Browse Arkansas Code titles and sections
16 U.S.C. § 2622 — Obligations to consider and determine
Federal law — U.S. Code and appendices · legal_authorities
Page 2202
TITLE 16—CONSERVATION
§ 2622
amended sections 6802 to 6807 of Title 42. For complete
classification of title I to the Code, see Tables.
Section 79z–5a of title 15, referred to in subsec.
(d)(10)(A)(ii), was repealed by Pub. L. 109–58, title XII,
§ 1263, Aug. 8, 2005, 119 Stat. 974.
AMENDMENTS
2021—Subsec. (d)(20). Pub. L. 117–58, § 40104(a)(1), added
par. (20).
Subsec. (d)(21). Pub. L. 117–58, § 40431(a), added par.
(21).
2009—Subsec. (d)(16) to (19). Pub. L. 111–5 redesignated
par. (16) relating to consideration of smart grid invest-
ments as (18) and par. (17) relating to smart grid infor-
mation as (19).
2007—Subsec. (d)(16), (17). Pub. L. 110–140, § 1307(a),
added pars. (16) and (17) relating to consideration of
smart grid investments and smart grid information, re-
spectively.
Pub. L. 110–140, § 532(a), added pars. (16) and (17) relat-
ing to integrated resource planning and rate design
modifications to promote energy efficiency invest-
ments, respectively.
2005—Subsec. (d)(11) to (13). Pub. L. 109–58, § 1251(a),
added pars. (11) to (13).
Subsec. (d)(14). Pub. L. 109–58, § 1252(a), added par. (14).
Subsec. (d)(15). Pub. L. 109–58, § 1254(a), added par. (15).
1992—Subsec. (c)(3). Pub. L. 102–486, § 111(b), added par.
(3).
Subsec. (d)(7) to (9). Pub. L. 102–486, § 111(a), added
pars. (7) to (9).
Subsec. (d)(10). Pub. L. 102–486, § 712, added par. (10).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2007 AMENDMENT
Amendment by Pub. L. 110–140 effective on the date
that is 1 day after Dec. 19, 2007, see section 1601 of Pub.
L. 110–140, set out as an Effective Date note under sec-
tion 1824 of Title 2, The Congress.
STATE AUTHORITIES; CONSTRUCTION
Nothing in amendment by section 712 of Pub. L.
102–486 to be construed
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 2622
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: c5581040bdc2292eea89302383b2bdab16e8d927fa21720db190b64eaea75e23. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-6d2237d8d63adb69c2f51124
Source file: Laws/federal/codes/united-states-code-2024/title-16/section-2622-obligations-to-consider-and-determine--a4dfb850f5.md
Pages: Not recorded – Not recorded
Passage SHA-256: 450874297039e9e0e32d0953377a728c2612b442d6da91623e0b38f8e5c08621
Source location: USCODE-2024-title16-chap46-subchapII-sec2622.pdf
Stored source content
Page 2202
TITLE 16—CONSERVATION
§ 2622
amended sections 6802 to 6807 of Title 42. For complete
classification of title I to the Code, see Tables.
Section 79z–5a of title 15, referred to in subsec.
(d)(10)(A)(ii), was repealed by Pub. L. 109–58, title XII,
§ 1263, Aug. 8, 2005, 119 Stat. 974.
AMENDMENTS
2021—Subsec. (d)(20). Pub. L. 117–58, § 40104(a)(1), added
par. (20).
Subsec. (d)(21). Pub. L. 117–58, § 40431(a), added par.
(21).
2009—Subsec. (d)(16) to (19). Pub. L. 111–5 redesignated
par. (16) relating to consideration of smart grid invest-
ments as (18) and par. (17) relating to smart grid infor-
mation as (19).
2007—Subsec. (d)(16), (17). Pub. L. 110–140, § 1307(a),
added pars. (16) and (17) relating to consideration of
smart grid investments and smart grid information, re-
spectively.
