Browse Arkansas Code titles and sections
42 U.S.C. § 2017 — Authorization of appropriations
Federal law — U.S. Code and appendices · legal_authorities
Page 5369
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 2017
(2) Historically Black college and university
The term ‘‘historically Black college or uni-
versity’’ has the meaning given the term ‘‘part
B institution’’ in section 1061 of title 20.
(3) Tribal college
The term ‘‘Tribal college’’ has the meaning
given the term ‘‘tribally controlled college or
university’’ in section 1801(a) of title 25.
(b) Partnership program
The Commission may establish and partici-
pate in activities relating to research, men-
toring, instruction, and training with institu-
tions of higher education, including Hispanic-
serving institutions, historically Black colleges
or universities, and Tribal colleges, to strength-
en the capacity of the institutions—
(1) to educate and train students (including
present or potential employees of the Commis-
sion); and
(2) to conduct research in the field of
science, engineering, or law, or any other field
that the Commission determines is important
to the work of the Commission.
(Aug. 1, 1946, ch. 724, title I, § 244, as added Pub.
L. 109–58, title VI, § 651(c)(4)(A), Aug. 8, 2005, 119
Stat. 802; amended Pub. L. 110–315, title IX,
§ 941(k)(2)(L), Aug. 14, 2008, 122 Stat. 3467.)
Editorial Notes
AMENDMENTS
2008—Subsec. (a)(3). Pub. L. 110–315 made technical
amendment to reference in original act which appears
in text as reference to section 1801(a) of title 25.
§ 2016. Repealed. Pub. L. 105–85, div. C, title
XXXI, § 3152(a)(1), Nov. 18, 1997, 111 Stat.
2042
Section, act Aug. 1, 1946, ch. 724, title I, § 251, as added
Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 960; amended June 11,
1959, Pub. L. 86–43, 73 Stat. 73; renumbered title I, Oct.
24, 1992, Pub. L. 102–486, title IX, § 902(a)(8), 106 Stat.
2944, required Commission to submit
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 2017
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: a38e1d817915a71e1c16248e6df6f3293d32df890dcce3e5230dab8ba98b8eed. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-43957ee2261979857973033f
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-2017-authorization-of-appropriations--0902e8eae3.md
Pages: Not recorded – Not recorded
Passage SHA-256: 1b5f0082a7daf5c6a240384e8109dd41e8d474ee40803e2ab5f1a94eb9a67aed
Source location: USCODE-2024-title42-chap23-divsnA-subchapI-sec2017.pdf
Stored source content
Page 5369
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 2017
(2) Historically Black college and university
The term ‘‘historically Black college or uni-
versity’’ has the meaning given the term ‘‘part
B institution’’ in section 1061 of title 20.
(3) Tribal college
The term ‘‘Tribal college’’ has the meaning
given the term ‘‘tribally controlled college or
university’’ in section 1801(a) of title 25.
(b) Partnership program
The Commission may establish and partici-
pate in activities relating to research, men-
toring, instruction, and training with institu-
tions of higher education, including Hispanic-
serving institutions, historically Black colleges
or universities, and Tribal colleges, to strength-
en the capacity of the institutions—
(1) to educate and train students (including
present or potential employees of the Commis-
sion); and
(2) to conduct research in the field of
science, engineering, or law, or any other field
that the Commission determines is important
to the work of the Commission.
(Aug. 1, 1946, ch. 724, title I, § 244, as added Pub.
L. 109–58, title VI, § 651(c)(4)(A), Aug. 8, 2005, 119
Stat. 802; amended Pub. L. 110–315, title IX,
§ 941(k)(2)(L), Aug. 14, 2008, 122 Stat. 3467.)
Editorial Notes
AMENDMENTS
2008—Subsec. (a)(3). Pub. L. 110–315 made technical
amendment to reference in original act which appears
in text as reference to section 1801(a) of title 25.
§ 2016. Repealed. Pub. L. 105–85, div. C, title
XXXI, § 3152(a)(1), Nov. 18, 1997, 111 Stat.
2042
Section, act Aug. 1, 1946, ch. 724, title I, § 251, as added
Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 960; amended June 11,
1959, Pub. L. 86–43, 73 Stat. 73; renumbered title I, Oct.
24, 1992, Pub. L. 102–486, title IX, § 902(a)(8), 106 Stat.
2944, required Commission to submit to Congress an-
nual report on its activities.
§ 2017. Authorization of appropriations
(a) Congressional authorization
No appropriation shall be made to the Com-
mission,
nor
shall
the
Commission
waive
charges for the use of materials under the Coop-
erative Power Reactor Demonstration Program,
unless previously authorized by legislation en-
acted by the Congress.
