Browse Arkansas Code titles and sections
42 U.S.C. § 7661a — Permit programs
Federal law — U.S. Code and appendices · legal_authorities
Page 7441
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7661a
1 So in original. Probably should be ‘‘part’’.
2 So in original. Probably should be ‘‘clauses’’.
(2) Major source
The term ‘‘major source’’ means any sta-
tionary source (or any group of stationary
sources located within a contiguous area and
under common control) that is either of the
following:
(A) A major source as defined in section
7412 of this title.
(B) A major stationary source as defined in
section 7602 of this title or part D of sub-
chapter I.
(3) Schedule of compliance
The term ‘‘schedule of compliance’’ means a
schedule of remedial measures, including an
enforceable sequence of actions or operations,
leading to compliance with an applicable im-
plementation plan, emission standard, emis-
sion limitation, or emission prohibition.
(4) Permitting authority
The term ‘‘permitting authority’’ means the
Administrator or the air pollution control
agency authorized by the Administrator to
carry out a permit program under this sub-
chapter.
(July 14, 1955, ch. 360, title V, § 501, as added Pub.
L. 101–549, title V, § 501, Nov. 15, 1990, 104 Stat.
2635.)
§ 7661a. Permit programs
(a) Violations
After the effective date of any permit program
approved or promulgated under this subchapter,
it shall be unlawful for any person to violate
any requirement of a permit issued under this
subchapter, or to operate an affected source (as
provided in subchapter IV–A), a major source,
any other source (including an area source) sub-
ject to standards or regulations under section
7411 or 7412 of this title, any other source re-
quired to have a permit under parts 1 C or D of
subchapter I, or any other stationary source in
a category designated (in whole or in part) by
regulations promulgated
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7661a
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: ccbf9eacb96d644e0b33b6d99f776ef192ace31be11f25a6cc330bb8cb27d175. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-36c0ab9cb980bd300a22a59d
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-7661a-permit-programs--b417f5b05d.md
Pages: Not recorded – Not recorded
Passage SHA-256: 76aa8846822dec11e8646eafe70df70b97ded03932bf95e63c7b4ae651f8c58b
Source location: USCODE-2024-title42-chap85-subchapV-sec7661a.pdf
Stored source content
Page 7441
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7661a
1 So in original. Probably should be ‘‘part’’.
2 So in original. Probably should be ‘‘clauses’’.
(2) Major source
The term ‘‘major source’’ means any sta-
tionary source (or any group of stationary
sources located within a contiguous area and
under common control) that is either of the
following:
(A) A major source as defined in section
7412 of this title.
(B) A major stationary source as defined in
section 7602 of this title or part D of sub-
chapter I.
(3) Schedule of compliance
The term ‘‘schedule of compliance’’ means a
schedule of remedial measures, including an
enforceable sequence of actions or operations,
leading to compliance with an applicable im-
plementation plan, emission standard, emis-
sion limitation, or emission prohibition.
(4) Permitting authority
The term ‘‘permitting authority’’ means the
Administrator or the air pollution control
agency authorized by the Administrator to
carry out a permit program under this sub-
chapter.
(July 14, 1955, ch. 360, title V, § 501, as added Pub.
L. 101–549, title V, § 501, Nov. 15, 1990, 104 Stat.
2635.)
§ 7661a. Permit programs
(a) Violations
After the effective date of any permit program
approved or promulgated under this subchapter,
it shall be unlawful for any person to violate
any requirement of a permit issued under this
subchapter, or to operate an affected source (as
provided in subchapter IV–A), a major source,
any other source (including an area source) sub-
ject to standards or regulations under section
7411 or 7412 of this title, any other source re-
quired to have a permit under parts 1 C or D of
subchapter I, or any other stationary source in
a category designated (in whole or in part) by
regulations promulgated by the Administrator
(after notice and public comment) which shall
include a finding setting forth the basis for such
designation, except in compliance with a permit
issued by a permitting authority under this sub-
chapter. (Nothing in this subsection shall be
construed to alter the applicable requirements
of this chapter that a permit be obtained before
construction or modification.) The Adminis-
trator may, in the Administrator’s discretion
and consistent with the applicable provisions of
this chapter, promulgate regulations to exempt
one or more source categories (in whole or in
part) from the requirements of this subsection if
the Administrator finds that compliance with
such requirements is impracticable, infeasible,
or unnecessarily burdensome on such categories,
except that the Administrator may not exempt
any major source from such requirements.
(b) Regulations
The Administrator shall promulgate within 12
months after November 15, 1990, regulations es-
tablishing the minimum elements of a permit
program to be administered by any air pollution
control agency. These elements shall include
each of the following:
(1) Requirements for permit applications, in-
cluding a standard application form and cri-
teria for determining in a timely fashion the
completeness of applications.
