Browse Arkansas Code titles and sections
42 U.S.C. § 18326 — Development of technologies and in-
Federal law — U.S. Code and appendices · legal_authorities
Page 9151
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 18326
(2) associated testing facilities, either in
being or under construction as of October 11,
2010.
(b) Discharge of requirements
In meeting the requirements of subsection (a),
the Administrator—
(1) shall, to the extent practicable, utilize
ground-based
manufacturing
capability,
ground testing activities, launch and oper-
ations infrastructure, and workforce expertise;
(2) shall, to the extent practicable, minimize
the modification and development of ground
infrastructure and maximize the utilization of
existing software, vehicle, and mission oper-
ations processes;
(3) shall complete construction and activa-
tion of the A–3 test stand with a completion
goal of September 30, 2013;
(4) may procure, develop, and flight test ap-
plicable components; and
(5) shall take appropriate actions to ensure
timely and cost-effective development of the
Space Launch System and the multi-purpose
crew vehicle, including the use of a procure-
ment approach that incorporates adequate and
effective oversight, the facilitation of con-
tractor efficiencies, and the stream-lining of
contract and procurement requirements.
(Pub. L. 111–267, title III, § 304, Oct. 11, 2010, 124
Stat. 2816.)
§ 18325. NASA launch support and infrastructure
modernization program
(a) In general
The Administrator shall carry out a program
the primary purpose of which is to prepare infra-
structure at the Kennedy Space Center that is
needed to enable processing and launch of the
Space Launch System. Vehicle interfaces and
other ground processing and payload integration
areas should be simplified to minimize overall
costs, enhance safety, and complement the pur-
pose of this section.
(b) Elements
The program required by this sect
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 18326
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: e5581ed696b93bad233a1b67fc1ce76f35b6efde0f17b881a7e52b7a7d4e9a01. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-5e1b143113c226f8f209a51d
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-18326-development-of-technologies-and-in--1815e77f98.md
Pages: Not recorded – Not recorded
Passage SHA-256: f39d00ee13e61104e44ae2a41ff75a363a8811dc6678dfc108f2db405a59e7d1
Source location: USCODE-2024-title42-chap159-subchapII-sec18326.pdf
Stored source content
Page 9151
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 18326
(2) associated testing facilities, either in
being or under construction as of October 11,
2010.
(b) Discharge of requirements
In meeting the requirements of subsection (a),
the Administrator—
(1) shall, to the extent practicable, utilize
ground-based
manufacturing
capability,
ground testing activities, launch and oper-
ations infrastructure, and workforce expertise;
(2) shall, to the extent practicable, minimize
the modification and development of ground
infrastructure and maximize the utilization of
existing software, vehicle, and mission oper-
ations processes;
(3) shall complete construction and activa-
tion of the A–3 test stand with a completion
goal of September 30, 2013;
(4) may procure, develop, and flight test ap-
plicable components; and
(5) shall take appropriate actions to ensure
timely and cost-effective development of the
Space Launch System and the multi-purpose
crew vehicle, including the use of a procure-
ment approach that incorporates adequate and
effective oversight, the facilitation of con-
tractor efficiencies, and the stream-lining of
contract and procurement requirements.
(Pub. L. 111–267, title III, § 304, Oct. 11, 2010, 124
Stat. 2816.)
§ 18325. NASA launch support and infrastructure
modernization program
(a) In general
The Administrator shall carry out a program
the primary purpose of which is to prepare infra-
structure at the Kennedy Space Center that is
needed to enable processing and launch of the
Space Launch System. Vehicle interfaces and
other ground processing and payload integration
areas should be simplified to minimize overall
costs, enhance safety, and complement the pur-
pose of this section.
(b) Elements
The program required by this section shall in-
clude—
(1) investments to improve civil and na-
tional security operations at the Kennedy
Space Center, to enhance the overall capabili-
ties of the Center, and to reduce the long term
cost of operations and maintenance;
(2) measures to provide multi-vehicle sup-
port, improvements in payload processing, and
partnering at the Kennedy Space Center; and
(3) such other measures, including invest-
ments to improve launch infrastructure at
NASA flight facilities scheduled to launch
cargo to the ISS under the commercial orbital
transportation services program as the Ad-
ministrator may consider appropriate.
