Arkansas Legal Resource Navigator

10 U.S.C. § 2811 — Repair of facilities

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2811 — Repair of facilities

Page 2239 TITLE 10—ARMED FORCES § 2811 (2) The location of the project. (3) A brief description of the scope of work. (4) A completed Department of Defense Form 1391 budget justification that includes the original project cost estimate. (5) A current working cost estimate, if dif- ferent that the cost estimate contained in such Form 1391. (6) Such other information as the Secretary considers appropriate. (c) BUDGET JUSTIFICATION DISPLAY.—The Sec- retary of Defense shall include with the defense budget materials for each fiscal year a consoli- dated budget justification display that individ- ually identifies each military construction project covered by subsection (a) and the amount requested for such project for such fis- cal year. (d) APPLICATION TO MILITARY CONSTRUCTION PROJECTS.—This section shall apply to military construction projects covered by subsection (a) for which a Department of Defense Form 1391 is submitted to the appropriate committees of Congress in connection with the budget of the Department of Defense for fiscal year 2023 and thereafter. (e) ANNUAL FIVE-YEAR PLANS ON IMPROVEMENT OF INNOVATION INFRASTRUCTURE.— (1) SUBMISSION.—Along with the budget for each fiscal year submitted by the President pursuant to section 1105(a) of title 31, each Secretary of a military department and the Secretary of Defense shall submit to the con- gressional defense committees a plan that de- scribes the objectives of that Secretary to im- prove innovation infrastructure during the five fiscal years following the fiscal year for which such budget is submitted. (2) ELEMENTS.—Each plan submitted by a Secretary of a military department under paragraph (1) shall include the following: (A) With respect to the five-year period covered by the plan,

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 2811

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: e62a969a9665fd2ec772d8fc982bc48ae4aae922ce1ad64f428c13a56444fea5. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-6aaa0beca2bd57b343b2ad32
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-2811-repair-of-facilities--dc930e416b.md
Pages: Not recorded – Not recorded
Passage SHA-256: f97a3c2511913f26e798e21f3594e5ca8c5602c8f57a8d7eb2a03b372c88e186

Source location: USCODE-2024-title10-subtitleA-partIV-chap169-subchapI-sec2811.pdf

