10 U.S.C. § 2815a — Stormwater management, shoreline ero-
Federal law — U.S. Code and appendices · legal_authorities
Page 2244
TITLE 10—ARMED FORCES
§ 2815a
(2) A project carried out under this section
using amounts under paragraph (1) may be car-
ried out only after the end of the 7-day period
beginning on the date on which a copy of the no-
tification described in paragraph (1) is provided
in an electronic medium pursuant to section 480
of this title.
(3) The maximum aggregate amount that the
Secretary concerned may obligate from amounts
available to the military department concerned
for operation and maintenance in any fiscal year
for projects under the authority of this sub-
section is $125,000,000.
(f) ANNUAL REPORT.—Not later than 90 days
after the end of each fiscal year until December
31, 2025, the Secretary of Defense shall submit to
the congressional defense committees a report
on the status of the planned and active projects
carried out under this section (including com-
pleted projects), and shall include in the report
with respect to each such project the following
information:
(1) The title, location, a brief description of
the scope of work, the original project cost es-
timate, and the current working cost esti-
mate.
(2) The information provided under sub-
section (b)(2).
(3) Such other information as the Secretary
considers appropriate.
(Added Pub. L. 116–92, div. B, title XXVIII,
§ 2801(b)(1), Dec. 20, 2019, 133 Stat. 1880; amended
Pub. L. 116–283, div. A, title III, § 315(a), Jan. 1,
2021, 134 Stat. 3514; Pub. L. 118–31, div. B, title
XXVIII, § 2804, Dec. 22, 2023, 137 Stat. 744.)
Editorial Notes
PRIOR PROVISIONS
A prior section 2815, added Pub. L. 106–398, § 1 [div. B,
title XXVIII, § 2801(b)(1)], Oct. 30, 2000, 114 Stat. 1654,
1654A–412; amended Pub. L. 107–314, div. A, title X,
§ 1062(a)(14), Dec. 2, 2002, 116 Stat. 2650, related
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 2815a
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: a2fdcdaccb545f018bb7db89ea706c05b2eefc0c4fe20c6a8a4afa53994f89f1. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-692a564361a4c1a7931536e6
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-2815a-stormwater-management-shoreline-ero--80f4159086.md
Pages: Not recorded – Not recorded
Passage SHA-256: b19accb3c624c90841b304431dcb282b019e87e0614be0924ee58d9f92827991
Source location: USCODE-2024-title10-subtitleA-partIV-chap169-subchapI-sec2815a.pdf
Stored source content
Page 2244
TITLE 10—ARMED FORCES
§ 2815a
(2) A project carried out under this section
using amounts under paragraph (1) may be car-
ried out only after the end of the 7-day period
beginning on the date on which a copy of the no-
tification described in paragraph (1) is provided
in an electronic medium pursuant to section 480
of this title.
(3) The maximum aggregate amount that the
Secretary concerned may obligate from amounts
available to the military department concerned
for operation and maintenance in any fiscal year
for projects under the authority of this sub-
section is $125,000,000.
(f) ANNUAL REPORT.—Not later than 90 days
after the end of each fiscal year until December
31, 2025, the Secretary of Defense shall submit to
the congressional defense committees a report
on the status of the planned and active projects
carried out under this section (including com-
pleted projects), and shall include in the report
with respect to each such project the following
information:
(1) The title, location, a brief description of
the scope of work, the original project cost es-
timate, and the current working cost esti-
mate.
(2) The information provided under sub-
section (b)(2).
(3) Such other information as the Secretary
considers appropriate.
(Added Pub. L. 116–92, div. B, title XXVIII,
§ 2801(b)(1), Dec. 20, 2019, 133 Stat. 1880; amended
Pub. L. 116–283, div. A, title III, § 315(a), Jan. 1,
2021, 134 Stat. 3514; Pub. L. 118–31, div. B, title
XXVIII, § 2804, Dec. 22, 2023, 137 Stat. 744.)
