30 U.S.C. § 1271 — Enforcement
Federal law — U.S. Code and appendices · legal_authorities
Page 297
TITLE 30—MINERAL LANDS AND MINING
§ 1271
§ 1270. Citizens suits
(a) Civil action to compel compliance with this
chapter
Except as provided in subsection (b) of this
section, any person having an interest which is
or may be adversely affected may commence a
civil action on his own behalf to compel compli-
ance with this chapter—
(1) against the United States or any other
governmental instrumentality or agency to
the extent permitted by the eleventh amend-
ment to the Constitution which is alleged to
be in violation of the provisions of this chap-
ter or of any rule, regulation, order or permit
issued pursuant thereto, or against any other
person who is alleged to be in violation of any
rule, regulation, order or permit issued pursu-
ant to this subchapter; or
(2) against the Secretary or the appropriate
State regulatory authority to the extent per-
mitted by the eleventh amendment to the
Constitution where there is alleged a failure of
the Secretary or the appropriate State regu-
latory authority to perform any act or duty
under this chapter which is not discretionary
with the Secretary or with the appropriate
State regulatory authority.
The district courts shall have jurisdiction, with-
out regard to the amount in controversy or the
citizenship of the parties.
(b) Limitation on bringing of action
No action may be commenced—
(1) under subsection (a)(1) of this section—
(A) prior to sixty days after the plaintiff
has given notice in writing of the violation
(i) to the Secretary, (ii) to the State in
which the violation occurs, and (iii) to any
alleged violator; or
(B) if the Secretary or the State has com-
menced and is diligently prosecuting a civil
action in a court of the United States or a
State to require compliance with the prov
Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 1271
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: f5614d217cda501511ac90c20a43b0184aba712813f9bca4b1dfa9e25b8b3f6f. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-4ba3188a3d668b639ab758c1
Source file: Laws/federal/codes/united-states-code-2024/title-30/section-1271-enforcement--083bc8b96a.md
Pages: Not recorded – Not recorded
Passage SHA-256: 473d136a5a73498348393f71db02c3771a5b5e90c97c7ba4cf894c5cd2279cce
Source location: USCODE-2024-title30-chap25-subchapV-sec1271.pdf
Stored source content
Page 297
TITLE 30—MINERAL LANDS AND MINING
§ 1271
§ 1270. Citizens suits
(a) Civil action to compel compliance with this
chapter
Except as provided in subsection (b) of this
section, any person having an interest which is
or may be adversely affected may commence a
civil action on his own behalf to compel compli-
ance with this chapter—
(1) against the United States or any other
governmental instrumentality or agency to
the extent permitted by the eleventh amend-
ment to the Constitution which is alleged to
be in violation of the provisions of this chap-
ter or of any rule, regulation, order or permit
issued pursuant thereto, or against any other
person who is alleged to be in violation of any
rule, regulation, order or permit issued pursu-
ant to this subchapter; or
(2) against the Secretary or the appropriate
State regulatory authority to the extent per-
mitted by the eleventh amendment to the
Constitution where there is alleged a failure of
the Secretary or the appropriate State regu-
latory authority to perform any act or duty
under this chapter which is not discretionary
with the Secretary or with the appropriate
State regulatory authority.
The district courts shall have jurisdiction, with-
out regard to the amount in controversy or the
citizenship of the parties.
(b) Limitation on bringing of action
No action may be commenced—
(1) under subsection (a)(1) of this section—
(A) prior to sixty days after the plaintiff
has given notice in writing of the violation
(i) to the Secretary, (ii) to the State in
which the violation occurs, and (iii) to any
alleged violator; or
(B) if the Secretary or the State has com-
menced and is diligently prosecuting a civil
action in a court of the United States or a
State to require compliance with the provi-
sions of this chapter, or any rule, regulation,
order, or permit issued pursuant to this
chapter, but in any such action in a court of
the United States any person may intervene
as a matter of right; or
(2) under subsection (a)(2) of this section
prior to sixty days after the plaintiff has given
notice in writing of such action to the Sec-
retary, in such manner as the Secretary shall
by regulation prescribe, or to the appropriate
State regulatory authority, except that such
action may be brought immediately after such
notification in the case where the violation or
order complained of constitutes an imminent
threat to the health or safety of the plaintiff
or would immediately affect a legal interest of
the plaintiff.
(c) Venue; intervention
(1) Any action respecting a violation of this
chapter or the regulations thereunder may be
brought only in the judicial district in which
the surface coal mining operation complained of
is located.
(2) In such action under this section, the Sec-
retary, or the State regulatory authority, if not
a party, may intervene as a matter of right.
