Browse Arkansas Code titles and sections
10 U.S.C. § 4236 — Negotiation of price for technical data be-
Federal law — U.S. Code and appendices · legal_authorities
Page 2715
TITLE 10—ARMED FORCES
§ 4236
that (1) preserves the mobilization production
base for that system, and (2) is feasible, as deter-
mined pursuant to regulations prescribed by the
Secretary of Defense.
(Added Pub. L. 101–189, div. A, title VIII, § 803(a),
Nov. 29, 1989, 103 Stat. 1487, § 2400; amended Pub.
L. 103–355, title III, § 3015, Oct. 13, 1994, 108 Stat.
3332; Pub. L. 104–106, div. A, title X, § 1062(d), div.
D, title XLIII, § 4321(b)(13), Feb. 10, 1996, 110 Stat.
444, 673; Pub. L. 107–107, div. A, title VIII, § 821(c),
Dec. 28, 2001, 115 Stat. 1182; renumbered § 4231 and
amended Pub. L. 116–283, div. A, title XVIII,
§ 1847(c)(1), Jan. 1, 2021, 134 Stat. 4254; Pub. L.
117–81, div. A, title XVII, § 1701(o)(6)(C)(ii), Dec.
27, 2021, 135 Stat. 2147.)
Editorial Notes
AMENDMENTS
2021—Pub. L. 116–283, § 1847(c)(1)(B), amended section
catchline generally. Prior to amendment, section
catchline read as follows: ‘‘Low-rate initial production
of new systems’’.
Pub. L. 116–283, § 1847(c)(1)(A), renumbered section
2400 of this title as this section.
Subsec. (a)(5). Pub. L. 116–283, § 1847(c)(1)(A)(i), as
amended by Pub. L. 117–81, § 1701(o)(6)(C)(ii), substituted
‘‘section 4351’’ for ‘‘section 2432’’.
Subsec. (b)(1). Pub. L. 116–283, § 1847(c)(1)(A)(ii), sub-
stituted ‘‘section 4171’’ for ‘‘section 2399’’.
2001—Subsec. (a)(1)(A). Pub. L. 107–107, § 821(c)(1), sub-
stituted ‘‘milestone B’’ for ‘‘milestone II’’.
Subsec. (a)(2). Pub. L. 107–107 substituted ‘‘milestone
B’’ for ‘‘milestone II’’ and ‘‘system development and
demonstration’’ for ‘‘engineering and manufacturing
development’’.
Subsec. (a)(4), (5). Pub. L. 107–107, § 821(c)(1), sub-
stituted ‘‘milestone B’’ for ‘‘milestone II’’.
1996—Subsec. (a)(5). Pub. L. 104–106, § 4321(b)(13), s
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 4236
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: b0f31b8e1ad2576290d2ccf5d062e370f5d7c7d55bc4ac0cd4d401062379fc8f. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-4ba234ded90d0dacc8c48dac
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-4236-negotiation-of-price-for-technical-data-be--ea8854b7ad.md
Pages: Not recorded – Not recorded
Passage SHA-256: 6ec105520d6a09200bd170e04404fdf56e28e675b1c930a1afabbfab6d446aeb
Source location: USCODE-2024-title10-subtitleA-partV-subpartF-chap322-subchapII-sec4236.pdf
Stored source content
Page 2715
TITLE 10—ARMED FORCES
§ 4236
that (1) preserves the mobilization production
base for that system, and (2) is feasible, as deter-
mined pursuant to regulations prescribed by the
Secretary of Defense.
(Added Pub. L. 101–189, div. A, title VIII, § 803(a),
Nov. 29, 1989, 103 Stat. 1487, § 2400; amended Pub.
L. 103–355, title III, § 3015, Oct. 13, 1994, 108 Stat.
3332; Pub. L. 104–106, div. A, title X, § 1062(d), div.
D, title XLIII, § 4321(b)(13), Feb. 10, 1996, 110 Stat.
