Browse Arkansas Code titles and sections
14 U.S.C. § 1137 — Contracting for major acquisitions pro-
Federal law — U.S. Code and appendices · legal_authorities
Page 104
TITLE 14—COAST GUARD
§ 1137
Act (41 U.S.C. 414) and related implementing
regulations and directives.
(Added Pub. L. 111–281, title IV, § 402(a), Oct. 15,
2010, 124 Stat. 2948, § 576; renumbered § 1136, Pub.
L. 115–282, title I, § 108(b), Dec. 4, 2018, 132 Stat.
4208.)
Editorial Notes
REFERENCES IN TEXT
Section 16 of the Office of Federal Procurement Pol-
icy Act, referred to in par. (2), is section 16 of Pub. L.
93–400, which was classified to section 414 of former
Title 41, Public Contracts, and was repealed and reen-
acted as section 1702 of Title 41, Public Contracts, by
Pub. L. 111–350, §§ 3, 7(b), Jan. 4, 2011, 124 Stat. 3677, 3855.
AMENDMENTS
2018—Pub. L. 115–282 renumbered section 576 of this
title as this section.
§ 1137. Contracting for major acquisitions pro-
grams
(a) IN GENERAL.—In carrying out authorities
provided to the Secretary to design, construct,
accept, or otherwise acquire assets and systems
under section 501(d), the Secretary, acting
through the Commandant or the head of an inte-
grated program office established for a major
acquisition program, may enter into contracts
for a major acquisition program and 3 Polar Se-
curity Cutters in addition to those approved as
part of a major acquisition program on Novem-
ber 1, 2019.
(b) AUTHORIZED METHODS.—Contracts entered
into under subsection (a)—
(1) may be block buy contracts;
(2) may be incrementally funded;
(3) may include combined purchases, also
known as economic order quantity purchases,
of—
(A) materials and components; and
(B) long lead time materials; and
(4) as provided in section 3501 of title 10, may
be multiyear contracts.
(c) SUBJECT TO APPROPRIATIONS.—Any contract
entered into under subsection (a) shall provide
that any obligation of the United State
Source: Supplied 2024 U.S. Code historical extraction · 14 U.S.C. § 1137
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 7d044f60b437f42bceb3db3cf3a46d64be7033b41d9bfa6883ae41b5df4fbb68. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-88e6a889c6fabf3023dd583d
Source file: Laws/federal/codes/united-states-code-2024/title-14/section-1137-contracting-for-major-acquisitions-pro--cd7c95c1d0.md
Pages: Not recorded – Not recorded
Passage SHA-256: 9d8ba26bb979a38e31ba8184a61e0be31360b63d0b522150b0e16972e5aa6307
Source location: USCODE-2024-title14-subtitleI-chap11-subchapII-sec1137.pdf
Stored source content
Page 104
TITLE 14—COAST GUARD
§ 1137
Act (41 U.S.C. 414) and related implementing
regulations and directives.
(Added Pub. L. 111–281, title IV, § 402(a), Oct. 15,
2010, 124 Stat. 2948, § 576; renumbered § 1136, Pub.
L. 115–282, title I, § 108(b), Dec. 4, 2018, 132 Stat.
4208.)
Editorial Notes
REFERENCES IN TEXT
Section 16 of the Office of Federal Procurement Pol-
icy Act, referred to in par. (2), is section 16 of Pub. L.
93–400, which was classified to section 414 of former
Title 41, Public Contracts, and was repealed and reen-
acted as section 1702 of Title 41, Public Contracts, by
Pub. L. 111–350, §§ 3, 7(b), Jan. 4, 2011, 124 Stat. 3677, 3855.
AMENDMENTS
2018—Pub. L. 115–282 renumbered section 576 of this
title as this section.
§ 1137. Contracting for major acquisitions pro-
grams
(a) IN GENERAL.—In carrying out authorities
provided to the Secretary to design, construct,
accept, or otherwise acquire assets and systems
under section 501(d), the Secretary, acting
through the Commandant or the head of an inte-
grated program office established for a major
acquisition program, may enter into contracts
for a major acquisition program and 3 Polar Se-
curity Cutters in addition to those approved as
part of a major acquisition program on Novem-
ber 1, 2019.
(b) AUTHORIZED METHODS.—Contracts entered
into under subsection (a)—
(1) may be block buy contracts;
(2) may be incrementally funded;
(3) may include combined purchases, also
known as economic order quantity purchases,
of—
(A) materials and components; and
(B) long lead time materials; and
(4) as provided in section 3501 of title 10, may
be multiyear contracts.
(c) SUBJECT TO APPROPRIATIONS.—Any contract
entered into under subsection (a) shall provide
that any obligation of the United States to
make a payment under the contract is subject
to the availability of amounts specifically pro-
vided in advance for that purpose in subsequent
appropriations Acts.
