Arkansas Legal Resource Navigator

16 U.S.C. § 797a — Congressional authorization for permits,

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 797a — Congressional authorization for permits,

Page 1373 TITLE 16—CONSERVATION § 797c electric power generation facilities by Federal rec- lamation projects; ‘‘(2) an estimate of the reduction, if any, of project power consumed as a result of the decreased amount of diversion; ‘‘(3) an estimate of the increase in the amount of electrical energy and related revenues which would result from the marketing of such power by the Sec- retary; ‘‘(4) an estimate of the fish and wildlife benefits which would result from the decreased or modified di- versions; ‘‘(5) a finding by the Secretary of the Interior that the activities proposed in the feasibility study can be carried out in accordance with applicable Federal and State law, interstate compacts and the contractual obligations of the Secretary; and ‘‘(6) a finding by the affected Federal Power Mar- keting Administrator that the hydroelectric compo- nent of the proposed water conservation feature is cost-effective and that the affected Administrator is able to market the hydro-electric power expected to be generated. ‘‘(b) CONSULTATION.—In preparing feasibility studies pursuant to this section, the Secretary of the Interior shall consult with, and seek the recommendations of, affected State, local and Indian tribal interests, and shall provide for appropriate public comment. ‘‘(c) AUTHORIZATION.—There is hereby authorized to be appropriated to the Secretary of the Interior such sums as may be necessary to carry out this section.’’ PROJECTS ON FRESH WATERS IN STATE OF HAWAII Pub. L. 102–486, title XXIV, § 2408, Oct. 24, 1992, 106 Stat. 3100, directed Federal Energy Regulatory Com- mission, in consultation with State of Hawaii, to carry out study of hydroelectric licensing in State of Hawaii for purposes of considering whether such licensing s

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 797a

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: d1a9ff593130227defb403cdb44206e13726465c1bfe275956c6b01e556a36c6. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-88e0313e23e59f471c7625f0
Source file: Laws/federal/codes/united-states-code-2024/title-16/section-797a-congressional-authorization-for-permits--068412e093.md
Pages: Not recorded – Not recorded
Passage SHA-256: f5aac91b3062f0e01e11912b8b1472bcabf56782dedfc6d4dffeb37252348dd2

Source location: USCODE-2024-title16-chap12-subchapI-sec797a.pdf

Stored source content

Page 1373 TITLE 16—CONSERVATION § 797c electric power generation facilities by Federal rec- lamation projects; ‘‘(2) an estimate of the reduction, if any, of project power consumed as a result of the decreased amount of diversion; ‘‘(3) an estimate of the increase in the amount of electrical energy and related revenues which would result from the marketing of such power by the Sec- retary; ‘‘(4) an estimate of the fish and wildlife benefits which would result from the decreased or modified di- versions; ‘‘(5) a finding by the Secretary of the Interior that the activities proposed in the feasibility study can be carried out in accordance with applicable Federal and State law, interstate compacts and the contractual obligations of the Secretary; and ‘‘(6) a finding by the affected Federal Power Mar- keting Administrator that the hydroelectric compo- nent of the proposed water conservation feature is cost-effective and that the affected Administrator is able to market the hydro-electric power expected to be generated. ‘‘(b) CONSULTATION.—In preparing feasibility studies pursuant to this section, the Secretary of the Interior shall consult with, and seek the recommendations of, affected State, local and Indian tribal interests, and shall provide for appropriate public comment. ‘‘(c) AUTHORIZATION.—There is hereby authorized to be appropriated to the Secretary of the Interior such sums as may be necessary to carry out this section.’’ PROJECTS ON FRESH WATERS IN STATE OF HAWAII Pub. L. 102–486, title XXIV, § 2408, Oct. 24, 1992, 106 Stat. 3100, directed Federal Energy Regulatory Com- mission, in consultation with State of Hawaii, to carry out study of hydroelectric licensing in State of Hawaii for purposes of considering whether such licensing should be transferred to State, and directed Commis- sion to complete study and submit report containing results of study to Congress within 18 months after Oct. 24, 1992. § 797a. Congressional authorization for permits, licenses, leases, or authorizations for dams, conduits, reservoirs, etc., within national parks or monuments On and after March 3, 1921, no permit, license, lease, or authorization for dams, conduits, res- ervoirs, power houses, transmission lines, or other works for storage or carriage of water, or for the development, transmission, or utiliza- tion of power within the limits as constituted, March 3, 1921, of any national park or national monument shall be granted or made without specific authority of Congress. (Mar. 3, 1921, ch. 129, 41 Stat. 1353.) Editorial Notes CODIFICATION Provisions repealing so much of this chapter ‘‘as au- thorizes licensing such uses of existing national parks and national monuments by the Federal Power Com- mission’’ have been omitted. Section was not enacted as part of the Federal Power Act which generally comprises this chapter. Statutory Notes and Related Subsidiaries CONSTRUCTION Act Aug. 26, 1935, ch. 687, title II, § 212, 49 Stat. 847, provided that nothing in this chapter should be con- strued to repeal or amend the provisions of the act ap- proved Mar. 3, 1921 (41 Stat. 1353) [16 U.S.C. 797a] or the provisions of any other Act relating to national parks and national monuments. See note preceding section 791 of this title. § 797b. Duty to keep Congress fully and currently informed The Federal Energy Regulatory Commission shall keep the Committee on Energy and Com- merce of the United States House of Representa- tives and the Committee on Energy and Natural Resources of the United States Senate fully and currently informed regarding actions of the Commission with respect to the provisions of Part I of the Federal Power Act [16 U.S.C. 791a et seq.]. (Pub. L. 99–495, § 16, Oct. 16, 1986, 100 Stat. 1259.) Editorial Notes REFERENCES IN TEXT The Federal Power Act, referred to in text, is act June 10, 1920, ch. 285, 41 Stat. 1063. Part I of the Federal Power Act is classified generally to this subchapter (§ 791a et seq.). For complete classification of this Act to the Code, see section 791a of this title and Tables. CODIFICATION Section was enacted as part of the Electric Con- sumers Protection Act of 1986, and not as part of the Federal Power Act which generally comprises this chapter. Statutory Notes and Related Subsidiaries CHANGE OF NAME Committee on Energy and Commerce of House of Representatives treated as referring to Committee on Commerce of House of Representatives by section 1(a) of Pub. L. 104–14, set out as a note preceding section 21 of Title 2, The Congress. Committee on Commerce of House of Representatives changed to Committee on En- ergy and Commerce of House of Representatives, and jurisdiction over matters relating to securities and ex- changes and insurance generally transferred to Com- mittee on Financial Services of House of Representa- tives by House Resolution No. 5, One Hundred Seventh Congress, Jan. 3, 2001. § 797c. Dams in National Park System units After October 24, 1992, the Federal Energy Reg- ulatory Commission may not issue an original license under Part I of the Federal Power Act [16 U.S.C. 791a et seq.] (nor an exemption from such Part) for any new hydroelectric power project located within the boundaries of any unit of the National Park System that would have a direct adverse effect on Federal lands within any such unit. Nothing in this section shall be construed as repealing any existing provision of law (or af- fecting any treaty) explicitly authorizing a hy- droelectric power project. (Pub. L. 102–486, title XXIV, § 2402, Oct. 24, 1992, 106 Stat. 3097.) Editorial Notes REFERENCES IN TEXT The Federal Power Act, referred to in text, is act June 10, 1920, ch. 285, 41 Stat. 1063. Part I of the Act is classified generally to this subchapter (§ 791a et seq.). For complete classification of this Act to the Code, see section 791a of this title and Tables. CODIFICATION Section was enacted as part of the Energy Policy Act of 1992, and not as part of the Federal Power Act which generally comprises this chapter.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 791a — Short title