(2) Monitoring and reporting requirements.
(3)(A) A requirement under State or local
law or interstate compact that the owner or
operator of all sources subject to the require-
ment to obtain a permit under this subchapter
pay an annual fee, or the equivalent over some
other period, sufficient to cover all reasonable
(direct and indirect) costs required to develop
and administer the permit program require-
ments of this subchapter, including section
7661f of this title, including the reasonable
costs of—
(i) reviewing and acting upon any applica-
tion for such a permit,
(ii) if the owner or operator receives a per-
mit for such source, whether before or after
November 15, 1990, implementing and enforc-
ing the terms and conditions of any such
permit (not including any court costs or
other costs associated with any enforcement
action),
(iii) emissions and ambient monitoring,
(iv) preparing generally applicable regula-
tions, or guidance,
(v) modeling, analyses, and demonstra-
tions, and
(vi) preparing inventories and tracking
emissions.
(B) The total amount of fees collected by the
permitting authority shall conform to the fol-
lowing requirements:
(i) The Administrator shall not approve a
program as meeting the requirements of this
paragraph unless the State demonstrates
that, except as otherwise provided in sub-
paragraphs 2 (ii) through (v) of this subpara-
graph, the program will result in the collec-
tion, in the aggregate, from all sources sub-
ject to subparagraph (A), of an amount not
less than $25 per ton of each regulated pol-
lutant, or such other amount as the Admin-
istrator may determine adequately reflects
the reasonable costs of the permit program.
(ii) As used in this subparagraph, the term
‘‘regulated pollutant’’ shall mean (I) a vola-
tile organic compound; (II) each pollutant
regulated under section 7411 or 7412 of this
title; and (III) each pollutant for which a na-
tional primary ambient air quality standard
has been promulgated (except that carbon
monoxide shall be excluded from this ref-
erence).
(iii) In determining the amount under
clause (i), the permitting authority is not
required to include any amount of regulated
pollutant emitted by any source in excess of
4,000 tons per year of that regulated pollut-
ant.
(iv) The requirements of clause (i) shall
not apply if the permitting authority dem-
onstrates that collecting an amount less
Page 7442
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7661a
than the amount specified under clause (i)
will meet the requirements of subparagraph
(A).
(v) The fee calculated under clause (i) shall
be increased (consistent with the need to
cover the reasonable costs authorized by
subparagraph (A)) in each year beginning
after 1990, by the percentage, if any, by
which the Consumer Price Index for the
most recent calendar year ending before the
beginning of such year exceeds the Con-
sumer Price Index for the calendar year 1989.
For purposes of this clause—
(I) the Consumer Price Index for any cal-
endar year is the average of the Consumer
Price Index for all-urban consumers pub-
lished by the Department of Labor, as of
the close of the 12-month period ending on
August 31 of each calendar year, and
(II) the revision of the Consumer Price
Index which is most consistent with the
Consumer Price Index for calendar year
1989 shall be used.
(C)(i) If the Administrator determines, under
subsection (d), that the fee provisions of the
operating permit program do not meet the re-
quirements of this paragraph, or if the Admin-
istrator makes a determination, under sub-
section (i), that the permitting authority is
not adequately administering or enforcing an
approved fee program, the Administrator may,
in addition to taking any other action author-
ized under this subchapter, collect reasonable
fees from the sources identified under subpara-
graph (A). Such fees shall be designed solely to
cover the Administrator’s costs of admin-
istering the provisions of the permit program
promulgated by the Administrator.
(ii) Any source that fails to pay fees lawfully
imposed by the Administrator under this sub-
paragraph shall pay a penalty of 50 percent of
the fee amount, plus interest on the fee
amount computed in accordance with section
6621(a)(2) of title 26 (relating to computation
of interest on underpayment of Federal taxes).
(iii) Any fees, penalties, and interest col-
lected under this subparagraph shall be depos-
ited in a special fund in the United States
Treasury for licensing and other services,
which thereafter shall be available for appro-
priation, to remain available until expended,
subject to appropriation, to carry out the
Agency’s activities for which the fees were
collected. Any fee required to be collected by
a State, local, or interstate agency under this
subsection shall be utilized solely to cover all
reasonable (direct and indirect) costs required
to support the permit program as set forth in
subparagraph (A).
(4) Requirements for adequate personnel and
funding to administer the program.
