Browse Arkansas Code titles and sections
42 U.S.C. § 7651i — Election for additional sources
Federal law — U.S. Code and appendices · legal_authorities
Page 7434
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651i
1 So in original. Probably should be section ‘‘7651a(12)’’.
2 So in original. Probably should be ‘‘this’’.
quire by regulation. The replacement of an ex-
isting utility unit with a new utility unit using
a repowering technology referred to in section
7651a(2) 1 of this title which is located at a dif-
ferent site, shall be treated as repowering of the
existing unit for purposes of this subchapter, if—
(1) the replacement unit is designated by the
owner or operator to replace such existing
unit, and
(2) the existing unit is retired from service
on or before the date on which the designated
replacement unit enters commercial oper-
ation.
(b) Extension
(1) An owner or operator satisfying the re-
quirements of subsection (a) shall be granted an
extension of the emission limitation require-
ment compliance date for that unit from Janu-
ary 1, 2000, to December 31, 2003. The extension
shall be specified in the permit issued to the
source under section 7651g of this title, together
with any compliance schedule and other require-
ments necessary to meet second phase require-
ments by the extended date. Any unit that is
granted an extension under this section shall
not be eligible for a waiver under section 7411(j)
of this title, and shall continue to be subject to
requirements under this subchapter as if it were
a unit subject to section 7651d of this title.
(2) If (A) the owner or operator of an existing
unit has been granted an extension under para-
graph (1) in order to repower such unit with a
clean coal unit, and (B) such owner or operator
demonstrates to the satisfaction of the Adminis-
trator that the repowering technology to be uti-
lized by such unit has been properly constructed
and te
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7651i
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: d1b7d87d5974dcfa799be1efffaafdcc245ec5986608a45d6deec20548bd6c7f. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-4aa2f1b68866c1f3fd1cbe91
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-7651i-election-for-additional-sources--d5025649c8.md
Pages: Not recorded – Not recorded
Passage SHA-256: 9db8c9b3f436d3c45c1eaa7eb027371083fdc101c26d07e2d3169be0dc027035
Source location: USCODE-2024-title42-chap85-subchapIV-A-sec7651i.pdf
Stored source content
Page 7434
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651i
1 So in original. Probably should be section ‘‘7651a(12)’’.
2 So in original. Probably should be ‘‘this’’.
quire by regulation. The replacement of an ex-
isting utility unit with a new utility unit using
a repowering technology referred to in section
7651a(2) 1 of this title which is located at a dif-
ferent site, shall be treated as repowering of the
existing unit for purposes of this subchapter, if—
(1) the replacement unit is designated by the
owner or operator to replace such existing
unit, and
(2) the existing unit is retired from service
on or before the date on which the designated
replacement unit enters commercial oper-
ation.
(b) Extension
(1) An owner or operator satisfying the re-
quirements of subsection (a) shall be granted an
extension of the emission limitation require-
ment compliance date for that unit from Janu-
ary 1, 2000, to December 31, 2003. The extension
shall be specified in the permit issued to the
source under section 7651g of this title, together
with any compliance schedule and other require-
ments necessary to meet second phase require-
ments by the extended date. Any unit that is
granted an extension under this section shall
not be eligible for a waiver under section 7411(j)
of this title, and shall continue to be subject to
requirements under this subchapter as if it were
a unit subject to section 7651d of this title.
(2) If (A) the owner or operator of an existing
unit has been granted an extension under para-
graph (1) in order to repower such unit with a
clean coal unit, and (B) such owner or operator
demonstrates to the satisfaction of the Adminis-
trator that the repowering technology to be uti-
lized by such unit has been properly constructed
and tested on such unit, but nevertheless has
been unable to achieve the emission reduction
limitations and is economically or techno-
logically infeasible, such existing unit may be
retrofitted or repowered with equipment or fa-
cilities utilizing another clean coal technology
or other available control technology.
(c) Allowances
(1) For the period of the extension under this
section, the Administrator shall allocate to the
owner or operator of the affected unit, annual
allowances for sulfur dioxide equal to the af-
fected unit’s baseline multiplied by the lesser of
the unit’s federally approved State Implementa-
tion Plan emissions limitation or its actual
emission rate for 1995 in lieu of any other alloca-
tion. Such allowances may not be transferred or
used by any other source to meet emission re-
quirements under this subchapter. The source
owner or operator shall notify the Adminis-
trator sixty days in advance of the date on
which the affected unit for which the extension
has been granted is to be removed from oper-
ation to install the repowering technology.
