Arkansas Legal Resource Navigator

42 U.S.C. § 8484 — Electric utility conservation plan

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 8484 — Electric utility conservation plan

Page 7616 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 8473 1 So in original. Probably should be ‘‘section’’. Pub. L. 95–620, set out as an Effective Date note under section 8301 of this title. This chapter, referred to in text, was in the original ‘‘this Act’’, meaning Pub. L. 95–620, Nov. 9, 1978, 92 Stat. 3289, known as the Powerplant and Industrial Fuel Use Act of 1978, which is classified principally to this chap- ter. For complete classification of this Act to the Code, see Short Title note set out under section 8301 of this title and Tables. § 8473. Environmental impact statements under section 4332 of this title The following actions are not deemed to be major Federal actions for purposes of section 4332(2)(C) of this title: (1) the grant or denial of any temporary ex- emption under this chapter for any electric powerplant; (2) the grant or denial of any permanent ex- emption under this chapter for any existing electric powerplant, other than an exemp- tion— (A) under section 8352(c) of this title, relat- ing to cogeneration; (B) Repealed. Pub. L. 100–42, § 1(c)(24)(B), May 21, 1987, 101 Stat. 314; (C) under section 8352(b) of this title, relat- ing to certain State or local requirements; (D) under section 8352(g) of this title, re- lating to certain intermediate load power- plants; and (3) the grant or denial of any exemption under this chapter for any powerplant for which the Secretary finds, in consultation with the appropriate Federal agency, and pub- lishes such finding that an environmental im- pact statement is required in connection with another Federal action and such statement will be prepared by such agency and will re- flect the exemption adequately. Except as provided in the preceding provisions of this section, any determinat

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 8484

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 606e378978ede63604b62c90de3d5c16b7dd86bf06cc7addb5b81c82d0bb7146. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-7d5b45f8b1cca6c292efffef
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-8484-electric-utility-conservation-plan--1bb661720d.md
Pages: Not recorded – Not recorded
Passage SHA-256: 17e6a5e24016f3592177f97cc21ad0bb68984cbc8787ff45ab2b0695b21ddfb9

