Browse Arkansas Code titles and sections
10 U.S.C. § 3782 — Technical data: challenges to contractor
Federal law — U.S. Code and appendices · legal_authorities
Page 2556
TITLE 10—ARMED FORCES
§ 3782
Subsec. (b). Pub. L. 116–283, § 1833(h)(1), (3), trans-
ferred subsec. (b) of section 2321 of this title to this sec-
tion and substituted ‘‘this subchapter’’ for ‘‘this sec-
tion’’ and ‘‘(as defined in section 3786 of this title) as-
serted’’ for ‘‘(as defined in subsection (i)) asserted’’.
Subsec. (c). Pub. L. 116–283, § 1833(h)(1), (4)(A), (C),
transferred subsec. (c) of section 2321 of this title to
this section and realigned margins of pars. (1) and (2).
Subsec. (c)(1). Pub. L. 116–283, § 1833(h)(4)(B), sub-
stituted ‘‘this subchapter’’ for ‘‘this section’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section and amendment by Pub. L. 116–283 effective
Jan. 1, 2022, with additional provisions for delayed im-
plementation and applicability of existing law, see sec-
tion 1801(d) of Pub. L. 116–283, set out as an Effective
Date of 2021 Amendment note preceding section 3001 of
this title.
§ 3782. Technical data: challenges to contractor
restrictions
(a) CHALLENGES BY SECRETARY OF DEFENSE.—
The Secretary of Defense may challenge a use or
release restriction asserted with respect to tech-
nical data by a contractor or subcontractor at
any tier under a contract subject to this sub-
chapter if the Secretary finds that—
(1) reasonable grounds exist to question the
current validity of the asserted restriction;
and
(2) the continued adherence by the United
States to the asserted restriction would make
it impracticable to procure the item to which
the technical data pertain competitively at a
later time.
(b) TIME LIMIT FOR CHALLENGES; EXCEPTIONS.—
(1) A challenge to a use or release restriction
asserted by the contractor in accordance with
applicable regulations may not be made under
subsection (a) after
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 3782
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: b0cbd4737c83bf02f3a32872cc880e5c51cc692fc361d9f61fbbe9e5aefa684c. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-2bbfb1308b89b7d532dee7ed
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-3782-technical-data-challenges-to-contractor--bd7e9afee6.md
Pages: Not recorded – Not recorded
Passage SHA-256: c77870096a864c8cca3096d860512776ca87ce81f6da821a0d49a97e9e81bdf0
Source location: USCODE-2024-title10-subtitleA-partV-subpartD-chap275-subchapII-sec3782.pdf
Stored source content
Page 2556
TITLE 10—ARMED FORCES
§ 3782
Subsec. (b). Pub. L. 116–283, § 1833(h)(1), (3), trans-
ferred subsec. (b) of section 2321 of this title to this sec-
tion and substituted ‘‘this subchapter’’ for ‘‘this sec-
tion’’ and ‘‘(as defined in section 3786 of this title) as-
serted’’ for ‘‘(as defined in subsection (i)) asserted’’.
Subsec. (c). Pub. L. 116–283, § 1833(h)(1), (4)(A), (C),
transferred subsec. (c) of section 2321 of this title to
this section and realigned margins of pars. (1) and (2).
Subsec. (c)(1). Pub. L. 116–283, § 1833(h)(4)(B), sub-
stituted ‘‘this subchapter’’ for ‘‘this section’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section and amendment by Pub. L. 116–283 effective
Jan. 1, 2022, with additional provisions for delayed im-
plementation and applicability of existing law, see sec-
tion 1801(d) of Pub. L. 116–283, set out as an Effective
Date of 2021 Amendment note preceding section 3001 of
this title.
§ 3782. Technical data: challenges to contractor
restrictions
(a) CHALLENGES BY SECRETARY OF DEFENSE.—
The Secretary of Defense may challenge a use or
release restriction asserted with respect to tech-
nical data by a contractor or subcontractor at
any tier under a contract subject to this sub-
chapter if the Secretary finds that—
(1) reasonable grounds exist to question the
current validity of the asserted restriction;
and
(2) the continued adherence by the United
States to the asserted restriction would make
it impracticable to procure the item to which
the technical data pertain competitively at a
later time.
