49 U.S.C. § 47110 — Allowable project costs

Federal law — U.S. Code and appendices · legal_authorities

49 U.S.C. § 47110 — Allowable project costs

Page 1611 TITLE 49—TRANSPORTATION § 47110 1 See References in Text note below. Subsec. (c). Pub. L. 103–305, § 114(2), struck out subsec. (c) which read as follows: ‘‘(c) LIMITATION.—Notwith- standing subsections (a) and (b) of this section, the Government’s share of project costs allowable under section 47110(d) of this title may not be more than 75 percent, except that the Government’s share shall be 85 percent for a project at a commercial service airport that does not have more than .05 percent of the total annual passenger boardings in the United States.’’ Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 2003 AMENDMENT Amendment by Pub. L. 108–176 applicable only to fis- cal years beginning after Sept. 30, 2003, except as other- wise specifically provided, see section 3 of Pub. L. 108–176, set out as a note under section 106 of this title. EFFECTIVE DATE OF 2000 AMENDMENT Amendment by Pub. L. 106–181 applicable only to fis- cal years beginning after Sept. 30, 1999, see section 3 of Pub. L. 106–181, set out as a note under section 106 of this title. EFFECTIVE DATE OF 1996 AMENDMENT Except as otherwise specifically provided, amend- ment by Pub. L. 104–264 applicable only to fiscal years beginning after Sept. 30, 1996, and not to be construed as affecting funds made available for a fiscal year end- ing before Oct. 1, 1996, see section 3 of Pub. L. 104–264, set out as a note under section 106 of this title. OUTREACH EFFORTS Pub. L. 117–254, § 2(b), Dec. 20, 2022, 136 Stat. 2361, pro- vided that: ‘‘Not later than 90 days after the date of en- actment of this Act [Dec. 20, 2022], the Administrator of the Federal Aviation Administration shall conduct an outreach effort to make airports aware of the higher cost share authority established

Source: Supplied 2024 U.S. Code historical extraction · 49 U.S.C. § 47110

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 889635aec155e83b82071db597bb36b9fff757949cf93761419bc550a237a799. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-6deecdb87e2c5205dcc6c273
Source file: Laws/federal/codes/united-states-code-2024/title-49/section-47110-allowable-project-costs--55d4a12200.md
Pages: Not recorded – Not recorded
Passage SHA-256: fac19566b9db49f46eecc7a33a133c7cd86ef29310873213093531396479e119

Source location: USCODE-2024-title49-subtitleVII-partB-chap471-subchapI-sec47110.pdf

