Browse Arkansas Code titles and sections
43 U.S.C. § 1541 — Allocation of costs; repayment
Federal law — U.S. Code and appendices · legal_authorities
Page 406
TITLE 43—PUBLIC LANDS
§ 1528
(Pub. L. 90–537, title III, § 308, Sept. 30, 1968, 82
Stat. 893.)
Editorial Notes
REFERENCES IN TEXT
The Federal Water Project Recreation Act, referred
to in text, is Pub. L. 89–72, July 9, 1965, 79 Stat. 213,
which is classified principally to part C (§ 460l–12 et
seq.) of subchapter LXIX of chapter 1 of Title 16, Con-
servation. For complete classification of this Act to
the Code, see Short Title note set out under section
460l–12 of Title 16 and Tables.
§ 1528. Authorization of appropriations
(a) There is hereby authorized to be appro-
priated for construction of the Central Arizona
Project, including prepayment for power genera-
tion and transmission facilities but exclusive of
distribution and drainage facilities for non-In-
dian lands, $832,180,000 plus or minus such
amounts, if any, as may be justified by reason of
ordinary fluctuations in construction costs as
indicated by engineering cost indices applicable
to the types of construction involved therein
and, in addition thereto, such sums as may be
required for operation and maintenance of the
project.
(b) There is also authorized to be appropriated
$100,000,000 for construction of distribution and
drainage facilities for non-Indian lands plus or
minus such amounts, if any, as may be justified
by reason of ordinary fluctuations in construc-
tion costs as indicated by engineering and cost
indices applicable to the types of construction
involved therein from September 30, 1968: Pro-
vided, That the Secretary shall enter into agree-
ments with non-Federal interests to provide not
less than 20 per centum of the total cost of such
facilities during the construction of such facili-
ties. Notwithstanding the provisions of section
1543 of this title, nei
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1541
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: fc397a220c745f7c6a9075a9477b312562e8d0c7371172da2f2dd111cb83a142. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-805e0a1826cbbc324d2c5591
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-1541-allocation-of-costs-repayment--a6be0316d4.md
Pages: Not recorded – Not recorded
Passage SHA-256: db966600a4cc2e9890ae7cc9c32c48de383b09f863839f36089f01a540897d10
Source location: USCODE-2024-title43-chap32-subchapIV-sec1541.pdf
Stored source content
Page 406
TITLE 43—PUBLIC LANDS
§ 1528
(Pub. L. 90–537, title III, § 308, Sept. 30, 1968, 82
Stat. 893.)
Editorial Notes
REFERENCES IN TEXT
The Federal Water Project Recreation Act, referred
to in text, is Pub. L. 89–72, July 9, 1965, 79 Stat. 213,
which is classified principally to part C (§ 460l–12 et
seq.) of subchapter LXIX of chapter 1 of Title 16, Con-
servation. For complete classification of this Act to
the Code, see Short Title note set out under section
460l–12 of Title 16 and Tables.
§ 1528. Authorization of appropriations
(a) There is hereby authorized to be appro-
priated for construction of the Central Arizona
Project, including prepayment for power genera-
tion and transmission facilities but exclusive of
distribution and drainage facilities for non-In-
dian lands, $832,180,000 plus or minus such
amounts, if any, as may be justified by reason of
ordinary fluctuations in construction costs as
indicated by engineering cost indices applicable
to the types of construction involved therein
and, in addition thereto, such sums as may be
required for operation and maintenance of the
project.
(b) There is also authorized to be appropriated
$100,000,000 for construction of distribution and
drainage facilities for non-Indian lands plus or
minus such amounts, if any, as may be justified
by reason of ordinary fluctuations in construc-
tion costs as indicated by engineering and cost
indices applicable to the types of construction
involved therein from September 30, 1968: Pro-
vided, That the Secretary shall enter into agree-
ments with non-Federal interests to provide not
less than 20 per centum of the total cost of such
facilities during the construction of such facili-
ties. Notwithstanding the provisions of section
1543 of this title, neither appropriations made
pursuant to the authorization contained in this
subsection nor revenues collected in connection
with the operation of such facilities shall be
credited to the Lower Colorado River Basin De-
velopment Fund and payments shall not be
made from that fund to the general fund of the
Treasury to return any part of the costs of con-
struction, operation, and maintenance of such
facilities.
