TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 8303
which paragraph (1) applied during the annual
period ending with the calendar month pre-
ceding the date of such report; and
(B) the amount, quality, and point of deliv-
ery by the pipeline to such person of the nat-
ural gas covered by paragraph (1) which is used
by the person during such annual period.
(3) Repealed. Pub. L. 100–42, § 1(c)(2)(H), May
21, 1987, 101 Stat. 310.
(4) For purposes of this subsection, the term
‘‘pipeline’’ means any interstate or intrastate
pipeline or local distribution company.
(Pub. L. 95–620, title I, § 103, Nov. 9, 1978, 92 Stat.
3292; Pub. L. 100–42, § 1(c)(2), May 21, 1987, 101
Stat. 310.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in subsecs. (a) and (b)(1), was
in the original ‘‘this Act’’, meaning Pub. L. 95–620, Nov.
9, 1978, 92 Stat. 3289, known as the Powerplant and In-
dustrial Fuel Use Act of 1978, which is classified prin-
cipally to this chapter. For complete classification of
this Act to the Code, see Short Title note set out under
section 8301 of this title and Tables.
The Clean Air Act, referred to in subsec. (a)(17)(B), is
act July 14, 1955, ch. 360, 69 Stat. 322, which is classified
generally to chapter 85 (§ 7401 et seq.) of this title. For
complete classification of this Act to the Code, see
Short Title note set out under section 7401 of this title
and Tables.
The Federal Water Pollution Control Act, referred to
in subsec. (a)(17)(B), is act June 30, 1948, ch. 758, as
amended generally by Pub. L. 92–500, § 2, Oct. 18, 1972, 86
Stat. 816, which is classified generally to chapter 26
(§ 1251 et seq.) of Title 33, Navigation and Navigable Wa-
ters. For complete classification of this Act to the
Code, see Short Title note s
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 8311
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 6e4b71a811c43849ab44fa6c564fdeae3e1eab1086a1b884873a1a7bd3d3b2a5. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-2ed2f79575a9b023a03b7bd4
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-8311-coal-capability-of-new-electric-power--1262a0fe14.md
Pages: Not recorded – Not recorded
Passage SHA-256: e4fcc97d4cfb9a5ed296207395187ef469daa33a4ae6a8f4ea2a252a83b2fb21
Source location: USCODE-2024-title42-chap92-subchapII-partA-sec8311.pdf
Stored source content
Page 7588
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 8303
which paragraph (1) applied during the annual
period ending with the calendar month pre-
ceding the date of such report; and
(B) the amount, quality, and point of deliv-
ery by the pipeline to such person of the nat-
ural gas covered by paragraph (1) which is used
by the person during such annual period.
(3) Repealed. Pub. L. 100–42, § 1(c)(2)(H), May
21, 1987, 101 Stat. 310.
(4) For purposes of this subsection, the term
‘‘pipeline’’ means any interstate or intrastate
pipeline or local distribution company.
(Pub. L. 95–620, title I, § 103, Nov. 9, 1978, 92 Stat.
3292; Pub. L. 100–42, § 1(c)(2), May 21, 1987, 101
Stat. 310.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in subsecs. (a) and (b)(1), was
in the original ‘‘this Act’’, meaning Pub. L. 95–620, Nov.
9, 1978, 92 Stat. 3289, known as the Powerplant and In-
dustrial Fuel Use Act of 1978, which is classified prin-
cipally to this chapter. For complete classification of
this Act to the Code, see Short Title note set out under
section 8301 of this title and Tables.
The Clean Air Act, referred to in subsec. (a)(17)(B), is
act July 14, 1955, ch. 360, 69 Stat. 322, which is classified
generally to chapter 85 (§ 7401 et seq.) of this title. For
complete classification of this Act to the Code, see
Short Title note set out under section 7401 of this title
and Tables.
The Federal Water Pollution Control Act, referred to
in subsec. (a)(17)(B), is act June 30, 1948, ch. 758, as
amended generally by Pub. L. 92–500, § 2, Oct. 18, 1972, 86
Stat. 816, which is classified generally to chapter 26
(§ 1251 et seq.) of Title 33, Navigation and Navigable Wa-
ters. For complete classification of this Act to the
Code, see Short Title note set out under section 1251 of
Title 33 and Tables.