(b) Accounting
Any Act appropriating funds to the Commis-
sion may appropriate specified portions thereof
to be accounted for upon the certification of the
Commission only.
(c) Restoration or replacement of facilities
Notwithstanding the provisions of subsection
(a), funds are hereby authorized to be appro-
priated for the restoration or replacement of
any plant or facility destroyed or otherwise seri-
ously damaged, and the Commission is author-
ized to use available funds for such purposes.
(d) Substituted construction projects
Funds authorized to be appropriated for any
construction project to be used in connection
with the development or production of special
nuclear material or atomic weapons may be
used to start another construction project not
otherwise authorized if the substituted con-
struction project is within the limit of cost of
the construction project for which substitution
is to be made, and the Commission certifies
that—
(1) the substituted project is essential to the
common defense and security;
(2) the substituted project is required by
changes in weapon characteristics or weapon
logistic operations; and
(3) the Commission is unable to enter into a
contract with any person on terms satisfac-
tory to it to furnish from a privately owned
plant or facility the product or services to be
provided by the new project.
(Aug. 1, 1946, ch. 724, title I, § 261, as added Aug.
30, 1954, ch. 1073, § 1, 68 Stat. 960; amended Pub.
L. 85–79, § 1, July 3, 1957, 71 Stat. 274; Pub. L.
87–615, § 8, Aug. 29, 1962, 76 Stat. 411; Pub. L.
88–72, § 107, July 22, 1963, 77 Stat. 88; renumbered
title I, Pub. L. 102–486, title IX, § 902(a)(8), Oct.
24, 1992, 106 Stat. 2944.)
Editorial Notes
PRIOR PROVISIONS
Provisions similar to those comprising this section
were contained in section 19 of act Aug. 1, 1946, ch. 724,
60 Stat. 775, which was classified to section 1819 of this
title, prior to the general amendment and renumbering
of act Aug. 1, 1946, by act Aug. 30, 1954.
AMENDMENTS
1963—Subsec. (a). Pub. L. 88–72 required legislative
authorization of appropriations to the Commission and
waiver of charges for use of materials under the Coop-
erative
Power
Reactor
Demonstration
Program.
Former provisions of subsec. (a) authorized appropria-
tions necessary and appropriate to carry out the provi-
sions and purposes of this chapter, excepting in par. (1)
sums necessary for acquisition of real property or facil-
ity acquisition, construction or expansion (and deem-
ing under certain conditions a nonmilitary experi-
mental reactor to be a facility) and in par. (2) sums
necessary to carry out cooperative programs for devel-
opment and construction of reactors for demonstration
of their use in production of electrical power or process
heat, or for propulsion, or for commercial provision of
byproduct material, irradiation or other special serv-
ice, for civilian use, by arrangements providing for pay-
ment of funds, rendering of services and undertaking of
research and development without full reimbursement,
the waiver of charges accompanying such arrangement
or the provision of other financial assistance pursuant
to such arrangement or the acquisition of real property
or facility acquisition, construction or expansion un-
dertaken by the Commission as part of such arrange-
ment.
Subsec. (b). Pub. L. 88–72 substituted ‘‘Any act appro-
priating funds to the Commission’’ for ‘‘The acts appro-
priating such sums.’’
Subsec. (c). Pub. L. 88–72 struck out authorization of
funds provision for advance planning, construction de-
sign and architectural services in connection with any
plant or facility and inserted ‘‘Notwithstanding’’
phrase.
Subsec. (d). Pub. L. 88–72 struck out ‘‘hereafter’’ after
‘‘Funds’’ and inserted ‘‘construction’’ before ‘‘project’’
wherever appearing.
1962—Subsecs. (c), (d). Pub. L. 87–615 added subsecs.
(c) and (d).
1957—Pub. L. 85–79 designated first sentence as intro-
ductory clause of subsec. (a) and as (a)(1), inserted pro-
Page 5370
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 2017a
viso to (a)(1), added (a)(2), by designating second sen-
tence as subsec. (b), and struck out former sentence
which provided that ‘‘Funds appropriated to the Com-
mission shall, if obligated by contract during the fiscal
year for which appropriated, remain available for ex-
penditure for four years following the expiration of the
fiscal year for which appropriated.’’
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1963 AMENDMENT
Pub. L. 88–72, § 107, July 22, 1963, 77 Stat. 88, provided
that the amendment made by that section is effective
Jan. 1, 1964.