(Pub. L. 90–537, title III, § 309, Sept. 30, 1968, 82
Stat. 893; Pub. L. 97–373, Dec. 20, 1982, 96 Stat.
1817.)
Editorial Notes
AMENDMENTS
1983—Subsec. (b). Pub. L. 97–373 substituted ‘‘There is
also authorized to be appropriated $100,000,000 for con-
struction of distribution and drainage facilities for
non-Indian lands plus or minus such amounts, if any, as
may be justified by reason of ordinary fluctuations in
construction costs as indicated by engineering and cost
indices applicable to the types of construction involved
therein from September 30, 1968: Provided, That the Sec-
retary shall enter into agreements with non-Federal in-
terests to provide not less than 20 per centum of the
total cost of such facilities during the construction of
such facilities’’ for ‘‘There is also authorized to be ap-
propriated $100,000,000 for construction of distribution
and drainage facilities for non-Indian lands’’.
SUBCHAPTER IV—LOWER COLORADO
RIVER BASIN DEVELOPMENT FUND
§ 1541. Allocation of costs; repayment
Upon completion of each lower basin unit of
the project herein or hereafter authorized, or
separate feature thereof, the Secretary shall al-
locate the total costs of constructing said unit
or features to (1) commercial power, (2) irriga-
tion, (3) municipal and industrial water supply,
(4) flood control, (5) navigation, (6) water qual-
ity control, (7) recreation, (8) fish and wildlife,
(9) the replenishment of the depletion of Colo-
rado River flows available for use in the United
States occasioned by performance of the Water
Treaty of 1944 with the United Mexican States
(Treaty Series 994; 59 Stat. 1219), and (10) any
other purposes authorized under the Federal rec-
lamation laws. Costs of construction, operation,
and maintenance allocated to the replenishment
of the depletion of Colorado River flows avail-
able for use in the United States occasioned by
compliance with the Mexican Water Treaty (in-
cluding losses in transit, evaporation from regu-
latory reservoirs, and regulatory losses at the
Mexican boundary, incurred in the transpor-
tation, storage, and delivery of water in dis-
charge of the obligations of that treaty) shall be
nonreimbursable:
Provided,
That
the
non-
reimbursable allocation shall be made on a pro
rata basis to be determined by the ratio between
the amount of water required to comply with
the Mexican Water Treaty and the total amount
of water by which the Colorado River is aug-
mented pursuant to the investigations author-
ized subchapter II of this chapter and any future
Congressional authorization. The repayment of
costs allocated to recreation and fish and wild-
life enhancement shall be in accordance with
the provisions of the Federal Water Project
Recreation Act (79 Stat. 213) [16 U.S.C. 460l–12 et
seq.]: Provided, That all of the separable and
joint costs allocated to recreation and fish and
wildlife enhancement as a part of the Dixie
project, Utah, shall be nonreimbursable. Costs
allocated to nonreimbursable purposes shall be
nonreturnable under the provisions of this chap-
ter.
(Pub. L. 90–537, title IV, § 401, Sept. 30, 1968, 82
Stat. 894.)
Editorial Notes
REFERENCES IN TEXT
The Federal reclamation laws, referred to in par. (10),
are identified in section 1554 of this title.
The Federal Water Project Recreation Act, referred
to in text, is Pub. L. 89–72, July 9, 1965, 79 Stat. 213,
which is classified principally to part C (§ 460l–12 et
seq.) of subchapter LXIX of chapter 1 of Title 16, Con-
servation. For complete classification of this Act to
the Code, see Short Title note set out under section
460l–12 of Title 16 and Tables.
This chapter, referred to in text, was in the original
‘‘this Act’’, meaning Pub. L. 90–537, Sept. 30, 1968, 82
Stat. 885, known as the Colorado River Basin Project
Act, which enacted this chapter and sections 616aa–1,
620a–1, 620a–2, 620c–1, and 620d–1 of this title, amended
sections 616hh, 620, and 620a of this title, and enacted
provisions set out as notes under sections 620, 620k, and
1501 of this title. For complete classification of this Act
to the Code, see Short Title note set out under section
1501 of this title and Tables.