Stored source content

Page 1611 TITLE 49—TRANSPORTATION § 47110 1 See References in Text note below. Subsec. (c). Pub. L. 103–305, § 114(2), struck out subsec. (c) which read as follows: ‘‘(c) LIMITATION.—Notwith- standing subsections (a) and (b) of this section, the Government’s share of project costs allowable under section 47110(d) of this title may not be more than 75 percent, except that the Government’s share shall be 85 percent for a project at a commercial service airport that does not have more than .05 percent of the total annual passenger boardings in the United States.’’ Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 2003 AMENDMENT Amendment by Pub. L. 108–176 applicable only to fis- cal years beginning after Sept. 30, 2003, except as other- wise specifically provided, see section 3 of Pub. L. 108–176, set out as a note under section 106 of this title. EFFECTIVE DATE OF 2000 AMENDMENT Amendment by Pub. L. 106–181 applicable only to fis- cal years beginning after Sept. 30, 1999, see section 3 of Pub. L. 106–181, set out as a note under section 106 of this title. EFFECTIVE DATE OF 1996 AMENDMENT Except as otherwise specifically provided, amend- ment by Pub. L. 104–264 applicable only to fiscal years beginning after Sept. 30, 1996, and not to be construed as affecting funds made available for a fiscal year end- ing before Oct. 1, 1996, see section 3 of Pub. L. 104–264, set out as a note under section 106 of this title. OUTREACH EFFORTS Pub. L. 117–254, § 2(b), Dec. 20, 2022, 136 Stat. 2361, pro- vided that: ‘‘Not later than 90 days after the date of en- actment of this Act [Dec. 20, 2022], the Administrator of the Federal Aviation Administration shall conduct an outreach effort to make airports aware of the higher cost share authority established in section 47109(g) of title 49, United States Code, as added by subsection (a).’’ AUTHORIZATION OF APPROPRIATIONS Pub. L. 117–254, § 2(d), Dec. 20, 2022, 136 Stat. 2362, pro- vided that: ‘‘The amendments made by this Act [amending this section] shall apply to amounts that first become available in fiscal year 2023 or thereafter.’’ TEMPORARY INCREASE IN GOVERNMENT SHARE OF CERTAIN AIP PROJECT COSTS Pub. L. 108–176, title I, § 161, Dec. 12, 2003, 117 Stat. 2513, as amended by Pub. L. 110–190, § 4(c), Feb. 28, 2008, 122 Stat. 644; Pub. L. 110–253, § 3(c)(3), June 30, 2008, 122 Stat. 2418; Pub. L. 110–330, § 5(i), Sept. 30, 2008, 122 Stat. 3718; Pub. L. 111–12, § 5(h), Mar. 30, 2009, 123 Stat. 1458; Pub. L. 111–69, § 5(i), Oct. 1, 2009, 123 Stat. 2055; Pub. L. 111–116, § 5(h), Dec. 16, 2009, 123 Stat. 3032; Pub. L. 111–153, § 5(h), Mar. 31, 2010, 124 Stat. 1085; Pub. L. 111–161, § 5(h), Apr. 30, 2010, 124 Stat. 1127; Pub. L. 111–197, § 5(h), July 2, 2010, 124 Stat. 1354; Pub. L. 111–216, title I, § 104(h), Aug. 1, 2010, 124 Stat. 2350; Pub. L. 111–249, § 5(i), Sept. 30, 2010, 124 Stat. 2628; Pub. L. 111–329, § 5(h), Dec. 22, 2010, 124 Stat. 3567; Pub. L. 112–7, § 5(h), Mar. 31, 2011, 125 Stat. 32; Pub. L. 112–16, § 5(h), May 31, 2011, 125 Stat. 219; Pub. L. 112–21, § 5(h), June 29, 2011, 125 Stat. 234; Pub. L. 112–27, § 5(h), Aug. 5, 2011, 125 Stat. 271; Pub. L. 112–30, title II, § 205(i), Sept. 16, 2011, 125 Stat. 358; Pub. L. 112–91, § 5(i), Jan. 31, 2012, 126 Stat. 4, provided that: ‘‘Notwithstanding section 47109(a) of title 49, United States Code, the Government’s share of allowable project costs for a grant made in any of fiscal years 2009 through 2011, or in the portion of fiscal year 2012 ending before February 18, 2012, under chapter 471 of that title for a project described in paragraph (2) or (3) of that section shall be 95 percent.’’ [Pub. L. 110–253, § 3(c)(3), which directed amendment of section 161 of Pub. L. 108–176, set out above, by sub- stituting ‘‘fiscal year 2008.’’ for ‘‘fiscal year 2008 before July 1, 2008.’’, was executed by substituting ‘‘fiscal year 2008,’’ for ‘‘fiscal year 2008 before July 1, 2008,’’ to re- flect the probable intent of Congress.] § 47110. Allowable project costs (a) GENERAL AUTHORITY.—Except as provided in section 47111 of this title, the United States Government may pay or be obligated to pay, from amounts appropriated to carry out this subchapter, a cost incurred in carrying out a project under this subchapter only if the Sec- retary of Transportation decides the cost is al- lowable. (b) ALLOWABLE COST STANDARDS.—A project cost is allowable— (1)(A) if the cost necessarily is incurred in carrying out the project in compliance with the grant agreement made for the project under this subchapter, including any cost a sponsor incurs related to an audit the Sec- retary requires under section 47121(b) or (d) of this title and any cost of moving a Federal fa- cility impeding the project if the rebuilt facil- ity is of an equivalent size and type; or (B) if the cost is an incentive payment in- curred in carrying out the project described in subparagraph (A) that is to be provided to a contractor upon early completion of a project, if— (i) such payment does not exceed the lesser of 5 percent of the initial construction con- tract amount or $1,000,000; (ii) the level of contractor’s control of, or access to, the worksite necessary to shorten the duration of the project does not nega- tively impact the operation of the airport; (iii) the contract specifies application of the incentive structure in the event of un- foreseeable, non-weather delays beyond the control of the contractor; (iv) nothing in any agreement with the contractor prevents the airport operator from retaining responsibility for the safety, efficiency, and capacity of the airport during the execution of the grant agreement; and (v) the Secretary determines that the use of an incentive payment is likely to increase airport capacity or efficiency or result in cost savings as a result of shortening the project’s duration; (2)(A) if the cost is incurred after the grant agreement is executed and is for airport devel- opment or airport planning carried out after the grant agreement is executed; (B) if the cost is incurred after June 1, 1989, by the airport operator (regardless of when the grant agreement is executed) as part of a Gov- ernment-approved noise compatibility pro- gram (including project formulation costs) and is consistent with all applicable statutory and administrative requirements; (C) if the Government’s share is paid only with amounts apportioned under paragraphs (1) and (2) of section 47114(c) or section 47114(d)(3)(A) 1 and if the cost is incurred— (i) after September 30, 1996; (ii) before a grant agreement is executed for the project; and Page 1612 TITLE 49—TRANSPORTATION § 47110 (iii) in accordance with an airport layout plan approved by the Secretary and with all statutory and administrative requirements that would have been applicable to the project if the project had been carried out after the grant agreement had been exe- cuted; or (D) if the cost is for airport development and is incurred before execution of the grant agreement, but in the same fiscal year as exe- cution of the grant agreement, and if— (i) the cost was incurred before execution of the grant agreement because the airport has a shortened construction season due to climatic conditions in the vicinity of the airport; (ii) the cost is in accordance with an air- port layout plan approved by the Secretary and with all statutory and administrative requirements that would have been applica- ble to the project if the project had been car- ried out after execution of the grant agree- ment, including submission of a complete grant application to the appropriate re- gional or district office of the Federal Avia- tion Administration; (iii) the sponsor notifies the Secretary be- fore authorizing work to commence on the project; (iv) the sponsor has an alternative funding source available to fund the project; and (v) the sponsor’s