization in addition to and alternative to any authority in existing laws related to particular projects and reserve to the Secretary the exclu- sive authority to develop small conduit hydro- power using Bureau of Reclamation facilities and pumped storage hydropower exclusively using Bureau of Reclamation reservoirs. No con- tract relating to municipal water supply or mis- cellaneous purposes or to electric power or power privileges shall be made unless, in the judgment of the Secretary, it will not impair the efficiency of the project for irrigation pur- poses. (2)(A) When carrying out this subsection, the Secretary shall first offer the lease of power privilege to an irrigation district or water users association operating the applicable transferred conduit, or to the irrigation district or water users association receiving water from the appli- cable reserved conduit. The Secretary shall de- termine a reasonable time frame for the irriga- tion district or water users association to accept or reject a lease of power privilege offer for a small conduit hydropower project. (B) If the irrigation district or water users as- sociation elects not accept 1 a lease of power privilege offer under subparagraph (A), the Sec- retary shall offer the lease of power privilege to other parties in accordance with this subsection. (3) The Bureau of Reclamation shall apply its categorical exclusion process under the National Page 167 TITLE 43—PUBLIC LANDS § 485h Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) to small conduit hydropower develop- ment under this subsection, excluding siting of associated transmission facilities on Federal lands. (4) The Power Resources Office of the Bureau of Reclamation shall be the lead office of small conduit hydropower policy and procedure-set- ting activities conducted under this subsection. (5) Nothing in this subsection shall obligate the Western Area Power Administration, the Bonneville Power Administration, or the South- western Power Administration to purchase or market any of the power produced by the facili- ties covered under this subsection and none of the costs associated with production or delivery of such power shall be assigned to project pur- poses for inclusion in project rates. (6) Nothing in this subsection shall alter or impede the delivery and management of water by Bureau of Reclamation facilities, as water used for conduit hydropower generation shall be deemed incidental to use of water for the origi- nal project purposes. Lease of power privilege shall be made only when, in the judgment of the Secretary, the exercise of the lease will not be incompatible with the purposes of the project or division involved, nor shall it create any unmiti- gated financial or physical impacts to the project or division involved. The Secretary shall notify and consult with the irrigation district or water users association operating the trans- ferred conduit before offering the lease of power privilege and shall prescribe terms and condi- tions that will adequately protect the planning, design, construction, operation, maintenance, and other interests of the United States and the project or division involved. (7) Nothing in this subsection shall alter or af- fect any existing agreements for the develop- ment of conduit hydropower projects or disposi- tion of revenues. (8) Nothing in this subsection shall alter or af- fect any existing preliminary permit, license, or exemption issued by the Federal Energy Regu- latory Commission under Part I of the Federal Power Act (16 U.S.C. 792 et seq.) or any project for which an application was filed with the Fed- eral Energy Regulatory Commission before Au- gust 9, 2013, and is still pending. (9) In this subsection: (A) CONDUIT.—The term ‘‘conduit’’ means any Bureau of Reclamation tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. (B) IRRIGATION DISTRICT.—The term ‘‘irriga- tion district’’ means any irrigation, water conservation or conservancy, multicounty water conservation or conservancy district, or any separate public entity composed of two or more such districts and jointly exercising powers of its member districts. (C) RESERVED CONDUIT.—The term ‘‘reserved conduit’’ means any conduit that is included in project works the care, operation, and maintenance of which has been reserved by the Secretary, through the Commissioner of the Bureau of Reclamation. (D) TRANSFERRED CONDUIT.—The term ‘‘transferred conduit’’ means any conduit that is included in project works the care, oper- ation, and maintenance of which has been transferred to a legally organized water users association or irrigation district. (E) SMALL CONDUIT HYDROPOWER.