Pub. L. 110–140, § 532(a), added pars. (16) and (17) relat-
ing to integrated resource planning and rate design
modifications to promote energy efficiency invest-
ments, respectively.
2005—Subsec. (d)(11) to (13). Pub. L. 109–58, § 1251(a),
added pars. (11) to (13).
Subsec. (d)(14). Pub. L. 109–58, § 1252(a), added par. (14).
Subsec. (d)(15). Pub. L. 109–58, § 1254(a), added par. (15).
1992—Subsec. (c)(3). Pub. L. 102–486, § 111(b), added par.
(3).
Subsec. (d)(7) to (9). Pub. L. 102–486, § 111(a), added
pars. (7) to (9).
Subsec. (d)(10). Pub. L. 102–486, § 712, added par. (10).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2007 AMENDMENT
Amendment by Pub. L. 110–140 effective on the date
that is 1 day after Dec. 19, 2007, see section 1601 of Pub.
L. 110–140, set out as an Effective Date note under sec-
tion 1824 of Title 2, The Congress.
STATE AUTHORITIES; CONSTRUCTION
Nothing in amendment by section 712 of Pub. L.
102–486 to be construed as affecting or intending to af-
fect, or in any way to interfere with, authority of any
State or local government relating to environmental
protection or siting of facilities, see section 731 of Pub.
L. 102–486, set out as a note under section 796 of this
title.
WAGE RATE REQUIREMENTS
For provisions relating to rates of wages to be paid to
laborers and mechanics on projects for construction,
alteration, or repair work funded under div. D or an
amendment by div. D of Pub. L. 117–58, including au-
thority of Secretary of Labor, see section 18851 of Title
42, The Public Health and Welfare.
REPORT
TO PRESIDENT
AND CONGRESS
ON ENCOURAGE-
MENT
OF INTEGRATED RESOURCE PLANNING
AND IN-
VESTMENTS
IN
CONSERVATION
AND
ENERGY
EFFI-
CIENCY BY ELECTRIC UTILITIES
Pub. L. 102–486, title I, § 111(e), Oct. 24, 1992, 106 Stat.
2796, provided that: ‘‘Not later than 2 years after the
date of the enactment of this Act [Oct. 24, 1992], the
Secretary shall transmit a report to the President and
to the Congress containing—
‘‘(1) a survey of all State laws, regulations, prac-
tices, and policies under which State regulatory au-
thorities implement the provisions of paragraphs (7),
(8), and (9) of section 111(d) of the Public Utility Reg-
ulatory Policies Act of 1978 [16 U.S.C. 2621(d)(7)–(9)];
‘‘(2) an evaluation by the Secretary of whether and
to what extent, integrated resource planning is likely
to result in—
‘‘(A) higher or lower electricity costs to an elec-
tric utility’s ultimate consumers or to classes or
groups of such consumers;
‘‘(B) enhanced or reduced reliability of electric
service; and
‘‘(C) increased or decreased dependence on par-
ticular energy resources; and
‘‘(3) a survey of practices and policies under which
electric cooperatives prepare integrated resource
plans, submit such plans to the Rural Electrification
Administration and the extent to which such inte-
grated resource planning is reflected in rates charged
to customers.
The report shall include an analysis prepared in con-
junction with the Federal Trade Commission, of the
competitive impact of implementation of energy con-
servation, energy efficiency, and other demand side
management programs by utilities on small businesses
engaged in the design, sale, supply, installation, or
servicing of similar energy conservation, energy effi-
ciency, or other demand side management measures
and whether any unfair, deceptive, or predatory acts
exist, or are likely to exist, from implementation of
such programs.’’
[For provisions relating to further requirements as to
subject matter contained in report under section 111(e)
of Pub. L. 102–486, set out above, see section 115(e) of
Pub. L. 102–486, set out as a note under section 3203 of
Title 15, Commerce and Trade.]