decision to proceed with the project in advance of execution of the grant agreement does not affect the priority assigned to the project by the Secretary for the allocation of discretionary funds; (3) to the extent the cost is reasonable in amount; (4) if the cost is not incurred in a project for airport development or airport planning for which other Government assistance has been granted; (5) if the total costs allowed for the project are not more than the amount stated in the grant agreement as the maximum the Govern- ment will pay (except as provided in section 47108(b) of this title); (6) if the cost is for a project not described in section 47102(3) for acquiring for use at a commercial service airport vehicles and ground support equipment owned by an airport that include low-emission technology, but only to the extent of the incremental cost of equipping such vehicles or equipment with low-emission technology, as determined by the Secretary; and (7) if the cost is incurred on a measure to improve the efficiency of an airport building (such as a measure designed to meet one or more of the criteria for being considered a high-performance green building as set forth under section 401(13) of the Energy Independ- ence and Security Act of 2007 (42 U.S.C. 17061(13))) and— (A) the measure is for a project for airport development; (B) the measure is for an airport building that is otherwise eligible for construction assistance under this subchapter; and (C) if the measure results in an increase in initial project costs, the increase is justified by expected savings over the life cycle of the project. (c) CERTAIN PRIOR COSTS AS ALLOWABLE COSTS.—The Secretary may decide that a project cost under subsection (b)(2)(A) of this section incurred before the date the grant agree- ment is executed is allowable if it is— (1) necessarily incurred in formulating or preparing for an airport development project, including costs incurred for field surveys, plans and specifications, property interests in land or airspace, utility relocation, work site preparation, and administration or other inci- dental items that would not have been in- curred except for the project; or (2) necessarily and directly incurred in de- veloping the work scope of an airport planning project. (d) RELOCATION OF AIRPORT-OWNED FACILI- TIES.—The Secretary may determine that the costs of relocating or replacing an airport-owned facility are allowable for an airport develop- ment project at an airport only if— (1) the Government’s share of such costs will be paid with funds apportioned to the airport sponsor under section 47114 or distributed from the small airport fund under section 47116; (2) the Secretary determines that the reloca- tion or replacement is required due to a change in the Secretary’s design standards; and (3) the Secretary determines that the change is beyond the control of the airport sponsor. (e) LETTERS OF INTENT.—(1) The Secretary may issue a letter of intent to the sponsor stat- ing an intention to obligate from future budget authority an amount, not more than the Gov- ernment’s share of allowable project costs, for an airport development project (including costs of formulating the project) at a primary or re- liever airport. The letter shall establish a sched- ule under which the Secretary will reimburse the sponsor for the Government’s share of allow- able project costs, as amounts become available, if the sponsor, after the Secretary issues the let- ter, carries out the project without receiving amounts under this subchapter. (2) Paragraph (1) of this subsection applies to a project— (A) about which the sponsor notifies the Sec- retary, before the project begins, of the spon- sor’s intent to carry out the project; (B) that will comply with all statutory and administrative requirements that would apply to the project if it were carried out with amounts made available under this sub- chapter; and (C) that meets the criteria of section 47115(d) and, if for a project at a medium hub airport or large hub airport, the Secretary decides will enhance system-wide airport capacity sig- nificantly. (3) A letter of intent issued under paragraph (1) of this subsection is not an obligation of the Government under section 1501 of title 31, and the letter is not deemed to be an administrative commitment for financing. An obligation or ad- ministrative commitment may be made only as amounts are provided in authorization and ap- propriation laws. Page 1613 TITLE 49—TRANSPORTATION § 47110 (4) The total estimated amount of future Gov- ernment obligations covered by all outstanding letters of intent under paragraph (1) of this sub- section may not be more than the amount au- thorized to carry out section 48103 of this title, less an amount reasonably estimated by the Secretary to be needed for grants under section 48103 that are not covered by a letter. (5) LETTERS OF INTENT.—The Secretary may not require an eligible agency to impose a pas- senger facility charge under section 40117 in order to obtain a letter of intent under this sec- tion. (6) LIMITATION ON STATUTORY CONSTRUCTION.— Nothing in this section shall be construed to prohibit the obligation of amounts pursuant to a letter of intent under this subsection in the same fiscal year as the letter of intent is issued. (7) PARTNERSHIP PROGRAM AIRPORTS.—The Sec- retary may issue a letter of intent under this subsection to an airport sponsor with an ap- proved application under section 47134(b) if— (A) the application was approved in fiscal year 2019; and (B) the project meets all other requirements set forth in this chapter. (f) NONALLOWABLE COSTS.—Except as provided in subsection (d) of this section and section 47118(f) of this title, a cost is not an allowable airport development project cost if it is for— (1) constructing a public parking facility for passenger automobiles; (2) constructing, altering, or repairing part of an airport building, except to the extent the building will be used for facilities or activities directly related to the safety of individuals at the airport; (3) decorative landscaping; or (4) providing or installing sculpture or art works. (g) USE OF DISCRETIONARY FUNDS.—A project for which cost reimbursement is provided under subsection (b)(2)(C) shall not receive priority consideration with respect to the use of discre- tionary funds made available under section 47115 of this title even if the amounts made available under paragraphs (1) and (2) of section 47114(c) or section 47114(d)(3)(A) 1 are not sufficient to cover the Government’s share of the cost of the project. (h) NONPRIMARY AIRPORTS.—The Secretary may decide that the construction costs of rev- enue producing aeronautical support facilities are allowable for an airport development project at a nonprimary airport if the Government’s share of such costs is paid only with funds ap- portioned to the airport sponsor under section 47114(c)(1)(D) or section 47114(d)(2)(A) and if the Secretary determines that the sponsor has made adequate provision for financing airside needs of the airport. (i) SMALL AIRPORT LETTERS OF INTENT.— (1) IN GENERAL.—The Secretary may issue a letter of intent to a sponsor stating an inten- tion to obligate an amount from future budget authority for an airport development project (including costs of formulating the project) at a nonhub airport or an airport that is not a primary airport. (2) CONTENTS.—In the letter issued under paragraph (1), the Secretary shall establish a schedule under which the Secretary will reim- burse the sponsor for the Government’s share of allowable project costs, as amounts become available, if the sponsor, after the Secretary issues the letter, carries out the project with- out receiving amounts under this subchapter. (3) LIMITATIONS.