444, 673; Pub. L. 107–107, div. A, title VIII, § 821(c),
Dec. 28, 2001, 115 Stat. 1182; renumbered § 4231 and
amended Pub. L. 116–283, div. A, title XVIII,
§ 1847(c)(1), Jan. 1, 2021, 134 Stat. 4254; Pub. L.
117–81, div. A, title XVII, § 1701(o)(6)(C)(ii), Dec.
27, 2021, 135 Stat. 2147.)
Editorial Notes
AMENDMENTS
2021—Pub. L. 116–283, § 1847(c)(1)(B), amended section
catchline generally. Prior to amendment, section
catchline read as follows: ‘‘Low-rate initial production
of new systems’’.
Pub. L. 116–283, § 1847(c)(1)(A), renumbered section
2400 of this title as this section.
Subsec. (a)(5). Pub. L. 116–283, § 1847(c)(1)(A)(i), as
amended by Pub. L. 117–81, § 1701(o)(6)(C)(ii), substituted
‘‘section 4351’’ for ‘‘section 2432’’.
Subsec. (b)(1). Pub. L. 116–283, § 1847(c)(1)(A)(ii), sub-
stituted ‘‘section 4171’’ for ‘‘section 2399’’.
2001—Subsec. (a)(1)(A). Pub. L. 107–107, § 821(c)(1), sub-
stituted ‘‘milestone B’’ for ‘‘milestone II’’.
Subsec. (a)(2). Pub. L. 107–107 substituted ‘‘milestone
B’’ for ‘‘milestone II’’ and ‘‘system development and
demonstration’’ for ‘‘engineering and manufacturing
development’’.
Subsec. (a)(4), (5). Pub. L. 107–107, § 821(c)(1), sub-
stituted ‘‘milestone B’’ for ‘‘milestone II’’.
1996—Subsec. (a)(5). Pub. L. 104–106, § 4321(b)(13), sub-
stituted ‘‘this paragraph’’ for ‘‘the preceding sentence’’.
Subsec. (c). Pub. L. 104–106, § 1062(d), struck out ‘‘(1)’’
before ‘‘With respect to’’, redesignated subpars. (A) and
(B) of former par. (1) as pars. (1) and (2), respectively,
and struck out former par. (2) which read as follows:
‘‘For each naval vessel program and military satellite
program, the Secretary of Defense shall submit to Con-
gress a report providing—
‘‘(A) an explanation of the rate and quantity pre-
scribed for low-rate initial production and the consid-
erations in establishing that rate and quantity;
‘‘(B) a test and evaluation master plan for that pro-
gram; and
‘‘(C) an acquisition strategy for that program that
has been approved by the Secretary, to include the
procurement objectives in terms of total quantity of
articles to be procured and annual production rates.’’
1994—Subsec. (a)(2). Pub. L. 103–355, § 3015(1), sub-
stituted ‘‘this section’’ for ‘‘paragraph (1)’’ and ‘‘engi-
neering and manufacturing development’’ for ‘‘full-
scale engineering development’’.
Subsec. (a)(4). Pub. L. 103–355, § 3015(2), (3), added par.
(4) and redesignated former par. (4) as (5).
Subsec. (a)(5). Pub. L. 103–355, § 3015(2), redesignated
par. (4) as (5) and inserted after first sentence ‘‘If the
quantity exceeds 10 percent of the total number of arti-
cles to be produced, as determined at the milestone II
decision with respect to that system, the Secretary
shall include in the statement the reasons for such
quantity.’’
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2021 AMENDMENT
Amendment by Pub. L. 117–81 applicable as if in-
cluded in the enactment of title XVIII of Pub. L. 116–283
as enacted, see section 1701(a)(2) of Pub. L. 117–81, set
out in a note preceding section 3001 of this title and
note below.
Amendment by Pub. L. 116–283 effective Jan. 1, 2022,
with additional provisions for delayed implementation
and applicability of existing law, see section 1801(d) of
Pub. L. 116–283, set out as a note preceding section 3001
of this title.