(5) A requirement that the permitting au-
thority have adequate authority to:
(A) issue permits and assure compliance by
all sources required to have a permit under
this subchapter with each applicable stand-
ard, regulation or requirement under this
chapter;
(B) issue permits for a fixed term, not to
exceed 5 years;
(C) assure that upon issuance or renewal
permits incorporate emission limitations
and other requirements in an applicable im-
plementation plan;
(D) terminate, modify, or revoke and re-
issue permits for cause;
(E) enforce permits, permit fee require-
ments, and the requirement to obtain a per-
mit, including authority to recover civil
penalties in a maximum amount of not less
than $10,000 per day for each violation, and
provide appropriate criminal penalties; and
(F) assure that no permit will be issued if
the Administrator objects to its issuance in
a timely manner under this subchapter.
(6) Adequate, streamlined, and reasonable
procedures for expeditiously determining when
applications are complete, for processing such
applications, for public notice, including offer-
ing an opportunity for public comment and a
hearing, and for expeditious review of permit
actions, including applications, renewals, or
revisions, and including an opportunity for ju-
dicial review in State court of the final permit
action by the applicant, any person who par-
ticipated in the public comment process, and
any other person who could obtain judicial re-
view of that action under applicable law.
(7) To ensure against unreasonable delay by
the permitting authority, adequate authority
and procedures to provide that a failure of
such permitting authority to act on a permit
application or permit renewal application (in
accordance with the time periods specified in
section 7661b of this title or, as appropriate,
subchapter IV–A) shall be treated as a final
permit action solely for purposes of obtaining
judicial review in State court of an action
brought by any person referred to in para-
graph (6) to require that action be taken by
the permitting authority on such application
without additional delay.
(8) Authority, and reasonable procedures
consistent with the need for expeditious ac-
tion by the permitting authority on permit ap-
plications and related matters, to make avail-
able to the public any permit application,
compliance plan, permit, and monitoring or
compliance report under section 7661b(e) of
this title, subject to the provisions of section
7414(c) of this title.
(9) A requirement that the permitting au-
thority, in the case of permits with a term of
3 or more years for major sources, shall re-
quire revisions to the permit to incorporate
applicable standards and regulations promul-
gated under this chapter after the issuance of
such permit. Such revisions shall occur as ex-
peditiously as practicable and consistent with
the procedures established under paragraph (6)
but not later than 18 months after the promul-
gation of such standards and regulations. No
such revision shall be required if the effective
date of the standards or regulations is a date
after the expiration of the permit term. Such
permit revision shall be treated as a permit re-
newal if it complies with the requirements of
this subchapter regarding renewals.
(10) Provisions to allow changes within a
permitted facility (or one operating pursuant
to section 7661b(d) of this title) without re-
quiring a permit revision, if the changes are
not modifications under any provision of sub-
Page 7443
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7661a
3 So in original. A closing parenthesis probably should precede
the colon.
chapter I and the changes do not exceed the
emissions allowable under the permit (whether
expressed therein as a rate of emissions or in
terms of total emissions: 3 Provided, That the
facility provides the Administrator and the
permitting authority with written notifica-
tion in advance of the proposed changes which
shall be a minimum of 7 days, unless the per-
mitting authority provides in its regulations a
different timeframe for emergencies.
(c) Single permit
A single permit may be issued for a facility
with multiple sources.
(d) Submission and approval
(1) Not later than 3 years after November 15,
1990, the Governor of each State shall develop
and submit to the Administrator a permit pro-
gram under State or local law or under an inter-
state compact meeting the requirements of this
subchapter. In addition, the Governor shall sub-
mit a legal opinion from the attorney general
(or the attorney for those State air pollution
control agencies that have independent legal
counsel), or from the chief legal officer of an
interstate agency, that the laws of the State, lo-
cality, or the interstate compact provide ade-
quate authority to carry out the program. Not
later than 1 year after receiving a program, and
after notice and opportunity for public com-
ment, the Administrator shall approve or dis-
approve such program, in whole or in part. The
Administrator may approve a program to the
extent that the program meets the requirements
of this chapter, including the regulations issued
under subsection (b). If the program is dis-
approved, in whole or in part, the Administrator
shall notify the Governor of any revisions or
modifications necessary to obtain approval. The
Governor shall revise and resubmit the program
for review under this section within 180 days
after receiving notification.
(2)(A) If the Governor does not submit a pro-
gram as required under paragraph (1) or if the
Administrator disapproves a program submitted
by the Governor under paragraph (1), in whole or
in part, the Administrator may, prior to the ex-
piration of the 18-month period referred to in
subparagraph (B), in the Administrator’s discre-
tion, apply any of the sanctions specified in sec-
tion 7509(b) of this title.