(c) Report on NASA launch support and infra-
structure modernization program
(1) Report required
Not later than 120 days after October 11, 2010,
the Administrator shall submit to the appro-
priate committees of Congress a report on the
plan for the implementation of the NASA
launch support and infrastructure moderniza-
tion program.
(2) Elements
The report required by this subsection shall
include—
(A) a description of the ground infrastruc-
ture plan tied to the Space Launch System
and potential ground investment activities
at other NASA centers related to supporting
the development of the Space Launch Sys-
tem;
(B) a description of proposed initiatives in-
tended to be conducted jointly or in coopera-
tion with Cape Canaveral Air Force Station,
Florida, or other installations or compo-
nents of the United States Government; and
(C) a description of plans to use funds au-
thorized to be appropriated by this chapter
to improve non-NASA facilities, which plans
shall include a business plan outlining the
nature and scope of investments planned by
other parties.
(Pub. L. 111–267, title III, § 305, Oct. 11, 2010, 124
Stat. 2817.)
§ 18326. Development of technologies and in-
space capabilities for beyond near-Earth
space missions
(a) Development authorized
The Administrator may initiate activities to
develop the following:
(1) Technologies identified as necessary ele-
ments of missions beyond low-Earth orbit.
(2) In-space capabilities such as refueling
and
storage
technology,
orbital
transfer
stages, innovative in-space propulsion tech-
nology, communications, and data manage-
ment that facilitate a broad range of users (in-
cluding military and commercial) and applica-
tions defining the architecture and design of
such missions.
(3) Spacesuit development and associated
life support technology.
(4) Flagship missions.
(b) Investments
In developing technologies and capabilities
under subsection (a), the Administrator may
make investments—
(1) in space technologies such as advanced
propulsion, propellant depots, in situ resource
utilization, and robotic payloads or capabili-
ties that enable human missions beyond low-
Earth orbit ultimately leading to Mars;
(2) in a space-based transfer vehicle includ-
ing these technologies with an ability to con-
duct space-based operations that provide capa-
bilities—
(A) to integrate with the Space Launch
System and other space-based systems;
(B) to provide opportunities for in-space
servicing of and delivery to multiple space-
based platforms; and
(C) to facilitate international efforts to ex-
pand human presence to deep space destina-
tions;
(3) in advanced life support technologies and
capabilities;
(4) in technologies and capabilities relating
to in-space power, propulsion, and energy sys-
tems;
Page 9152
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 18327
(5) in technologies and capabilities relating
to in-space propellant transfer and storage;
(6) in technologies and capabilities relating
to in situ resource utilization; and
(7) in expanded research to understand the
greatest biological impediments to human
deep space missions, especially the radiation
challenge.
(c) Utilization of ISS as testbed
The Administrator may utilize the ISS as a
testbed for any technology or capability devel-
oped under subsection (a) in a manner con-
sistent with the provisions of this chapter.
(d) Coordination
The Administrator shall coordinate develop-
ment of technologies and capabilities under this
section through an overall agency technology
approach, as authorized by section 905 of this
Act.
(Pub. L. 111–267, title III, § 308, Oct. 11, 2010, 124
Stat. 2818.)
Editorial Notes
REFERENCES IN TEXT
Section 905 of this Act, referred to in subsec. (d), is
Pub. L. 111–267, title IX, § 905, Oct. 11, 2010, 124 Stat.
2836, which is not classified to the Code.
§ 18327. Report requirement
Within 90 days after October 11, 2010, or upon
completion of reference designs for the Space
Launch System and Multi-purpose Crew Vehicle
authorized by this chapter, whichever occurs
first, the Administrator shall provide a detailed
report to the appropriate committees of Con-
gress that provides an overall description of the
reference vehicle design, the assumptions, de-
scription, data, and analysis of the systems
trades and resolution process, justification of
trade decisions, the design factors which imple-
ment the essential system and vehicle capa-
bility requirements established by this chapter,
the explanation and justification of any devi-
ations from those requirements, the plan for uti-
lization of existing contracts, civil service and
contract workforce, supporting infrastructure
utilization and modifications, and procurement
strategy to expedite development activities
through modification of existing contract vehi-
cles, and the schedule of design and development
milestones and related schedules leading to the
accomplishment of operational goals established
by this chapter. The Administrator shall provide
an update of this report as part of the Presi-
dent’s annual Budget Request.