Source location: USCODE-2024-title42-chap92-subchapVIII-sec8484.pdf

Stored source content

Page 7616 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 8473 1 So in original. Probably should be ‘‘section’’. Pub. L. 95–620, set out as an Effective Date note under section 8301 of this title. This chapter, referred to in text, was in the original ‘‘this Act’’, meaning Pub. L. 95–620, Nov. 9, 1978, 92 Stat. 3289, known as the Powerplant and Industrial Fuel Use Act of 1978, which is classified principally to this chap- ter. For complete classification of this Act to the Code, see Short Title note set out under section 8301 of this title and Tables. § 8473. Environmental impact statements under section 4332 of this title The following actions are not deemed to be major Federal actions for purposes of section 4332(2)(C) of this title: (1) the grant or denial of any temporary ex- emption under this chapter for any electric powerplant; (2) the grant or denial of any permanent ex- emption under this chapter for any existing electric powerplant, other than an exemp- tion— (A) under section 8352(c) of this title, relat- ing to cogeneration; (B) Repealed. Pub. L. 100–42, § 1(c)(24)(B), May 21, 1987, 101 Stat. 314; (C) under section 8352(b) of this title, relat- ing to certain State or local requirements; (D) under section 8352(g) of this title, re- lating to certain intermediate load power- plants; and (3) the grant or denial of any exemption under this chapter for any powerplant for which the Secretary finds, in consultation with the appropriate Federal agency, and pub- lishes such finding that an environmental im- pact statement is required in connection with another Federal action and such statement will be prepared by such agency and will re- flect the exemption adequately. Except as provided in the preceding provisions of this section, any determination of what con- stitutes or does not constitute a major Federal action shall be made under section 4332 of this title. (Pub. L. 95–620, title VII, § 763, Nov. 9, 1978, 92 Stat. 3346; Pub. L. 100–42, § 1(c)(24), May 21, 1987, 101 Stat. 314.) Editorial Notes REFERENCES IN TEXT This chapter, referred to in text, was in the original ‘‘this Act’’, meaning Pub. L. 95–620, Nov. 9, 1978, 92 Stat. 3289, known as the Powerplant and Industrial Fuel Use Act of 1978, which is classified principally to this chap- ter. For complete classification of this Act to the Code, see Short Title note set out under section 8301 of this title and Tables. AMENDMENTS 1987—Par. (1). Pub. L. 100–42, § 1(c)(24)(A), struck out ‘‘or major fuel-burning installation’’ after ‘‘power- plant’’. Par. (2). Pub. L. 100–42, § 1(c)(24), struck out ‘‘or major fuel-burning installation’’ after ‘‘powerplant’’ and struck out subpar. (B) which read as follows: ‘‘under section 8352(l) of this title, relating to scheduled equip- ment outages;’’. Par. (3). Pub. L. 100–42, § 1(c)(24)(A), struck out ‘‘or major fuel-burning installation’’ after ‘‘powerplant’’. SUBCHAPTER VIII—MISCELLANEOUS PROVISIONS § 8481. Repealed. Pub. L. 100–42, § 1(a)(7), May 21, 1987, 101 Stat. 310 Section, Pub. L. 95–620, title VIII, § 801, Nov. 9, 1978, 92 Stat. 3346, required annual disclosure of extent, charac- teristics, and productive capacity of coal reserves, and of interests held therein, with discretionary exception for small reserves, and publication of such information by Secretary. § 8482. Repealed. Pub. L. 104–66, title I, § 1051(e), Dec. 21, 1995, 109 Stat. 716 Section, Pub. L. 95–620, title VIII, § 806, Nov. 9, 1978, 92 Stat. 3348, directed Secretary of Energy to submit an- nual report to Congress on actions already taken and actions to be taken under this chapter and under sec- tion 792 of title 15. § 8483. Submission of reports Copies of any report required by this chapter to be submitted to the Congress shall be sepa- rately submitted to the Committee on Inter- state and Foreign Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate. (Pub. L. 95–620, title VIII, § 807, Nov. 9, 1978, 92 Stat. 3348.) Editorial Notes REFERENCES IN TEXT This chapter, referred to in text, was in the original ‘‘this Act’’, meaning Pub. L. 95–620, Nov. 9, 1978, 92 Stat. 3289, known as the Powerplant and Industrial Fuel Use Act of 1978, which is classified principally to this chap- ter. For complete classification of this Act to the Code, see Short Title note set out under section 8301 of this title and Tables. Statutory Notes and Related Subsidiaries CHANGE OF NAME Committee on Interstate and Foreign Commerce of House of Representatives changed to Committee on En- ergy and Commerce of House of Representatives imme- diately prior to noon on Jan. 3, 1981, by House Resolu- tion No. 549, Ninety-sixth Congress, Mar. 25, 1980. Com- mittee on Energy and Commerce of House of Represent- atives treated as referring to Committee on Commerce of House of Representatives by section 1(a) of Pub. L. 104–14, set out as a note preceding section 21 of Title 2, The Congress. Committee on Commerce of House of Representatives changed to Committee on Energy and Commerce of House of Representatives, and jurisdic- tion over matters relating to securities and exchanges and insurance generally transferred to Committee on Financial Services of House of Representatives by House Resolution No. 5, One Hundred Seventh Con- gress, Jan. 3, 2001. § 8484. Electric utility conservation plan (a) Applicability An electric utility is subject to this sub- section 1 if— (1) the utility owns or operates any existing electric powerplant in which natural gas was used as a primary energy source at any time during the 1-year period ending on August 13, 1981, and Page 7617 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 8501 (2) the utility plans to use natural gas as a primary energy source in any electric power- plant. (b) Submission and approval of plan The Secretary shall require each electric util- ity subject to this section to— (1) submit, within 1 year after August 13, 1981, and have approved by the Secretary, a conservation plan which meets the require- ments of subsection (c); and (2) implement such plan during the 5-year period beginning on the date of the initial ap- proval of such plan. (c) Contents of plan (1) Any conservation plan under this section shall set forth means determined by the utility to achieve conservation of electric energy not later than the 5th year after its initial approval at a level, measured on an annual basis, at least equal to 10 percent of the electric energy output of that utility during the most recent 4 calendar quarters ending prior to August 13, 1981, which is attributable to natural gas. (2) The conservation plan shall include— (A) all activities required for such utility by part 1 of title II of the National Energy Con- servation Policy Act [42 U.S.C. 8211 et seq.]; (B) an effective public information program for conservation; and (C) such other measures as the utility may consider appropriate. (3) Any such plan may set forth a program for the use of renewable energy sources (other than hydroelectric power). (4) Any such plan shall contain procedures to permit the amounts expended by such utility in developing and implementing the plan to be re- covered in a manner specified by the appropriate State regulatory authority (or by the utility in the case of a nonregulated utility). (d) Plan approval (1) The Secretary shall, by order, approve or disapprove any conservation plan proposed under this subsection 1 by an electric utility within 120 days after its submission. The Sec- retary shall approve any such proposed plan un- less the Secretary finds that such plan does not meet the requirements of subsection (c) and states in writing the reasons therefor. (2) In the event the Secretary disapproves under paragraph (1) the plan originally sub- mitted, the Secretary shall provide a reasonable period of time for resubmission. (3) An electric utility may amend any ap- proved plan, except that the plan as amended shall be subject to approval in accordance with paragraph (1). (Pub. L. 95–620, title VIII, § 808, as added Pub. L. 97–35, title X, § 1023(a), Aug. 13, 1981, 95 Stat. 616.) Editorial Notes REFERENCES IN TEXT The National Energy Conservation Policy Act, re- ferred to in subsec. (c)(2)(A), is Pub. L. 95–619, Nov. 9, 1978, 92 Stat. 3208. Part 1 of title II of the National En- ergy Conservation Policy Act was classified generally to part A (§ 8211 et seq.) of subchapter II of chapter 91 of this title, and was omitted from the Code pursuant to section 8229 of this title which terminated authority under that part June 30, 1989. For complete classifica- tion of this Act to the Code, see Short Title note set out under section 8201 of this title and Tables. Statutory Notes and Related Subsidiaries EFFECTIVE DATE Section effective Aug. 13, 1981, see section 1038 of Pub. L. 97–35, set out as an Effective Date of 1981 Amend- ment note under section 6240 of this title. CHAPTER 93—EMERGENCY ENERGY CONSERVATION Sec. 8501. Congressional findings and purposes. 8502. Definitions. SUBCHAPTER I—EMERGENCY ENERGY CONSERVATION PROGRAM 8511. National and State emergency conservation targets. 8512. State emergency conservation plan. 8513. Standby Federal conservation plan. 8514. Judicial review. 8515. Reports. SUBCHAPTER II—OTHER AUTOMOBILE FUEL PURCHASE MEASURES 8521. Minimum automobile fuel purchase measures. 8522. Out-of-State vehicles to be exempted from odd-even motor fuel purchase restrictions. SUBCHAPTER III—STUDIES 8531. Study and report. 8532. Middle distillate monitoring program. SUBCHAPTER IV—ADMINISTRATIVE PROVISIONS 8541. Administration. § 8501. Congressional findings and purposes (a) Findings The Congress finds that— (1) serious disruptions have recently oc- curred in the gasoline and diesel fuel markets of the United States; (2) it is likely that such disruptions will recur; (3) interstate commerce is significantly af- fected by those market disruptions; (4) an urgent need exists to provide for emer- gency conservation and other measures with respect to gasoline, diesel fuel, home heating oil, and other energy sources in potentially short supply in order to cope with market dis- ruptions and protect interstate commerce; and (5) up-to-date and reliable information con- cerning the supply and demand of gasoline, diesel fuel, and other related data is not avail- able to the President, the Congress, or the public. (b) Purposes The purposes of this chapter are to— (1) provide a means for the Federal Govern- ment, States, and units of local government to establish emergency conservation measures with respect to gasoline, diesel fuel, home heating oil, and other energy sources which may be in short supply; (2) establish other emergency measures to alleviate disruptions in gasoline and diesel fuel markets; (3) obtain data concerning such fuels; and

