Browse Arkansas Code titles and sections
42 U.S.C. § 7651h — Repowered sources
Federal law — U.S. Code and appendices · legal_authorities
Page 7433
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651h
for the affected source. The provisions of section
558(c) of title 5 (relating to renewals) shall apply
to permits issued by a permitting authority
under this subchapter and subchapter V.
(4) The permit issued in accordance with this
subsection for an affected source shall provide
that the affected units at the affected source
may not emit an annual tonnage of sulfur diox-
ide in excess of the number of allowances to
emit sulfur dioxide the owner or operator or des-
ignated representative hold for the unit.
(e) New units
The owner or operator of each source that in-
cludes a new electric utility steam generating
unit shall submit a permit application and com-
pliance plan to the permitting authority not
later than 24 months before the later of (1) Janu-
ary 1, 2000, or (2) the date on which the unit
commences operation. The permitting authority
shall issue a permit to the owner or operator, or
the designated representative thereof, of the
unit that satisfies the requirements of sub-
chapter V and this subchapter.
(f) Units subject to certain other limits
The owner or operator, or designated rep-
resentative thereof, of any unit subject to an
emission rate requirement under section 7651f of
this title shall submit a permit application and
compliance plan for such unit to the permitting
authority, not later than January 1, 1998. The
permitting authority shall issue a permit to the
owner or operator that satisfies the require-
ments of subchapter V and this subchapter, in-
cluding any appropriate monitoring and report-
ing requirements.
(g) Amendment of application and compliance
plan
At any time after the submission of an appli-
cation and compliance plan under this section,
the applican
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7651h
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: f7a69239a29e616c125ed30b39b9e05444195261c4b897a48d2b56779b020f5a. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-3647425a5bd99f29a9778b52
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-7651h-repowered-sources--b91d2b6823.md
Pages: Not recorded – Not recorded
Passage SHA-256: 4fac5b687928bd07005adb3ddb01bd85e0adbba084bc57177306318f5679e1e4
Source location: USCODE-2024-title42-chap85-subchapIV-A-sec7651h.pdf
Stored source content
Page 7433
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651h
for the affected source. The provisions of section
558(c) of title 5 (relating to renewals) shall apply
to permits issued by a permitting authority
under this subchapter and subchapter V.
(4) The permit issued in accordance with this
subsection for an affected source shall provide
that the affected units at the affected source
may not emit an annual tonnage of sulfur diox-
ide in excess of the number of allowances to
emit sulfur dioxide the owner or operator or des-
ignated representative hold for the unit.
(e) New units
The owner or operator of each source that in-
cludes a new electric utility steam generating
unit shall submit a permit application and com-
pliance plan to the permitting authority not
later than 24 months before the later of (1) Janu-
ary 1, 2000, or (2) the date on which the unit
commences operation. The permitting authority
shall issue a permit to the owner or operator, or
the designated representative thereof, of the
unit that satisfies the requirements of sub-
chapter V and this subchapter.
(f) Units subject to certain other limits
The owner or operator, or designated rep-
resentative thereof, of any unit subject to an
emission rate requirement under section 7651f of
this title shall submit a permit application and
compliance plan for such unit to the permitting
authority, not later than January 1, 1998. The
permitting authority shall issue a permit to the
owner or operator that satisfies the require-
ments of subchapter V and this subchapter, in-
cluding any appropriate monitoring and report-
ing requirements.
(g) Amendment of application and compliance
plan
At any time after the submission of an appli-
cation and compliance plan under this section,
the applicant may submit a revised application
and compliance plan, in accordance with the re-
quirements of this section. In considering any
permit application and compliance plan under
this subchapter, the permitting authority shall
ensure coordination with the applicable electric
ratemaking authority, in the case of regulated
utilities, and with unregulated public utilities.
(h) Prohibition
(1) It shall be unlawful for an owner or oper-
ator, or designated representative, required to
submit a permit application or compliance plan
under this subchapter to fail to submit such ap-
plication or plan in accordance with the dead-
lines specified in this section or to otherwise fail
to comply with regulations implementing this
section.
(2) It shall be unlawful for any person to oper-
ate any source subject to this subchapter except
in compliance with the terms and requirements
of a permit application and compliance plan (in-
cluding amendments thereto) or permit issued
by the Administrator or a State with an ap-
proved permit program. For purposes of this
subsection, compliance, as provided in section
7661c(f) of this title, with a permit issued under
subchapter V which complies with this sub-
chapter for sources subject to this subchapter
shall be deemed compliance with this subsection
as well as section 7661a(a) of this title.
