Browse Arkansas Code titles and sections
42 U.S.C. § 16023 — Project organization
Federal law — U.S. Code and appendices · legal_authorities
Page 8760
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 16023
shall collaborate with other National Labora-
tories, institutions of higher education, other
research institutes, industrial researchers, and
international researchers to carry out the
Project.
(2) Industrial partnerships
(A) In general
The Idaho National Laboratory shall orga-
nize a consortium of appropriate industrial
partners that will carry out cost-shared re-
search, development, design, and construc-
tion activities, and operate research facili-
ties, on behalf of the Project.
(B) Cost-sharing
Activities of industrial partners funded by
the Project shall be cost-shared in accord-
ance with section 16352 of this title.
(C) Preference
Preference in determining the final struc-
ture of the consortium or any partnerships
under this part shall be given to a structure
(including designating as a lead industrial
partner an entity incorporated in the United
States) that retains United States techno-
logical leadership in the Project while maxi-
mizing cost sharing opportunities and mini-
mizing Federal funding responsibilities.
(3) Prototype plant siting
The prototype nuclear reactor and associ-
ated plant shall be sited at the Idaho National
Laboratory in Idaho.
(4) Reactor test capabilities
The Project shall use, if appropriate, reactor
test capabilities at the Idaho National Labora-
tory.
(5) Other Laboratory capabilities
The Project may use, if appropriate, facili-
ties at other National Laboratories.
(Pub. L. 109–58, title VI, § 642, Aug. 8, 2005, 119
Stat. 795.)
§ 16023. Project organization
(a) Major project elements
The Project shall consist of the following
major program elements:
(1) High-temperature hydrogen production
technology development and validation.
(2) Energy co
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 16023
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: d5a71664ed088ef182a3575be8913f2ad2318fea0725e0a488d40b4a84d6b9c4. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-3bb17749541a99a443007601
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-16023-project-organization--8f1f45c814.md
Pages: Not recorded – Not recorded
Passage SHA-256: 1f5475e518b822a40b598a0d9357a8ebcd5247825caff26a28ae330a297ab119
Source location: USCODE-2024-title42-chap149-subchapVI-partB-sec16023.pdf
Stored source content
Page 8760
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 16023
shall collaborate with other National Labora-
tories, institutions of higher education, other
research institutes, industrial researchers, and
international researchers to carry out the
Project.
(2) Industrial partnerships
(A) In general
The Idaho National Laboratory shall orga-
nize a consortium of appropriate industrial
partners that will carry out cost-shared re-
search, development, design, and construc-
tion activities, and operate research facili-
ties, on behalf of the Project.
(B) Cost-sharing
Activities of industrial partners funded by
the Project shall be cost-shared in accord-
ance with section 16352 of this title.
(C) Preference
Preference in determining the final struc-
ture of the consortium or any partnerships
under this part shall be given to a structure
(including designating as a lead industrial
partner an entity incorporated in the United
States) that retains United States techno-
logical leadership in the Project while maxi-
mizing cost sharing opportunities and mini-
mizing Federal funding responsibilities.
(3) Prototype plant siting
The prototype nuclear reactor and associ-
ated plant shall be sited at the Idaho National
Laboratory in Idaho.
(4) Reactor test capabilities
The Project shall use, if appropriate, reactor
test capabilities at the Idaho National Labora-
tory.
(5) Other Laboratory capabilities
The Project may use, if appropriate, facili-
ties at other National Laboratories.
(Pub. L. 109–58, title VI, § 642, Aug. 8, 2005, 119
Stat. 795.)
§ 16023. Project organization
(a) Major project elements
The Project shall consist of the following
major program elements:
(1) High-temperature hydrogen production
technology development and validation.
(2) Energy conversion technology develop-
ment and validation.
(3) Nuclear fuel development, characteriza-
tion, and qualification.
(4) Materials selection, development, test-
ing, and qualification.
(5) Reactor and balance-of-plant design, en-
gineering, safety analysis, and qualification.
