Browse Arkansas Code titles and sections
43 U.S.C. § 509a — Project beneficiaries
Federal law — U.S. Code and appendices · legal_authorities
Page 182
TITLE 43—PUBLIC LANDS
§ 509a
Pub. L. 106–377, § 1(a)(2) [title II], Oct. 27, 2000, 114
Stat. 1441, 1441A–67; Pub. L. 107–117, div. B,
§ 503(2), Jan. 10, 2002, 115 Stat. 2308; Pub. L.
108–439, § 1(b), Dec. 3, 2004, 118 Stat. 2627; Pub. L.
114–113, div. D, title II, § 204, Dec. 18, 2015, 129
Stat. 2406.)
Editorial Notes
AMENDMENTS
2015—Pub. L. 114–113, § 204(b), in proviso, substituted
‘‘$20,000,000’’ for ‘‘$1,250,000’’ and ‘‘Committee on Nat-
ural Resources of the House of Representatives and the
Committee on Energy and Natural Resources of the
Senate’’ for ‘‘Congress’’ and inserted at end ‘‘For modi-
fication expenditures between $1,800,000 and $20,000,000
(October 1, 2015, price levels), the Secretary of the Inte-
rior shall, at least 30 days before the date on which the
funds are expended, submit written notice of the ex-
penditures to the Committee on Natural Resources of
the House of Representatives and Committee on Energy
and Natural Resources of the Senate that provides a
summary of the project, the cost of the project, and
any alternatives that were considered.’’
Pub. L. 114–113, § 204(a), which directed insertion of
‘‘and effective October 1, 2015, not to exceed an addi-
tional $1,100,000,000 (October 1, 2003, price levels),’’ after
‘‘(October 1, 2003, price levels),’’ in first sentence, was
executed by making the insertion after ‘‘(October 1,
2003, price levels),’’ first time appearing to reflect the
probable intent of Congress.
2004—Pub. L. 108–439 inserted ‘‘and, effective October
1, 2003, not to exceed an additional $540,000,000 (October
1, 2003, price levels),’’ after ‘‘(October 1, 2001, price lev-
els),’’ and substituted ‘‘$1,250,000 (October 1, 2003, price
levels), as adjusted to reflect any ordinary fluctuations
in con
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 509a
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 602c1e968f3a5aba88ebd6fb8850d032adb8185a0c5fecb537d08fabab294190. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-801a8a0414109232e3737e20
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-509a-project-beneficiaries--c8ab669310.md
Pages: Not recorded – Not recorded
Passage SHA-256: 5216ab6899e1a2aac653c778b1ecff0a9e32b8dc2cdbc193a3de595e197d45f4
Source location: USCODE-2024-title43-chap12-subchapXI-A-sec509a.pdf
Stored source content
Page 182
TITLE 43—PUBLIC LANDS
§ 509a
Pub. L. 106–377, § 1(a)(2) [title II], Oct. 27, 2000, 114
Stat. 1441, 1441A–67; Pub. L. 107–117, div. B,
§ 503(2), Jan. 10, 2002, 115 Stat. 2308; Pub. L.
108–439, § 1(b), Dec. 3, 2004, 118 Stat. 2627; Pub. L.
114–113, div. D, title II, § 204, Dec. 18, 2015, 129
Stat. 2406.)
Editorial Notes
AMENDMENTS
2015—Pub. L. 114–113, § 204(b), in proviso, substituted
‘‘$20,000,000’’ for ‘‘$1,250,000’’ and ‘‘Committee on Nat-
ural Resources of the House of Representatives and the
Committee on Energy and Natural Resources of the
Senate’’ for ‘‘Congress’’ and inserted at end ‘‘For modi-
fication expenditures between $1,800,000 and $20,000,000
(October 1, 2015, price levels), the Secretary of the Inte-
rior shall, at least 30 days before the date on which the
funds are expended, submit written notice of the ex-
penditures to the Committee on Natural Resources of
the House of Representatives and Committee on Energy
and Natural Resources of the Senate that provides a
summary of the project, the cost of the project, and
any alternatives that were considered.’’
Pub. L. 114–113, § 204(a), which directed insertion of
‘‘and effective October 1, 2015, not to exceed an addi-
tional $1,100,000,000 (October 1, 2003, price levels),’’ after
‘‘(October 1, 2003, price levels),’’ in first sentence, was
executed by making the insertion after ‘‘(October 1,
2003, price levels),’’ first time appearing to reflect the
probable intent of Congress.
2004—Pub. L. 108–439 inserted ‘‘and, effective October
1, 2003, not to exceed an additional $540,000,000 (October
1, 2003, price levels),’’ after ‘‘(October 1, 2001, price lev-
els),’’ and substituted ‘‘$1,250,000 (October 1, 2003, price
levels), as adjusted to reflect any ordinary fluctuations
in construction costs indicated by applicable engineer-
ing cost indexes,’’ for ‘‘$750,000’’.