The Solid Waste Disposal Act, referred to in subsec.
(a)(17)(B), is title II of Pub. L. 89–272, Oct. 20, 1965, 79
Stat. 997, as amended generally by Pub. L. 94–580, § 2,
Oct. 21, 1976, 90 Stat. 2795, which is classified generally
to chapter 82 (§ 6901 et seq.) of this title. For complete
classification of this Act to the Code, see Short Title
note set out under section 6901 of this title and Tables.
The National Environmental Policy Act of 1969, re-
ferred to in subsec. (a)(17)(B), is Pub. L. 91–190, Jan. 1,
1970, 83 Stat. 852, which is classified generally to chap-
ter 55 (§ 4321 et seq.) of this title. For complete classi-
fication of this Act to the Code, see Short Title note
set out under section 4321 of this title and Tables.
AMENDMENTS
1987—Subsec. (a)(13)(B)(ii). Pub. L. 100–42, § 1(c)(2)(A),
inserted ‘‘and’’ at end of subcl. (I), substituted period
for ‘‘; or’’ at end of subcl. (II), and struck out subcl.
(III) which read as follows: ‘‘in the case of a major fuel-
burning installation, without incurring significant
operational detriment of the unit (as determined by the
Secretary).’’
Subsec. (a)(15). Pub. L. 100–42, § 1(c)(2)(B), struck out
‘‘or major fuel-burning installation’’ after ‘‘electric
powerplant’’.
Subsec. (a)(16). Pub. L. 100–42, § 1(c)(2)(C), struck out
‘‘or installation’’ after ‘‘any powerplant’’ in introduc-
tory provisions and after ‘‘such powerplant’’ in intro-
ductory provisions and subpar. (D).
Subsec. (a)(19). Pub. L. 100–42, § 1(c)(2)(D), struck out
‘‘or a major fuel-burning installation’’ after ‘‘electric
powerplant’’.
Subsec. (a)(20). Pub. L. 100–42, § 1(c)(2)(E), struck out
‘‘or major fuel-burning installation’’ after ‘‘life of an
electric powerplant’’.
Subsec. (b)(1). Pub. L. 100–42, § 1(c)(2)(F), struck out
‘‘or major fuel-burning installation’’ after ‘‘used by a
powerplant’’ in introductory provisions.
Subsec. (b)(1)(D). Pub. L. 100–42, § 1(c)(2)(G), sub-
stituted a period for ‘‘, except that for purposes of the
prohibition under section 8311(2) of this title against
powerplants being constructed without the capability
of using coal or another alternate fuel, only permits, li-
censes, and approvals for the construction of such syn-
thetic gas facilities shall be required under this sub-
paragraph to be certified and documented.’’
Subsec. (b)(2). Pub. L. 100–42, § 1(c)(2)(F), struck out
‘‘or major fuel-burning installation’’ after ‘‘by any
powerplant’’ in introductory provisions.
Subsec. (b)(3). Pub. L. 100–42, § 1(c)(2)(H), struck out
par. (3) which read as follows: ‘‘In the case of any boiler
subject to a prohibition under section 8371 of this title,
the preceding provisions of this subsection shall apply
with respect to such boiler to the same extent and in
the same manner as they apply in the case of major
fuel-burning installations.’’
Executive Documents
TRANSFER OF FUNCTIONS
For transfer of certain functions from Nuclear Regu-
latory Commission to Chairman thereof, see Reorg.
Plan No. 1 of 1980, 45 F.R. 40561, 94 Stat. 3585, set out as
a note under section 5841 of this title.
§ 8303. Territorial application
The provisions of this chapter shall only apply
within the contiguous 48 States and the District
of Columbia.
(Pub. L. 95–620, title I, § 104, Nov. 9, 1978, 92 Stat.
3298; Pub. L. 100–42, § 1(c)(3), May 21, 1987, 101
Stat. 311.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in text, was in the original
‘‘this Act’’, meaning Pub. L. 95–620, Nov. 9, 1978, 92 Stat.