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 8211 — Untitled legal text

Page 7541 TITLE 42—THE PUBLIC HEALTH AND WELFARE §§ 8211 to 8229 Sec. 8287b. Reports. 8287c. Definitions. 8287d. Assistance to Federal agencies in achieving energy efficiency in Federal facilities and operations. SUBCHAPTER I—GENERAL PROVISIONS § 8201. Findings and statement of purposes (a) Findings The Congress finds that— (1) the United States has survived a period of energy shortage and has made significant progress toward improving energy efficiency in all sectors of the economy; (2) effective measures must continue to be taken by the Federal Government and other users and suppliers of energy to control the rate of growth of demand for energy and the efficiency of its use; (3) the continuation of this effort will permit the United States to become increasingly independent of the world oil market, less vul- nerable to interruption of foreign oil supplies, and more able to provide energy to meet fu- ture needs; and (4) all sectors of the economy of the United States should continue to reduce significantly the demand for nonrenewable energy resources such as oil and natural gas by implementing and maintaining effective conservation meas- ures for the efficient use of these and other en- ergy sources. (b) Statement of purposes The purposes of this chapter are to provide for the regulation of interstate commerce, to reduce the growth in demand for energy in the United States, and to conserve nonrenewable energy re- sources produced in this Nation and elsewhere, without inhibiting beneficial economic growth. (Pub. L. 95–619, title I, § 102, Nov. 9, 1978, 92 Stat. 3208; Pub. L. 99–412, title I, § 101, Aug. 28, 1986, 100 Stat. 932.) Editorial Notes REFERENCES IN TEXT This chapter, referred to in subsec. (b), was in the original ‘‘this

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 8211

Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 8211. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 8484 — Electric utility conservation plan

**(a) Applicability** An electric utility is subject to this subsection 11 So in original. Probably should be “section”. if— (1) the utility owns or operates any existing electric powerplant in which natural gas was used as a primary energy source at any time during the 1-year period ending on August 13, 1981, and (2) the utility plans to use natural gas as a primary energy source in any electric powerplant. **(b) Submission and approval of plan** The Secretary shall require each electric utility subject to this section to— (1) submit, within 1 year after August 13, 1981, and have approved by the Secretary, a conservation plan which meets the requirements of subsection (c); and (2) implement such plan during the 5-year period beginning on the date of the initial approval of such plan. **(c) Contents of plan** (1) Any conservation plan under this section shall set forth means determined by the utility to achieve conservation of electric energy not later than the 5th year after its initial approval at a level, measured on an annual basis, at least equal to 10 percent of the electric energy output of that utility during the most recent 4 calendar quarters ending prior to August 13, 1981, which is attributable to natural gas. (2) The conservation plan shall include— (A) all activities required for such utility by part 1 of title II of the National Energy Conservation Policy Act [[42 U.S.C. 8211](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8211&num=0&edition=prelim) et seq.]; (B) an effective public information program for conservation; and (C) such other measures as the utility may consider appropriate. (3) Any such plan may set forth a program for the use of renewable energy sources (other than hydroelectric power). (4) An

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 8484

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.