Stored source content

Page 2239 TITLE 10—ARMED FORCES § 2811 (2) The location of the project. (3) A brief description of the scope of work. (4) A completed Department of Defense Form 1391 budget justification that includes the original project cost estimate. (5) A current working cost estimate, if dif- ferent that the cost estimate contained in such Form 1391. (6) Such other information as the Secretary considers appropriate. (c) BUDGET JUSTIFICATION DISPLAY.—The Sec- retary of Defense shall include with the defense budget materials for each fiscal year a consoli- dated budget justification display that individ- ually identifies each military construction project covered by subsection (a) and the amount requested for such project for such fis- cal year. (d) APPLICATION TO MILITARY CONSTRUCTION PROJECTS.—This section shall apply to military construction projects covered by subsection (a) for which a Department of Defense Form 1391 is submitted to the appropriate committees of Congress in connection with the budget of the Department of Defense for fiscal year 2023 and thereafter. (e) ANNUAL FIVE-YEAR PLANS ON IMPROVEMENT OF INNOVATION INFRASTRUCTURE.— (1) SUBMISSION.—Along with the budget for each fiscal year submitted by the President pursuant to section 1105(a) of title 31, each Secretary of a military department and the Secretary of Defense shall submit to the con- gressional defense committees a plan that de- scribes the objectives of that Secretary to im- prove innovation infrastructure during the five fiscal years following the fiscal year for which such budget is submitted. (2) ELEMENTS.—Each plan submitted by a Secretary of a military department under paragraph (1) shall include the following: (A) With respect to the five-year period covered by the plan, an identification of the major lines of effort, milestones, and invest- ment goals of the Secretary over such period relating to the improvement of innovation infrastructure and a description of how such goals support such goals, including the use of— (i) military construction, facilities res- toration and modernization funds; (ii) the defense lab modernization pro- gram under section 2805(d) of this title; and (iii) military construction projects for innovation, research, development, test, and evaluation under this section. (B) The estimated costs of necessary inno- vation infrastructure improvements and a description of how such costs would be ad- dressed by the Department of Defense budg- et request submitted during the same year as the plan and the applicable future-years defense program. (C) Information regarding the plan of the Secretary to initiate such environmental and engineering studies as may be necessary to carry out planned innovation infrastruc- ture improvements. (D) Detailed information regarding how in- novation infrastructure improvement projects will be paced and sequenced to en- sure continuous operations. (3) INCORPORATION OF RESULTS-ORIENTED MAN- AGEMENT PRACTICES.—Each plan under sub- section (a) shall incorporate the leading re- sults-oriented management practices identi- fied in the report of the Comptroller General of the United States titled ‘‘Actions Needed to Improve Poor Conditions of Facilities and Equipment that Affect Maintenance Timeli- ness and Efficiency’’ (GAO–19–242), or any suc- cessor report, including— (A) analytically based goals; (B) results-oriented metrics; (C) the identification of required re- sources, risks, and stakeholders; and (D) regular reporting on progress to deci- sion makers. (4) INNOVATIVE INFRASTRUCTURE DEFINED.—In this subsection, the term ‘‘innovation infra- structure’’ includes laboratories, test and evaluation ranges, and any other infrastruc- ture whose primary purpose is research, devel- opment, test, and evaluation. (Added Pub. L. 117–263, div. B, title XXVIII, § 2805(a), Dec. 23, 2022, 136 Stat. 2994; amended Pub. L. 118–159, div. B, title XXVIII, § 2806(a), Dec. 23, 2024, 138 Stat. 2249.) Editorial Notes PRIOR PROVISIONS A prior section 2810, added Pub. L. 99–499, title II, § 211(b)(1), Oct. 17, 1986, 100 Stat. 1725, related to mili- tary construction projects for environmental response actions, prior to repeal by Pub. L. 107–314, div. A, title III, § 313(b), Dec. 2, 2002, 116 Stat. 2507. AMENDMENTS 2024—Subsec. (e). Pub. L. 118–159 added subsec. (e). Statutory Notes and Related Subsidiaries DEADLINE Pub. L. 118–159, div. B, title XXVIII, § 2806(b), Dec. 23, 2024, 138 Stat. 2250, provided that: ‘‘The first plan re- quired under subsection (e) of such section [meaning 10 U.S.C. 2810] (as amended by subsection (a)) shall be sub- mitted as part of the annual budget submission of the President to Congress pursuant to section 1105(a) of title 31, United States Code, for fiscal year 2027.’’ § 2811. Repair of facilities (a) REPAIRS USING OPERATIONS AND MAINTE- NANCE FUNDS.—Using funds available to the Sec- retary concerned for operation and mainte- nance, the Secretary concerned may carry out repair projects for an entire single-purpose facil- ity or one or more functional areas of a multipurpose facility. (b) APPROVAL REQUIRED FOR MAJOR REPAIRS.— A repair project costing more than $7,500,000 may not be carried out under this section unless approved in advance by the Secretary con- cerned. In determining the total cost of a repair project, the Secretary shall include all phases of a multi-year repair project to a single facility. In considering a repair project for approval, the Secretary shall ensure that the project is con- sistent with force structure plans, that repair of the facility is more cost effective than replace- Page 2240 TITLE 10—ARMED FORCES § 2812 ment, and that the project is an appropriate use of operation and maintenance funds. (c) PROHIBITION ON NEW CONSTRUCTION OR ADDI- TIONS.—Construction of new facilities or addi- tions to existing facilities may not be carried out under the authority of this section. (d) CONGRESSIONAL NOTIFICATION.