This chapter may be cited as the “Federal Power Act”.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 791a

Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 791a — Short title

Page 1364 TITLE 16—CONSERVATION § 791 Sec. Statutory Notes and Related Subsidiaries FINDINGS Pub. L. 113–23, § 2, Aug. 9, 2013, 127 Stat. 493, provided that: ‘‘Congress finds that— ‘‘(1) the hydropower industry currently employs ap- proximately 300,000 workers across the United States; ‘‘(2) hydropower is the largest source of clean, re- newable electricity in the United States; ‘‘(3) as of the date of enactment of this Act [Aug. 9, 2013], hydropower resources, including pumped stor- age facilities, provide— ‘‘(A) nearly 7 percent of the electricity generated in the United States; and ‘‘(B) approximately 100,000 megawatts of electric capacity in the United States; ‘‘(4) only 3 percent of the 80,000 dams in the United States generate electricity, so there is substantial potential for adding hydropower generation to non- powered dams; and ‘‘(5) according to one study, by utilizing currently untapped resources, the United States could add ap- proximately 60,000 megawatts of new hydropower ca- pacity by 2025, which could create 700,000 new jobs over the next 13 years.’’ SUBCHAPTER I—REGULATION OF THE DE- VELOPMENT OF WATER POWER AND RE- SOURCES Statutory Notes and Related Subsidiaries CODIFICATION; CONSTRUCTION Act Aug. 26, 1935, ch. 687, title II, § 212, 49 Stat. 847, provided that sections 1 to 29 of the Federal Water Power Act, as amended (sections 792, 793, 794 to 797, 798 to 818, 819, and 820 to 823 of this title) shall constitute part I of the act. Said section 212 also repealed sections 25 and 30 of the act (sections 819, 791 of this title). It also contained a proviso as follows: ‘‘That nothing in that Act, as amended, shall be construed to repeal or amend the provisions of the amendment to the Federal Water Power Act approved March 3, 192

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 791a

Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 797a — Congressional authorization for permits, licenses, leases, or authorizations for dams, conduits, reservoirs, etc., within national parks or monuments

On and after March 3, 1921, no permit, license, lease, or authorization for dams, conduits, reservoirs, power houses, transmission lines, or other works for storage or carriage of water, or for the development, transmission, or utilization of power within the limits as constituted, March 3, 1921, of any national park or national monument shall be granted or made without specific authority of Congress.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 797a

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.