STUDY CONCERNING ELECTRIC RATES OF STATE UTILITY
AGENCIES
Pub. L. 95–617, title VI, § 601, Nov. 9, 1978, 92 Stat. 3164,
directed the Secretary to conduct a study concerning
the effects of provisions of Federal law on rates estab-
lished by State utility agencies and to submit a report
to Congress on the results of such study not later than
1 year after Nov. 9, 1978.
§ 2622. Obligations to consider and determine
(a) Request for consideration and determination
Each State regulatory authority (with respect
to each electric utility for which it has rate-
making authority) and each nonregulated elec-
tric utility may undertake the consideration
and make the determination referred to in sec-
tion 2621 of this title with respect to any stand-
ard established by section 2621(d) of this title in
any proceeding respecting the rates of the elec-
tric utility. Any participant or intervenor (in-
cluding an intervenor referred to in section 2631
of this title) in such a proceeding may request,
and shall obtain, such consideration and deter-
mination in such proceeding. In undertaking
such consideration and making such determina-
tion in any such proceeding with respect to the
application to any electric utility of any stand-
ard established by section 2621(d) of this title, a
State regulatory authority (with respect to an
electric utility for which it has ratemaking au-
thority) or nonregulated electric utility may
take into account in such proceeding—
(1) any appropriate prior determination with
respect to such standard—
(A) which is made in a proceeding which
takes place after November 9, 1978, or
(B) which was made before such date (or is
made in a proceeding pending on such date)
and complies, as provided in section 2634 of
this title, with the requirements of this
chapter; and
(2) the evidence upon which such prior deter-
mination was based (if such evidence is ref-
erenced in such proceeding).
(b) Time limitations
(1) Not later than 2 years after November 9,
1978 (or after October 24, 1992, in the case of
Page 2203
TITLE 16—CONSERVATION
§ 2622
standards under paragraphs (7), (8), and (9) of
section 2621(d) of this title), each State regu-
latory authority (with respect to each electric
utility for which it has ratemaking authority)
and each nonregulated electric utility shall
commence the consideration referred to in sec-
tion 2621 of this title, or set a hearing date for
such consideration, with respect to each stand-
ard established by section 2621(d) of this title.
(2) Not later than three years after November
9, 1978 (or after October 24, 1992, in the case of
standards under paragraphs (7), (8), and (9) of
section 2621(d) of this title), each State regu-
latory authority (with respect to each electric
utility for which it has ratemaking authority),
and each nonregulated electric utility, shall
complete the consideration, and shall make the
determination, referred to in section 2621 of this
title with respect to each standard established
by section 2621(d) of this title.
(3)(A) Not later than 2 years after August 8,
2005, each State regulatory authority (with re-
spect to each electric utility for which it has
ratemaking authority) and each nonregulated
electric utility shall commence the consider-
ation referred to in section 2621 of this title, or
set a hearing date for such consideration, with
respect to each standard established by para-
graphs (11) through (13) of section 2621(d) of this
title.
(B) Not later than 3 years after August 8, 2005,
each State regulatory authority (with respect to
each electric utility for which it has ratemaking
authority), and each nonregulated electric util-
ity, shall complete the consideration, and shall
make the determination, referred to in section
2621 of this title with respect to each standard
established by paragraphs (11) through (13) of
section 2621(d) of this title.
(4)(A) Not later than 1 year after August 8,
2005, each State regulatory authority (with re-
spect to each electric utility for which it has
ratemaking authority) and each nonregulated
electric utility shall commence the consider-
ation referred to in section 2621 of this title, or
set a hearing date for such consideration, with
respect to the standard established by paragraph
(14) of section 2621(d) of this title.
(B) Not later than 2 years after August 8, 2005,
each State regulatory authority (with respect to
each electric utility for which it has ratemaking
authority), and each nonregulated electric util-
ity, shall complete the consideration, and shall
make the determination, referred to in section
2621 of this title with respect to the standard es-
tablished by paragraph (14) of section 2621(d) of
this title.