—When a de- cision is made to carry out a repair project under this section with an estimated cost in ex- cess of $7,500,000, the Secretary concerned shall submit, in an electronic medium pursuant to section 480 of this title, to the appropriate com- mittees of Congress a report containing— (1) the justification for the repair project and the current estimate of the cost of the project, including, in the case of a multi-year repair project to a single facility, the total cost of all phases of the project; (2) if the current estimate of the cost of the repair project exceeds 75 percent of the esti- mated cost of a military construction project to replace the facility, an explanation of the reasons why replacement of the facility is not in the best interest of the Government; and (3) a description of the elements of military construction, including the elements specified in section 2802(b) of this title, incorporated into the repair project. (e) REPAIR PROJECT DEFINED.—In this section, the term ‘‘repair project’’ means a project— (1) to restore a real property facility, sys- tem, or component to such a condition that it may effectively be used for its designated functional purpose; or (2) to convert a real property facility, sys- tem, or component to a new functional pur- pose without increasing its external dimen- sions. (Added Pub. L. 99–661, div. A, title III, § 315(a), Nov. 14, 1986, 100 Stat. 3854, § 2810; renumbered § 2811, Pub. L. 100–26, § 7(e)(3), Apr. 21, 1987, 101 Stat. 281; amended Pub. L. 103–337, div. B, title XXVIII, § 2801(a), Oct. 5, 1994, 108 Stat. 3050; Pub. L. 105–85, div. B, title XXVIII, § 2802, Nov. 18, 1997, 111 Stat. 1990; Pub. L. 108–375, div. B, title XXVIII, § 2801, Oct. 28, 2004, 118 Stat. 2119; Pub. L. 111–84, div. B, title XXVIII, § 2802, Oct. 28, 2009, 123 Stat. 2661; Pub. L. 114–328, div. B, title XXVIII, § 2802, Dec. 23, 2016, 130 Stat. 2712; Pub. L. 115–91, div. B, title XXVIII, § 2801(a)(8), Dec. 12, 2017, 131 Stat. 1841.) Editorial Notes AMENDMENTS 2017—Subsec. (d). Pub. L. 115–91 inserted ‘‘, in an elec- tronic medium pursuant to section 480 of this title,’’ after ‘‘shall submit’’ in introductory provisions. 2016—Subsec. (e). Pub. L. 114–328 amended subsec. (e) generally. Prior to amendment, text read as follows: ‘‘In this section, the term ‘repair project’ means a project to restore a real property facility, system, or component to such a condition that it may effectively be used for its designated functional purpose.’’ 2009—Subsec. (d)(2), (3). Pub. L. 111–84 added pars. (2) and (3) and struck out former par. (2) which read as fol- lows: ‘‘the justification for carrying out the project under this section.’’ 2004—Subsec. (b). Pub. L. 108–375, § 2801(a), substituted ‘‘$7,500,000’’ for ‘‘$5,000,000’’. Subsec. (d). Pub. L. 108–375, § 2801(b), substituted ‘‘$7,500,000’’ for ‘‘$10,000,000’’ in introductory provisions. Subsec. (d)(1). Pub. L. 108–375, § 2801(c), inserted before semicolon ‘‘, including, in the case of a multi-year re- pair project to a single facility, the total cost of all phases of the project’’. 1997—Subsecs. (d), (e). Pub. L. 105–85 added subsecs. (d) and (e). 1994—Pub. L. 103–337 substituted ‘‘Repair’’ for ‘‘Ren- ovation’’ in section catchline and amended text gen- erally. Prior to amendment, text read as follows: ‘‘(a) The Secretary concerned may carry out renova- tion projects that combine maintenance, repair, and minor construction projects for an entire single-pur- pose facility, or one or more functional areas of a multipurpose facility, using funds available for oper- ations and maintenance. ‘‘(b) The amount obligated on such a renovation project may not exceed the maximum amount specified by law for a minor construction project under section 2805 of this title. ‘‘(c) Construction of new facilities or additions to ex- isting facilities may not be carried out under the au- thority of this section.’’ § 2812. Lease-purchase of facilities (a)(1) The Secretary concerned may enter into an agreement with a private contractor for the lease of a facility of the kind specified in para- graph (2) if the facility is provided at the ex- pense of the contractor on a military installa- tion under the jurisdiction of the Department of Defense. (2) The facilities that may be leased pursuant to paragraph (1) are as follows: (A) Administrative office facilities. (B) Troop housing facilities. (C) Energy production facilities. (D) Utilities, including potable and waste water treatment facilities. (E) Hospital and medical facilities. (F) Transient quarters. (G) Depot or storage facilities. (H) Child care centers. (I) Classroom and laboratories. (b) Leases entered into under subsection (a)— (1) may not exceed a term of 32 years; (2) shall provide that, at the end of the term of the lease, title to the leased facility shall vest in the United States; and (3) shall include such other terms and condi- tions as the Secretary concerned determines are necessary or desirable to protect the inter- ests of the United States. (c)(1) The Secretary concerned may enter into a lease under this section only after the end of the 14-day period beginning on the date on which the Secretary submits, in an electronic medium pursuant to section 480 of this title, to the ap- propriate committees of Congress a justification of the need for the facility covered by the pro- posed lease, including an economic analysis (based upon accepted life-cycle costing proce- dures) that demonstrates the cost effectiveness of the proposed lease compared with a military construction project for the same facility. (2) Each Secretary concerned may, under this section, enter into— (A) not more than three leases in fiscal year 1990; and (B) not more than five leases in each of the fiscal years 1991 and 1992. (d) Each lease entered into under this section shall include a provision that the obligation of

