Browse Arkansas Code titles and sections
42 U.S.C. § 17388 — Advisory committee
Federal law — U.S. Code and appendices · legal_authorities
Page 9058
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 17388
(A) analysis of the potential benefits of de-
velopment of integrated electric systems on
the electric grid;
(B) analysis of the potential contributions
of integrated energy systems to different
grid architecture scenarios;
(C) research and development goals for
various integrated energy systems, includ-
ing those identified in subsection (a);
(D) assessment of policy and market bar-
riers to the adoption of integrated energy
systems;
(E) analysis of the technical and economic
feasibility of adoption of different integrated
energy systems; and
(F) a 10-year roadmap to guide the pro-
gram established under subsection (a).
(2) Updates
Not less than once every 3 years for the du-
ration of this research program, the Secretary
shall submit an updated version of the stra-
tegic plan to the Committee on Science,
Space, and Technology of the House of Rep-
resentatives and the Committee on Energy
and Natural Resources of the Senate.
(c) Program implementation
In carrying out the research, development,
demonstration,
and
commercial
application
aims of subsection (a), the Secretary shall—
(1) implement the recommendations set
forth in the strategic plan in subsection (b);
(2) coordinate across all relevant program
offices at the Department, including—
(A) the Office of Energy Efficiency and Re-
newable Energy;
(B) the Office of Nuclear Energy; and
(C) the Office of Fossil Energy;
(3) leverage existing programs and resources
of the Department; and
(4) prioritize activities that accelerate the
development of integrated electricity genera-
tion, storage, and distribution systems with
net zero greenhouse gas emissions.
(d) Integrated energy system defined
The term ‘‘integrated energy system’’
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 17388
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 1dd443cea317bad783a1e6c6fa11a7aad5abcd6dbb322ef7a0ed182349894d71. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-3c0c9f1fbbd4fe9255ff2a0f
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-17388-advisory-committee--432904a0a1.md
Pages: Not recorded – Not recorded
Passage SHA-256: 0069118a459e847ace428e2b930606be563d20d703f7273d31d6d3fc075a5341
Source location: USCODE-2024-title42-chap152-subchapIX-sec17388.pdf
Stored source content
Page 9058
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 17388
(A) analysis of the potential benefits of de-
velopment of integrated electric systems on
the electric grid;
(B) analysis of the potential contributions
of integrated energy systems to different
grid architecture scenarios;
(C) research and development goals for
various integrated energy systems, includ-
ing those identified in subsection (a);
(D) assessment of policy and market bar-
riers to the adoption of integrated energy
systems;
(E) analysis of the technical and economic
feasibility of adoption of different integrated
energy systems; and
(F) a 10-year roadmap to guide the pro-
gram established under subsection (a).
(2) Updates
Not less than once every 3 years for the du-
ration of this research program, the Secretary
shall submit an updated version of the stra-
tegic plan to the Committee on Science,
Space, and Technology of the House of Rep-
resentatives and the Committee on Energy
and Natural Resources of the Senate.
(c) Program implementation
In carrying out the research, development,
demonstration,
and
commercial
application
aims of subsection (a), the Secretary shall—
(1) implement the recommendations set
forth in the strategic plan in subsection (b);
(2) coordinate across all relevant program
offices at the Department, including—
(A) the Office of Energy Efficiency and Re-
newable Energy;
(B) the Office of Nuclear Energy; and
(C) the Office of Fossil Energy;
(3) leverage existing programs and resources
of the Department; and
(4) prioritize activities that accelerate the
development of integrated electricity genera-
tion, storage, and distribution systems with
net zero greenhouse gas emissions.
(d) Integrated energy system defined
The term ‘‘integrated energy system’’ means a
system composed of 2 or more co-located or
jointly operated sub-systems of energy genera-
tion, energy storage, or other energy tech-
nologies.
(Pub. L. 110–140, title XIII, § 1310, as added Pub.