—The term ‘‘small conduit hydropower’’ means a facility capable of producing 5 megawatts or less of electric capacity. (d) Delivery of water for irrigation; repayment contract prerequisites No water may be delivered for irrigation of lands in connection with any new project, new division of a project, or supplemental works on a project until an organization, satisfactory in form and powers to the Secretary, has entered into a repayment contract with the United States, in a form satisfactory to the Secretary, providing among other things— (1) That the Secretary may fix a develop- ment period for each irrigation block, if any, of not to exceed ten years from and including the first calendar year in which water is deliv- ered for the lands in said block; and that dur- ing the development period water shall be de- livered to the lands in the irrigation block in- volved at a charge per annum per acre-foot, or other charge, to be fixed by the Secretary each year and to be paid in advance of delivery of water: Provided, That where the lands included in an irrigation block are for the most part lands owned by the United States, the Sec- retary, prior to execution of a repayment con- tract, may fix a development period, but in such case execution of such a contract shall be a condition precedent to delivery of water after the close of the development period: Pro- vided further, That when the Secretary, by con- tract or by notice given thereunder, shall have fixed a development period of less than ten years, and at any time thereafter but before commencement of the repayment period con- ditions arise which in the judgment of the Sec- retary would have justified the fixing of a longer period, he may amend such contract or notice to extend such development period to a date not to exceed ten years from its com- mencement, and in a case where no develop- ment period was provided, he may amend such contract within the same limits: Provided fur- ther, That when the Secretary shall have de- ferred the payment of all or any part of any installments of construction charges under any repayment contract pursuant to the au- thority of the Act of September 21, 1959 (73 Stat. 584), he may, at any time prior to the due date prescribed for the first installment not reduced by such deferment, and by agree- ment with the contracting organization, ter- minate the supplemental contract by which such deferment was effected, credit the con- struction payments made, and exercise the au- thority granted in this section. After the close of the development period, any such charges collected and which the Secretary determines to be in excess of the cost of the operation and maintenance during the development period shall be credited to the construction cost of the project in the manner determined by the Secretary. Page 168 TITLE 43—PUBLIC LANDS § 485h (2) That the part of the construction costs allocated by the Secretary to irrigation shall be included in a general repayment obligation of the organization; and that the organization may vary its distribution of construction charges in a manner that takes into account the productivity of the various classes of lands and the benefits accruing to the lands by rea- son of the construction: Provided, That no dis- tribution of construction charges over the lands included in the organization shall in any manner be deemed to relieve the organization or any party or any land therein of the organi- zation’s general obligation to the United States. (3) That the general repayment obligation of the organization shall be spread in annual in- stallments, of the number and amounts fixed by the Secretary, over a period of not more than 40 years, exclusive of any development period fixed under paragraph (1) of this sub- section, for any project contract unit or, if the project contract unit be divided into two or more irrigation blocks, for any such block, or as near to said period of not more than forty years as is consistent with the adoption and operation of a variable payment formula which, being based on full repayment within such period under average conditions, permits variance in the required annual payments in the light of economic factors pertinent to the ability of the organization to pay. (4) That the first annual installment for any project contract unit, or for any irrigation block, as the case may be, shall accrue, on the date fixed by the Secretary, in the year after the last year of the development period or, if there be not development period, in the cal- endar year after the Secretary announces that the construction contemplated in the repay- ment contract is substantially completed or is advanced to a point where delivery of water can be made to substantially all of the lands in said unit or block to be irrigated; and if there be no development period fixed, that prior to and including the year in which the Secretary makes said announcement water shall be delivered only on the toll charge basis hereinbefore provided for development periods. (e) Contracts to furnish water In lieu of entering into a repayment contract pursuant to the provisions of subsection (d) of this section to cover that part of the cost of the construction of works connected with water sup- ply and allocated to irrigation, the Secretary, in his discretion, may enter into either short- or long-term contracts to furnish water for irriga- tion purposes. Each such contract shall be for such period, not to exceed forty years, and at such rates as in the Secretary’s judgment will produce revenues at least sufficient to cover an appropriate share of the annual operation and maintenance cost and an appropriate share of such fixed charges as the Secretary deems prop- er, due consideration being given to that part of the cost of construction of works connected with water supply and allocated to irrigation; and shall require payment of said rates each year in advance of delivery of water for said year. In the event such contracts are made for