EFFECTIVE DATE OF 1996 AMENDMENT
For effective date and applicability of amendment by
section 4321(b)(13) of Pub. L. 104–106, see section 4401 of
Pub. L. 104–106, set out as a note under section 2220 of
this title.
§ 4232. Prohibition on use of lowest price tech-
nically acceptable source selection process
(a) IN GENERAL.—The Department of Defense
shall not use a lowest price technically accept-
able source selection process for the engineering
and manufacturing development contract of a
major defense acquisition program.
(b) DEFINITIONS.—In this section:
(1) LOWEST
PRICE
TECHNICALLY
ACCEPTABLE
SOURCE SELECTION PROCESS.—The term ‘‘lowest
price technically acceptable source selection
process’’ has the meaning given that term in
part 15 of the Federal Acquisition Regulation.
(2) ENGINEERING AND MANUFACTURING DEVEL-
OPMENT
CONTRACT.—The term ‘‘engineering
and manufacturing development contract’’
means a prime contract for the engineering
and manufacturing development of a major de-
fense acquisition program.
(Added Pub. L. 115–91, div. A, title VIII,
§ 832(a)(1), Dec. 12, 2017, 131 Stat. 1468, § 2442; re-
numbered § 4232 and amended Pub. L. 116–283,
div. A, title XVIII, § 1847(c)(2), Jan. 1, 2021, 134
Stat. 4254.)
Editorial Notes
AMENDMENTS
2021—Pub. L. 116–283 renumbered section 2442 of this
title as this section and, in subsec. (b), redesignated
par. (3) as (2) and struck out former par. (2) which de-
fined ‘‘major defense acquisition program’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2021 AMENDMENT
Amendment by Pub. L. 116–283 effective Jan. 1, 2022,
with additional provisions for delayed implementation
and applicability of existing law, see section 1801(d) of
Pub. L. 116–283, set out as a note preceding section 3001
of this title.
EFFECTIVE DATE
Pub. L. 115–91, div. A, title VIII, § 832(b), Dec. 12, 2017,
131 Stat. 1468, provided that: ‘‘The requirements of sec-
tion 2442 of title 10, United States Code [now 10 U.S.C.
4232], as added by subsection (a), shall apply to major
defense acquisition programs for which budgetary au-
thority is requested for fiscal year 2019 or a subsequent
fiscal year.’’
§ 4236. Negotiation of price for technical data be-
fore
development,
production,
or
sustainment of major weapon systems
The Secretary of Defense shall ensure, to the
maximum extent practicable, that the Depart-
ment of Defense, before selecting a contractor
for the engineering and manufacturing develop-
ment of a major weapon system, production of a
Page 2716
TITLE 10—ARMED FORCES
§ 4251
major weapon system, or sustainment of a
major weapon system, negotiates a price for
technical data to be delivered under a contract
for
such
development,
production,
or
sustainment.
(Added Pub. L. 115–91, div. A, title VIII,
§ 835(a)(1), Dec. 12, 2017, 131 Stat. 1471, § 2439;
amended Pub. L. 115–232, div. A, title VIII, § 867,
Aug. 13, 2018, 132 Stat. 1901; renumbered § 4236,
Pub. L. 116–283, div. A, title XVIII, § 1847(c)(3),
Jan. 1, 2021, 134 Stat. 4254.)
Editorial Notes
AMENDMENTS
2021—Pub. L. 116–283 renumbered section 2439 of this
title as this section.
2018—Pub.
L.
115–232,
§ 867(4),
substituted
‘‘, production, or sustainment’’ for ‘‘or production’’ in
section catchline.
Pub. L. 115–232, § 867(1)–(3), inserted ‘‘, to the max-
imum extent practicable,’’ after ‘‘shall ensure’’ and
substituted ‘‘production of a major weapon system, or
sustainment of a major weapon system’’ for ‘‘or for the
production
of
a
major
weapon
system’’
and
‘‘, production, or sustainment’’ for ‘‘or production’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2021 AMENDMENT
Amendment by Pub. L. 116–283 effective Jan. 1, 2022,
with additional provisions for delayed implementation
and applicability of existing law, see section 1801(d) of
Pub. L. 116–283, set out as a note preceding section 3001
of this title.