Editorial Notes
PRIOR PROVISIONS
A prior section 2815, added Pub. L. 106–398, § 1 [div. B,
title XXVIII, § 2801(b)(1)], Oct. 30, 2000, 114 Stat. 1654,
1654A–412; amended Pub. L. 107–314, div. A, title X,
§ 1062(a)(14), Dec. 2, 2002, 116 Stat. 2650, related to annual
evaluation of joint use military construction projects,
prior to repeal by Pub. L. 112–81, div. A, title X,
§ 1061(23)(A), Dec. 31, 2011, 125 Stat. 1584.
AMENDMENTS
2023—Subsec.
(e)(3).
Pub.
L.
118–31
substituted
‘‘$125,000,000’’ for ‘‘$100,000,000’’.
2021—Subsec. (a). Pub. L. 116–283, § 315(a)(1), inserted
‘‘(except as provided in subsections (d)(3) and (e))’’ be-
fore period at end.
Subsec. (c). Pub. L. 116–283, § 315(a)(2), substituted
‘‘Except as provided in subsection (e)(2), a project’’ for
‘‘A project’’.
Subsecs. (d) to (f). Pub. L. 116–283, § 315(a)(3), (4),
added subsecs. (d) and (e) and redesignated former sub-
sec. (d) as (f).
§ 2815a. Stormwater management, shoreline ero-
sion control, and water resilience projects
for installations and defense access roads
(a) PROJECTS AUTHORIZED.—The Secretary con-
cerned may carry out one or more of the fol-
lowing projects on or related to a military in-
stallation:
(1) A stormwater management project for
the purposes of—
(A) improving military installation resil-
ience or the resilience of a defense access
road or other essential civilian infrastruc-
ture supporting a military installation; and
(B)
protecting
nearby
waterways
and
stormwater-stressed ecosystems.
(2) A shoreline erosion control project for
the purpose of improving, protecting, or re-
pairing shoreline to protect the infrastructure
of a military installation or a defense access
road.
(3) A project to provide water storage and
filtration, flood mitigation, or otherwise sup-
port water resilience.
(b) PROJECT METHODS AND FUNDING SOURCES.—
Using such amounts as may be provided in ad-
vance in appropriation Acts, the Secretary con-
cerned may carry out a project under this sec-
tion as, or as part of, any of the following:
(1) An authorized military construction
project.
(2) An unspecified minor military construc-
tion project under section 2805 of this title, in-
cluding using appropriations available for op-
eration and maintenance subject to the limi-
tation in subsection (c) of such section.
(3) A military installation resilience project
under section 2815 of this title, including the
use of appropriations available for operations
and maintenance subject to the limitation of
subsection (e)(3) of such section.
(4) A defense community infrastructure re-
silience project under section 2391(d) of this
title.
(5) A military installation resilience project
under section 2684a of this title.
(6) A construction project under section 2914
of this title.
(7) A reserve component facility project
under section 18233 of this title.
(8) A defense access road project under sec-
tion 210 of title 23.
(c) PROJECT PRIORITIES.—In selecting projects
to be carried out under this section, the Sec-
retary concerned shall give a priority to a
project proposal that—
(1)
minimizes
the
runoff
of
untreated
stormwater into freshwater systems or tidal
systems;
(2) protects military installations and de-
fense access roads from stormwater runoff and
water levels resulting from extreme weather
conditions;
(3) controls shoreline erosion control that
involve the improvement, protection, or repair
of
shoreline
subject
to
wave
action
or
stormwater runoff and water levels resulting
from extreme weather condition; or
(4) supports water resilience at military in-
stallations.
(d) PROJECT
ACTIVITIES.—Activities carried
out as part of a project under this section may
include, but are not limited to, the following:
(1) The installation, expansion, or refurbish-
ment of stormwater ponds and other water-
slowing, retention, or filtration measures to
address storm water management.
(2) The installation of permeable pavement
in lieu of, or to replace existing, nonpermeable
pavement.