Page 407
TITLE 43—PUBLIC LANDS
§ 1543
§ 1542. Repayment capability of Indian lands
The Secretary shall determine the repayment
capability of Indian lands within, under, or
served by any unit of the project. Construction
costs allocated to irrigation of Indian lands (in-
cluding provision of water for incidental domes-
tic and stock water uses) and within the repay-
ment capability of such lands shall be subject to
section 386a of title 25, and such costs that are
beyond repayment capability of such lands shall
be nonreimbursable.
(Pub. L. 90–537, title IV, § 402, Sept. 30, 1968, 82
Stat. 894.)
§ 1543. Lower Colorado River Basin Development
Fund
(a) Establishment
There is hereby established a separate fund in
the Treasury of the United States to be known
as the Lower Colorado River Basin Development
Fund (hereafter called the ‘‘development fund’’),
which shall remain available until expended as
hereafter provided.
(b) Appropriations
(1) All appropriations made for the purpose of
carrying out the provisions of subchapter III of
this chapter shall be credited to the develop-
ment fund as advances from the general fund of
the Treasury, and shall be available for such
purpose.
(2) Except as provided in section 1528(b) of this
title, sums advanced by non-Federal entities for
the purpose of carrying out the provisions of
subchapter III of this chapter shall be credited
to the development fund and shall be available
without further appropriation for such purpose.
(c) Revenues credited to fund
There shall also be credited to the develop-
ment fund—
(1) all revenues collected in connection with
the operation of facilities authorized in sub-
chapter III in furtherance of the purposes of
this chapter (except entrance, admission, and
other recreation fees or charges and proceeds
received
from
recreation
concessionaires),
until completion of repayment requirements
of the Central Arizona project;
(2) any Federal revenues from the Boulder
Canyon and Parker-Davis projects which, after
completion of repayment requirements of the
said
Boulder
Canyon
and
Parker-Davis
projects, are surplus, as determined by the
Secretary, to the operation, maintenance, and
replacement requirements of those projects:
Provided, however, That for the Boulder Can-
yon project commencing June 1, 1987, and for
the Parker-Davis project commencing June 1,
2005, and until the end of the repayment period
for the Central Arizona project described in
section 1521(a) of this title, the Secretary of
Energy shall provide for surplus revenues by
including the equivalent of 41⁄2
mills per
kilowatthour in the rates charged to pur-
chasers in Arizona for application to the pur-
poses specified in subsection (f) of this section
and by including the equivalent 21⁄2 mills per
kilowatthour in the rates charged to pur-
chasers in California and Nevada for applica-
tion to the purposes of subsection (g) of this
section as amended and supplemented: Pro-
vided further, That after the repayment period
for said Central Arizona project, the equiva-
lent of 21⁄2 mills per kilowatthour shall be in-
cluded by the Secretary of Energy in the rates
charged to purchasers in Arizona, California,
and Nevada to provide revenues for applica-
tion to the purposes of said subsection (g) of
this section: Provided, however, That the Sec-
retary is authorized and directed to continue
the in-lieu-of-tax payments to the States of
Arizona and Nevada provided for in section
618a(c) of this title so long as revenues accrue
from the operation of the Boulder Canyon
project; and
(3) any Federal revenues from that portion
of the Pacific Northwest-Pacific Southwest
intertie located in the States of Nevada and
Arizona which, after completion of repayment
requirements of the said part of the Pacific
Northwest-Pacific Southwest intertie located
in the States of Nevada and Arizona, are sur-
plus, as determined by the Secretary, to the
operation, maintenance, and replacement re-
quirements of said portion of the Pacific
Northwest-Pacific Southwest intertie and re-
lated facilities.
(d) Use of revenue funds
All moneys collected and credited to the de-
velopment fund pursuant to subsection (b) and
clauses (1) and (3) of subsection (c) of this sec-
tion and the portion of revenues derived from
the sale of power and energy for use in Arizona
pursuant to clause (2) of subsection (c) of this
section shall be available, without further ap-
propriation, for—
(1) defraying the costs of operation, mainte-
nance, and replacements of, and emergency ex-
penditures for, all facilities of the projects,
within such separate limitations as may be in-
cluded in annual appropriation Acts; and
(2) payments to reimburse water users in the
State of Arizona for losses sustained as a re-
sult of diminution of the production of hydro-
electric power at Coolidge Dam, Arizona, re-
sulting from exchanges of water between users
in the States of Arizona and New Mexico as set
forth in section 1524(f) of this title.