furnishing water for irrigation purposes, the costs of any irrigation water distribution works constructed by the United States in connection with the new project, new division of a project, or supple- mental works on a project, shall be covered by a repayment contract entered into pursuant to said subsection (d). (f) Public participation No less than sixty days before entering into or amending any repayment contract or any con- tract for the delivery of irrigation water (except any contract for the delivery of surplus or in- terim irrigation water whose duration is for one year or less) the Secretary shall— (1) publish notice of the proposed contract or amendment in newspapers of general circula- tion in the affected area and shall make rea- sonable efforts to otherwise notify interested parties which may be affected by such con- tract or amendment, together with informa- tion indicating to whom comments or inquir- ies concerning the proposed actions can be ad- dressed; and (2) provide an opportunity for submission of written data, views and arguments, and shall consider all substantive comments so received. (Aug. 4, 1939, ch. 418, § 9, 53 Stat. 1193; July 26, 1947, ch. 343, title II, § 205(a), 61 Stat. 501; Pub. L. 85–611, §§ 1, 3, Aug. 8, 1958, 72 Stat. 542, 543; Pub. L. 87–613, § 2, Aug. 28, 1962, 76 Stat. 407; Pub. L. 97–293, title II, § 226, Oct. 12, 1982, 96 Stat. 1273; Pub. L. 113–24, § 2, Aug. 9, 2013, 127 Stat. 498; Pub. L. 117–58, div. D, title III, § 40335, Nov. 15, 2021, 135 Stat. 1025.) Editorial Notes REFERENCES IN TEXT The Rural Electrification Act of 1936, referred to in subsec. (c)(1), is act May 20, 1936, ch. 432, 49 Stat. 1363, which is classified generally to chapter 31 (§ 901 et seq.) of Title 7, Agriculture. For complete classification of this Act to the Code, see section 901 of Title 7 and Ta- bles. The National Environmental Policy Act of 1969, re- ferred to in subsec. (c)(3), is Pub. L. 91–190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to chapter 55 (§ 4321 et seq.) of Title 42, The Public Health and Wel- fare. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of Title 42 and Tables. The Federal Power Act, referred to in subsec. (c)(8), is act June 10, 1920, ch. 285, 41 Stat. 1063. Part I of the Act is classified generally to subchapter I (§ 791a et seq.) of chapter 12 of Title 16, Conservation. For com- plete classification of this Act to the Code, see section 791a of Title 16 and Tables. Act of September 21, 1959, referred to in subsec. (d)(1), is Pub. L. 86–308, Sept. 21, 1959, 73 Stat. 584, which amended section 485b–1 of this title, enacted provisions set out as a note under section 485b–1 of this title, and amended provisions set out as a note under section 485b of this title. For complete classification of this Act to the Code, see Tables. AMENDMENTS 2021—Subsec. (c)(1). Pub. L. 117–58, § 40335(1), in fourth sentence, substituted ‘‘and reserve to the Secretary the exclusive authority to develop small conduit hydro- power using Bureau of Reclamation facilities and pumped storage hydropower exclusively using Bureau of Reclamation reservoirs’’ for ‘‘, including small con- duit hydropower development’’. Subsec. (c)(8). Pub. L. 117–58, § 40335(2), substituted ‘‘was filed with the Federal Energy Regulatory Com- Page 169 TITLE 43—PUBLIC LANDS § 485h–1 mission before August 9, 2013, and is still pending’’ for ‘‘has been filed with the Federal Energy Regulatory Commission as of August 9, 2013’’. 2013—Subsec. (c). Pub. L. 113–24 designated existing provisions as par. (1) and redesignated former pars. (1) and (2) as subpars. (A) and (B), respectively, of par. (1), substituted ‘‘respecting the sales of electric power and leases of power privileges shall be an authorization in addition to and alternative to any authority in existing laws related to particular projects, including small conduit hydropower development’’ for ‘‘respecting the terms of sales of electric power and leases of power privileges shall be in addition and alternative to any authority in existing laws relating to particular projects’’, and added pars. (2) to (9). 1982—Subsec. (f). Pub. L. 97–293 added subsec. (f). 1962—Subsec. (d)(1). Pub. L. 87–613 authorized the Sec- retary, when a development period of less than ten years was fixed by contract and, before repayment pe- riod conditions arose which would justify a longer pe- riod, to amend such contract to extend such period to not exceed ten years from its start, and where no pe- riod was provided, to grant a period not to exceed ten years, and where he deferred payment of any construc- tion charges pursuant to act of September 21, 1959, au- thorized him, prior to the due date of the first install- ment not reduced by such deferment, by agreement with the contracting organization, to terminate the supplemental contract by which such deferment was ef- fected, credit the construction payments made, and ex- ercise the authority granted in this section. 