(Added Pub. L. 115–282, title III, § 311(b), Dec. 4,
2018, 132 Stat. 4249; amended Pub. L. 116–283, div.
G, title LVXXXI [LXXXI], § 8111(b), Jan. 1, 2021,
134 Stat. 4639; Pub. L. 117–81, div. A, title XVII,
§ 1702(d)(2), Dec. 27, 2021, 135 Stat. 2156.)
Editorial Notes
AMENDMENTS
2021—Subsec. (a). Pub. L. 116–283 inserted ‘‘and 3
Polar Security Cutters in addition to those approved as
part of a major acquisition program on November 1,
2019’’ before period at end.
Subsec. (b)(4). Pub. L. 117–81 substituted ‘‘section
3501’’ for ‘‘section 2306b’’.
Statutory Notes and Related Subsidiaries
INTERNAL REGULATIONS AND POLICY
Pub. L. 115–282, title III, § 311(e), Dec. 4, 2018, 132 Stat.
4249, provided that: ‘‘Not later than 180 days after the
date of enactment of this Act [Dec. 4, 2018], the Sec-
retary of the department in which the Coast Guard is
operating shall establish the internal regulations and
policies necessary to exercise the authorities provided
under this section [enacting this section, amending sec-
tion 501 of this title, enacting provisions set out as a
note under section 1133 of this title, amending provi-
sions formerly set out as a note under former section
573 of this title, and repealing provisions set out as
notes under former sections 87 and 577 of this title], in-
cluding the amendments made in this section.’’
SUBCHAPTER III—PROCUREMENT
Editorial Notes
AMENDMENTS
2018—Pub. L. 115–282, title I, § 108(c)(4), Dec. 4, 2018, 132
Stat. 4210, inserted subchapter III designation and
heading.
Statutory Notes and Related Subsidiaries
PROHIBITION ON MAJOR ACQUISITION CONTRACTS WITH
ENTITIES ASSOCIATED WITH CHINESE COMMUNIST PARTY
Pub. L. 117–263, div. K, title CXII, § 11267, Dec. 23, 2022,
136 Stat. 4063, provided that:
‘‘(a) IN GENERAL.—The Commandant [of the Coast
Guard] may not award any major acquisition contract
until the Commandant receives a certification from the
party that it has not, during the 10-year period pre-
ceding the planned date of award, directly or indirectly
held an economic interest in an entity that is—
‘‘(1) owned or controlled by the People’s Republic of
China; and
‘‘(2) part of the defense industry of the Chinese
Communist Party.
‘‘(b) INAPPLICABILITY TO TAIWAN.—Subsection (a) shall
not apply with respect to an economic interest in an
entity owned or controlled by Taiwan.’’
§ 1151. Restriction on construction of vessels in
foreign shipyards
(a) Except as provided in subsection (b), no
Coast Guard vessel, and no major component of
the hull or superstructure of a Coast Guard ves-
sel, may be constructed in a foreign shipyard.
(b) The President may authorize exceptions to
the prohibition in subsection (a) when the Presi-
dent determines that it is in the national secu-
rity interest of the United States to do so. The
President shall transmit notice to Congress of
any such determination, and no contract may be
made pursuant to the exception authorized until
the end of the 30-day period beginning on the
date the notice of such determination is re-
ceived by Congress.
(Added Pub. L. 100–448, § 26(a), Sept. 28, 1988, 102
Stat. 1847, § 665; renumbered § 1151, Pub. L.
115–282, title I, § 108(b), Dec. 4, 2018, 132 Stat.
4208.)
Editorial Notes
AMENDMENTS
2018—Pub. L. 115–282 renumbered section 665 of this
title as this section.
§ 1152. Advance procurement funding
(a) IN GENERAL.—With respect to any Coast
Guard vessel for which amounts are appro-
priated and any amounts otherwise made avail-
able for vessels for the Coast Guard in any fiscal
year, the Commandant may enter into a con-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In General.—** In carrying out authorities provided to the Secretary to design, construct, accept, or otherwise acquire assets and systems under section 501(d), the Secretary, acting through the Commandant or the head of an integrated program office established for a major acquisition program, may enter into contracts for a major acquisition program and 3 Polar Security Cutters in addition to those approved as part of a major acquisition program on November 1, 2019.
**(b) Authorized Methods.—** Contracts entered into under subsection (a)—
(1) may be block buy contracts;
(2) may be incrementally funded;
(3) may include combined purchases, also known as economic order quantity purchases, of—
(A) materials and components; and
(B) long lead time materials; and
(4) as provided in [section 3501 of title 10](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3501&num=0&edition=prelim), may be multiyear contracts.
**(c) Subject to Appropriations.—** Any contract entered into under subsection (a) shall provide that any obligation of the United States to make a payment under the contract is subject to the availability of amounts specifically provided in advance for that purpose in subsequent appropriations Acts.
Source: Supplied U.S. Code snapshot — release unconfirmed · 14 U.S.C. § 1137
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.