(3) In order to ensure reliability of electric
power, nothing in this subchapter or subchapter
V shall be construed as requiring termination of
operations of an electric utility steam gener-
ating unit for failure to have an approved per-
mit or compliance plan, except that any such
unit may be subject to the applicable enforce-
ment provisions of section 7413 of this title.
(i) Multiple owners
No permit shall be issued under this section to
an affected unit until the designated representa-
tive of the owners or operators has filed a cer-
tificate of representation with regard to matters
under this subchapter, including the holding and
distribution of allowances and the proceeds of
transactions involving allowances. Where there
are multiple holders of a legal or equitable title
to, or a leasehold interest in, such a unit, or
where a utility or industrial customer purchases
power from an affected unit (or units) under life-
of-the-unit, firm power contractual arrange-
ments, the certificate shall state (1) that allow-
ances and the proceeds of transactions involving
allowances will be deemed to be held or distrib-
uted in proportion to each holder’s legal, equi-
table, leasehold, or contractual reservation or
entitlement, or (2) if such multiple holders have
expressly provided for a different distribution of
allowances by contract, that allowances and the
proceeds of transactions involving allowances
will be deemed to be held or distributed in ac-
cordance with the contract. A passive lessor, or
a person who has an equitable interest through
such lessor, whose rental payments are not
based, either directly or indirectly, upon the
revenues or income from the affected unit shall
not be deemed to be a holder of a legal, equi-
table, leasehold, or contractual interest for the
purpose of holding or distributing allowances as
provided in this subsection, during either the
term of such leasehold or thereafter, unless ex-
pressly provided for in the leasehold agreement.
Except as otherwise provided in this subsection,
where all legal or equitable title to or interest
in an affected unit is held by a single person, the
certification shall state that all allowances re-
ceived by the unit are deemed to be held for that
person.
(July 14, 1955, ch. 360, title IV, § 408, as added
Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104
Stat. 2616.)
§ 7651h. Repowered sources
(a) Availability
Not later than December 31, 1997, the owner or
operator of an existing unit subject to the emis-
sions limitation requirements of section 7651d(b)
and (c) of this title may demonstrate to the per-
mitting authority that one or more units will be
repowered with a qualifying clean coal tech-
nology to comply with the requirements under
section 7651d of this title. The owner or operator
shall, as part of any such demonstration, pro-
vide, not later than January 1, 2000, satisfactory
documentation of a preliminary design and engi-
neering effort for such repowering and an exe-
cuted and binding contract for the majority of
the equipment to repower such unit and such
other information as the Administrator may re-
Page 7434
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651i
1 So in original. Probably should be section ‘‘7651a(12)’’.
2 So in original. Probably should be ‘‘this’’.
quire by regulation. The replacement of an ex-
isting utility unit with a new utility unit using
a repowering technology referred to in section
7651a(2) 1 of this title which is located at a dif-
ferent site, shall be treated as repowering of the
existing unit for purposes of this subchapter, if—
(1) the replacement unit is designated by the
owner or operator to replace such existing
unit, and
(2) the existing unit is retired from service
on or before the date on which the designated
replacement unit enters commercial oper-
ation.
(b) Extension
(1) An owner or operator satisfying the re-
quirements of subsection (a) shall be granted an
extension of the emission limitation require-
ment compliance date for that unit from Janu-
ary 1, 2000, to December 31, 2003. The extension
shall be specified in the permit issued to the
source under section 7651g of this title, together
with any compliance schedule and other require-
ments necessary to meet second phase require-
ments by the extended date. Any unit that is
granted an extension under this section shall
not be eligible for a waiver under section 7411(j)
of this title, and shall continue to be subject to
requirements under this subchapter as if it were
a unit subject to section 7651d of this title.
(2) If (A) the owner or operator of an existing
unit has been granted an extension under para-
graph (1) in order to repower such unit with a
clean coal unit, and (B) such owner or operator
demonstrates to the satisfaction of the Adminis-
trator that the repowering technology to be uti-
lized by such unit has been properly constructed
and tested on such unit, but nevertheless has
been unable to achieve the emission reduction
limitations and is economically or techno-
logically infeasible, such existing unit may be
retrofitted or repowered with equipment or fa-
cilities utilizing another clean coal technology
or other available control technology.