(5)(A) Not later than 1 year after August 8,
2005, each State regulatory authority (with re-
spect to each electric utility for which it has
ratemaking authority) and each nonregulated
utility shall commence the consideration re-
ferred to in section 2621 of this title, or set a
hearing date for consideration, with respect to
the standard established by paragraph (15) of
section 2621(d) of this title.
(B) Not later than two years after August 8,
2005, each State regulatory authority (with re-
spect to each electric utility for which it has
ratemaking authority), and each nonregulated
electric utility, shall complete the consider-
ation, and shall make the determination, re-
ferred to in section 2621 of this title with respect
to each standard established by paragraph (15) of
section 2621(d) of this title.
(6)(A) Not later than 1 year after December 19,
2007, each State regulatory authority (with re-
spect to each electric utility for which it has
ratemaking authority) and each nonregulated
utility shall commence the consideration re-
ferred to in section 2621 of this title, or set a
hearing date for consideration, with respect to
the standards established by paragraphs (16)
through (19) of section 2621(d) of this title.
(B) Not later than 2 years after December 19,
2007, each State regulatory authority (with re-
spect to each electric utility for which it has
ratemaking authority), and each nonregulated
electric utility, shall complete the consider-
ation, and shall make the determination, re-
ferred to in section 2621 of this title with respect
to each standard established by paragraphs (16)
through (19) of section 2621(d) of this title.
(7)(A) Not later than 1 year after November 15,
2021, each State regulatory authority (with re-
spect to each electric utility for which the State
has ratemaking authority) and each nonregu-
lated electric utility shall commence consider-
ation under section 2621 of this title, or set a
hearing date for consideration, with respect to
the standard established by paragraph (20) of
section 2621(d) of this title.
(B) Not later than 2 years after November 15,
2021, each State regulatory authority (with re-
spect to each electric utility for which the State
has ratemaking authority), and each nonregu-
lated electric utility shall complete the consid-
eration and make the determination under sec-
tion 2621 of this title with respect to the stand-
ard established by paragraph (20) of section
2621(d) of this title.
(8)(A) Not later than 1 year after November 15,
2021, each State regulatory authority (with re-
spect to each electric utility for which the State
has ratemaking authority) and each nonregu-
lated utility shall commence consideration
under section 2621 of this title, or set a hearing
date for consideration, with respect to the
standard established by paragraph (21) of section
2621(d) of this title.
(B) Not later than 2 years after November 15,
2021, each State regulatory authority (with re-
spect to each electric utility for which the State
has ratemaking authority), and each nonregu-
lated electric utility shall complete the consid-
eration and make the determination under sec-
tion 2621 of this title with respect to the stand-
ard established by paragraph (21) of section
2621(d) of this title.
(c) Failure to comply
Each State regulatory authority (with respect
to each electric utility for which it has rate-
making authority) and each nonregulated elec-
tric utility shall undertake the consideration,
and make the determination, referred to in sec-
tion 2621 of this title with respect to each stand-
ard established by section 2621(d) of this title in
the first rate proceeding commenced after the
date three years after November 9, 1978, respect-
ing the rates of such utility if such State regu-
latory authority or nonregulated electric utility
Page 2204
TITLE 16—CONSERVATION
§ 2622
has not, before such date, complied with sub-
section (b)(2) with respect to such standard. In
the case of each standard established by para-
graphs (11) through (13) of section 2621(d) of this
title, the reference contained in this subsection
to November 9, 1978, shall be deemed to be a ref-
erence to August 8, 2005. In the case of the
standard established by paragraph (14) of section
2621(d) of this title, the reference contained in
this subsection to November 9, 1978, shall be
deemed to be a reference to August 8, 2005. In
the case of the standard established by para-
graph (15) of section 2621(d) of this title, the ref-
erence contained in this subsection to November
9, 1978, shall be deemed to be a reference to Au-
gust 8, 2005. In the case of the standards estab-
lished by paragraphs (16) through (19) of section
2621(d) of this title, the reference contained in
this subsection to November 9, 1978, shall be
deemed to be a reference to December 19, 2007. In
the case of the standard established by para-
graph (20) of section 2621(d) of this title, the ref-
erence contained in this subsection to November
9, 1978, shall be deemed to be a reference to No-
vember 15, 2021. In the case of the standard es-
tablished by paragraph (21) of section 2621(d) of
this title, the reference contained in this sub-
section to November 9, 1978, shall be deemed to
be a reference to November 15, 2021.