(3) The use of planters, tree boxes, cisterns,
and rain gardens to reduce stormwater runoff.
(4) The capture or storage of stormwater for
use in supporting water resilience at a mili-
tary installation.
Page 2245
TITLE 10—ARMED FORCES
§ 2816
(5) The use of sheet piles, riprap, armor
stone, sea walls, natural plantings, or any
other technologies created to address shore-
line erosion control.
(e) PROJECT COORDINATION.—(1) In the case of a
project carried out under this section on or re-
lated to a military installation and any project
related to the same installation carried out
under section 2391, 2684, 2815, or 2914 of this title,
the Secretary concerned shall ensure coordina-
tion between the projects regarding the water
access, management, conservation, security, and
resilience aspects of the projects.
(2) The Assistant Secretary of Defense for En-
ergy, Installations, and Environment shall des-
ignate an official to be responsible for coordi-
nating projects under this section among the
military departments.
(f) ANNUAL REPORT.—(1) Not later than 90 days
after the end of each fiscal year, each Secretary
concerned shall submit to the congressional de-
fense committees a report describing—
(A) the status of planned and active projects
carried out by that Secretary under this sec-
tion; and
(B) all projects completed by the Secretary
concerned during the previous fiscal year.
(2) Each report shall include the following in-
formation with respect to each project described
in the report:
(A) The title, location, a brief description of
the scope of work, the original project cost es-
timate, and the current working cost esti-
mate.
(B) The rationale for how the project will—
(i) improve military installation resilience
or the resilience of a defense access road or
other essential civilian infrastructure sup-
porting a military installation;
(ii) protect waterways and stormwater-
stressed ecosystems;
(iii) improve, protect, or repair shoreline
to protect infrastructure of a military in-
stallation or a defense access road from
shoreline erosion; or
(iv) provide water storage and filtration,
flood mitigation, or otherwise support water
resilience.
(C) Such other information as the Secretary
concerned considers appropriate.
(g) DEFINITIONS.—In this section:
(1) The term ‘‘defense access road’’ means a
road certified to the Secretary of Transpor-
tation as important to the national defense
under the provisions of section 210 of title 23.
(2) The terms ‘‘facility’’ and ‘‘State’’ have
the meanings given those terms in section
18232 of this title.
(3) The term ‘‘military installation’’ in-
cludes a facility of a reserve component owned
by a State rather than the United States.
(4) The term ‘‘military installation resil-
ience’’ has the meaning given that term in
section 101 of this title.
(5) The term ‘‘Secretary concerned’’ means—
(A) the Secretary of a military department
with respect to military installations under
the jurisdiction of that Secretary; and
(B) the Secretary of Defense with respect
to matters concerning the Defense Agencies
and facilities of a reserve component owned
by a State rather than the United States.
(6) The term ‘‘water resilience’’ means the
capacity of a military installation to miti-
gate, respond, or adapt to changes in water
availability due to manmade or natural phe-
nomena.
(Added Pub. L. 117–81, div. B, title XXVIII, § 2803,
Dec. 27, 2021, 135 Stat. 2186; amended Pub. L.
118–159, div. B, title XXVIII, § 2847, Dec. 23, 2024,
138 Stat. 2264.)
Editorial Notes
AMENDMENTS
2024—Pub. L. 118–159, § 2847(a)(1), amended section
catchline generally. Prior to amendment, catchline
read as follows: ‘‘Stormwater management projects for
installation and defense access road resilience and wa-
terway and ecosystems conservation’’.
Subsec. (a). Pub. L. 118–159, § 2847(a)(2), amended sub-
sec. (a) generally. Prior to amendment, text read as fol-
lows: ‘‘The Secretary concerned may carry out a
stormwater management project on or related to a
military installation for the purpose of—
‘‘(1) improving military installation resilience or
the resilience of a defense access road or other essen-
tial civilian infrastructure supporting the military
installation; and
‘‘(2) protecting nearby waterways and stormwater-
stressed ecosystems.’’