(Pub. L. 111–267, title III, § 309, Oct. 11, 2010, 124
Stat. 2819.)
SUBCHAPTER III—DEVELOPMENT AND USE
OF
COMMERCIAL
CREW
AND
CARGO
TRANSPORTATION CAPABILITIES
§ 18341. Commercial Cargo Development pro-
gram
The Administrator shall continue to support
the existing Commercial Resupply Services pro-
gram, aimed at enabling the commercial space
industry in support of NASA to develop reliable
means of launching cargo and supplies to the
ISS throughout the duration of the facility’s op-
eration. The Administrator may apply funds to-
wards the reduction of risk to the timely start
of these services, specifically—
(1) efforts to conduct a flight test;
(2) accelerate development; and
(3) develop the ground infrastructure needed
for commercial cargo capability.
(Pub. L. 111–267, title IV, § 401, Oct. 11, 2010, 124
Stat. 2820; Pub. L. 115–10, title III, § 302(f), Mar.
21, 2017, 131 Stat. 26.)
Editorial Notes
AMENDMENTS
2017—Pub. L. 115–10 substituted ‘‘Commercial Resup-
ply Services’’ for ‘‘Commercial Orbital Transportation
Services’’ in introductory provisions.
§ 18342. Requirements applicable to development
of commercial crew transportation capabili-
ties and services
(a) FY 2011 contracts and procurement agree-
ments
(1) In general
Except as provided in paragraph (2), the Ad-
ministrator may not execute a contract or
procurement agreement with respect to fol-
low-on commercial crew services during fiscal
year 2011.
(2) Exception
Notwithstanding paragraph (1), the Adminis-
trator may execute a contract or procurement
agreement with respect to follow-on commer-
cial crew services during fiscal year 2011 if—
(A) the requirements of paragraphs (1), (2),
and (3) of subsection (b) are met; and
(B) the total amount involved for all such
contracts and procurement agreements exe-
cuted during fiscal year 2011 does not exceed
$50,000,000 for fiscal year 2011.
(b) Support
The Administrator may, beginning in fiscal
year 2012 through the duration of the program,
support follow-on commercially-developed crew
transportation systems dependent upon the
completion of each of the following:
(1) Human rating requirements
Not later than 60 days after October 11, 2010,
the Administrator shall develop and make
available to the public detailed human rating
processes and requirements to guide the de-
sign of commercially-developed crew transpor-
tation capabilities, which requirements shall
be at least equivalent to proven requirements
for crew transportation in use as of October 11,
2010.
(2) Commercial market assessment
Not later than 180 days after October 11, 2010,
the Administrator shall submit to the appro-
priate committees of Congress an assessment,
conducted, in coordination with the Federal
Aviation Administration’s Office of Commer-
cial Space Transportation, for purposes of this
paragraph, of the potential non-Government
market for commercially-developed crew and
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** In developing the Space Launch System pursuant to [section 18322 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section18322&num=0&edition=prelim) and the multi-purpose crew vehicle pursuant to [section 18323 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section18323&num=0&edition=prelim), the Administrator shall, to the extent practicable utilize—
(1) existing contracts, investments, workforce, industrial base, and capabilities from the Space Shuttle and Orion and Ares 1 projects, including—
(A) space-suit development activities for application to, and coordinated development of, a multi-purpose crew vehicle suit and associated life-support requirements with potential development of standard NASA-certified suit and life support systems for use in alternative commercially-developed crew transportation systems; and
(B) Space Shuttle-derived components and Ares 1 components that use existing United States propulsion systems, including liquid fuel engines, external tank or tank-related capability, and solid rocket motor engines; and
(2) associated testing facilities, either in being or under construction as of October 11, 2010.
**(b) Discharge of requirements** In meeting the requirements of subsection (a), the Administrator—
(1) shall, to the extent practicable, utilize ground-based manufacturing capability, ground testing activities, launch and operations infrastructure, and workforce expertise;
(2) shall, to the extent practicable, minimize the modification and development of ground infrastructure and maximize the utilization of existing software, vehicle, and mission operations processes;
(3) shall complete construction and activation of the A–3 test stand with a c
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 18326
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.