L. 116–260, div. Z, title VIII, § 8003, Dec. 27, 2020,
134 Stat. 2581.)
§ 17388. Advisory committee
(a) In general
Not later than 180 days after December 27,
2020, the Secretary shall designate an existing
advisory committee to advise the Secretary on
the authorization of research, development, and
demonstration projects under sections 17384 and
17384a of this title.
(b) Responsibility
The Secretary shall annually solicit from the
advisory committee—
(1) comments to identify grid modernization
technology needs;
(2) an assessment of the progress of the re-
search activities on grid modernization; and
(3) assistance in annually updating grid
modernization technology roadmaps.
(Pub. L. 110–140, title XIII, § 1311, as added Pub.
L. 116–260, div. Z, title VIII, § 8005, Dec. 27, 2020,
134 Stat. 2585.)
§ 17389. Technology demonstration on the dis-
tribution grid
(a) In general
The Secretary shall establish a grant program
to carry out eligible projects related to the mod-
ernization of the electric grid, including the ap-
plication of technologies to improve observ-
ability, advanced controls, and prediction of sys-
tem performance on the distribution system.
(b) Eligible projects
To be eligible for a grant under subsection (a),
a project shall—
(1) be designed to improve the performance
and efficiency of the future electric grid, while
ensuring the continued provision of safe, se-
cure, reliable, and affordable power; and
(2) demonstrate—
(A) secure integration and management of
two or more energy resources, including dis-
tributed energy generation, combined heat
and power, micro-grids, energy storage, elec-
tric vehicles, energy efficiency, demand re-
sponse, and intelligent loads; and
(B) secure integration and interoperability
of communications and information tech-
nologies.
(Pub. L. 116–260, div. Z, title VIII, § 8007, Dec. 27,
2020, 134 Stat. 2586.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Energy Act of 2020,
and not as part of the Energy Independence and Secu-
rity Act of 2007 which comprises this chapter.
Statutory Notes and Related Subsidiaries
APPLICATION
Provisions of section 3212 of this title applicable to
construction, alteration, or repair work of demonstra-
tion projects funded by grants or contracts authorized
under this section, see section 9006(b) of div. Z of Pub.
L. 116–260, set out as a note under section 16237 of this
title.
§ 17390. Voluntary model pathways
(a) Establishment of voluntary model pathways
(1) Establishment
Not later than 90 days after December 27,
2020, the Secretary of Energy (in this section
referred to as the ‘‘Secretary’’), in consulta-
tion with the steering committee established
under paragraph (3), shall initiate the develop-
ment of voluntary model pathways for mod-
ernizing the electric grid through a collabo-
rative, public-private effort that—
(A) produces illustrative policy pathways
encompassing a diverse range of tech-
nologies that can be adapted for State and
regional applications by regulators and pol-
icymakers;
(B) facilitates the modernization of the
electric grid and associated communications
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Matching fund** The Secretary shall establish a Smart Grid Investment Matching Grant Program to provide grants of up to one-half (50 percent) of qualifying Smart Grid investments.
**(b) Qualifying investments** Qualifying Smart Grid investments may include any of the following made on or after November 15, 2021:
(1) In the case of appliances covered for purposes of establishing energy conservation standards under part B of title III of the Energy Policy and Conservation Act of 1975 ([42 U.S.C. 6291](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6291&num=0&edition=prelim) et seq.), the documented expenditures incurred by a manufacturer of such appliances associated with purchasing or designing, creating the ability to manufacture, and manufacturing and installing for one calendar year, internal devices that allow the appliance to engage in Smart Grid functions.
(2) In the case of specialized electricity-using equipment, including motors and drivers, installed in industrial or commercial applications, the documented expenditures incurred by its owner or its manufacturer of installing devices or modifying that equipment to engage in Smart Grid functions.
(3) In the case of transmission and distribution equipment fitted with monitoring and communications devices to enable smart grid functions, the documented expenditures incurred by the electric utility to purchase and install such monitoring and communications devices.
(4) In the case of metering devices, sensors, control devices, and other devices integrated with and attached to an electric utility system or retail distributor or marketer of electricity that are capable of engaging in Smart Grid functions, the documented expenditures incurred by the electric utility, distributor, o
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 17388
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.