(B) If the Governor does not submit a program
as required under paragraph (1), or if the Admin-
istrator disapproves any such program sub-
mitted by the Governor under paragraph (1), in
whole or in part, 18 months after the date re-
quired for such submittal or the date of such
disapproval, as the case may be, the Adminis-
trator shall apply sanctions under section
7509(b) of this title in the same manner and sub-
ject to the same deadlines and other conditions
as are applicable in the case of a determination,
disapproval, or finding under section 7509(a) of
this title.
(C) The sanctions under section 7509(b)(2) of
this title shall not apply pursuant to this para-
graph in any area unless the failure to submit or
the disapproval referred to in subparagraph (A)
or (B) relates to an air pollutant for which such
area has been designated a nonattainment area
(as defined in part D of subchapter I).
(3) If a program meeting the requirements of
this subchapter has not been approved in whole
for any State, the Administrator shall, 2 years
after the date required for submission of such a
program under paragraph (1), promulgate, ad-
minister, and enforce a program under this sub-
chapter for that State.
(e) Suspension
The Administrator shall suspend the issuance
of permits promptly upon publication of notice
of approval of a permit program under this sec-
tion, but may, in such notice, retain jurisdiction
over permits that have been federally issued,
but for which the administrative or judicial re-
view process is not complete. The Administrator
shall continue to administer and enforce feder-
ally issued permits under this subchapter until
they are replaced by a permit issued by a per-
mitting program. Nothing in this subsection
should be construed to limit the Administrator’s
ability to enforce permits issued by a State.
(f) Prohibition
No partial permit program shall be approved
unless, at a minimum, it applies, and ensures
compliance with, this subchapter and each of
the following:
(1) All requirements established under sub-
chapter IV–A applicable to ‘‘affected sources’’.
(2) All requirements established under sec-
tion 7412 of this title applicable to ‘‘major
sources’’, ‘‘area sources,’’ and ‘‘new sources’’.
(3) All requirements of subchapter I (other
than section 7412 of this title) applicable to
sources required to have a permit under this
subchapter.
Approval of a partial program shall not relieve
the State of its obligation to submit a complete
program, nor from the application of any sanc-
tions under this chapter for failure to submit an
approvable permit program.
(g) Interim approval
If a program (including a partial permit pro-
gram) submitted under this subchapter substan-
tially meets the requirements of this sub-
chapter, but is not fully approvable, the Admin-
istrator may by rule grant the program interim
approval. In the notice of final rulemaking, the
Administrator shall specify the changes that
must be made before the program can receive
full approval. An interim approval under this
subsection shall expire on a date set by the Ad-
ministrator not later than 2 years after such ap-
proval, and may not be renewed. For the period
of any such interim approval, the provisions of
subsection (d)(2), and the obligation of the Ad-
ministrator to promulgate a program under this
subchapter for the State pursuant to subsection
(d)(3), shall be suspended. Such provisions and
such obligation of the Administrator shall apply
after the expiration of such interim approval.
(h) Effective date
The effective date of a permit program, or par-
tial or interim program, approved under this
subchapter, shall be the effective date of ap-
proval by the Administrator. The effective date
Page 7444
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7661b
of a permit program, or partial permit program,
promulgated by the Administrator shall be the
date of promulgation.
(i) Administration and enforcement
(1) Whenever the Administrator makes a de-
termination that a permitting authority is not
adequately administering and enforcing a pro-
gram, or portion thereof, in accordance with the
requirements of this subchapter, the Adminis-
trator shall provide notice to the State and
may, prior to the expiration of the 18-month pe-
riod referred to in paragraph (2), in the Adminis-
trator’s discretion, apply any of the sanctions
specified in section 7509(b) of this title.
(2) Whenever the Administrator makes a de-
termination that a permitting authority is not
adequately administering and enforcing a pro-
gram, or portion thereof, in accordance with the
requirements of this subchapter, 18 months after
the date of the notice under paragraph (1), the
Administrator shall apply the sanctions under
section 7509(b) of this title in the same manner
and subject to the same deadlines and other con-
ditions as are applicable in the case of a deter-
mination, disapproval, or finding under section
7509(a) of this title.
(3) The sanctions under section 7509(b)(2) of
this title shall not apply pursuant to this sub-
section in any area unless the failure to ade-
quately enforce and administer the program re-
lates to an air pollutant for which such area has
been designated a nonattainment area.
(4) Whenever the Administrator has made a
finding under paragraph (1) with respect to any
State, unless the State has corrected such defi-
ciency within 18 months after the date of such
finding, the Administrator shall, 2 years after
the date of such finding, promulgate, admin-
ister, and enforce a program under this sub-
chapter for that State. Nothing in this para-
graph shall be construed to affect the validity of
a program which has been approved under this
subchapter or the authority of any permitting
authority acting under such program until such
time as such program is promulgated by the Ad-
ministrator under this paragraph.