—The amount the Secretary intends to obligate in a letter of intent issued under this subsection shall not exceed the larger of— (A) the Government’s share of allowable project costs; or (B) $10,000,000. (4) FINANCING.—Allowable project costs under paragraphs (1) and (2) may include costs associated with making payments for debt service on indebtedness incurred to carry out the project. (5) REQUIREMENTS.—The Secretary shall issue a letter of intent under paragraph (1) only if— (A) the sponsor notifies the Secretary, be- fore the project begins, of the intent of the sponsor to carry out the project and requests a letter of intent; and (B) the sponsor agrees to comply with all statutory and administrative requirements that would apply to the project if it were carried out with amounts made available under this subchapter. (6) ASSESSMENT.—In reviewing a request for a letter of intent under this subsection, the Secretary shall consider the grant history of an airport, the enplanements or operations of an airport, and such other factors as the Sec- retary determines appropriate. (7) PRIORITIZATION.—In issuing letters of in- tent under this subsection, the Secretary shall— (A) prioritize projects that— (i) cannot reasonably be funded by an airport sponsor using funds apportioned under section 47114(c), 47114(d)(2)(A), or 47114(d)(6), including funds apportioned under such sections in multiple fiscal years pursuant to section 47117(b)(1); and (ii) are necessary to the continued safe operation or development of an airport; and (B) structure the reimbursement schedules under such letters in a manner that mini- mizes unnecessary or undesirable project segmentation. (8) NO OBLIGATION OR COMMITMENT.— (A) IN GENERAL.—A letter of intent issued under this subsection is not an obligation of the Government under section 1501 of title 31, and the letter is not deemed to be an ad- ministrative commitment for financing. (B) OBLIGATION OR COMMITMENT.—An obli- gation or administrative commitment may be made only as amounts are provided in au- thorization and appropriation Acts. (9) LIMITATION ON STATUTORY CONSTRUC- TION.—Nothing in this section shall be con- strued to prohibit the obligation of amounts pursuant to a letter of intent under this sub- section in the same fiscal year as the letter of intent is issued. Page 1614 TITLE 49—TRANSPORTATION § 47110 (Pub. L. 103–272, § 1(e), July 5, 1994, 108 Stat. 1264; Pub. L. 103–305, title I, § 115, Aug. 23, 1994, 108 Stat. 1579; Pub. L. 103–429, § 6(64), Oct. 31, 1994, 108 Stat. 4385; Pub. L. 104–264, title I, § 144, Oct. 9, 1996, 110 Stat. 3222; Pub. L. 106–181, title I, § 127, Apr. 5, 2000, 114 Stat. 76; Pub. L. 107–71, title I, § 119(a)(2), Nov. 19, 2001, 115 Stat. 628; Pub. L. 108–176, title I, §§ 145, 149(b), 159(c), Dec. 12, 2003, 117 Stat. 2504, 2505, 2511; Pub. L. 109–115, div. A, title I, § 176(b), Nov. 30, 2005, 119 Stat. 2427; Pub. L. 112–95, title I, §§ 111(c)(2)(A)(ii), 138, Feb. 14, 2012, 126 Stat. 18, 25; Pub. L. 115–254, div. B, title I, § 184(b), title V, § 539(n), Oct. 5, 2018, 132 Stat. 3234, 3371; Pub. L. 117–186, § 2, Oct. 10, 2022, 136 Stat. 2199; Pub. L. 118–63, title VII, §§ 709–710(b)(1), May 16, 2024, 138 Stat. 1252, 1253.) HISTORICAL AND REVISION NOTES PUB. L. 103–272 Revised Section Source (U.S. Code) Source (Statutes at Large) 47110(a) ...... 49 App.:2212(a) (1st, last sentences). Sept. 3, 1982, Pub. L. 97–248, § 513(a), 96 Stat. 689; Aug. 4, 1989, Pub. L. 101–71, § 3, 103 Stat. 181. 47110(b) ...... 49 App.:2212(a) (2d sentence cls. (1), (2) (words before period), (3), (4)). 47110(c) ...... 49 App.:2212(a) (2d sentence cl. (2) (words after pe- riod)). 47110(d) ...... 49 App.:2212(b)(1), (6). Sept. 3, 1982, Pub. L. 97–248, § 513(b)(1), (6), 96 Stat. 691; Oct. 31, 1992, Pub. L. 102–581, § 110(a), 106 Stat. 4879. 47110(e) ...... 49 App.:2212(d). Sept. 3, 1982, Pub. L. 97–248, 96 Stat. 324, § 513(d); added Dec. 30, 1987, Pub. L. 100–223, § 111(c), 101 Stat. 1503; Oct. 31, 1992, Pub. L. 102–581, § 111, 106 Stat. 4880. 47110(f) ....... 49 App.:2212(c). Sept. 3, 1982, Pub. L. 97–248, § 513(c), 96 Stat. 691; Dec. 30, 1987, Pub. L. 100–223, § 111(b), 101 Stat. 1503; Oct. 31, 1992, Pub. L. 102–581, § 107(c)(2), 106 Stat. 4879. In subsection (a), the words ‘‘for airport development or airport planning’’ are omitted because of the defini- tion of ‘‘project’’ in section 47102 of the revised title. The text of 49 App.:2212(a) (last sentence) is omitted as surplus because of 49:322(a). In subsection (b)(1), the word ‘‘approved’’ is omitted as surplus because a project that was not approved could not be carried out in compliance with a grant agreement. The words ‘‘in compliance with the grant agreement made for the project under this subchapter’’ are substituted for ‘‘in conformity with the terms and conditions of the grant agreement entered into in con- nection with the project’’ to eliminate unnecessary words. The word ‘‘sponsor’’ is substituted for ‘‘recipi- ent’’ for clarity. In subsection (b)(2)(A), the words ‘‘with respect to the project’’ are omitted as unnecessary because ‘‘the grant agreement’’ means ‘‘the grant agreement made for the project’’ referred to in clause (1) of this subsection. The words ‘‘under the project’’ are omitted as surplus. Subsection (b)(3) is substituted for ‘‘in the opinion of the Secretary it is reasonable in amount, and if the Secretary determines that a project cost is unreason- able in amount, the Secretary may allow as an allow- able project cost only so much of such project cost as the Secretary determines to be reasonable’’ to elimi- nate unnecessary words. Subsection (b)(5) is substituted for ‘‘except that in no event may the Secretary allow project costs in excess of the definite amount stated in the grant agreement except to the extent authorized by section 2211(b) of this Appendix’’ for consistency in this section. In subsection (c), before clause (1), the words ‘‘The Secretary may decide that a project cost . . . is allow- able’’ are substituted for ‘‘However, the allowable costs of a project . . . may include . . . and the allowable costs of a project . . . may include’’ for clarity and con- sistency in the revised title. The words ‘‘incurred after May 13, 1946, and before the date the grant agreement is executed’’ are substituted for ‘‘which were incurred prior to the execution of the grant agreement and sub- sequent to May 13, 1946’’ and ‘‘which were incurred sub- sequent to May 13, 1946’’ to eliminate unnecessary words. In clause (1), the words ‘‘preparation of’’, ‘‘ac- quisition of’’, ‘‘by the sponsor specifically in connec- tion with the accomplishment of the project for airport development’’ are omitted as surplus. The words ‘‘prop- erty interests in land or airspace’’ are substituted for ‘‘land or interests therein or easements through or other interests in airspace’’ to eliminate unnecessary words. In subsection (d)(1), before clause (A), the words ‘‘The Secretary may decide that the cost . . . is allowable’’ are substituted for ‘‘the Secretary may approve, as al- lowable project costs’’ and ‘‘The Secretary shall ap- prove project costs allowable under paragraph (1) of this subsection’’ for clarity and consistency in this sec- tion. In clause (B), the words ‘‘the boundaries of’’ are omitted as surplus. In clause (C), the words ‘‘and condi- tions’’ are omitted as being included in ‘‘terms’’. In subsection (d)(2), the words ‘‘In making a decision under paragraph (1) of this subsection, the Secretary may approve as allowable costs’’ are substituted for ‘‘In the case of a commercial service airport . . . the Sec- retary may approve, under the preceding sentence as allowable project costs’’ for consistency in this sub- section. In subsection (e)(1), the word ‘‘sponsor’’ is substituted for ‘‘applicant’’ for consistency. The words ‘‘stipulated as’’ and ‘‘Subject to the provisions of this paragraph’’ are omitted as surplus. The word ‘‘reimburse’’ is sub- stituted for ‘‘make payments under paragraph (2) of this subsection’’ and ‘‘pay’’ for clarity. The words ‘‘pay- able on account of such project in accordance with such letter of intent’’ are omitted as surplus. In subsection (e)(2), before clause (A), the text of 49 App.:2212(d)(1)(C) (last sentence) is omitted as obsolete. In subsection (e)(3), the words ‘‘A letter of intent issued’’ are substituted for ‘‘action’’ for clarity. The word ‘‘deemed’’ before ‘‘an obligation’’ is omitted as surplus. In subsection (f)(2), the words ‘‘of a hangar or’’ are omitted as being included in ‘‘airport building’’. PUB. L. 103–429 The source credits for all of subsection (b) are in- cluded for clarity though only subsection (b)(2) is af- fected by the amendment. The source credits for 49:47110(c) are included to correct a mistake on p. 405 of H. R. Rept. 103–180 (103d Cong., 1st Sess., July 15, 1993). Revised Section Source (U.S. Code) Source (Statutes at Large) 47110(b) ...... 