3289, known as the Powerplant and Industrial Fuel Use
Act of 1978, which is classified principally to this chap-
ter. For complete classification of this Act to the Code,
see Short Title note set out under section 8301 of this
title and Tables.
AMENDMENTS
1987—Pub. L. 100–42 amended section generally. Prior
to amendment, section read as follows: ‘‘The provisions
of this chapter shall apply in all the States, Puerto
Rico, and the territories and possessions of the United
States, except that—
‘‘(1) the provisions of subchapters II and III of this
chapter (other than section 8341 of this title) shall
only apply to powerplants and installations situated
within the contiguous 48 States, Alaska, and the Dis-
trict of Columbia; and
‘‘(2) the provisions of section 8341 of this title shall
only apply to powerplants situated within the contig-
uous 48 States and the District of Columbia.’’
SUBCHAPTER II—NEW FACILITIES
PART A—PROHIBITIONS
§ 8311. Coal capability of new electric power-
plants; certification of compliance
(a) General prohibition
Except to such extent as may be authorized
under part B, no new electric powerplant may be
constructed or operated as a base load power-
plant without the capability to use coal or an-
other alternate fuel as a primary energy source.
(b) Capability to use coal or alternate fuel
An electric powerplant has the capability to
use coal or another alternate fuel for purposes of
this section if such electric powerplant—
Page 7589
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 8321
1 So in original. Probably should be ‘‘not’’.
(1) has sufficient inherent design character-
istics to permit the addition of equipment (in-
cluding all necessary pollution devices) nec-
essary to render such electric powerplant ca-
pable of using coal or another alternate fuel as
its primary energy source; and
(2) is not physically, structurally, or techno-
logically precluded from using coal or another
alternate fuel as its primary energy source.
Capability to use coal or another alternate fuel
shall not be interpreted to require any such pow-
erplant to be immediately able to use coal or an-
other alternate fuel as its primary energy
source on its initial day of operation.
(c) Applicability to base load powerplants
(1) This section shall apply only to base load
powerplants, and shall not apply to peakload
powerplants or intermediate load powerplants.
(2) For the purposes of this section, hours of
electrical generation pursuant to emergency sit-
uations, as defined by the Secretary and re-
ported to the Secretary, shall not be included in
a determination of whether a powerplant is
being operated as a base load powerplant.
(d) Self-certification
(1) In order to meet the requirement of sub-
section (a), the owner or operator of any new
electric powerplant to be operated as a base load
powerplant proposing to use natural gas or pe-
troleum as its primary energy source shall cer-
tify to the Secretary prior to construction, or
prior to operation as a base load powerplant in
the case of a new electric powerplant operated
as a peakload powerplant or intermediate load
powerplant, that such powerplant has capability
to use coal or another alternate fuel, within the
meaning of subsection (b). Such certification
shall be effective to establish compliance with
the requirement of subsection (a) as of the date
it is filed with the Secretary. Within 15 days
after receipt of a certification submitted pursu-
ant to this paragraph, the Secretary shall pub-
lish in the Federal Register a notice reciting
that the certification has been filed.
(2) The Secretary, within 60 days after the fil-
ing of a certification under paragraph (1), may
require the owner or operator of such power-
plant to provide such supporting documents as
may be necessary to verify the certification.
(Pub. L. 95–620, title II, § 201, Nov. 9, 1978, 92 Stat.
3298; Pub. L. 100–42, § 1(c)(4)(A), May 21, 1987, 101
Stat. 311.)
Editorial Notes
AMENDMENTS
1987—Pub. L. 100–42 substituted ‘‘Coal capability of
new electric powerplants; certification of compliance’’
for ‘‘New electric powerplants’’ in section catchline and
amended text generally. Prior to amendment, text read
as follows: ‘‘Except to such extent as may be author-
ized under part B—
‘‘(1) natural gas or petroleum shall not be used as
a primary energy source in any new electric power-
plant; and
‘‘(2) no new electric powerplant may be constructed
without the capability to use coal or any other alter-
nate fuel as a primary energy source.’’