(b) Project phases
The Project shall be conducted in the fol-
lowing phases:
(1) First project phase
A first project phase shall be conducted to—
(A) select and validate the appropriate
technology under subsection (a)(1);
(B) carry out enabling research, develop-
ment, and demonstration activities on tech-
nologies and components under paragraphs
(2) through (4) of subsection (a);
(C) determine whether it is appropriate to
combine electricity generation and hydrogen
production in a single prototype nuclear re-
actor and plant; and
(D) carry out initial design activities for a
prototype nuclear reactor and plant, includ-
ing development of design methods and safe-
ty analytical methods and studies under sub-
section (a)(5).
(2) Second project phase
A second project phase shall be conducted
to—
(A) continue appropriate activities under
paragraphs (1) through (5) of subsection (a);
(B) develop, through a competitive proc-
ess, a final design for the prototype nuclear
reactor and plant;
(C) apply for licenses to construct and op-
erate the prototype nuclear reactor from the
Nuclear Regulatory Commission; and
(D) construct and start up operations of
the prototype nuclear reactor and its associ-
ated hydrogen or electricity production fa-
cilities.
(c) Project requirements
(1) In general
The Secretary shall ensure that the Project
is structured so as to maximize the technical
interchange and transfer of technologies and
ideas into the Project from other sources of
relevant expertise, including—
(A) the nuclear power industry, including
nuclear powerplant construction firms, par-
ticularly with respect to issues associated
with plant design, construction, and oper-
ational and safety issues;
(B) the chemical processing industry, par-
ticularly with respect to issues relating to—
(i) the use of process energy for produc-
tion of hydrogen; and
(ii) the integration of technologies devel-
oped by the Project into chemical proc-
essing environments; and
(C) international efforts in areas related to
the Project, particularly with respect to hy-
drogen production technologies.
(2) International collaboration
(A) In general
The Secretary shall seek international co-
operation, participation, and financial con-
tributions for the Project.
(B) Assistance from international partners
The Secretary, through the Idaho National
Laboratory, may contract for assistance
from specialists or facilities from member
countries of the Generation IV International
Forum, the Russian Federation, or other
international partners if the specialists or
facilities provide access to cost-effective and
relevant skills or test capabilities.
(C) Partner nations
The Project may involve demonstration of
selected project objectives in a partner coun-
try.
(D) Generation IV International Forum
The Secretary shall ensure that inter-
national activities of the Project are coordi-
Page 8761
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 16025
nated with the Generation IV International
Forum.
(3) Review by Nuclear Energy Research Advi-
sory Committee
(A) In general
The Nuclear Energy Research Advisory
Committee of the Department (referred to in
this paragraph as the ‘‘NERAC’’) shall—
(i) review all program plans for the
Project and all progress under the Project
on an ongoing basis; and
(ii) ensure that important scientific,
technical, safety, and program manage-
ment issues receive attention in the
Project and by the Secretary.
(B) Additional expertise
The NERAC shall supplement the exper-
tise of the NERAC or appoint subpanels to
incorporate into the review by the NERAC
the relevant sources of expertise described
under paragraph (1).
(C) Initial review
Not later than 180 days after August 8,
2005, the NERAC shall—
(i) review existing program plans for the
Project in light of the recommendations of
the document entitled ‘‘Design Features
and Technology Uncertainties for the Next
Generation Nuclear Plant,’’ dated June 30,
2004; and
(ii) address any recommendations of the
document not incorporated in program
plans for the Project.
(D) First project phase review
On a determination by the Secretary that
the appropriate activities under the first
project phase under subsection (b)(1) are
nearly complete, the Secretary shall request
the NERAC to conduct a comprehensive re-
view of the Project and to report to the Sec-
retary the recommendation of the NERAC
concerning whether the Project is ready to
proceed to the second project phase under
subsection (b)(2).
(E) Transmittal of reports to Congress
Not later than 60 days after receiving any
report from the NERAC related to the
Project, the Secretary shall submit to the
appropriate committees of the Senate and
the House of Representatives a copy of the
report, along with any additional views of
the Secretary that the Secretary may con-
sider appropriate.