(July 14, 1955, ch. 360, title V, § 502, as added Pub.
L. 101–549, title V, § 501, Nov. 15, 1990, 104 Stat.
2635.)
§ 7661b. Permit applications
(a) Applicable date
Any source specified in section 7661a(a) of this
title shall become subject to a permit program,
and required to have a permit, on the later of
the following dates—
(1) the effective date of a permit program or
partial or interim permit program applicable
to the source; or
(2) the date such source becomes subject to
section 7661a(a) of this title.
(b) Compliance plan
(1) The regulations required by section 7661a(b)
of this title shall include a requirement that the
applicant submit with the permit application a
compliance plan describing how the source will
comply with all applicable requirements under
this chapter. The compliance plan shall include
a schedule of compliance, and a schedule under
which the permittee will submit progress re-
ports to the permitting authority no less fre-
quently than every 6 months.
(2) The regulations shall further require the
permittee to periodically (but no less frequently
than annually) certify that the facility is in
compliance with any applicable requirements of
the permit, and to promptly report any devi-
ations from permit requirements to the permit-
ting authority.
(c) Deadline
Any person required to have a permit shall,
not later than 12 months after the date on which
the source becomes subject to a permit program
approved or promulgated under this subchapter,
or such earlier date as the permitting authority
may establish, submit to the permitting author-
ity a compliance plan and an application for a
permit signed by a responsible official, who shall
certify the accuracy of the information sub-
mitted. The permitting authority shall approve
or disapprove a completed application (con-
sistent with the procedures established under
this subchapter for consideration of such appli-
cations), and shall issue or deny the permit,
within 18 months after the date of receipt there-
of, except that the permitting authority shall
establish a phased schedule for acting on permit
applications submitted within the first full year
after the effective date of a permit program (or
a partial or interim program). Any such sched-
ule shall assure that at least one-third of such
permits will be acted on by such authority annu-
ally over a period of not to exceed 3 years after
such effective date. Such authority shall estab-
lish reasonable procedures to prioritize such ap-
proval or disapproval actions in the case of ap-
plications for construction or modification
under the applicable requirements of this chap-
ter.
(d) Timely and complete applications
Except for sources required to have a permit
before construction or modification under the
applicable requirements of this chapter, if an ap-
plicant has submitted a timely and complete ap-
plication for a permit required by this sub-
chapter (including renewals), but final action
has not been taken on such application, the
source’s failure to have a permit shall not be a
violation of this chapter, unless the delay in
final action was due to the failure of the appli-
cant timely to submit information required or
requested to process the application. No source
required to have a permit under this subchapter
shall be in violation of section 7661a(a) of this
title before the date on which the source is re-
quired to submit an application under sub-
section (c).
(e) Copies; availability
A copy of each permit application, compliance
plan (including the schedule of compliance),
emissions or compliance monitoring report, cer-
tification, and each permit issued under this
subchapter, shall be available to the public. If
an applicant or permittee is required to submit
information entitled to protection from disclo-
sure under section 7414(c) of this title, the appli-
cant or permittee may submit such information
separately. The requirements of section 7414(c)
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Violations** After the effective date of any permit program approved or promulgated under this subchapter, it shall be unlawful for any person to violate any requirement of a permit issued under this subchapter, or to operate an affected source (as provided in subchapter IV–A), a major source, any other source (including an area source) subject to standards or regulations under section 7411 or 7412 of this title, any other source required to have a permit under parts 11 So in original. Probably should be “part”. C or D of subchapter I, or any other stationary source in a category designated (in whole or in part) by regulations promulgated by the Administrator (after notice and public comment) which shall include a finding setting forth the basis for such designation, except in compliance with a permit issued by a permitting authority under this subchapter. (Nothing in this subsection shall be construed to alter the applicable requirements of this chapter that a permit be obtained before construction or modification.) The Administrator may, in the Administrator’s discretion and consistent with the applicable provisions of this chapter, promulgate regulations to exempt one or more source categories (in whole or in part) from the requirements of this subsection if the Administrator finds that compliance with such requirements is impracticable, infeasible, or unnecessarily burdensome on such categories, except that the Administrator may not exempt any major source from such requirements.
**(b) Regulations** The Administrator shall promulgate within 12 months after November 15, 1990, regulations establishing the minimum elements of a permit program to be administered by any air pollution control agency. These elements shall include each of the following:
(1) Requirem
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7661a
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.