(c) Allowances
(1) For the period of the extension under this
section, the Administrator shall allocate to the
owner or operator of the affected unit, annual
allowances for sulfur dioxide equal to the af-
fected unit’s baseline multiplied by the lesser of
the unit’s federally approved State Implementa-
tion Plan emissions limitation or its actual
emission rate for 1995 in lieu of any other alloca-
tion. Such allowances may not be transferred or
used by any other source to meet emission re-
quirements under this subchapter. The source
owner or operator shall notify the Adminis-
trator sixty days in advance of the date on
which the affected unit for which the extension
has been granted is to be removed from oper-
ation to install the repowering technology.
(2) Effective on that date, the unit shall be
subject to the requirements of section 7651d of
this title. Allowances for the year in which the
unit is removed from operation to install the
repowering technology shall be calculated as the
product of the unit’s baseline multiplied by 1.20
lbs/mmBtu, divided by 2,000, and prorated ac-
cordingly, and are transferable.
(3) Allowances for such existing utility units
for calendar years after the year the repowering
is complete shall be calculated as the product of
the existing unit’s baseline multiplied by 1.20
lbs/mmBtu, divided by 2,000.
(4) Notwithstanding the provisions of section
7651b(a) and (e) of this title, allowances shall be
allocated under this section for a designated re-
placement unit which replaces an existing unit
(as provided in the last sentence of subsection
(a)) in lieu of any further allocations of allow-
ances for the existing unit.
(5) For the purpose of meeting the aggregate
emissions limitation requirement set forth in
section 7651b(a)(1) of this title, the units with an
extension under this subsection shall be treated
in each calendar year during the extension pe-
riod as holding allowances allocated under para-
graph (3).
(d) Control requirements
Any unit qualifying for an extension under
this section that does not increase actual hourly
emissions for any pollutant regulated under
the 2 chapter shall not be subject to any stand-
ard of performance under section 7411 of this
title. Notwithstanding the provisions of this
subsection, no new unit (1) designated as a re-
placement for an existing unit, (2) qualifying for
the extension under subsection (b), and (3) lo-
cated at a different site than the existing unit
shall receive an exemption from the require-
ments imposed under section 7411 of this title.
(e) Expedited permitting
State permitting authorities and, where appli-
cable, the Administrator, are encouraged to give
expedited consideration to permit applications
under parts C and D of subchapter I of this chap-
ter for any source qualifying for an extension
under this section.
(f) Prohibition
It shall be unlawful for the owner or operator
of a repowered source to fail to comply with the
requirement of this section, or any regulations
of permit requirements to implement this sec-
tion, including the prohibition against emitting
sulfur dioxide in excess of allowances held.
(July 14, 1955, ch. 360, title IV, § 409, as added
Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104
Stat. 2619.)
§ 7651i. Election for additional sources
(a) Applicability
The owner or operator of any unit that is not,
nor will become, an affected unit under section
7651b(e), 7651c, or 7651d of this title, or that is a
process source under subsection (d), that emits
sulfur dioxide, may elect to designate that unit
or source to become an affected unit and to re-
ceive allowances under this subchapter. An elec-
tion shall be submitted to the Administrator for
approval, along with a permit application and
proposed compliance plan in accordance with
section 7651g of this title. The Administrator
shall approve a designation that meets the re-
quirements of this section, and such designated
unit, or source, shall be allocated allowances,
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Availability** Not later than December 31, 1997, the owner or operator of an existing unit subject to the emissions limitation requirements of section 7651d(b) and (c) of this title may demonstrate to the permitting authority that one or more units will be repowered with a qualifying clean coal technology to comply with the requirements under [section 7651d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651d&num=0&edition=prelim). The owner or operator shall, as part of any such demonstration, provide, not later than January 1, 2000, satisfactory documentation of a preliminary design and engineering effort for such repowering and an executed and binding contract for the majority of the equipment to repower such unit and such other information as the Administrator may require by regulation. The replacement of an existing utility unit with a new utility unit using a repowering technology referred to in section 7651a(2) 11 So in original. Probably should be section “7651a(12)”. of this title which is located at a different site, shall be treated as repowering of the existing unit for purposes of this subchapter, if—
(1) the replacement unit is designated by the owner or operator to replace such existing unit, and
(2) the existing unit is retired from service on or before the date on which the designated replacement unit enters commercial operation.
**(b) Extension**
(1) An owner or operator satisfying the requirements of subsection (a) shall be granted an extension of the emission limitation requirement compliance date for that unit from January 1, 2000, to December 31, 2003. The extension shall be specified in the permit issued to the source under [section 7651g of this title](https://uscode.house.gov/view.xhtml?req=g
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7651h
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.