49 App.:2212(a) (2d sentence cls. (1), (2)(A) (words be- fore period), (B), (3), (4)). Sept. 3, 1982, Pub. L. 97–248, § 513(a) (2d sentence), as amended May 26, 1994, Pub. L. 103–260, § 106, 108 Stat. 699. 47110(c) ...... 49 App.:2212(a) (2d sentence cl. (2)(A) (words after pe- riod). In subsection (b)(2)(C)(ii), the words ‘‘before the cost is incurred’’ are added for clarity. Editorial Notes REFERENCES IN TEXT Section 47114(d)(3)(A), referred to in subsecs. (b)(2)(C) and (g), was redesignated section 47114(d)(2)(A) by Pub. L. 118–63, title VII, § 712(b)(6), May 16, 2024, 138 Stat. 1256. Page 1615 TITLE 49—TRANSPORTATION § 47110 AMENDMENTS 2024—Subsec. (c). Pub. L. 118–63, § 709(1)(A), struck out ‘‘after May 13, 1946, and’’ after ‘‘this section incurred’’ in introductory provisions. Subsec. (c)(1). Pub. L. 118–63, § 709(1)(B), inserted ‘‘or preparing for’’ after ‘‘formulating’’ and ‘‘utility reloca- tion, work site preparation,’’ before ‘‘and administra- tion’’. Subsec. (d)(1). Pub. L. 118–63, § 709(2), substituted ‘‘section 47114 or distributed from the small airport fund under section 47116’’ for ‘‘section 47114(c)(1) or 47114(d)’’. Subsec. (e)(2)(C). Pub. L. 118–63, § 709(3), substituted ‘‘medium hub airport or large hub airport’’ for ‘‘com- mercial service airport having at least 0.25 percent of the boardings each year at all such airports’’. Subsec. (e)(7). Pub. L. 118–63, § 710(b)(1), substituted ‘‘under this subsection’’ for ‘‘under this section’’ in in- troductory provisions. Subsec. (h). Pub. L. 118–63, § 709(4), substituted ‘‘sec- tion 47114(c)(1)(D) or section 47114(d)(2)(A)’’ for ‘‘section 47114(d)(3)(A)’’. Subsec. (i). Pub. L. 118–63, §§ 709(5), 710(a), added sub- sec. (i) and struck out former subsec. (i) which related to bird-detecting radar systems. 2022—Subsec. (b)(1). Pub. L. 117–186, § 2(a), designated existing provisions as subpar. (A) and added subpar. (B). Subsec. (e)(7). Pub. L. 117–186, § 2(b), substituted ‘‘PARTNERSHIP PROGRAM AIRPORTS’’ for ‘‘PARTNERSHIP PROGRAM AIRPORTS’’ in heading. 2018—Subsec. (b)(2)(B). Pub. L. 115–254, § 539(n)(1), sub- stituted ‘‘compatibility’’ for ‘‘compatability’’. Subsec. (b)(2)(D)(i). Pub. L. 115–254, § 539(n)(2), sub- stituted ‘‘climatic’’ for ‘‘climactic’’. Subsec. (e)(7). Pub. L. 115–254, § 184(b), added par. (7). 2012—Subsec. (b)(2)(D). Pub. L. 112–95, § 138(a), amend- ed subpar. (D) generally. Prior to amendment, subpar. (D) read as follows: ‘‘if the cost is incurred after Sep- tember 11, 2001, for a project described in section 47102(3)(J), 47102(3)(K), or 47102(3)(L) and shall not de- pend upon the date of execution of a grant agreement made under this subchapter;’’. Subsec. (b)(7). Pub. L. 112–95, § 138(b), added par. (7). Subsec. (d). Pub. L. 112–95, § 138(c), amended subsec. (d) generally. Prior to amendment, subsec. (d) related to terminal development costs. Subsec. (e)(5). Pub. L. 112–95, § 111(c)(2)(A)(ii), sub- stituted ‘‘charge’’ for ‘‘fee’’. Subsec. (h). Pub. L. 112–95, § 138(d), inserted ‘‘con- struction’’ before ‘‘costs of revenue producing’’ and struck out ‘‘, including fuel farms and hangars,’’ before ‘‘are allowable’’. Subsec. (i). Pub. L. 112–95, § 138(e), added subsec. (i). 2005—Subsec. (d)(2)(A). Pub. L. 109–115, which directed amendment of section 47110(d)(2)(A), without specifying the title to be amended, by substituting ‘‘(A) except as provided in section 47108(e)(3), the’’ for ‘‘(A) the’’, was executed to this section, to reflect the probable intent of Congress. 2003—Subsec. (b)(1). Pub. L. 108–176, § 145, inserted ‘‘and any cost of moving a Federal facility impeding the project if the rebuilt facility is of an equivalent size and type’’ before semicolon at end. Subsec. (b)(2)(C). Pub. L. 108–176, § 149(b)(1), sub- stituted ‘‘or section 47114(d)(3)(A)’’ for ‘‘of this title’’ in introductory provisions. Subsec. (b)(6). Pub. L. 108–176, § 159(c), added par. (6). Subsec. (g). Pub. L. 108–176, § 149(b)(2), inserted ‘‘or section 47114(d)(3)(A)’’ after ‘‘of section 47114(c)’’ and substituted ‘‘of the project’’ for ‘‘of project’’. Subsec. (h). Pub. L. 108–176, § 149(b)(3), added subsec. (h). 2001—Subsec. (b)(2)(D). Pub. L. 107–71 added subpar. (D). 2000—Subsec. (e)(2)(C). Pub. L. 106–181, § 127(1), added subpar. (C) and struck out former subpar. (C) which read as follows: ‘‘the Secretary decides will enhance system-wide airport capacity significantly and meets the criteria of section 47115(d) of this title.’’ Subsec. (e)(5). Pub. L. 106–181, § 127(2), added par. (5) and struck out former par. (5) which read as follows: ‘‘A letter of intent issued under paragraph (1) of this sub- section may not condition the obligation of amounts on the imposition of a passenger facility fee.’’ 1996—Subsec. (b)(2)(C). Pub. L. 104–264, § 144(a), amend- ed subpar. (C) generally. Prior to amendment, subpar. (C) read as follows: ‘‘if the Government’s share is paid only with amounts apportioned under section 47114(c)(1)(A) and (2) of this title and if the cost is in- curred— ‘‘(i) during the fiscal year ending September 30, 1994; ‘‘(ii) before a grant agreement is executed for the project but according to an airport layout plan the Secretary approves before the cost is incurred and all applicable statutory and administrative require- ments that would apply to the project if the agree- ment had been executed; and ‘‘(iii) for work related to a project for which a grant agreement previously was executed during the fiscal year ending September 30, 1994;’’. Subsec. (g). Pub. L. 104–264, § 144(b), added subsec. (g). 1994—Subsec. (b)(2). Pub. L. 103–429 amended par. (2) generally. Prior to amendment, par. (2) read as follows: ‘‘if the cost is incurred— ‘‘(A) after the grant agreement is executed and is for airport development or airport planning carried out after the grant agreement is executed; or ‘‘(B) after June 1, 1989, by the airport operator (re- gardless of when the grant agreement is executed) as part of a Government-approved noise compatibility program (including project formulation costs) and is consistent with all applicable statutory and adminis- trative requirements;’’. Subsec. (e)(6). Pub. L. 103–305 added par. (6). Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 2003 AMENDMENT Amendment by Pub. L. 108–176 applicable only to fis- cal years beginning after Sept. 30, 2003, except as other- wise specifically provided, see section 3 of Pub. L. 108–176, set out as a note under section 106 of this title. EFFECTIVE DATE OF 2000 AMENDMENT Amendment by Pub. L. 106–181 applicable only to fis- cal years beginning after Sept. 30, 1999, see section 3 of Pub. L. 106–181, set out as a note under section 106 of this title. EFFECTIVE DATE OF 1996 AMENDMENT Except as otherwise specifically provided, amend- ment by Pub. L. 104–264 applicable only to fiscal years beginning after Sept. 30, 1996, and not to be construed as affecting funds made available for a fiscal year end- ing before Oct. 1, 1996, see section 3 of Pub. L. 104–264, set out as a note under section 106 of this title. LETTERS OF INTENT FOR AIRPORT SECURITY IMPROVEMENT PROJECTS Pub. L. 108–7, div. I, title III, § 367, Feb. 20, 2003, 117 Stat. 423, provided that: ‘‘(a) The Under Secretary of Transportation for Secu- rity [now Administrator of the Transportation Secu- rity Administration] may issue a letter of intent to an airport committing to obligate from future budget au- thority an amount, not more than the Federal Govern- ment’s share of the project’s cost, for an airport secu- rity improvement project (including interest costs and costs of formulating the project) at the airport. The letter shall establish a schedule under which the Under Secretary will reimburse the airport for the Govern- ment’s share of the project’s costs, as amounts become available, if the airport, after the Under Secretary issues the letter, carries out the project without receiv- ing amounts under Chapter 471 of title 49 [United States Code]. ‘‘(b) The airport shall notify the Under Secretary of the airport’s intent to carry out the airport security improvement project before the project begins. Page 1616 TITLE 49—TRANSPORTATION § 47111 ‘‘(c) A letter of intent may be issued under this sec- tion only if— ‘‘(1) The airport security improvement project to which the letter applies involves the replacement of baggage conveyer systems or the reconfiguration of terminal baggage areas in order to install explosive detection systems; and ‘‘(2) The Under Secretary determines that the project will improve security or will improve the effi- ciency of the airport without lessening security. ‘‘(d) A letter of intent issued under this section is not an obligation of the Government under section 1501 of title 31 [United States Code], and the letter is not deemed to be an administrative commitment for fi- nancing. An obligation or administrative commitment may be made only as amounts are provided in author- ization and appropriations laws. ‘‘(e) The Government’s share of the project’s cost shall be 75 percent for a project at an airport having at least 0.25 percent of the total number of passenger boardings each year at all airports and 90 percent for a project at any other airport. ‘‘(f) Nothing in this section shall be construed to pro- hibit the obligation of amounts pursuant to a letter of intent under this section in the same fiscal year as the letter of intent is issued. ‘‘(g) The Under Secretary shall notify the House and Senate Committees on Appropriations, the House Transportation and Infrastructure Committee, and the Senate Commerce, Science, and Transportation Com- mittee at least 3 days prior to the issuance of a letter of intent under this section. ‘‘(h) There is authorized to be appropriated to carry out this section $500,000,000 in each of fiscal years 2003, 2004, 2005, 2006, and 2007.’’ LETTERS OF INTENT; DURATION OF AUTHORITY AND APPROVAL BY CONGRESS Pub. L. 102–388, title III, § 320, Oct. 6, 1992, 106 Stat. 1546, provided that: ‘‘The authority conferred by sec- tion 513(d) of the Airport and Airway Improvement Act of 1982, as amended [see subsec. (e) of this section], to issue letters of intent shall remain in effect subsequent to September 30, 1992. Letters of intent may be issued under such subsection to applicants determined to be qualified under such Act [substantially repealed by Pub. L. 103–272, § 7(b), July 5, 1994, 108 Stat. 1379, and re- enacted by first section thereof as this subchapter]: Provided, That, notwithstanding any other provision of law, all such letters of intent in excess of $10,000,000 shall be submitted for approval to the Committees on Appropriations of the Senate and the House of Rep- resentatives; the Committee on Commerce, Science, and Transportation of the Senate; and the Committee on Public Works and Transportation [now Committee on Transportation and Infrastructure] of the House of Representatives.’’ Similar provisions were contained in the following prior appropriation acts: Pub. L. 102–143, title III, § 320, Oct. 28, 1991, 105 Stat. 942. Pub. L. 101–516, title III, § 320, Nov. 5, 1990, 104 Stat. 2181. Pub. L. 101–164 title III, § 326, Nov. 21, 1989, 103 Stat. 1096. Pub. L. 100–457, title III, § 334, Sept. 30, 1988, 102 Stat. 2153. § 47111. Payments under project grant agree- ments (a) GENERAL AUTHORITY.—After making a project grant agreement under this subchapter and consulting with the sponsor, the Secretary of Transportation may decide when and in what amounts payments under the agreement will be made. Payments totaling not more than 90 per- cent of the United States Government’s share of the project’s estimated allowable costs may be made before the project is completed if the spon- sor certifies to the Secretary that the total amount expended from the advance payments at any time will not be more than the cost of the airport development work completed on the project at that time. (b) RECOVERING PAYMENTS.—If the Secretary determines that the total amount of payments made under a grant agreement under this sub- chapter is more than the Government’s share of the total allowable project costs, the Govern- ment may recover the excess amount. If the Sec- retary finds that a project for which an advance payment was made has not been completed within a reasonable time, the Government may recover any part of the advance payment for which the Government received no benefit. (c) PAYMENT DEPOSITS.—A payment under a project grant agreement under this subchapter may be made only to an official or depository designated by the sponsor and authorized by law to receive public money. (d) WITHHOLDING PAYMENTS.—(1) The Sec- retary may withhold a payment under a grant agreement under this subchapter for more than 180 days after the payment is due only if the Secretary— (A) notifies the sponsor and provides an op- portunity for a hearing; and (B) finds that the sponsor has violated the agreement. (2) The 180-day period may be extended by— (A) agreement of the Secretary and the sponsor; or (B) the hearing officer if the officer decides an extension is necessary because the sponsor did not follow the schedule the officer estab- lished. (3) A person adversely affected by an order of the Secretary withholding a payment may apply for review of the order by filing a petition in the United States Court of Appeals for the District of Columbia Circuit or in the court of appeals of the United States for the circuit in which the project is located. The petition must be filed not later than 60 days after the order is served on the petitioner. (e) ACTION ON GRANT ASSURANCES CONCERNING AIRPORT REVENUES.—If, after notice and oppor- tunity for a hearing, the Secretary finds a viola- tion of section 47107(b) of this title, as further defined by the Secretary under section 47107(k) of this title, or a violation of an assurance made under section 47107(b) of this title, and the Sec- retary has provided an opportunity for the air- port sponsor to take corrective action to cure such violation, and such corrective action has not been taken within the period of time set by the Secretary, the Secretary shall withhold ap- proval of any new grant application for funds under this chapter, or any proposed modifica- tion to an existing grant that would increase the amount of funds made available under this chap- ter to the airport sponsor, and withhold ap- proval of any new application to impose a charge under section 40117 of this title. Such ap- plications may thereafter be approved only upon a finding by the Secretary that such corrective action as the Secretary requires has been taken to address the violation and that the violation no longer exists.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 17061 — Development of national smart manufacturing plan