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2810 — Military construction projects for innovation, research, development, test, and evaluation

**(a) Project Authorization Required.—** The Secretary of Defense may carry out such military construction projects for innovation, research, development, test, and evaluation as are authorized by law, using funds appropriated or otherwise made available for that purpose. **(b) Submission of Project Proposals.—** As part of the defense budget materials for each fiscal year, the Secretary of Defense shall include the following information for each military construction project covered by subsection (a): (1) The project title. (2) The location of the project. (3) A brief description of the scope of work. (4) A completed Department of Defense Form 1391 budget justification that includes the original project cost estimate. (5) A current working cost estimate, if different that the cost estimate contained in such Form 1391. (6) Such other information as the Secretary considers appropriate. **(c) Budget Justification Display.—** The Secretary of Defense shall include with the defense budget materials for each fiscal year a consolidated budget justification display that individually identifies each military construction project covered by subsection (a) and the amount requested for such project for such fiscal year. **(d) Application to Military Construction Projects.—** This section shall apply to military construction projects covered by subsection (a) for which a Department of Defense Form 1391 is submitted to the appropriate committees of Congress in connection with the budget of the Department of Defense for fiscal year 2023 and thereafter. **(e) Annual Five-year Plans on Improvement of Innovation Infrastructure.—** (1) **Submission.—** — Along with the budget for each fiscal year submitted by the President pursuant to [section 1105(a) of title 31](https://usco

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2810

Stored review status: release_metadata_unconfirmed. The source passage cites 10 U.S.C. § 2810. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2810 — Military construction projects for innova-

Page 2238 TITLE 10—ARMED FORCES § 2810 viding that no more than 5 contracts may be entered into under this section other than contracts for child care centers, and providing that authority to enter into such contracts was to expire on Sept. 30, 1991. 1989—Subsec. (a)(1)(B)(ii). Pub. L. 101–189, § 2803(1), substituted ‘‘Utilities, including potable’’ for ‘‘Pota- ble’’. Subsec. (b). Pub. L. 101–189, § 2803(2), substituted ‘‘ac- tivities and services described in clause (i) or (ii) of subsection (a)(1)(B)’’ for ‘‘child care centers’’. Subsec. (c). Pub. L. 101–189, § 2803(3), substituted ‘‘1991’’ for ‘‘1989’’. 1988—Subsec. (a)(3). Pub. L. 100–456 substituted ‘‘32’’ for ‘‘20’’. 1987—Subsec. (a)(1)(B)(vi), (vii). Pub. L. 100–180, § 2302(a), added cl. (vi) and redesignated former cl. (vi) as (vii). Subsec. (c). Pub. L. 100–180, § 2302(b), substituted ‘‘1989’’ for ‘‘1987’’. 1986—Subsec. (a)(1). Pub. L. 99–661, § 2711, amended par. (1) generally. Prior to amendment, par. (1) read as follows: ‘‘The Secretary concerned may enter into a contract for the construction, management, and oper- ation of a facility on or near a military installation in the United States for the provision of child care serv- ices, waste water treatment, or depot supply activities in a case in which the Secretary concerned determines that the facility can be more efficiently and more eco- nomically provided under a long-term contract than by other appropriate means.’’ Pub. L. 99–661, § 1343(a)(20)(A), substituted ‘‘a con- tract’’ for ‘‘contracts’’, ‘‘a facility’’ for ‘‘facilities’’, ‘‘a military installation’’ for ‘‘military installations’’, ‘‘a case’’ for ‘‘cases’’, ‘‘facility’’ for ‘‘facilities’’, and ‘‘a long-term contract’’ for ‘‘long-term contracts’’ and in- serted a comma af

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 2810

Stored review status: historical_2024_not_currentness_verified. The source passage cites 10 U.S.C. § 2810. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2811 — Repair of facilities

**(a) Repairs Using Operations and Maintenance Funds.—** Using funds available to the Secretary concerned for operation and maintenance, the Secretary concerned may carry out repair projects for an entire single-purpose facility or one or more functional areas of a multipurpose facility. **(b) Approval Required for Major Repairs.—** A repair project costing more than $7,500,000 may not be carried out under this section unless approved in advance by the Secretary concerned. In determining the total cost of a repair project, the Secretary shall include all phases of a multi-year repair project to a single facility. In considering a repair project for approval, the Secretary shall ensure that the project is consistent with force structure plans, that repair of the facility is more cost effective than replacement, and that the project is an appropriate use of operation and maintenance funds. **(c) Prohibition on New Construction or Additions.—** Construction of new facilities or additions to existing facilities may not be carried out under the authority of this section. **(d) Congressional Notification.—** When a decision is made to carry out a repair project under this section with an estimated cost in excess of $7,500,000, the Secretary concerned shall submit, in an electronic medium pursuant to [section 480 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section480&num=0&edition=prelim), to the appropriate committees of Congress a report containing— (1) the justification for the repair project and the current estimate of the cost of the project, including, in the case of a multi-year repair project to a single facility, the total cost of all phases of the project; (2) if the current estimate of the cost of the repair project excee

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2811

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.