(d) Prior State actions relating to standard
under certain paragraphs of section 2621(d)
Subsections (b) and (c) of this section shall not
apply to the standards established by para-
graphs (11) through (13) and paragraphs (16)
through (19) of section 2621(d) of this title in the
case of any electric utility in a State if, before
August 8, 2005—
(1) the State has implemented for such util-
ity the standard concerned (or a comparable
standard);
(2) the State regulatory authority for such
State or relevant nonregulated electric utility
has conducted a proceeding to consider imple-
mentation of the standard concerned (or a
comparable standard) for such utility; or
(3) the State legislature has voted on the im-
plementation of such standard (or a com-
parable standard) for such utility.
(e) Prior State actions relating to standard
under section 2621(d)(14)
Subsections (b) and (c) of this section shall not
apply to the standard established by paragraph
(14) of section 2621(d) of this title in the case of
any electric utility in a State if, before August
8, 2005—
(1) the State has implemented for such util-
ity the standard concerned (or a comparable
standard);
(2) the State regulatory authority for such
State or relevant nonregulated electric utility
has conducted a proceeding to consider imple-
mentation of the standard concerned (or a
comparable standard) for such utility within
the previous 3 years; or
(3) the State legislature has voted on the im-
plementation of such standard (or a com-
parable standard) for such utility within the
previous 3 years.
(f) Prior State actions relating to standard under
section 2621(d)(15)
Subsections (b) and (c) of this section shall not
apply to the standard established by paragraph
(15) of section 2621(d) of this title in the case of
any electric utility in a State if, before August
8, 2005—
(1) the State has implemented for such util-
ity the standard concerned (or a comparable
standard);
(2) the State regulatory authority for such
State or relevant nonregulated electric utility
has conducted a proceeding to consider imple-
mentation of the standard concerned (or a
comparable standard) for such utility; or
(3) the State legislature has voted on the im-
plementation of such standard (or a com-
parable standard) for such utility.
(g) Prior State actions
Subsections (b) and (c) shall not apply to the
standard established by paragraph (20) of section
2621(d) of this title in the case of any electric
utility in a State if, before November 15, 2021—
(1) the State has implemented for the elec-
tric utility the standard (or a comparable
standard);
(2) the State regulatory authority for the
State or the relevant nonregulated electric
utility has conducted a proceeding to consider
implementation of the standard (or a com-
parable standard) for the electric utility; or
(3) the State legislature has voted on the im-
plementation of the standard (or a comparable
standard) for the electric utility.
(h) Other prior State actions
Subsections (b) and (c) shall not apply to the
standard established by paragraph (21) of section
2621(d) of this title in the case of any electric
utility in a State if, before November 15, 2021—
(1) the State has implemented for the elec-
tric utility the standard (or a comparable
standard);
(2) the State regulatory authority for the
State or the relevant nonregulated electric
utility has conducted a proceeding to consider
implementation of the standard (or a com-
parable standard) for the electric utility; or
(3) the State legislature has voted on the im-
plementation of the standard (or a comparable
standard) for the electric utility during the 3-
year period ending on November 15, 2021.
