Browse Arkansas Code titles and sections
33 U.S.C. § 2255 — Inland waterways riverbank stabilization
Federal law — U.S. Code and appendices · legal_authorities
Page 746
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2255
the Water Resources Development Act of 1986 which
comprises this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 113–121, set out as a note under section
2201 of this title.
§ 2255. Inland waterways riverbank stabilization
(a) In general
Not later than 1 year after June 10, 2014, and
biennially thereafter, the Secretary shall con-
duct a study to determine the feasibility of—
(1) carrying out projects for the inland and
intracoastal waterways for purposes of—
(A) flood damage reduction;
(B) emergency streambank and shoreline
protection; and
(C) prevention and mitigation of shore
damages attributable to navigation improve-
ments; and
(2) modifying projects for the inland and in-
tracoastal waterways for the purpose of im-
proving the quality of the environment.
(b) Recommendations
In conducting the study, the Secretary shall
develop specific project recommendations and
prioritize those recommendations based on—
(1) the extent of damage and land loss result-
ing from riverbank erosion;
(2) the rate of erosion;
(3) the significant threat of future flood risk
to public property, public infrastructure, or
public safety;
(4) the destruction of natural resources or
habitats; and
(5) the potential cost savings for mainte-
nance of the channel.
(c) Disposition
The Secretary may carry out any project iden-
tified in the study conducted pursuant to sub-
section (a) in accordance with the criteria for
projects carried out under one of the following
authorities:
(1) Section 701r of this title.
(2) Section 701s of this title.
(3) Section 426i of this title.
(4) Section 2309a of this title.
(d) Annual re
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2255
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 9e93ca3522c042e632e64ffc5ea7a6946b4686efd2807810f823b4784ca66f7f. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-2d6f7119accdad5cc1ae4194
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2255-inland-waterways-riverbank-stabilization--a410291d1b.md
Pages: Not recorded – Not recorded
Passage SHA-256: bb1a6a8ae336fa1c0f071736fd99414a9182c3fa804a94dcb085af0d3dd074d4
Source location: USCODE-2024-title33-chap36-subchapIII-sec2255.pdf
Stored source content
Page 746
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2255
the Water Resources Development Act of 1986 which
comprises this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 113–121, set out as a note under section
2201 of this title.
§ 2255. Inland waterways riverbank stabilization
(a) In general
Not later than 1 year after June 10, 2014, and
biennially thereafter, the Secretary shall con-
duct a study to determine the feasibility of—
(1) carrying out projects for the inland and
intracoastal waterways for purposes of—
(A) flood damage reduction;
(B) emergency streambank and shoreline
protection; and
(C) prevention and mitigation of shore
damages attributable to navigation improve-
ments; and
(2) modifying projects for the inland and in-
tracoastal waterways for the purpose of im-
proving the quality of the environment.
(b) Recommendations
In conducting the study, the Secretary shall
develop specific project recommendations and
prioritize those recommendations based on—
(1) the extent of damage and land loss result-
ing from riverbank erosion;
(2) the rate of erosion;
(3) the significant threat of future flood risk
to public property, public infrastructure, or
public safety;
(4) the destruction of natural resources or
habitats; and
(5) the potential cost savings for mainte-
nance of the channel.
(c) Disposition
The Secretary may carry out any project iden-
tified in the study conducted pursuant to sub-
section (a) in accordance with the criteria for
projects carried out under one of the following
authorities:
(1) Section 701r of this title.
(2) Section 701s of this title.
(3) Section 426i of this title.
(4) Section 2309a of this title.
(d) Annual report
For a project recommended pursuant to the
study that cannot be carried out under any of
the authorities specified in subsection (c), upon
a determination by the Secretary of the feasi-
bility of the project, the Secretary may include
a recommendation concerning the project in the
annual report submitted to Congress under sec-
tion 2282d of this title.
(Pub. L. 113–121, title II, § 2009, June 10, 2014, 128
Stat. 1269.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Reform and Development Act of 2014, and not as part of
the Water Resources Development Act of 1986 which
comprises this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 113–121, set out as a note under section
2201 of this title.
§ 2255a. High water-low water preparedness
(a) Definitions
In this section:
(1) Bypass
The term ‘‘bypass’’ means an alternate
water route adjacent to a lock and dam on a
Federal inland waterway system that can be
used for commercial navigation during high
water conditions.
(2) Emergency condition
The term ‘‘emergency condition’’ means—
(A) unsafe conditions on a Federal inland
waterway system that prevent the operation
of commercial vessels, resulting from a
major change in water level or flows;
(B) an obstruction in a Federal inland wa-
terway system, including silt, sediment,
rock formation, or a shallow channel;
(C) an impaired or inoperable Federal lock
and dam; or
(D) any other condition determined appro-
priate by the Secretary.
(b) Emergency determination
The Secretary, in consultation with the Dis-
trict Commanders responsible for maintaining
any Federal inland waterway system, the users
of the waterway system, and the Coast Guard,
may make a determination that an emergency
condition exists on the waterway system.
(c) Emergency mitigation project
(1) In general
Subject to paragraph (2) and the availability
of appropriations, and in accordance with all
applicable Federal requirements, the Sec-
retary may carry out an emergency mitiga-
tion project on a Federal inland waterway sys-
tem with respect to which the Secretary has
determined that an emergency condition ex-
ists under subsection (b), or on a bypass of
such system, to remedy that emergency condi-
tion.
(2) Deadline
An emergency mitigation project under
paragraph (1) shall—
(A) be initiated by not later than 60 days
after the date on which the Secretary makes
the applicable determination under sub-
section (b); and
(B) to the maximum extent practicable, be
completed by not later than 1 year after the
date on which the Secretary makes such de-
termination.
(d) Authorization of appropriations
There is authorized to be appropriated to the
Secretary to carry out this section $25,000,000 for
each of fiscal years 2022 through 2024, to remain
available until expended.
(Pub. L. 116–260, div. AA, title I, § 151, Dec. 27,
2020, 134 Stat. 2657.)
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Requirements for qualifying projects** With respect to each qualifying project, the Secretary shall require—
(1) for each project manager, that—
(A) the project manager have formal project management training and certification; and
(B) the project manager be assigned from among personnel certified by the Chief of Engineers; and
(2) for an applicable cost estimation, that—
(A) the Secretary utilize a risk-based cost estimate with a confidence level of at least 80 percent; and
(B) the cost estimate be developed—
(i) for a qualifying project that requires an increase in the authorized amount in accordance with [section 2280 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2280&num=0&edition=prelim), during the preparation of a post-authorization change report or other similar decision document;
(ii) for a qualifying project for which the first construction contract has not been awarded, prior to the award of the first construction contract;
(iii) for a qualifying project without a completed feasibility report in accordance with [section 2282 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2282&num=0&edition=prelim), prior to the completion of such a report; and
(iv) for a qualifying project with a completed feasibility report in accordance with [section 2282 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2282&num=0&edition=prelim) that has not yet been authorized, during design for the qualifying project.
**(b) Additional project delivery process reforms** Not later than 18 months after June 10, 2014, the Secretary shall—
(1) establish a system to identify and apply on a continuing basis best management p
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2255
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.