1958—Subsec. (d)(3). Pub. L. 85–611, § 1, permitted the general repayment obligation to be spread in annual in- stallments as near to the period of not more than 40 years as is consistent with the adoption and operation of a variable payment formula which permits variance in the required annual payments. Subsec. (d)(5). Pub. L. 85–611, § 3, struck out provisions which required repayment contracts to provide that each year the installment of the organization’s repay- ment obligation scheduled for such year shall be the construction charges due and payable for such year, or that each year the installment for such year of the or- ganization’s repayment obligation shall be increased or decreased on the basis of the normal and percentages plan provided in former section 485c of this title for modification of existing obligations to pay construc- tion charges, and the amount of the annual install- ment, as thus increased or decreased, shall be the con- struction charges due and payable for such year. Statutory Notes and Related Subsidiaries CHANGE OF NAME Department of War designated Department of the Army and title of Secretary of War changed to Sec- retary of the Army by section 205(a) of act July 26, 1947, ch. 343, title II, 61 Stat. 501. Section 205(a) of act July 26, 1947, was repealed by section 53 of act Aug. 10, 1956, ch. 1041, 70A Stat. 641. Section 1 of act Aug. 10, 1956, en- acted ‘‘Title 10, Armed Forces’’ which in sections 3010 to 3013 continued Department of the Army under ad- ministrative supervision of Secretary of the Army. CONSTRUCTION WITH SECTION 701–1 OF TITLE 33 Section as amended and modified by act Dec. 22, 1944, ch. 665, § 1(c), 58 Stat. 665, see section 701–1(c) of Title 33, Navigation and Navigable Waters. WAGE RATE REQUIREMENTS For provisions relating to rates of wages to be paid to laborers and mechanics on projects for construction, alteration, or repair work funded under div. D or an amendment by div. D of Pub. L. 117–58, including au- thority of Secretary of Labor, see section 18851 of Title 42, The Public Health and Welfare. MUNICIPAL, DOMESTIC, AND INDUSTRIAL WATER SUPPLY CONTRACTS; RENEWALS; CONFORMING AMENDMENTS TO EXISTING CONTRACTS; ‘‘LONG-TERM CONTRACT’’ DE- FINED Pub. L. 88–44, June 21, 1963, 77 Stat. 68, provided: ‘‘That the Secretary of the Interior shall, upon request of the other party to any long-term contract for munic- ipal, domestic, or industrial water supply hereafter en- tered into under clause (2) in the proviso to the first sentence of section 9, subsection (c), of the Reclama- tion Project Act of 1939 (53 Stat. 1195, 43 U.S.C. 485h), include provision for renewal thereof subject to renego- tiation of (1) the charges set forth in the contract in the light of circumstances prevailing at the time of re- newal and (2) any other matters with respect to which the right to renegotiate is reserved in the contract. Any right of renewal shall be exercised within such rea- sonable time prior to the expiration of the contract as the parties shall have agreed upon and set forth there- in. ‘‘SEC. 2. The Secretary shall also, upon like request, provide in any such long-term contract or in any con- tract entered into under clause (1) of the proviso afore- said that the other party to the contract shall, during the term of the contract and of any renewal thereof and subject to fulfillment of all obligations thereunder, have a first right for the purposes stated in the con- tract (to which right the holders of any other type of contract for municipal, domestic, or industrial water supply shall be subordinate) to a stated share or quan- tity of the project’s water supply available for munic- ipal, domestic, or industrial use. ‘‘SEC. 3. The Secretary is hereby authorized, upon re- quest by the other party, to negotiate amendments to existing contracts entered into pursuant to the first sentence of section 9, subsection (c), of the Reclama- tion Project Act of 1939 [subsec. (c) of this section] to conform said contracts to the provisions of this Act. ‘‘SEC. 4. As used in this Act, the term ‘long-term con- tract’ means any contract the term of which is more than ten years.’’ EXTENSION OF VARIABLE PAYMENT PLAN TO OTHER ORGANIZATIONS Pub. L. 85–611, § 2, Aug. 8, 1958, 72 Stat. 542, provided that: ‘‘The benefits of a variable payment plan as pro- vided in the amendment to paragraph (3) of section 9, subsection (d), of the Reclamation Project Act of 1939 [subsec. (d)(3) of this section] contained in section 1 of this Act may be extended by the Secretary to any orga- nization with which he contracts or has contracted for the repayment of construction costs allocated to irri- gation on any project undertaken by the United States, including contracts under the Act of August 11, 1939 (53 Stat. 1418), as amended [section 590y et seq. of Title 16, Conservation], and contracts for the storage of water or for the use of stored water under section 8 of the Act of December 22, 1944 (58 Stat. 887, 891) [section 390 of this title]. In the case of any project for which a max- imum repayment period longer than that prescribed in said paragraph (3) has been or is allowed by Act of Con- gress, the period so allowed may be used by the Sec- retary in lieu of the forty-year period provided in said amendment to paragraph (3).’’ § 485h–1. Administration of repayment contracts and long-term contracts to furnish water; re- newal and conversion; credit for payments; right to available water supply; rates; con- struction component In administering subsections (d) and (e) of sec- tion 485h of this title, the Secretary of the Inte- rior shall— (1) include in any long-term contract here- after entered into under subsection (e) of sec-