(Pub. L. 95–617, title I, § 112, Nov. 9, 1978, 92 Stat.
3122; Pub. L. 102–486, title I, § 111(c), Oct. 24, 1992,
106
Stat.
2795;
Pub.
L.
109–58,
title
XII,
§§ 1251(b)(1)–(3)(A), 1252(g)–(i)(1), 1254(b)(1)–(3)(A),
Aug. 8, 2005, 119 Stat. 963, 966, 967, 971; Pub. L.
110–140, title XIII, § 1307(b), Dec. 19, 2007, 121 Stat.
1793; Pub. L. 111–5, div. A, title IV, § 408(b), Feb.
17, 2009, 123 Stat. 146; Pub. L. 117–58, div. D, title
I,
§ 40104(a)(2)(A)–(C)(i),
title
IV,
§ 40431(b)(1)–(3)(A), Nov. 15, 2021, 135 Stat. 931, 932,
1048.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in subsec. (a)(1)(B), was in
the original ‘‘this title’’, meaning title I (§ 101 et seq.)
of Pub. L. 95–617, Nov. 9, 1978, 92 Stat. 3120, which en-
Page 2205
TITLE 16—CONSERVATION
§ 2623
acted subchapters I to IV of this chapter and section
6808 of Title 42, The Public Health and Welfare, and
amended sections 6802 to 6807 of Title 42. For complete
classification of title I to the Code, see Tables.
CODIFICATION
‘‘October 24, 1992’’, referred to in subsec. (b)(1), (2),
was in the original ‘‘the enactment of the Comprehen-
sive National Energy Policy Act’’, and was translated
as meaning the enactment of the Energy Policy Act of
1992, Pub. L. 102–486, to reflect the probable intent of
Congress. The Comprehensive National Energy Policy
Act was the original short title of H.R. 776, which was
enacted into law on Oct. 24, 1992, as Pub. L. 102–486.
AMENDMENTS
2021—Subsec. (b)(7). Pub. L. 117–58, § 40104(a)(2)(A),
added par. (7).
Subsec. (b)(8). Pub. L. 117–58, § 40431(b)(1), added par.
(8).
Subsec. (c). Pub. L. 117–58, § 40431(b)(2), inserted at end
‘‘In the case of the standard established by paragraph
(21) of section 2621(d) of this title, the reference con-
tained in this subsection to November 9, 1978, shall be
deemed to be a reference to November 15, 2021.’’
Pub. L. 117–58, § 40104(a)(2)(B)(i), substituted ‘‘August
8, 2005. In the case of the standard established by para-
graph (15) of section 2621(d) of this title, the reference
contained in this subsection to November 9, 1978, shall
be deemed to be a reference to August 8, 2005. In the
case of the standards established by paragraphs (16)’’
for ‘‘August 8, 2005. In the case of the standards estab-
lished by paragraphs (16)’’ and inserted at end ‘‘In the
case of the standard established by paragraph (20) of
section 2621(d) of this title, the reference contained in
this subsection to November 9, 1978, shall be deemed to
be a reference to November 15, 2021.’’
Subsec. (d). Pub. L. 117–58, § 40104(a)(2)(B)(ii), repealed
Pub. L. 109–58, § 1254(b)(2). See 2005 Amendment note
below.
Subsec. (g). Pub. L. 117–58, § 40104(a)(2)(C)(i), added
subsec. (g).
Subsec. (h). Pub. L. 117–58, § 40431(b)(3)(A), added sub-
sec. (h).
2009—Subsecs. (b)(6), (d). Pub. L. 111–5 substituted
‘‘(16) through (19)’’ for ‘‘(17) through (18)’’ wherever ap-
pearing.
2007—Subsec. (b)(6). Pub. L. 110–140, § 1307(b)(1), added
par. (6).