§ 8312. Repealed. Pub. L. 100–42, § 1(a)(1), May 21,
1987, 101 Stat. 310
Section, Pub. L. 95–620, title II, § 202, Nov. 9, 1978, 92
Stat. 3298, prohibited, except to extent authorized
under part B, use of natural gas or petroleum as pri-
mary energy source in new major fuel-burning installa-
tion consisting of a boiler, and authorized Secretary to
prohibit nonboilers from using natural gas or petro-
leum.
PART B—EXEMPTIONS
§ 8321. Temporary exemptions
(a) General exemption due to lack of alternate
fuel supply, site limitations, or environ-
mental requirements
After consideration of a petition (and com-
ments thereon) for an exemption for a power-
plant from the prohibitions of part A, the Sec-
retary shall, by order, grant an exemption under
this subsection for the use of natural gas or pe-
troleum, if he finds that the petitioner has dem-
onstrated that for the period of the proposed ex-
emption, despite diligent good faith efforts—
(1) it is likely that an adequate and reliable
supply of coal or other alternate fuel of the
quality necessary to conform with design and
operational requirements for use as a primary
energy source will not be available to such
powerplant at a cost (taking into account as-
sociated facilities for the transportation and
use of such fuel) which, based upon the best
practicable estimates, does not substantially
exceed the cost, as determined by rule by the
Secretary, of the fuel that would be used as a
primary energy source;
(2) one or more site limitations exist which
would ot 1 permit the location or operation of
such a powerplant using coal or any other al-
ternate fuel as a primary energy source; or
(3) the prohibitions of section 8311 of this
title could not be satisfied without violating
applicable environmental requirements.
(b) Temporary exemption based upon future use
of synthetic fuels
After consideration of a petition (and com-
ments thereon) for an exemption for a power-
plant from the prohibitions of part A, the Sec-
retary shall, by order, grant an exemption under
this subsection for the use of natural gas or pe-
troleum, if he finds that the petitioner has dem-
onstrated that—
(1) the petitioner will comply with the prohi-
bitions of part A by the end of the proposed ex-
emption by the use of a synthetic fuel derived
from coal or another alternate fuel; and
(2) the petitioner is not able to comply with
such prohibitions by the use of such synthetic
fuel until the end of the proposed exemption.
The effectiveness of an exemption under this
subsection is conditioned on the petitioner filing
and maintaining a compliance plan meeting the
requirements of section 8324(b) of this title.
(c), (d) Repealed. Pub. L. 100–42, § 1(c)(5)(E), May
21, 1987, 101 Stat. 312
(e) Duration of temporary exemptions
(1) Except as provided in paragraph (2), exemp-
tions under this section for any powerplant may
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) General prohibition** Except to such extent as may be authorized under part B, no new electric powerplant may be constructed or operated as a base load powerplant without the capability to use coal or another alternate fuel as a primary energy source.
**(b) Capability to use coal or alternate fuel** An electric powerplant has the capability to use coal or another alternate fuel for purposes of this section if such electric powerplant—
(1) has sufficient inherent design characteristics to permit the addition of equipment (including all necessary pollution devices) necessary to render such electric powerplant capable of using coal or another alternate fuel as its primary energy source; and
(2) is not physically, structurally, or technologically precluded from using coal or another alternate fuel as its primary energy source.
Capability to use coal or another alternate fuel shall not be interpreted to require any such powerplant to be immediately able to use coal or another alternate fuel as its primary energy source on its initial day of operation.
**(c) Applicability to base load powerplants**
(1) This section shall apply only to base load powerplants, and shall not apply to peakload powerplants or intermediate load powerplants.
(2) For the purposes of this section, hours of electrical generation pursuant to emergency situations, as defined by the Secretary and reported to the Secretary, shall not be included in a determination of whether a powerplant is being operated as a base load powerplant.
**(d) Self-certification**
(1) In order to meet the requirement of subsection (a), the owner or operator of any new electric powerplant to be operated as a base load powerplant proposing to use natural gas or petroleum as its primary energy source shall certify to t