**(a) In general** Not later than 3 years after December 27, 2020, the Secretary of Energy (in this section referred to as the “Secretary”), in consultation with the National Academies, shall develop and complete a national plan for smart manufacturing technology development and deployment to improve the productivity and energy efficiency of the manufacturing sector of the United States. **(b) Content** (1) **In general** — The plan developed under subsection (a) shall identify areas in which agency actions by the Secretary and other heads of relevant Federal agencies would— (A) facilitate quicker development, deployment, and adoption of smart manufacturing technologies and processes; (B) result in greater energy efficiency and lower environmental impacts for all American manufacturers; and (C) enhance competitiveness and strengthen the manufacturing sectors of the United States. (2) **Inclusions** — Agency actions identified under paragraph (1) shall include— (A) an assessment of previous and current actions of the Department relating to smart manufacturing; (B) the establishment of voluntary interconnection protocols and performance standards; (C) the use of smart manufacturing to improve energy efficiency and reduce emissions in supply chains across multiple companies; (D) actions to increase cybersecurity in smart manufacturing infrastructure; (E) deployment of existing research results; (F) the leveraging of existing high-performance computing infrastructure; and (G) consideration of the impact of smart manufacturing on existing manufacturing jobs and future manufacturing jobs. **(c) Biennial revisions** Not later than 2 years after the date on which the Secretary completes the plan under subsection (a), and not less frequently tha