EFFECTIVE DATE
Pub. L. 115–91, div. A, title VIII, § 835(a)(3), Dec. 12,
2017, 131 Stat. 1471, provided that: ‘‘Section 2439 of title
10, United States Code [now 10 U.S.C. 4236], as added by
paragraph (1), shall apply with respect to any contract
for engineering and manufacturing development of a
major weapon system, or for the production of a major
weapon system, for which the contract solicitation is
issued on or after the date occurring one year after the
date of the enactment of this Act [Dec. 12, 2017].’’
SUBCHAPTER III—MILESTONES FOR
MAJOR DEFENSE ACQUISITION PROGRAMS
Sec.
4251.
Major defense acquisition programs: factors
to be considered before Milestone A ap-
proval.
4252.
Major defense acquisition programs: factors
to be considered before Milestone B ap-
proval.
4253.
Major defense acquisition programs: submis-
sions to Congress on Milestone C.
4254.
[Reserved].
Editorial Notes
AMENDMENTS
2024—Pub. L. 118–159, div. A, title VIII, §§ 806(a)(2),
807(1), Dec. 23, 2024, 138 Stat. 1974, substituted ‘‘factors
to be considered’’ for ‘‘determination required’’ in item
4251 and ‘‘factors to be considered before’’ for ‘‘certifi-
cation required before’’ in item 4252. Amendment to
item 4252 was made pursuant to operation of section 102
of this title.
§ 4251. Major defense acquisition programs: fac-
tors to be considered before Milestone A ap-
proval
(a) RESPONSIBILITIES.—Before granting Mile-
stone A approval for a major defense acquisition
program or a major subprogram, the milestone
decision authority for the program or subpro-
gram shall ensure that—
(1) information about the program or subpro-
gram is sufficient to warrant entry of the pro-
gram or subprogram into the risk reduction
phase;
(2) the cost, schedule, technical feasibility,
and performance trade-offs that have been
made with regard to the program do not over-
ly constrain future trade space; and
(3) there are sound plans for progression of
the program or subprogram to the develop-
ment phase.
(b) FACTORS TO BE CONSIDERED FOR MILESTONE
A APPROVAL.—A major defense acquisition pro-
gram or subprogram may not receive Milestone
A approval or otherwise be initiated prior to
Milestone B approval until the milestone deci-
sion authority confirms that the following fac-
tors were considered in the decision to grant
Milestone A approval:
(1) The program or subprogram fulfills an
approved requirements document.
(2) The program or subprogram has con-
ducted appropriate market research.
(3) With respect to any identified areas of
risk, there is a plan to reduce the risk.
(4) Planning for sustainment has been ad-
dressed.
(5) An analysis of alternatives has been per-
formed consistent with study guidance devel-
oped by the Director of Cost Assessment and
Program Evaluation, or in lieu of an analysis
of alternatives, early experimentation with a
combatant commander has been conducted.
(6) A life cycle cost estimate for the program
or subprogram has been submitted by the com-
ponent and that the level of resources required
to complete the technology maturation and
risk reduction phase of the program is suffi-
cient for successful program execution.
(7) The program or subprogram meets any
other considerations the milestone decision
authority considers relevant.
(c) WRITTEN RECORD
OF
A MILESTONE DECI-
SION.—The milestone decision authority shall
issue a written record of a milestone decision at
the time that Milestone A approval is granted.
The record shall confirm compliance with sub-
section (b) and specifically state that the mile-
stone decision authority considered the factors
described in such subsection prior to the deci-
sion to grant milestone approval. The milestone
decision authority shall retain records of the
basis for the milestone decision.