(2) Effective on that date, the unit shall be
subject to the requirements of section 7651d of
this title. Allowances for the year in which the
unit is removed from operation to install the
repowering technology shall be calculated as the
product of the unit’s baseline multiplied by 1.20
lbs/mmBtu, divided by 2,000, and prorated ac-
cordingly, and are transferable.
(3) Allowances for such existing utility units
for calendar years after the year the repowering
is complete shall be calculated as the product of
the existing unit’s baseline multiplied by 1.20
lbs/mmBtu, divided by 2,000.
(4) Notwithstanding the provisions of section
7651b(a) and (e) of this title, allowances shall be
allocated under this section for a designated re-
placement unit which replaces an existing unit
(as provided in the last sentence of subsection
(a)) in lieu of any further allocations of allow-
ances for the existing unit.
(5) For the purpose of meeting the aggregate
emissions limitation requirement set forth in
section 7651b(a)(1) of this title, the units with an
extension under this subsection shall be treated
in each calendar year during the extension pe-
riod as holding allowances allocated under para-
graph (3).
(d) Control requirements
Any unit qualifying for an extension under
this section that does not increase actual hourly
emissions for any pollutant regulated under
the 2 chapter shall not be subject to any stand-
ard of performance under section 7411 of this
title. Notwithstanding the provisions of this
subsection, no new unit (1) designated as a re-
placement for an existing unit, (2) qualifying for
the extension under subsection (b), and (3) lo-
cated at a different site than the existing unit
shall receive an exemption from the require-
ments imposed under section 7411 of this title.
(e) Expedited permitting
State permitting authorities and, where appli-
cable, the Administrator, are encouraged to give
expedited consideration to permit applications
under parts C and D of subchapter I of this chap-
ter for any source qualifying for an extension
under this section.
(f) Prohibition
It shall be unlawful for the owner or operator
of a repowered source to fail to comply with the
requirement of this section, or any regulations
of permit requirements to implement this sec-
tion, including the prohibition against emitting
sulfur dioxide in excess of allowances held.
(July 14, 1955, ch. 360, title IV, § 409, as added
Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104
Stat. 2619.)
§ 7651i. Election for additional sources
(a) Applicability
The owner or operator of any unit that is not,
nor will become, an affected unit under section
7651b(e), 7651c, or 7651d of this title, or that is a
process source under subsection (d), that emits
sulfur dioxide, may elect to designate that unit
or source to become an affected unit and to re-
ceive allowances under this subchapter. An elec-
tion shall be submitted to the Administrator for
approval, along with a permit application and
proposed compliance plan in accordance with
section 7651g of this title. The Administrator
shall approve a designation that meets the re-
quirements of this section, and such designated
unit, or source, shall be allocated allowances,
Page 7435
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651j
1 So in original. Probably should be ‘‘section’’.
1 So in original. Probably should be ‘‘section’’.
and be an affected unit for purposes of this sub-
chapter.
(b) Establishment of baseline
The baseline for a unit designated under this
section shall be established by the Adminis-
trator by regulation, based on fuel consumption
and operating data for the unit for calendar
years 1985, 1986, and 1987, or if such data is not
available, the Administrator may prescribe a
baseline based on alternative representative
data.
(c) Emission limitations
Annual emissions limitations for sulfur diox-
ide shall be equal to the product of the baseline
multiplied by the lesser of the unit’s 1985 actual
or allowable emission rate in lbs/mmBtu, or, if
the unit did not operate in 1985, by the lesser of
the unit’s actual or allowable emission rate for
a calendar year after 1985 (as determined by the
Administrator), divided by 2,000.
(d) Process sources
Not later than 18 months after November 15,
1990, the Administrator shall establish a pro-
gram under which the owner or operator of a
process source that emits sulfur dioxide may
elect to designate that source as an affected
unit for the purpose of receiving allowances
under this subchapter. The Administrator shall,
by regulation, define the sources that may be
designated; specify the emissions limitation;
specify the operating, emission baseline, and
other data requirements; prescribe CEMS or
other monitoring requirements; and promulgate
permit, reporting, and any other requirements
necessary to implement such a program.
(e) Allowances and permits
The Administrator shall issue allowances to
an affected unit under this section in an amount
equal to the emissions limitation calculated
under subsection (c) or (d), in accordance with
section 7651b of this title. Such allowance may
be used in accordance with, and shall be subject
to, the provisions of section 7651b of this title.