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 17061

Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 17061. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 17061 — Definitions

Page 8953 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 17061 1 See References in Text note below. 2 So in original. Does not fit with cl. (ii) introductory provi- sion. § 17054. Biofuels distribution and advanced biofuels infrastructure (a) In general The Secretary, in coordination with the Sec- retary of Transportation and in consultation with the Administrator of the Environmental Protection Agency, shall carry out a program of research, development, and demonstration relat- ing to existing transportation fuel distribution infrastructure and new alternative distribution infrastructure. (b) Focus The program described in subsection (a) shall focus on the physical and chemical properties of biofuels and efforts to prevent or mitigate against adverse impacts of those properties in the areas of— (1) corrosion of metal, plastic, rubber, cork, fiberglass, glues, or any other material used in pipes and storage tanks; (2) dissolving of storage tank sediments; (3) clogging of filters; (4) contamination from water or other adulterants or pollutants; (5) poor flow properties related to low tem- peratures; (6) oxidative and thermal instability in long- term storage and uses; (7) microbial contamination; (8) problems associated with electrical con- ductivity; and (9) such other areas as the Secretary con- siders appropriate. (Pub. L. 110–140, title II, § 248, Dec. 19, 2007, 121 Stat. 1548.) Statutory Notes and Related Subsidiaries EFFECTIVE DATE Section effective on the date that is 1 day after Dec. 19, 2007, see section 1601 of Pub. L. 110–140, set out as a note under section 1824 of Title 2, The Congress. SUBCHAPTER III—ENERGY SAVINGS IN BUILDINGS AND INDUSTRY § 17061. Definitions In this title: 1 (1) Administrator The term ‘‘Administrator’’

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 17061

Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 17061. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

49 U.S.C. § 47110 — Allowable project costs

**(a) General Authority.—** Except as provided in [section 47111 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title49-section47111&num=0&edition=prelim), the United States Government may pay or be obligated to pay, from amounts appropriated to carry out this subchapter, a cost incurred in carrying out a project under this subchapter only if the Secretary of Transportation decides the cost is allowable. **(b) Allowable Cost Standards.—** A project cost is allowable— (1) (A) if the cost necessarily is incurred in carrying out the project in compliance with the grant agreement made for the project under this subchapter, including any cost a sponsor incurs related to an audit the Secretary requires under section 47121(b) or (d) of this title and any cost of moving a Federal facility impeding the project if the rebuilt facility is of an equivalent size and type; or (B) if the cost is an incentive payment incurred in carrying out the project described in subparagraph (A) that is to be provided to a contractor upon early completion of a project, if— (i) such payment does not exceed the lesser of 5 percent of the initial construction contract amount or $1,000,000; (ii) the level of contractor’s control of, or access to, the worksite necessary to shorten the duration of the project does not negatively impact the operation of the airport; (iii) the contract specifies application of the incentive structure in the event of unforeseeable, non-weather delays beyond the control of the contractor; (iv) nothing in any agreement with the contractor prevents the airport operator from retaining responsibility for the safety, efficiency, and capacity of the airport during the execution of the grant agreement; and (v) the Secret

Source: Supplied U.S. Code snapshot — release unconfirmed · 49 U.S.C. § 47110

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.