Browse Arkansas Code titles and sections
30 U.S.C. § 28 — Mining district regulations by miners: loca-
Federal law — U.S. Code and appendices · legal_authorities
Page 10
TITLE 30—MINERAL LANDS AND MINING
§ 28
§ 28. Mining district regulations by miners: loca-
tion, recordation, and amount of work; mark-
ing of location on ground; records; annual
labor or improvements on claims pending
issue of patent; co-owner’s succession in in-
terest upon delinquency in contributing pro-
portion of expenditures; tunnel as lode ex-
penditure
The miners of each mining district may make
regulations not in conflict with the laws of the
United States, or with the laws of the State or
Territory in which the district is situated, gov-
erning the location, manner of recording,
amount of work necessary to hold possession of
a mining claim, subject to the following require-
ments: The location must be distinctly marked
on the ground so that its boundaries can be
readily traced. All records of mining claims
made after May 10, 1872, shall contain the name
or names of the locators, the date of the loca-
tion, and such a description of the claim or
claims located by reference to some natural ob-
ject or permanent monument as will identify
the claim. On each claim located after the 10th
day of May 1872, that is granted a waiver under
section 28f of this title, and until a patent has
been issued therefor, not less than $100 worth of
labor shall be performed or improvements made
during each year. On all claims located prior to
the 10th day of May 1872, $10 worth of labor shall
be performed or improvements made each year,
for each one hundred feet in length along the
vein until a patent has been issued therefor; but
where such claims are held in common, such ex-
penditure may be made upon any one claim; and
upon a failure to comply with these conditions,
the claim or mine upon which such failure oc-
curred shall be open to relocation
Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 28
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: ee83a592a9113f5efc2f8b07d06ad3e0dbbea5b82ec07eefff17be202aacbc61. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-364713526db82e6e5925f7f9
Source file: Laws/federal/codes/united-states-code-2024/title-30/section-28-mining-district-regulations-by-miners-loca--3b15243de3.md
Pages: Not recorded – Not recorded
Passage SHA-256: 419c961337f732264a71c14706d0ccfbf2dcd6bbb5739f35f423457a3090b8fc
Source location: USCODE-2024-title30-chap2-sec28.pdf
Stored source content
Page 10
TITLE 30—MINERAL LANDS AND MINING
§ 28
§ 28. Mining district regulations by miners: loca-
tion, recordation, and amount of work; mark-
ing of location on ground; records; annual
labor or improvements on claims pending
issue of patent; co-owner’s succession in in-
terest upon delinquency in contributing pro-
portion of expenditures; tunnel as lode ex-
penditure
The miners of each mining district may make
regulations not in conflict with the laws of the
United States, or with the laws of the State or
Territory in which the district is situated, gov-
erning the location, manner of recording,
amount of work necessary to hold possession of
a mining claim, subject to the following require-
ments: The location must be distinctly marked
on the ground so that its boundaries can be
readily traced. All records of mining claims
made after May 10, 1872, shall contain the name
or names of the locators, the date of the loca-
tion, and such a description of the claim or
claims located by reference to some natural ob-
ject or permanent monument as will identify
the claim. On each claim located after the 10th
day of May 1872, that is granted a waiver under
section 28f of this title, and until a patent has
been issued therefor, not less than $100 worth of
labor shall be performed or improvements made
during each year. On all claims located prior to
the 10th day of May 1872, $10 worth of labor shall
be performed or improvements made each year,
for each one hundred feet in length along the
vein until a patent has been issued therefor; but
where such claims are held in common, such ex-
penditure may be made upon any one claim; and
upon a failure to comply with these conditions,
the claim or mine upon which such failure oc-
curred shall be open to relocation in the same
manner as if no location of the same had ever
been made, provided that the original locators,
their heirs, assigns, or legal representatives,
have not resumed work upon the claim after
failure and before such location. Upon the fail-
ure of any one of several coowners to contribute
his proportion of the expenditures required here-
by, the coowners who have performed the labor
or made the improvements may, at the expira-
tion of the year, give such delinquent co-owner
personal notice in writing or notice by publica-
tion in the newspaper published nearest the
claim, for at least once a week for ninety days,
and if at the expiration of ninety days after such
notice in writing or by publication such delin-
quent should fail or refuse to contribute his pro-
portion of the expenditure required by this sec-
tion, his interest in the claim shall become the
property of his co-owners who have made the re-
quired expenditures. The period within which
the work required to be done annually on all
unpatented mineral claims located since May 10,
1872, including such claims in the Territory of
Alaska, shall commence at 12:01 ante meridian
on the first day of September succeeding the
date of location of such claim.