Subsec. (c). Pub. L. 110–140, § 1307(b)(2), inserted at end
‘‘In the case of the standards established by paragraphs
(16) through (19) of section 2621(d) of this title, the ref-
erence contained in this subsection to November 9, 1978,
shall be deemed to be a reference to December 19, 2007.’’
Subsec. (d). Pub. L. 110–140, § 1307(b)(3), inserted ‘‘and
paragraphs (17) through (18)’’ before ‘‘of section 2621(d)’’
in introductory provisions.
2005—Subsec. (b)(3). Pub. L. 109–58, § 1251(b)(1), added
par. (3).
Subsec. (b)(4). Pub. L. 109–58, § 1252(g), added par. (4).
Subsec. (b)(5). Pub. L. 109–58, § 1254(b)(1), added par.
(5).
Subsec. (c). Pub. L. 109–58, § 1252(h), inserted at end
‘‘In the case of the standard established by paragraph
(14) of section 2621(d) of this title, the reference con-
tained in this subsection to November 9, 1978, shall be
deemed to be a reference to August 8, 2005.’’
Pub. L. 109–58, § 1251(b)(2), inserted at end ‘‘In the case
of each standard established by paragraphs (11) through
(13) of section 2621(d) of this title, the reference con-
tained in this subsection to November 9, 1978, shall be
deemed to be a reference to August 8, 2005.’’
Subsec. (d). Pub. L. 109–58, § 1254(b)(2), which directed
amendment of subsec. (d) by inserting at end ‘‘In the
case of the standard established by paragraph (15), the
reference contained in this subsection to November 9,
1978, shall be deemed to be a reference to August 8,
2005.’’, was repealed and made void by Pub. L. 117–58,
§ 40104(a)(2)(B)(ii). See Effective Date of 2021 Amend-
ment note below.
Pub. L. 109–58, § 1251(b)(3)(A), added subsec. (d).
Subsec. (e). Pub. L. 109–58, § 1252(i)(1), added subsec.
(e).
Subsec. (f). Pub. L. 109–58, § 1254(b)(3)(A), added sub-
sec. (f).
1992—Subsec. (b)(1), (2). Pub. L. 102–486 inserted ‘‘(or
after October 24, 1992, in the case of standards under
paragraphs (7), (8), and (9) of section 2621(d) of this
title)’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2021 AMENDMENT
Pub. L. 117–58, div. D, title I, § 40104(a)(2)(B)(ii), Nov.
15, 2021, 135 Stat. 931, provided that: ‘‘Paragraph (2) of
section 1254(b) of the Energy Policy Act of 2005 (Public
Law 109–58; 119 Stat. 971) [amending this section] is re-
pealed and the amendment made by that paragraph (as
in effect on the day before the date of enactment of this
Act [Nov. 15, 2021]) is void, and section 112(d) of the
Public Utility Regulatory Policies Act of 1978 (16 U.S.C.
2622(d)) shall be in effect as if that amendment had not
been enacted.’’
EFFECTIVE DATE OF 2007 AMENDMENT
Amendment by Pub. L. 110–140 effective on the date
that is 1 day after Dec. 19, 2007, see section 1601 of Pub.
L. 110–140, set out as an Effective Date note under sec-
tion 1824 of Title 2, The Congress.
WAGE RATE REQUIREMENTS
For provisions relating to rates of wages to be paid to
laborers and mechanics on projects for construction,
alteration, or repair work funded under div. D or an
amendment by div. D of Pub. L. 117–58, including au-
thority of Secretary of Labor, see section 18851 of Title
42, The Public Health and Welfare.