(d) Costs; filing of bonds
The court, in issuing any final order in any ac-
tion brought pursuant to subsection (a) of this
section, may award costs of litigation (including
attorney and expert witness fees) to any party,
whenever the court determines such award is ap-
propriate. The court may, if a temporary re-
straining order or preliminary injunction is
sought require the filing of a bond or equivalent
security in accordance with the Federal Rules of
Civil Procedure.
(e) Effect on other enforcement methods
Nothing in this section shall restrict any right
which any person (or class of persons) may have
under any statute or common law to seek en-
forcement of any of the provisions of this chap-
ter and the regulations thereunder, or to seek
any other relief (including relief against the
Secretary or the appropriate State regulatory
authority).
(f) Action for damages
Any person who is injured in his person or
property through the violation by any operator
of any rule, regulation, order, or permit issued
pursuant to this chapter may bring an action for
damages (including reasonable attorney and ex-
pert witness fees) only in the judicial district in
which the surface coal mining operation com-
plained of is located. Nothing in this subsection
shall affect the rights established by or limits
imposed under State Workmen’s Compensation
laws.
(Pub. L. 95–87, title V, § 520, Aug. 3, 1977, 91 Stat.
503.)
Editorial Notes
REFERENCES IN TEXT
The Federal Rules of Civil Procedure, referred to in
subsec. (d), are set out in the Appendix to Title 28, Ju-
diciary and Judicial Procedure.
§ 1271. Enforcement
(a) Notice of violation; Federal inspection; waiv-
er of notification period; cessation order; af-
firmative obligation on operator; suspension
or revocation of permits; contents of notices
and orders
(1) Whenever, on the basis of any information
available to him, including receipt of informa-
tion from any person, the Secretary has reason
to believe that any person is in violation of any
requirement of this chapter or any permit condi-
tion required by this chapter, the Secretary
shall notify the State regulatory authority, if
one exists, in the State in which such violation
exists. If no such State authority exists or the
State regulatory authority fails within ten days
after notification to take appropriate action to
cause said violation to be corrected or to show
good cause for such failure and transmit notifi-
cation of its action to the Secretary, the Sec-
retary shall immediately order Federal inspec-
tion of the surface coal mining operation at
which the alleged violation is occurring unless
the information available to the Secretary is a
result of a previous Federal inspection of such
surface coal mining operation. The ten-day noti-
fication period shall be waived when the person
Page 298
TITLE 30—MINERAL LANDS AND MINING
§ 1271
informing the Secretary provides adequate proof
that an imminent danger of significant environ-
mental harm exists and that the State has failed
to take appropriate action. When the Federal in-
spection results from information provided to
the Secretary by any person, the Secretary shall
notify such person when the Federal inspection
is proposed to be carried out and such person
shall be allowed to accompany the inspector
during the inspection.
(2) When, on the basis of any Federal inspec-
tion, the Secretary or his authorized representa-
tive determines that any condition or practices
exist, or that any permittee is in violation of
any requirement of this chapter or any permit
condition required by this chapter, which condi-
tion, practice, or violation also creates an immi-
nent danger to the health or safety of the public,
or is causing, or can reasonably be expected to
cause
significant,
imminent
environmental
harm to land, air, or water resources, the Sec-
retary or his authorized representative shall im-
mediately order a cessation of surface coal min-
ing and reclamation operations or the portion
thereof relevant to the condition, practice, or
violation. Such cessation order shall remain in
effect until the Secretary or his authorized rep-
resentative determines that the condition, prac-
tice, or violation has been abated, or until modi-
fied, vacated, or terminated by the Secretary or
his authorized representative pursuant to para-
graph (5) of this subsection. Where the Secretary
finds that the ordered cessation of surface coal
mining and reclamation operations, or any por-
tion thereof, will not completely abate the im-
minent danger to health or safety of the public
or the significant imminent environmental
harm to land, air, or water resources, the Sec-
retary shall, in addition to the cessation order,
impose affirmative obligations on the operator
requiring him to take whatever steps the Sec-
retary deems necessary to abate the imminent
danger or the significant environmental harm.
(3) When, on the basis of a Federal inspection
which is carried out during the enforcement of a
Federal program or a Federal lands program,
Federal inspection pursuant to section 1252, or
section 1254(b) of this title, or during Federal en-
forcement of a State program in accordance
with subsection (b) of this section, the Secretary
or his authorized representative determines that
any permittee is in violation of any requirement
of this chapter or any permit condition required
by this chapter; but such violation does not cre-
ate an imminent danger to the health or safety
of the public, or cannot be reasonably expected
to cause significant, imminent environmental
harm to land, air, or water resources, the Sec-
retary or authorized representative shall issue a
notice to the permittee or his agent fixing a rea-
sonable time but not more than ninety days for
the abatement of the violation and providing op-
portunity for public hearing.