(Pub. L. 109–58, title VI, § 643, Aug. 8, 2005, 119
Stat. 795.)
§ 16024. Nuclear Regulatory Commission
(a) In general
In accordance with section 5842 of this title,
the Nuclear Regulatory Commission shall have
licensing and regulatory authority for any reac-
tor authorized under this part.
(b) Licensing strategy
Not later than 3 years after August 8, 2005, the
Secretary and the Chairman of the Nuclear Reg-
ulatory Commission shall jointly submit to the
appropriate committees of the Senate and the
House of Representatives a licensing strategy
for the prototype nuclear reactor, including—
(1) a description of ways in which current li-
censing requirements relating to light-water
reactors need to be adapted for the types of
prototype nuclear reactor being considered by
the Project;
(2) a description of analytical tools that the
Nuclear Regulatory Commission will have to
develop to independently verify designs and
performance characteristics of components,
equipment, systems, or structures associated
with the prototype nuclear reactor;
(3) other research or development activities
that may be required on the part of the Nu-
clear Regulatory Commission in order to re-
view a license application for the prototype
nuclear reactor; and
(4) an estimate of the budgetary require-
ments associated with the licensing strategy.
(c) Ongoing interaction
The Secretary shall seek the active participa-
tion of the Nuclear Regulatory Commission
throughout the duration of the Project to—
(1) avoid design decisions that will com-
promise adequate safety margins in the design
of the reactor or impair the accessibility of
nuclear safety-related components of the pro-
totype reactor for inspection and mainte-
nance;
(2) develop tools to facilitate inspection and
maintenance needed for safety purposes; and
(3) develop risk-based criteria for any future
commercial development of a similar reactor
architectures.
(Pub. L. 109–58, title VI, § 644, Aug. 8, 2005, 119
Stat. 797.)
§ 16025. Project timelines and authorization of
appropriations
(a) Target date to complete the first project
phase
Not later than September 30, 2011, the Sec-
retary shall—
(1) select the technology to be used by the
Project for high-temperature hydrogen pro-
duction and the initial design parameters for
the prototype nuclear plant; or
(2) submit to Congress a report establishing
an alternative date for making the selection.
(b) Design competition for second project phase
(1) In general
The Secretary, acting through the Idaho Na-
tional Laboratory, shall fund not more than 4
teams for not more than 2 years to develop de-
tailed proposals for competitive evaluation
and selection of a single proposal for a final
design of the prototype nuclear reactor.
(2) Systems integration
The Secretary may structure Project activi-
ties in the second project phase to use the lead
industrial partner of the competitively se-
lected design under paragraph (1) in a systems
integration role for final design and construc-
tion of the Project.
(c) Target date to complete project construction
Not later than September 30, 2021, the Sec-
retary shall—
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Departmental management**
(1) **In general** — The Project shall be managed in the Department by the Office of Nuclear Energy, Science, and Technology.
(2) **Generation IV Nuclear Energy Systems program** — The Secretary may combine the Project with the Generation IV Nuclear Energy Systems Initiative.
(3) **Existing DOE project management expertise** — The Secretary may utilize capabilities for review of construction projects for advanced scientific facilities within the Office of Science to track the progress of the Project.
**(b) Laboratory management**
(1) **Lead Laboratory** — The Idaho National Laboratory shall be the lead National Laboratory for the Project and shall collaborate with other National Laboratories, institutions of higher education, other research institutes, industrial researchers, and international researchers to carry out the Project.
(2) **Industrial partnerships**
(A) *In general* — The Idaho National Laboratory shall organize a consortium of appropriate industrial partners that will carry out cost-shared research, development, design, and construction activities, and operate research facilities, on behalf of the Project.
(B) *Cost-sharing* — Activities of industrial partners funded by the Project shall be cost-shared in accordance with [section 16352 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section16352&num=0&edition=prelim).
(C) *Preference* — Preference in determining the final structure of the consortium or any partnerships under this part shall be given to a structure (including designating as a lead industrial partner an entity incorporated in the United States) that retains United States technological leadership in the Project while maximizing cost sharing opportunities and mi
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 16023
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.