Subsec. (b). Pub. L. 118–159, § 2847(a)(3)(A), struck out
‘‘stormwater management’’ before ‘‘project under this
section’’ in introductory provisions.
Subsec. (b)(5) to (8). Pub. L. 118–159, § 2847(a)(3)(B), (C),
added par.(5) and redesignated former pars. (5) to (7) as
(6) to (8), respectively.
Subsec. (c). Pub. L. 118–159, § 2847(a)(4), amended sub-
sec. (c) generally. Prior to amendment, text read as fol-
lows: ‘‘In selecting stormwater management projects to
be carried out under this section, the Secretary con-
cerned shall give a priority to project proposals involv-
ing the retrofitting of buildings and grounds on a mili-
tary installation or retrofitting a defense access road
to reduce stormwater runoff and ponding or standing
water that includes the combination of stormwater
runoff and water levels resulting from extreme weather
conditions.’’
Subsec. (d). Pub. L. 118–159, § 2847(a)(5)(A), struck out
‘‘stormwater management’’ before ‘‘project’’ in intro-
ductory provisions.
Subsec. (d)(1). Pub. L. 118–159, § 2847(a)(5)(B), sub-
stituted ‘‘, retention, or filtration measures to address
storm water management’’ for ‘‘and retention meas-
ures’’.
Subsec. (d)(4), (5). Pub. L. 118–159, § 2847(a)(5)(C), added
pars. (4) and (5).
Subsec. (e). Pub. L. 118–159, § 2847(a)(6), designated ex-
isting provisions as par. (1), struck out ‘‘stormwater
management’’ before ‘‘project carried’’, substituted
‘‘section 2391, 2684,’’ for ‘‘section 2391(d),’’, and added
par. (2).
Subsec. (f)(1)(A). Pub. L. 118–159, § 2847(a)(7)(A), struck
out ‘‘stormwater management’’ before ‘‘projects’’.
Subsec. (f)(2). Pub. L. 118–159, § 2847(a)(7)(A), struck
out ‘‘stormwater management’’ before ‘‘project’’ in in-
troductory provisions.
Subsec.
(f)(2)(B)(iii),
(iv).
Pub.
L.
118–159,
§ 2847(a)(7)(B), added cls. (iii) and (iv).
Subsec. (g)(4). Pub. L. 118–159, § 2847(b), substituted
‘‘section 101’’ for ‘‘section 101(e)(8)’’.
Subsec. (g)(6). Pub. L. 118–159, § 2847(a)(8), added par.
(6).
§ 2816. Consideration of energy security and en-
ergy resilience in life-cycle cost for military
construction
(a) IN GENERAL.—(1) The Secretary concerned,
when evaluating the life-cycle designed cost of a
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Projects Authorized.—** The Secretary concerned may carry out one or more of the following projects on or related to a military installation:
(1) A stormwater management project for the purposes of—
(A) improving military installation resilience or the resilience of a defense access road or other essential civilian infrastructure supporting a military installation; and
(B) protecting nearby waterways and stormwater-stressed ecosystems.
(2) A shoreline erosion control project for the purpose of improving, protecting, or repairing shoreline to protect the infrastructure of a military installation or a defense access road.
(3) A project to provide water storage and filtration, flood mitigation, or otherwise support water resilience.
**(b) Project Methods and Funding Sources.—** Using such amounts as may be provided in advance in appropriation Acts, the Secretary concerned may carry out a project under this section as, or as part of, any of the following:
(1) An authorized military construction project.
(2) An unspecified minor military construction project under [section 2805 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2805&num=0&edition=prelim), including using appropriations available for operation and maintenance subject to the limitation in subsection (c) of such section.
(3) A military installation resilience project under [section 2815 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2815&num=0&edition=prelim), including the use of appropriations available for operations and maintenance subject to the limitation of subsection (e)(3) of such section.
(4) A defense community infrastructure resilience project under [section 2391(d) of this title](https://uscode.h