If, upon expiration of the period of time as
originally fixed or subsequently extended, for
good cause shown and upon the written finding
of the Secretary or his authorized representa-
tive, the Secretary or his authorized representa-
tive finds that the violation has not been
abated, he shall immediately order a cessation
of surface coal mining and reclamation oper-
ations or the portion thereof relevant to the vio-
lation. Such cessation order shall remain in ef-
fect until the Secretary or his authorized rep-
resentative determines that the violation has
been abated, or until modified, vacated, or ter-
minated by the Secretary or his authorized rep-
resentative pursuant to paragraph (5) of this
subsection. In the order of cessation issued by
the Secretary under this subsection, the Sec-
retary shall determine the steps necessary to
abate the violation in the most expeditious
manner possible, and shall include the necessary
measures in the order.
(4) When, on the basis of a Federal inspection
which is carried out during the enforcement of a
Federal program or a Federal lands program,
Federal inspection pursuant to section 1252 or
section 1254 of this title or during Federal en-
forcement of a State program in accordance
with subsection (b) of this section, the Secretary
or his authorized representative determines that
a pattern of violations of any requirements of
this chapter or any permit conditions required
by this chapter exists or has existed, and if the
Secretary or his authorized representative also
find that such violations are caused by the un-
warranted failure of the permittee to comply
with any requirements of this chapter or any
permit conditions, or that such violations are
willfully caused by the permittee, the Secretary
or his authorized representative shall forthwith
issue an order to the permittee to show cause as
to why the permit should not be suspended or re-
voked and shall provide opportunity for a public
hearing. If a hearing is requested the Secretary
shall inform all interested parties of the time
and place of the hearing. Upon the permittee’s
failure to show cause as to why the permit
should not be suspended or revoked, the Sec-
retary or his authorized representative shall
forthwith suspend or revoke the permit.
(5) Notices and orders issued pursuant to this
section shall set forth with reasonable speci-
ficity the nature of the violation and the reme-
dial action required, the period of time estab-
lished for abatement, and a reasonable descrip-
tion of the portion of the surface coal mining
and reclamation operation to which the notice
or order applies. Each notice or order issued
under this section shall be given promptly to
the permittee or his agent by the Secretary or
his authorized representative who issues such
notice or order, and all such notices and orders
shall be in writing and shall be signed by such
authorized representatives. Any notice or order
issued pursuant to this section may be modified,
vacated, or terminated by the Secretary or his
authorized representative. A copy of any such
order or notice shall be sent to the State regu-
latory authority in the State in which the viola-
tion occurs: Provided, That any notice or order
issued pursuant to this section which requires
cessation of mining by the operator shall expire
within thirty days of actual notice to the oper-
ator unless a public hearing is held at the site or
within such reasonable proximity to the site
that any viewings of the site can be conducted
during the course of public hearing.
Page 299
TITLE 30—MINERAL LANDS AND MINING
§ 1272
1 So in original. Probably should be ‘‘subsection’’.
(b) Inadequate State enforcement; notice and
hearing
Whenever on the basis of information avail-
able to him, the Secretary has reason to believe
that violations of all or any part of an approved
State program result from a failure of the State
to enforce such State program or any part there-
of effectively, he shall after public notice and
notice to the State, hold a hearing thereon in
the State within thirty days of such notice. If as
a result of said hearing the Secretary finds that
there are violations and such violations result
from a failure of the State to enforce all or any
part of the State program effectively, and if he
further finds that the State has not adequately
demonstrated its capability and intent to en-
force such State program, he shall give public
notice of such finding. During the period begin-
ning with such public notice and ending when
such State satisfies the Secretary that it will
enforce this chapter, the Secretary shall en-
force, in the manner provided by this chapter,
any permit condition required under this chap-
ter, shall issue new or revised permits in accord-
ance with requirements of this chapter, and may
issue such notices and orders as are necessary
for compliance therewith: Provided, That in the
case of a State permittee who has met his obli-
gations under such permit and who did not will-
fully secure the issuance of such permit through
fraud or collusion, the Secretary shall give the
permittee a reasonable time to conform ongoing
surface mining and reclamation to the require-
ments of this chapter before suspending or re-
voking the State permit.