(d) SUBMISSIONS
TO CONGRESS
ON MILESTONE
A.—
(1) NOTIFICATION.—Not later than 15 days
after granting Milestone A approval for a
major defense acquisition program, the mile-
stone decision authority for the program shall
provide to the congressional defense commit-
tees and, in the case of intelligence or intel-
ligence-related activities, the congressional
intelligence committees a written record of
the milestone decision.
(2) ADDITIONAL INFORMATION.—At the request
of any of the congressional defense commit-
tees or, in the case of intelligence or intel-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In General.—** The Department of Defense shall not use a lowest price technically acceptable source selection process for the engineering and manufacturing development contract of a major defense acquisition program.
**(b) Definitions.—** In this section:
(1) **Lowest price technically acceptable source selection process.—** — The term “lowest price technically acceptable source selection process” has the meaning given that term in part 15 of the Federal Acquisition Regulation.
(2) **Engineering and manufacturing development contract.—** — The term “engineering and manufacturing development contract” means a prime contract for the engineering and manufacturing development of a major defense acquisition program.
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 4232
Stored review status: release_metadata_unconfirmed. The source passage cites 10 U.S.C. § 4232. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 2715
TITLE 10—ARMED FORCES
§ 4236
that (1) preserves the mobilization production
base for that system, and (2) is feasible, as deter-
mined pursuant to regulations prescribed by the
Secretary of Defense.
(Added Pub. L. 101–189, div. A, title VIII, § 803(a),
Nov. 29, 1989, 103 Stat. 1487, § 2400; amended Pub.
L. 103–355, title III, § 3015, Oct. 13, 1994, 108 Stat.
3332; Pub. L. 104–106, div. A, title X, § 1062(d), div.
D, title XLIII, § 4321(b)(13), Feb. 10, 1996, 110 Stat.
444, 673; Pub. L. 107–107, div. A, title VIII, § 821(c),
Dec. 28, 2001, 115 Stat. 1182; renumbered § 4231 and
amended Pub. L. 116–283, div. A, title XVIII,
§ 1847(c)(1), Jan. 1, 2021, 134 Stat. 4254; Pub. L.
117–81, div. A, title XVII, § 1701(o)(6)(C)(ii), Dec.
27, 2021, 135 Stat. 2147.)
Editorial Notes
AMENDMENTS
2021—Pub. L. 116–283, § 1847(c)(1)(B), amended section
catchline generally. Prior to amendment, section
catchline read as follows: ‘‘Low-rate initial production
of new systems’’.
Pub. L. 116–283, § 1847(c)(1)(A), renumbered section
2400 of this title as this section.
Subsec. (a)(5). Pub. L. 116–283, § 1847(c)(1)(A)(i), as
amended by Pub. L. 117–81, § 1701(o)(6)(C)(ii), substituted
‘‘section 4351’’ for ‘‘section 2432’’.
Subsec. (b)(1). Pub. L. 116–283, § 1847(c)(1)(A)(ii), sub-
stituted ‘‘section 4171’’ for ‘‘section 2399’’.
2001—Subsec. (a)(1)(A). Pub. L. 107–107, § 821(c)(1), sub-
stituted ‘‘milestone B’’ for ‘‘milestone II’’.
Subsec. (a)(2). Pub. L. 107–107 substituted ‘‘milestone
B’’ for ‘‘milestone II’’ and ‘‘system development and
demonstration’’ for ‘‘engineering and manufacturing
development’’.
Subsec. (a)(4), (5). Pub. L. 107–107, § 821(c)(1), sub-
stituted ‘‘milestone B’’ for ‘‘milestone II’’.
1996—Subsec. (a)(5). Pub. L. 104–106, § 4321(b)(13), s
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 4232
Stored review status: historical_2024_not_currentness_verified. The source passage cites 10 U.S.C. § 4232. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
The Secretary of Defense shall ensure, to the maximum extent practicable, that the Department of Defense, before selecting a contractor for the engineering and manufacturing development of a major weapon system, production of a major weapon system, or sustainment of a major weapon system, negotiates a price for technical data to be delivered under a contract for such development, production, or sustainment.
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 4236
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.