§ 2017a. Omitted
Editorial Notes
CODIFICATION
Section, act Sept. 26, 1962, Pub. L. 87–701, § 103, 76
Stat. 601, which authorized appropriations for the
Atomic Energy Commission for advance planning, con-
struction design, and architectural services in connec-
tion with certain projects, was from an Act authorizing
appropriations for the Atomic Energy Commission, and
was not enacted as part of the Atomic Energy Act of
1954 which comprises this chapter. See section 2017a–1
of this title.
Similar provisions were contained in the following
prior appropriation authorization acts:
Sept. 26, 1961, Pub. L. 87–315, § 103, 75 Stat. 678.
May 13, 1960, Pub. L. 86–457, § 103, 74 Stat. 121.
June 23, 1959, Pub. L. 86–50, § 103, 73 Stat. 83.
Aug. 4, 1958, Pub. L. 85–590, § 103, 72 Stat. 493.
Aug. 21, 1957, Pub. L. 85–162, title I, § 103, 71 Stat. 406.
May 3, 1956, ch. 233, § 103, 70 Stat. 129.
July 11, 1955, ch. 304, § 103, 69 Stat. 293.
§ 2017a–1. Omitted
Editorial Notes
CODIFICATION
Section, Pub. L. 95–39, title III, § 304, June 3, 1977, 91
Stat. 189, which authorized the Administrator of the
Energy Research and Development Administration to
perform construction design services for any Adminis-
tration construction project whenever the Adminis-
trator made certain determinations, was from an Act
authorizing appropriations for fiscal year 1977 to the
Energy Research and Development Administration, and
was not enacted as part of the Atomic Energy Act of
1954 which comprises this chapter. See section 5821(g) of
this title.
Similar provisions were contained in the following
prior appropriation authorization acts:
Pub. L. 94–187, title III, § 301, Dec. 31, 1975, 89 Stat.
1073.
Pub. L. 93–276, title I, § 103, May 10, 1974, 88 Stat. 118.
Pub. L. 93–60, § 103, July 6, 1973, 87 Stat. 144.
Pub. L. 92–314, title I, § 103, June 16, 1972, 86 Stat. 225.
Pub. L. 92–84, title I, § 103, Aug. 11, 1971, 85 Stat. 306.
Pub. L. 91–273, § 103, June 2, 1970, 84 Stat. 300.
Pub. L. 91–44, § 103, July 11, 1969, 83 Stat. 47.
Pub. L. 90–289, § 103, Apr. 19, 1968, 82 Stat. 97.
Pub. L. 90–56, § 103, July 26, 1967, 81 Stat. 125.
Pub. L. 89–428, § 103, May 21, 1966, 80 Stat. 163.
Pub. L. 89–32, § 103, June 2, 1965, 79 Stat. 122.
Pub. L. 88–332, § 104, June 30, 1964, 78 Stat. 229.
§ 2017b. Omitted
Editorial Notes
CODIFICATION
Section, act Sept. 26, 1962, Pub. L. 87–701, § 104, 76
Stat. 601, which authorized appropriations for the
Atomic Energy Commission for restoration or replace-
ment of facilities, was from an Act authorizing appro-
priations for the Atomic Energy Commission, and was
not enacted as part of the Atomic Energy Act of 1954
which comprises this chapter. See section 2017(c) of this
title.
Similar provisions were contained in the following
prior appropriation authorization acts:
Sept. 26, 1961, Pub. L. 87–315, § 104, 75 Stat. 678.
May 13, 1960, Pub. L. 86–457, § 104, 74 Stat. 122.
June 23, 1959, Pub. L. 86–50, § 104, 73 Stat. 83.
Aug. 4, 1958, Pub. L. 85–590, 72 Stat. 493.
Aug. 21, 1957, Pub. L. 85–162, title I, § 104, 71 Stat. 406.
May 3, 1956, ch. 233, § 104, 70 Stat. 129.
July 11, 1955, ch. 304, § 104, 69 Stat. 293.
§ 2018. Agency jurisdiction
Nothing in this chapter shall be construed to
affect the authority or regulations of any Fed-
eral, State, or local agency with respect to the
generation, sale, or transmission of electric
power produced through the use of nuclear fa-
cilities licensed by the Commission: Provided,
That this section shall not be deemed to confer
upon any Federal, State, or local agency any au-
thority to regulate, control, or restrict any ac-
tivities of the Commission.
(Aug. 1, 1946, ch. 724, title I, § 271, as added Aug.
30, 1954, ch. 1073, § 1, 68 Stat. 960; amended Pub.
L. 89–135, Aug. 24, 1965, 79 Stat. 551; renumbered
title I, Pub. L. 102–486, title IX, § 902(a)(8), Oct.