Where a person or company has or may run a
tunnel for the purposes of developing a lode or
lodes, owned by said person or company, the
money so expended in said tunnel shall be taken
and considered as expended on said lode or lodes,
whether located prior to or since May 10, 1872;
and such person or company shall not be re-
quired to perform work on the surface of said
lode or lodes in order to hold the same as re-
quired by this section. On all such valid claims
the annual period ending December 31, 1921,
shall continue to 12 o’clock meridian July 1,
1922.
(R.S. § 2324; Feb. 11, 1875, ch. 41, 18 Stat. 315; Jan.
22, 1880, ch. 9, § 2, 21 Stat. 61; Aug. 24, 1921, ch. 84,
42 Stat. 186; Pub. L. 85–736, § 1, Aug. 23, 1958, 72
Stat. 829; Pub. L. 103–66, title X, § 10105(b), Aug.
10, 1993, 107 Stat. 406; Pub. L. 110–161, div. F, title
I, (1), Dec. 26, 2007, 121 Stat. 2101.)
Editorial Notes
CODIFICATION
R.S. § 2324 derived from act May 10, 1872, ch. 152, § 5,
17 Stat. 92.
Pub. L. 110–161, which directed the amendment of sec-
tion 28 of title 30, United States Code, ‘‘in section 28’’,
was executed by making the amendment to R.S. § 2324,
which is classified to this section, to reflect the prob-
able intent of Congress. See 2007 Amendment note
below.
AMENDMENTS
2007—Pub. L. 110–161 substituted ‘‘shall commence at
12:01 ante meridian on the first day of September’’ for
‘‘shall commence at 12 o’clock meridian on the 1st day
of September’’. See Codification note above.
1993—Pub. L. 103–66 inserted ‘‘that is granted a waiver
under section 28f of this title,’’ after ‘‘On each claim lo-
cated after the 10th day of May 1872,’’.
1958—Pub. L. 85–736 changed period for doing annual
assessment work on unpatented mineral claims, sub-
stituting ‘‘1st day of September’’ for ‘‘1st day of July’’.
Statutory Notes and Related Subsidiaries
ASSESSMENT WORK YEARS, 1957–58 AND 1958–59
Pub. L. 85–736, § 2, Aug. 23, 1958, 72 Stat. 829, provided
that the period commencing in 1957 for the performance
of annual assessment work under this section shall end
at 12 o’clock meridian on the 1st day of July 1958, and
the period commencing in 1958 for the performance of
such annual assessment work shall commence at 12
o’clock meridian on the 1st day of July 1958, and shall
continue to 12 o’clock meridian on Sept. 1, 1959.
Executive Documents
ADMISSION OF ALASKA AS STATE
Admission of Alaska into the Union was accom-
plished Jan. 3, 1959, on issuance of Proc. No. 3269, Jan.
3, 1959, 24 F.R. 81, 73 Stat. c16, as required by sections
1 and 8(c) of Pub. L. 85–508, July 7, 1958, 72 Stat. 339, set
out as notes preceding section 21 of Title 48, Territories
and Insular Possessions.
§ 28–1. Inclusion of certain surveys in labor re-
quirements of mining claims; conditions and
restrictions
The term ‘‘labor’’, as used in the third sen-
tence of section 28 of this title, shall include,
without being limited to, geological, geo-
chemical and geophysical surveys conducted by
qualified experts and verified by a detailed re-
port filed in the county office in which the claim
is located which sets forth fully (a) the location
of the work performed in relation to the point of
discovery and boundaries of the claim, (b) the
nature, extent, and cost thereof, (c) the basic
findings therefrom, and (d) the name, address,
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
The miners of each mining district may make regulations not in conflict with the laws of the United States, or with the laws of the State or Territory in which the district is situated, governing the location, manner of recording, amount of work necessary to hold possession of a mining claim, subject to the following requirements: The location must be distinctly marked on the ground so that its boundaries can be readily traced. All records of mining claims made after May 10, 1872, shall contain the name or names of the locators, the date of the location, and such a description of the claim or claims located by reference to some natural object or permanent monument as will identify the claim. On each claim located after the 10th day of May 1872, that is granted a waiver under [section 28f of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section28f&num=0&edition=prelim), and until a patent has been issued therefor, not less than $100 worth of labor shall be performed or improvements made during each year. On all claims located prior to the 10th day of May 1872, $10 worth of labor shall be performed or improvements made each year, for each one hundred feet in length along the vein until a patent has been issued therefor; but where such claims are held in common, such expenditure may be made upon any one claim; and upon a failure to comply with these conditions, the claim or mine upon which such failure occurred shall be open to relocation in the same manner as if no location of the same had ever been made, provided that the original locators, their heirs, assigns, or legal representatives, have not resumed work upon the claim after failure and before such location. Upon the failure of any one of several coowners to contribute his proporti
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 28
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.