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 792 — Federal Power Commission; creation; number; appointment; term; qualifications; vacancies; quorum; chairman; salary; place of holding sessions

A commission is created and established to be known as the Federal Power Commission (hereinafter referred to as the “commission”) which shall be composed of five commissioners who shall be appointed by the President, by and with the advice and consent of the Senate, one of whom shall be designated by the President as chairman and shall be the principal executive officer of the commission. Each chairman, when so designated, shall act as such until the expiration of his term of office.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 792

Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 792. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 792 — Federal Power Commission; creation; num-

Page 1364 TITLE 16—CONSERVATION § 791 Sec. Statutory Notes and Related Subsidiaries FINDINGS Pub. L. 113–23, § 2, Aug. 9, 2013, 127 Stat. 493, provided that: ‘‘Congress finds that— ‘‘(1) the hydropower industry currently employs ap- proximately 300,000 workers across the United States; ‘‘(2) hydropower is the largest source of clean, re- newable electricity in the United States; ‘‘(3) as of the date of enactment of this Act [Aug. 9, 2013], hydropower resources, including pumped stor- age facilities, provide— ‘‘(A) nearly 7 percent of the electricity generated in the United States; and ‘‘(B) approximately 100,000 megawatts of electric capacity in the United States; ‘‘(4) only 3 percent of the 80,000 dams in the United States generate electricity, so there is substantial potential for adding hydropower generation to non- powered dams; and ‘‘(5) according to one study, by utilizing currently untapped resources, the United States could add ap- proximately 60,000 megawatts of new hydropower ca- pacity by 2025, which could create 700,000 new jobs over the next 13 years.’’ SUBCHAPTER I—REGULATION OF THE DE- VELOPMENT OF WATER POWER AND RE- SOURCES Statutory Notes and Related Subsidiaries CODIFICATION; CONSTRUCTION Act Aug. 26, 1935, ch. 687, title II, § 212, 49 Stat. 847, provided that sections 1 to 29 of the Federal Water Power Act, as amended (sections 792, 793, 794 to 797, 798 to 818, 819, and 820 to 823 of this title) shall constitute part I of the act. Said section 212 also repealed sections 25 and 30 of the act (sections 819, 791 of this title). It also contained a proviso as follows: ‘‘That nothing in that Act, as amended, shall be construed to repeal or amend the provisions of the amendment to the Federal Water Power Act approved March 3, 192

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 792

Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 792. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 4321 — Repealed. Pub. L. 117–58, div. G, title VIII, § 70801(h), Nov. 15, 2021, 135 Stat. 1294

### Statutory Notes Section, Pub. L. 114–94, div. D, title XLI, § 41013, Dec. 4, 2015, 129 Stat. 1761, provided that this subchapter shall terminate 7 years after Dec. 4, 2015.

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 4321

Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 4321. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 4321 — Congressional declaration of purpose

Page 6095 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 4321 Sec. 4368a. Utilization of talents of older Americans in projects of pollution prevention, abate- ment, and control. 4368b. General assistance program. 4369. Miscellaneous reports. 4369a. Reports on environmental research and devel- opment activities of Agency. 4370. Reimbursement for use of facilities. 4370a. Assistant Administrators of Environmental Protection Agency; appointment; duties. 4370b. Availability of fees and charges to carry out Agency programs. 4370c. Environmental Protection Agency fees. 4370d. Percentage of Federal funding for organiza- tions owned by socially and economically disadvantaged individuals. 4370e. Working capital fund in Treasury. 4370f. Availability of funds after expiration of pe- riod for liquidating obligations. 4370g. Availability of funds for uniforms and certain services. 4370h. Availability of funds for facilities. 4370i. Regional liaisons for minority, tribal, and low-income communities. 4370j. Municipal Ombudsman. SUBCHAPTER IV—FEDERAL PERMITTING IMPROVEMENT 4370m. Definitions. 4370m–1. Federal Permitting Improvement Steering Council. 4370m–2. Permitting process improvement. 4370m–3. Interstate compacts. 4370m–4. Coordination of required reviews. 4370m–5. Delegated State permitting programs. 4370m–6. Litigation, judicial review, and savings provi- sion. 4370m–7. Reports. 4370m–8. Funding for governance, oversight, and proc- essing of environmental reviews and per- mits. 4370m–9. Application. 4370m–10. GAO report. 4370m–11. Savings provision. 4370m–12. Repealed. § 4321. Congressional declaration of purpose The purposes of this chapter are: To declare a national policy which will encourage productive and enjoyable harmony