Affected sources under this section shall be sub-
ject to the requirements of sections 7651b, 7651g,
7651j, 7651k, 7651l, and 7651m of this title.
(f) Limitation
Any unit designated under this section shall
not transfer or bank allowances produced as a
result of reduced utilization or shutdown, except
that, such allowances may be transferred or car-
ried forward for use in subsequent years to the
extent that the reduced utilization or shutdown
results from the replacement of thermal energy
from the unit designated under this section,
with thermal energy generated by any other
unit or units subject to the requirements of this
subchapter, and the designated unit’s allow-
ances are transferred or carried forward for use
at such other replacement unit or units. In no
case may the Administrator allocate to a source
designated under this section allowances in an
amount greater than the emissions resulting
from operation of the source in full compliance
with the requirements of this chapter. No such
allowances shall authorize operation of a unit in
violation of any other requirements of this
chapter.
(g) Implementation
The Administrator shall issue regulations to
implement this section not later than eighteen
months after November 15, 1990.
(h) Small diesel refineries
The Administrator shall issue allowances to
owners or operators of small diesel refineries
who produce diesel fuel after October 1, 1993,
meeting the requirements of subsection 1 7545(i)
of this title.
(1) Allowance period
Allowances may be allocated under this sub-
section only for the period from October 1,
1993, through December 31, 1999.
(2) Allowance determination
The number of allowances allocated pursu-
ant to this paragraph shall equal the annual
number of pounds of sulfur dioxide reduction
attributable to desulfurization by a small re-
finery divided by 2,000. For the purposes of this
calculation, the concentration of sulfur re-
moved from diesel fuel shall be the difference
between 0.274 percent (by weight) and 0.050 per-
cent (by weight).
(3) Refinery eligibility
As used in this subsection, the term ‘‘small
refinery’’ shall mean a refinery or portion of a
refinery—
(A) which, as of November 15, 1990, has
bona fide crude oil throughput of less than
18,250,000 barrels per year, as reported to the
Department of Energy, and
(B) which, as of November 15, 1990, is
owned or controlled by a refiner with a total
combined bona fide crude oil throughput of
less than 50,187,500 barrels per year, as re-
ported to the Department of Energy.
(4) Limitation per refinery
The maximum number of allowances that
can be annually allocated to a small refinery
pursuant to this subsection is one thousand
and five hundred.
(5) Limitation on total
In any given year, the total number of allow-
ances allocated pursuant to this subsection
shall not exceed thirty-five thousand.
(6) Required certification
The Administrator shall not allocate any al-
lowances pursuant to this subsection unless
the owner or operator of a small diesel refin-
ery shall have certified, at a time and in a
manner prescribed by the Administrator, that
all motor diesel fuel produced by the refinery
for which allowances are claimed, including
motor diesel fuel for off-highway use, shall
have met the requirements of subsection 1
7545(i) of this title.
(July 14, 1955, ch. 360, title IV, § 410, as added
Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104
Stat. 2621.)
§ 7651j. Excess emissions penalty
(a) Excess emissions penalty
The owner or operator of any unit or process
source subject to the requirements of sections 1
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Applicability** The owner or operator of any unit that is not, nor will become, an affected unit under section 7651b(e), 7651c, or 7651d of this title, or that is a process source under subsection (d), that emits sulfur dioxide, may elect to designate that unit or source to become an affected unit and to receive allowances under this subchapter. An election shall be submitted to the Administrator for approval, along with a permit application and proposed compliance plan in accordance with [section 7651g of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651g&num=0&edition=prelim). The Administrator shall approve a designation that meets the requirements of this section, and such designated unit, or source, shall be allocated allowances, and be an affected unit for purposes of this subchapter.
**(b) Establishment of baseline** The baseline for a unit designated under this section shall be established by the Administrator by regulation, based on fuel consumption and operating data for the unit for calendar years 1985, 1986, and 1987, or if such data is not available, the Administrator may prescribe a baseline based on alternative representative data.
**(c) Emission limitations** Annual emissions limitations for sulfur dioxide shall be equal to the product of the baseline multiplied by the lesser of the unit’s 1985 actual or allowable emission rate in lbs/mmBtu, or, if the unit did not operate in 1985, by the lesser of the unit’s actual or allowable emission rate for a calendar year after 1985 (as determined by the Administrator), divided by 2,000.
**(d) Process sources** Not later than 18 months after November 15, 1990, the Administrator shall establish a program under which the owner or operator of a process source that e
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7651i
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.