(c) Civil action for relief
The Secretary may request the Attorney Gen-
eral to institute a civil action for relief, includ-
ing a permanent or temporary injunction, re-
straining order, or any other appropriate order
in the district court of the United States for the
district in which the surface coal mining and
reclamation operation is located or in which the
permittee thereof has his principal office, when-
ever such permittee or his agent (A) violates or
fails or refuses to comply with any order or deci-
sion issued by the Secretary under this chapter,
or (B) interferes with, hinders, or delays the
Secretary or his authorized representatives in
carrying out the provisions of this chapter, or
(C) refuses to admit such authorized representa-
tive to the mine, or (D) refuses to permit inspec-
tion of the mine by such authorized representa-
tive, or (E) refuses to furnish any information or
report requested by the Secretary in furtherance
of the provisions of this chapter, or (F) refuses
to permit access to, and copying of, such records
as the Secretary determines necessary in car-
rying out the provisions of this chapter. Such
court shall have jurisdiction to provide such re-
lief as may be appropriate. Temporary restrain-
ing orders shall be issued in accordance with
rule 65 of the Federal Rules of Civil Procedure,
as amended. Any relief granted by the court to
enforce an order under clause (A) of this sec-
tion 1 shall continue in effect until the comple-
tion or final termination of all proceedings for
review of such order under this subchapter, un-
less, prior thereto, the district court granting
such relief sets it aside or modifies it.
(d) Sanctions; effect on additional enforcement
rights under State law
As a condition of approval of any State pro-
gram submitted pursuant to section 1253 of this
title, the enforcement provisions thereof shall,
at a minimum, incorporate sanctions no less
stringent than those set forth in this section,
and shall contain the same or similar procedural
requirements relating thereto. Nothing herein
shall be construed so as to eliminate any addi-
tional enforcement rights or procedures which
are available under State law to a State regu-
latory authority but which are not specifically
enumerated herein.
(Pub. L. 95–87, title V, § 521, Aug. 3, 1977, 91 Stat.
504.)
Editorial Notes
REFERENCES IN TEXT
Rule 65 of the Federal Rules of Civil Procedure, re-
ferred to in subsec. (c), is set out in the Appendix to
Title 28, Judiciary and Judicial Procedure.
§ 1272. Designating areas unsuitable for surface
coal mining
(a) Establishment of State planning process;
standards; State process requirements; inte-
gration with present and future land use
planning and regulation processes; savings
provisions
(1) To be eligible to assume primary regu-
latory authority pursuant to section 1253 of this
title, each State shall establish a planning proc-
ess enabling objective decisions based upon com-
petent and scientifically sound data and infor-
mation as to which, if any, land areas of a State
are unsuitable for all or certain types of surface
coal mining operations pursuant to the stand-
ards set forth in paragraphs (2) and (3) of this
subsection but such designation shall not pre-
vent the mineral exploration pursuant to the
chapter of any area so designated.
(2) Upon petition pursuant to subsection (c) of
this section, the State regulatory authority
shall designate an area as unsuitable for all or
certain types of surface coal mining operations
if the State regulatory authority determines
that reclamation pursuant to the requirements
of this chapter is not technologically and eco-
nomically feasible.
(3) Upon petition pursuant to subsection (c) of
this section, a surface area may be designated
unsuitable for certain types of surface coal min-
ing operations if such operations will—
(A) be incompatible with existing State or
local land use plans or programs; or
(B) affect fragile or historic lands in which
such operations could result in significant
damage to important historic, cultural, sci-
entific, and esthetic values and natural sys-
tems; or
(C) affect renewable resource lands in which
such operations could result in a substantial
loss or reduction of long-range productivity of
water supply or of food or fiber products, and
such lands to include aquifers and aquifer re-
charge areas; or
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Notice of violation; Federal inspection; waiver of notification period; cessation order; affirmative obligation on operator; suspension or revocation of permits; contents of notices and orders**
(1) Whenever, on the basis of any information available to him, including receipt of information from any person, the Secretary has reason to believe that any person is in violation of any requirement of this chapter or any permit condition required by this chapter, the Secretary shall notify the State regulatory authority, if one exists, in the State in which such violation exists. If no such State authority exists or the State regulatory authority fails within ten days after notification to take appropriate action to cause said violation to be corrected or to show good cause for such failure and transmit notification of its action to the Secretary, the Secretary shall immediately order Federal inspection of the surface coal mining operation at which the alleged violation is occurring unless the information available to the Secretary is a result of a previous Federal inspection of such surface coal mining operation. The ten-day notification period shall be waived when the person informing the Secretary provides adequate proof that an imminent danger of significant environmental harm exists and that the State has failed to take appropriate action. When the Federal inspection results from information provided to the Secretary by any person, the Secretary shall notify such person when the Federal inspection is proposed to be carried out and such person shall be allowed to accompany the inspector during the inspection.
(2) When, on the basis of any Federal inspection, the Secretary or his authorized representative determines that any condition or practices exist, or that an