2002—Pub. L. 107–117 inserted ‘‘and, effective October
1, 2001, not to exceed an additional $32,000,000 (October
1, 2001, price levels),’’ after ‘‘(October 1, 2000, price lev-
els),’’.
2000—Pub. L. 106–377 inserted ‘‘and, effective October
1, 2000, not to exceed an additional $95,000,000 (October
1, 2000, price levels),’’ after ‘‘(October 1, 1983, price lev-
els),’’ and substituted ‘‘30 calendar days’’ for ‘‘sixty
days (which sixty days shall not include days on which
either the House of Representatives or the Senate is
not in session because of an adjournment of more than
three calendar days to a day certain)’’.
1984—Pub. L. 98–404 substituted ‘‘and, effective Octo-
ber 1, 1983, not to exceed an additional $650,000,000 (Oc-
tober 1, 1983, price levels), plus or minus such amounts,
if any, as may be justified by reason of ordinary fluc-
tuations in construction costs as indicated by engineer-
ing cost indexes applicable to the types of construction
involved herein, to carry out the provisions of this sub-
chapter to remain available until expended if so pro-
vided by the appropriations Act: Provided, That no
funds exceeding $750,000’’ for ‘‘, but not to exceed
$100,000,000, to carry out the provisions of this sub-
chapter of this title to remain available until expended
if so provided by the appropriations Act: Provided, That
no funds’’.
§ 509a. Project beneficiaries
(a) Notice of modification
On identifying a Bureau of Reclamation facil-
ity for modification, the Secretary shall provide
to the project beneficiaries written notice—
(1) describing the need for the modification
and the process for identifying and imple-
menting the modification; and
(2) summarizing the administrative and
legal requirements relating to the modifica-
tion.
(b) Consultation
The Secretary shall—
(1) provide project beneficiaries an oppor-
tunity to consult with the Bureau of Reclama-
tion on the planning, design, and construction
of the proposed modification; and
(2)
in
consultation
with
project
bene-
ficiaries, develop and provide timeframes for
the consultation described in paragraph (1).
(c) Alternatives
(1) Prior to submitting the reports required
under section 509 of this title, the Secretary
shall consider any alternative submitted in
writing, in accordance with the timeframes es-
tablished under subsection (b), by a project ben-
eficiary that has elected to consult with the Bu-
reau of Reclamation on a modification.
(2) The Secretary shall provide to the project
beneficiary a timely written response describing
proposed actions, if any, to address the rec-
ommendation.
(3) The response of the Secretary shall be in-
cluded in the reports required by section 509 of
this title.
(d) Waiver
The Secretary may waive 1 or more of the re-
quirements of subsections (a), (b), and (c), if the
Secretary determines that implementation of
the requirement could have an adverse impact
on dam safety or security.
(Pub. L. 95–578, § 5A, as added Pub. L. 108–439,
§ 2(b), Dec. 3, 2004, 118 Stat. 2627.)
§ 509b. Additional project benefits through the
construction of new or supplementary works
Notwithstanding section 507 of this title, if the
Secretary, in her judgment, determines that ad-
ditional project benefits, including but not lim-
ited to additional conservation storage capacity,
are necessary and in the interests of the United
States and the project and are feasible and not
inconsistent with the purposes of this sub-
chapter, the Secretary is authorized to develop
additional project benefits through the con-
struction of new or supplementary works on a
project in conjunction with the Secretary’s ac-
tivities under section 506 of this title and sub-
ject to the conditions described in the feasibility
study, provided a cost share agreement related
to the additional project benefits is reached
among non-Federal and Federal funding partici-
pants and the costs associated with developing
the additional project benefits are allocated ex-
clusively among beneficiaries of the additional
project benefits and repaid consistent with all
provisions of Federal Reclamation law (the Act
of June 17, 1902, 43 U.S.C. 371 et seq.) and acts
supplemental to and amendatory of that Act.
(Pub. L. 95–578, § 5B, as added Pub. L. 114–113, div.
D, title II, § 203(2), Dec. 18, 2015, 129 Stat. 2406.)
Editorial Notes
REFERENCES IN TEXT
Act of June 17, 1902, referred to in text, is act June
17, 1902, ch. 1093, 32 Stat. 388, popularly known as the
Reclamation Act, which is classified generally to this
chapter. For complete classification of this Act to the
Code, see Short Title note set out under section 371 of
this title and Tables.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
When used in sections 371, 376, 377, 412, 417, 433, 462, 466, 478, 493, 494, 500, 501, and 526 of this title—
**(a)** The word “Secretary” means the Secretary of the Interior.
**(b)** The words “reclamation law” mean the Act of June 17, 1902 (32 Stat. 388), and all Acts amendatory thereof or supplementary thereto.