(e) Appropriation by Congress required for con-
struction of works
Except as provided in subsection (f), revenues
credited to the development fund shall not be
available for construction of the works com-
prised within any unit of the project herein or
hereafter authorized except upon appropriation
by the Congress.
(f) Additional uses of revenue funds
(1) Crediting against Central Arizona Water
Conservation District payments
Funds credited to the development fund pur-
suant to subsection (b) and paragraphs (1) and
(3) of subsection (c), the portion of revenues
derived from the sale of power and energy for
use in the State of Arizona pursuant to sub-
section (c)(2) in excess of the amount nec-
essary to meet the requirements of paragraphs
(1) and (2) of subsection (d), and any annual
payment by the Central Arizona Water Con-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
Section, Pub. L. 88–29, § 1, May 28, 1963, 77 Stat. 49, related to congressional findings and declaration of policy. See [section 200101 of Title 54](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title54-section200101&num=0&edition=prelim), National Park Service and Related Programs.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 460l
Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 460l. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 629
TITLE 16—CONSERVATION
§ 460l–3
(4) carrying out two or more of the purposes
set forth in paragraphs (1) through (3) of this
section, and are adjacent to, or within, the
said conservation areas, except that the acqui-
sition of any land or interest therein pursuant
to this section shall be accomplished only
with such funds as may be appropriated there-
for by the Congress or donated for such pur-
poses, but such property shall not be acquired
with funds obtained from the sale of Federal
migratory bird hunting stamps.
Lands acquired pursuant to this section shall be-
come a part of the particular conservation area
to which they are adjacent.
(Pub. L. 87–714, § 2, Sept. 28, 1962, 76 Stat. 653;
Pub. L. 92–534, Oct. 23, 1972, 86 Stat. 1063; Pub. L.
93–205, § 13(d), Dec. 28, 1973, 87 Stat. 902.)
Editorial Notes
AMENDMENTS
1973—Pub. L. 93–205 inserted references to the acquisi-
tion of interest in land the conservation of endangered
species or threatened species listed by the Secretary
pursuant to section 1533 of this title.
1972—Pub. L. 92–534 substituted provisions author-
izing the Secretary to acquire lands suitable for fish
and wildlife oriented recreational development, or for
the protection of natural resources and adjacent to
conservation areas, for provisions authorizing the Sec-
retary to acquire limited areas of land for recreational
development adjacent to conservation areas in exist-
ence or approved by the Migratory Bird Conservation
Commission as of September 28, 1962.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1973 AMENDMENT
Amendment by Pub. L. 93–205 effective Dec. 28, 1973,
see section 16 of Pub. L. 93–205, set out as a note under
section 1531 of this title.
§ 460k–2. Cooperation with agencies, organiza-
tio
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 460l
Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 460l. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Upon completion of each lower basin unit of the project herein or hereafter authorized, or separate feature thereof, the Secretary shall allocate the total costs of constructing said unit or features to (1) commercial power, (2) irrigation, (3) municipal and industrial water supply, (4) flood control, (5) navigation, (6) water quality control, (7) recreation, (8) fish and wildlife, (9) the replenishment of the depletion of Colorado River flows available for use in the United States occasioned by performance of the Water Treaty of 1944 with the United Mexican States (Treaty Series 994; 59 Stat. 1219), and (10) any other purposes authorized under the Federal reclamation laws. Costs of construction, operation, and maintenance allocated to the replenishment of the depletion of Colorado River flows available for use in the United States occasioned by compliance with the Mexican Water Treaty (including losses in transit, evaporation from regulatory reservoirs, and regulatory losses at the Mexican boundary, incurred in the transportation, storage, and delivery of water in discharge of the obligations of that treaty) shall be nonreimbursable: Provided, That the nonreimbursable allocation shall be made on a pro rata basis to be determined by the ratio between the amount of water required to comply with the Mexican Water Treaty and the total amount of water by which the Colorado River is augmented pursuant to the investigations authorized subchapter II of this chapter and any future Congressional authorization. The repayment of costs allocated to recreation and fish and wildlife enhancement shall be in accordance with the provisions of the Federal Water Project Recreation Act (79 Stat. 213) [[16 U.S.C. 460](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-sect
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1541
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.