24, 1992, 106 Stat. 2944.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in text, was in the original
‘‘this Act’’, meaning act Aug. 1, 1946, ch. 724, as added
by act Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 919, known as
the Atomic Energy Act of 1954, which is classified prin-
cipally to this chapter. For complete classification of
this Act to the Code, see Short Title note set out under
section 2011 of this title and Tables.
AMENDMENTS
1965—Pub. L. 89–135 inserted ‘‘produced through the
use of nuclear facilities licensed by the Commission:
Provided, That this section shall not be deemed to con-
fer upon any Federal, State, or local agency any au-
thority to regulate, control, or restrict any activities
of the Commission.’’
§ 2019. Applicability of Federal Power Act
Every licensee under this chapter who holds a
license from the Commission for a utilization or
production facility for the generation of com-
mercial electric energy under section 2133 of this
title and who transmits such electric energy in
interstate commerce or sells it at wholesale in
interstate commerce shall be subject to the reg-
ulatory provisions of the Federal Power Act [16
U.S.C. 791a et seq.].
(Aug. 1, 1946, ch. 724, title I, § 272, as added Aug.
30, 1954, ch. 1073, § 1, 68 Stat. 960; renumbered
title I, Pub. L. 102–486, title IX, § 902(a)(8), Oct.
24, 1992, 106 Stat. 2944.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in text, was in the original
‘‘this Act’’, meaning act Aug. 1, 1946, ch. 724, as added
by act Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 919, known as
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
This chapter may be cited as the “Federal Power Act”.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 791a
Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 1364
TITLE 16—CONSERVATION
§ 791
Sec.
Statutory Notes and Related Subsidiaries
FINDINGS
Pub. L. 113–23, § 2, Aug. 9, 2013, 127 Stat. 493, provided
that: ‘‘Congress finds that—
‘‘(1) the hydropower industry currently employs ap-
proximately 300,000 workers across the United States;
‘‘(2) hydropower is the largest source of clean, re-
newable electricity in the United States;
‘‘(3) as of the date of enactment of this Act [Aug. 9,
2013], hydropower resources, including pumped stor-
age facilities, provide—
‘‘(A) nearly 7 percent of the electricity generated
in the United States; and
‘‘(B) approximately 100,000 megawatts of electric
capacity in the United States;
‘‘(4) only 3 percent of the 80,000 dams in the United
States generate electricity, so there is substantial
potential for adding hydropower generation to non-
powered dams; and
‘‘(5) according to one study, by utilizing currently
untapped resources, the United States could add ap-
proximately 60,000 megawatts of new hydropower ca-
pacity by 2025, which could create 700,000 new jobs
over the next 13 years.’’
SUBCHAPTER I—REGULATION OF THE DE-
VELOPMENT OF WATER POWER AND RE-
SOURCES
Statutory Notes and Related Subsidiaries
CODIFICATION; CONSTRUCTION
Act Aug. 26, 1935, ch. 687, title II, § 212, 49 Stat. 847,
provided that sections 1 to 29 of the Federal Water
Power Act, as amended (sections 792, 793, 794 to 797, 798
to 818, 819, and 820 to 823 of this title) shall constitute
part I of the act. Said section 212 also repealed sections
25 and 30 of the act (sections 819, 791 of this title). It
also contained a proviso as follows: ‘‘That nothing in
that Act, as amended, shall be construed to repeal or
amend the provisions of the amendment to the Federal
Water Power Act approved March 3, 192
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 791a
Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Congressional authorization** No appropriation shall be made to the Commission, nor shall the Commission waive charges for the use of materials under the Cooperative Power Reactor Demonstration Program, unless previously authorized by legislation enacted by the Congress.
**(b) Accounting** Any Act appropriating funds to the Commission may appropriate specified portions thereof to be accounted for upon the certification of the Commission only.
**(c) Restoration or replacement of facilities** Notwithstanding the provisions of subsection (a), funds are hereby authorized to be appropriated for the restoration or replacement of any plant or facility destroyed or otherwise seriously damaged, and the Commission is authorized to use available funds for such purposes.
**(d) Substituted construction projects** Funds authorized to be appropriated for any construction project to be used in connection with the development or production of special nuclear material or atomic weapons may be used to start another construction project not otherwise authorized if the substituted construction project is within the limit of cost of the construction project for which substitution is to be made, and the Commission certifies that—
(1) the substituted project is essential to the common defense and security;
(2) the substituted project is required by changes in weapon characteristics or weapon logistic operations; and
(3) the Commission is unable to enter into a contract with any person on terms satisfactory to it to furnish from a privately owned plant or facility the product or services to be provided by the new project.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 2017
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.