**(c)** The words “reclamation fund” mean the fund provided by the reclamation law.
**(d)** The word “project” means a Federal irrigation project authorized by the reclamation law.
**(e)** The words “division of a project” mean a substantial irrigable area of a project designated as a division by order of the Secretary.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 371
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 371. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 79
TITLE 43—PUBLIC LANDS
§ 371
Sec.
SUBCHAPTER XXXII—BRANTLEY PROJECT,
PECOS RIVER BASIN, NEW MEXICO
615jjj to 615ooo.
Omitted.
SUBCHAPTER XXXIII—SALMON FALLS DIVISION,
UPPER SNAKE RIVER PROJECT, IDAHO
615ppp to 615www.
Omitted.
SUBCHAPTER XXXIV—O’NEILL UNIT, PICK-SLOAN
MISSOURI BASIN PROGRAM, NEBRASKA
615xxx to 615cccc.
Omitted.
SUBCHAPTER
XXXV—NORTH
LOUP
DIVISION,
PICK-SLOAN MISSOURI BASIN PROGRAM, NE-
BRASKA
615dddd to 615jjjj.
Omitted.
SUBCHAPTER
XXXVI—POLECAT
BENCH
AREA,
SHOSHONE
EXTENSIONS
UNIT,
PICK-SLOAN
MISSOURI BASIN PROGRAM, WYOMING
615kkkk to 615kkkk–6.
Omitted.
SUBCHAPTER XXXVII—POLLOCK-HERREID UNIT,
PICK-SLOAN
MISSOURI
BASIN
PROGRAM,
SOUTH DAKOTA
615llll to 615llll–6.
Omitted or Repealed.
SUBCHAPTER XXXVIII—FRYINGPAN-ARKANSAS
PROJECT, COLORADO
616 to 616f.
Omitted.
SUBCHAPTER XXXIX—MANN CREEK PROJECT,
IDAHO
616g to 616j.
Omitted.
SUBCHAPTER XL—ARBUCKLE PROJECT,
OKLAHOMA
616k to 616s.
Omitted.
SUBCHAPTER XLI—BAKER PROJECT, OREGON
616t to 616w.
Omitted.
SUBCHAPTER XLII—DIXIE PROJECT, UTAH
616aa to 616hh.
Omitted.
SUBCHAPTER
XLIII—SAVERY-POT
HOOK
PROJECT,
COLORADO-WYOMING;
BOSTWICK
PARK AND FRUITLAND MESA PROJECTS, COLO-
RADO
616ii to 616mm.
Omitted.
SUBCHAPTER XLIV—LOWER TETON DIVISION OF
TETON BASIN PROJECT, IDAHO
616nn to 616rr.
Omitted.
SUBCHAPTER XLV—WHITESTONE COULEE UNIT,
CHIEF JOSEPH DAM PROJECT, WASHINGTON
616ss to 616vv–5.
Omitted.
SUBCHAPTER XLVI—McKAY DAM AND
RESERVOIR, UMATILLA PROJECT, OREGON
616ww to 616ww–5.
Omitted.
SUBCHAPTER
XLVII—AUBURN-FOLSOM
SOUTH
UNIT; SAN FELIPE DIVISION: CENTRAL VALLEY
PROJECT, CALIFORNIA
616aaa to 616fff–7.
Omitted.
SUBCHAPTER XLVIII—SOUTHERN NEVADA
PROJECT, NEVADA
616ggg to 616mmm.
Omitted.
SUBCHAPTER XLIX—TUALATIN PROJECT,
OREGON
616nnn
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 371
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 371. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Notice of modification** On identifying a Bureau of Reclamation facility for modification, the Secretary shall provide to the project beneficiaries written notice—
(1) describing the need for the modification and the process for identifying and implementing the modification; and
(2) summarizing the administrative and legal requirements relating to the modification.
**(b) Consultation** The Secretary shall—
(1) provide project beneficiaries an opportunity to consult with the Bureau of Reclamation on the planning, design, and construction of the proposed modification; and
(2) in consultation with project beneficiaries, develop and provide timeframes for the consultation described in paragraph (1).
**(c) Alternatives**
(1) Prior to submitting the reports required under [section 509 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section509&num=0&edition=prelim), the Secretary shall consider any alternative submitted in writing, in accordance with the timeframes established under subsection (b), by a project beneficiary that has elected to consult with the Bureau of Reclamation on a modification.
(2) The Secretary shall provide to the project beneficiary a timely written response describing proposed actions, if any, to address the recommendation.
(3) The response of the Secretary shall be included in the reports required by [section 509 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section509&num=0&edition=prelim).
**(d) Waiver** The Secretary may waive 1 or more of the requirements of subsections (a), (b), and (c), if the Secretary determines that implementation of the requirement could have an adverse impact on dam safety or security.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 509a
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.