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 4321

Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 4321. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 485h — New projects; sale of water and electric power; lease of power privileges

**(a) Findings of Secretary** No expenditures for the construction of any new project, new division of a project, or new supplemental works on a project shall be made, nor shall estimates be submitted therefor, by the Secretary until after he has made an investigation thereof and has submitted to the President and to the Congress his report and findings on— (1) the engineering feasibility of the proposed construction; (2) the estimated cost of the proposed construction; (3) the part of the estimated cost which can properly be allocated to irrigation and probably be repaid by the water users; (4) the part of the estimated cost which can properly be allocated to power and probably be returned to the United States in net power revenues; (5) the part of the estimated cost which can properly be allocated to municipal water supply or other miscellaneous purposes and probably be returned to the United States. If the proposed construction is found by the Secretary to have engineering feasibility and if the repayable and returnable allocations to irrigation, power, and municipal water supply or other miscellaneous purposes found by the Secretary to be proper, together with any allocation to flood control or navigation made under subsection (b) of this section, equal the total estimated cost of construction as determined by the Secretary, then the new project, new division of a project, or supplemental works on a project, covered by his findings, shall be deemed authorized and may be undertaken by the Secretary. If all such allocations do not equal said total estimated cost, then said new project, new division, or new supplemental works may be undertaken by the Secretary only after provision therefor has been made by Act of Congress enacted after the Secretary has submitted

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 485h

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

7 U.S.C. § 901 — Short title

This chapter may be cited as the “Rural Electrification Act of 1936”.

Source: Supplied U.S. Code snapshot — release unconfirmed · 7 U.S.C. § 901

Stored review status: release_metadata_unconfirmed. The source passage cites 7 U.S.C. § 901. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

7 U.S.C. § 901 — Short title

Page 518 TITLE 7—AGRICULTURE § 901 Sec. 918b. Acquisition of existing systems in rural com- munities with high energy costs. 918c. Rural and remote communities electrifica- tion grants. SUBCHAPTER II—RURAL TELEPHONE SERVICE 921. Congressional declaration of policy. 921a, 921b. Repealed. 922. Loans for telephone service. 923. State regulation of telephone service. 924. Definition of telephone service and rural area. 925. Loan feasibility. 926. Certain rural development investments by qualified telephone borrowers not treated as dividends or distributions. 927. General duties and prohibitions. 928. Prompt processing of telephone loans. SUBCHAPTER III—RURAL ELECTRIC AND TELEPHONE DIRECT LOAN PROGRAMS 930. Congressional declaration of policy. 931. Rural Electrification and Telephone Revolv- ing Fund. 931a. Level of loan programs under Rural Elec- trification and Telephone Revolving Fund. 932. Liabilities and uses of Rural Electrification and Telephone Revolving Fund. 933. Moneys in the Rural Electrification and Tele- phone Revolving Fund. 934. Authorized financial transactions; interim notes; purchase of obligations for resale; sale of notes and certificates; liens. 935. Insured loans; interest rates and lending lev- els. 936. Guaranteed loans; accommodation and subor- dination of liens; interest rates; assign- ability of guaranteed loans and related guarantees. 936a. Prepayment of loans. 936b. Sale or prepayment of direct or insured loans. 936c. Refinancing and prepayment of FFB loans. 936d. Eligibility of distribution borrowers for loans, loan guarantees, and lien accom- modations. 936e. Administrative prohibitions applicable to cer- tain electric borrowers. 936f. Substantially underserved trust areas. 937.

Source: Supplied 2024 U.S. Code historical extraction · 7 U.S.C. § 901

Stored review status: historical_2024_not_currentness_verified. The source passage cites 7 U.S.C. § 901. This identifies an authority to review, not proof of applicability.