§ 2623. Adoption of certain standards
(a) Adoption of standards
Not later than two years after November 9,
1978, each State regulatory authority (with re-
spect to each electric utility for which it has
ratemaking authority), and each nonregulated
electric utility, shall provide public notice and
conduct a hearing respecting the standards es-
tablished by subsection (b) and, on the basis of
such hearing, shall—
(1) adopt the standards established by sub-
section (b) (other than paragraph (4) thereof)
if, and to the extent, such authority or non-
regulated electric utility determines that such
adoption is appropriate to carry out the pur-
poses of this chapter, is otherwise appropriate,
and is consistent with otherwise applicable
State law, and
(2) adopt the standard established by sub-
section (b)(4) if, and to the extent, such au-
thority or nonregulated electric utility deter-
mines that such adoption is appropriate and
consistent with otherwise applicable State
law.
For purposes of any determination under para-
graphs (1) or (2) and any review of such deter-
mination in any court in accordance with sec-
tion 2633 of this title, the purposes of this chap-
ter supplement otherwise applicable State law.
Nothing in this subsection prohibits any State
regulatory authority or nonregulated electric
utility from making any determination that it
is not appropriate to adopt any such standard,
pursuant to its authority under otherwise appli-
cable State law.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
The purposes of this chapter are to encourage—
(1) conservation of energy supplied by electric utilities;
(2) the optimization of the efficiency of use of facilities and resources by electric utilities; and
(3) equitable rates to electric consumers.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 2621
Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 2621. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 2197
TITLE 16—CONSERVATION
§ 2621
CODIFICATION
This section was not enacted as part of title I of Pub.
L. 95–617 which comprises this chapter.
AMENDMENTS
1992—Pars. (19) to (21). Pub. L. 102–486 added pars. (19)
to (21).
§ 2603. Relationship to antitrust laws
Nothing in this Act or in any amendment
made by this Act affects—
(1) the applicability of the antitrust laws to
any electric utility or gas utility (as defined
in section 3202 of title 15), or
(2) any authority of the Secretary or of the
Commission under any other provision of law
(including the Federal Power Act [16 U.S.C.
791a et seq.] and the Natural Gas Act [15 U.S.C.
717 et seq.]) respecting unfair methods of com-
petition or anticompetitive acts or practices.
(Pub. L. 95–617, § 4, Nov. 9, 1978, 92 Stat. 3120.)
Editorial Notes
REFERENCES IN TEXT
This Act, referred to in text, is act Pub. L. 95–617,
Nov. 9, 1978, 92 Stat. 3117, known as the Public Utility
Regulatory Policies Act of 1978. For complete classi-
fication of this Act to the Code, see Short Title note
set out under section 2601 of this title and Tables.
The Federal Power Act, referred to in par. (2), is act
June 10, 1920, ch. 285, 41 Stat. 1063, which is classified
generally to chapter 12 (§ 791a et seq.) of this title. For
complete classification of this Act to the Code, see sec-
tion 791a of this title and Tables.
The Natural Gas Act, referred to in par. (2), is act
June 21, 1938, ch. 556, 52 Stat. 821, which is classified
generally to chapter 15B (§ 717 et seq.) of Title 15, Com-
merce and Trade. For complete classification of this
Act to the Code, see section 717w of Title 15 and Tables.
CODIFICATION
This section was not enacted as part of title I of Pub.
L. 95–617 which comprises this chapter.
SUBCHAPTER I—R
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 2621
Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 2621. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Volume of total retail sales** This chapter applies to each electric utility in any calendar year, and to each proceeding relating to each electric utility in such year, if the total sales of electric energy by such utility for purposes other than resale exceeded 500 million kilowatt-hours during any calendar year beginning after December 31, 1975, and before the immediately preceding calendar year.
**(b) Exclusion of wholesale sales** The requirements of this chapter do not apply to the operations of an electric utility, or to proceedings respecting such operations, to the extent that such operations or proceedings relate to sales of electric energy for purposes of resale.
**(c) List of covered utilities** Before the beginning of each calendar year, the Secretary shall publish a list identifying each electric utility to which this chapter applies during such calendar year. Promptly after publication of such list each State regulatory authority shall notify the Secretary of each electric utility on the list for which such State regulatory authority has ratemaking authority.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 2622
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.