(b) TIME LIMIT FOR CHALLENGES; EXCEPTIONS.—
(1) A challenge to a use or release restriction
asserted by the contractor in accordance with
applicable regulations may not be made under
subsection (a) after the end of the six-year pe-
riod described in paragraph (2) unless the tech-
nical data involved—
(A) are publicly available;
(B) have been furnished to the United
States without restriction;
(C) have been otherwise made available
without restriction; or
(D) are the subject of a fraudulently as-
serted use or release restriction.
(2) The six-year period referred to in para-
graph (1) is the six-year period beginning on
the later of—
(A) the date on which final payment is
made on the contract under which the tech-
nical data are required to be delivered; or
(B) the date on which the technical data
are delivered under the contract.
(c) WRITTEN NOTICE TO CONTRACTOR OR SUBCON-
TRACTOR.—If the Secretary challenges an as-
serted use or release restriction under sub-
section (a), the Secretary shall provide written
notice of the challenge to the contractor or sub-
contractor asserting the restriction. Any such
notice shall—
(1) state the specific grounds for challenging
the asserted restriction;
(2) require a response within 60 days justi-
fying the current validity of the asserted re-
striction; and
(3) state that evidence of a justification de-
scribed in subsection (d) may be submitted.
(d) JUSTIFICATION.—It is a justification of an
asserted use or release restriction challenged
under subsection (a) that, within the three-year
period preceding the challenge to the restric-
tion, the Department of Defense validated a re-
striction identical to the asserted restriction
if—
(1) such validation occurred after a chal-
lenge to the validated restriction under this
section; and
(2) the validated restriction was asserted by
the same contractor or subcontractor (or a li-
censee of such contractor or subcontractor).
(Added and amended Pub. L. 116–283, div. A, title
XVIII, § 1833(g), (i), Jan. 1, 2021, 134 Stat. 4231.)
Editorial Notes
CODIFICATION
The text of subsec. (d) of section 2321 of this title,
which was transferred to this section and amended by
Pub. L. 116–283, § 1833(i), was based on Pub. L. 100–26,
§ 7(a)(5)(A)(ii), Apr. 21, 1987, 101 Stat. 276; Pub. L.
100–180, div. A, title XII, § 1231(6)(A), Dec. 4, 1987, 101
Stat. 1160; Pub. L. 103–35, title II, § 201(g)(4), May 31,
1993, 107 Stat. 100; Pub. L. 111–383, div. A, title VIII,
§ 824(c), Jan. 7, 2011, 124 Stat. 4269; Pub. L. 112–81, div. A,
title VIII, § 815(b), Dec. 31, 2011, 125 Stat. 1492.
PRIOR PROVISIONS
A prior section 3782, act Aug. 10, 1956, ch. 1041, 70A
Stat. 218; Pub. L. 86–616, § 2(a), July 12, 1960, 74 Stat. 387,
provided for boards of inquiry, composed of three or
more officers, to be convened at such places as Sec-
retary of the Army prescribes, to receive evidence and
make findings and recommendations whether an offi-
cer, required to show cause under section 3781 of this
title, should be retained on active list of Regular Army,
prior to repeal by Pub. L. 96–513, title II, § 213, title VII,
§ 701, Dec. 12, 1980, 94 Stat. 2885, 2955, effective Sept. 15,
1981. See section 1182 of this title.
AMENDMENTS
2021—Pub. L. 116–283, § 1833(i)(1)(A), transferred sub-
sec. (d) of section 2321 of this title to this section and
struck out subsec. (d) designation and heading ‘‘Chal-
lenges to Restrictions’’ at beginning.
Subsec. (a). Pub. L. 116–283, § 1833(i)(1)(B), (2), redesig-
nated par. (1) of section 2321(d) of this title as subsec.
(a) of this section, inserted heading, substituted ‘‘this
subchapter’’ for ‘‘this section’’ in introductory provi-
sions, and redesignated subpars. (A) and (B) as pars. (1)
and (2), respectively.
Subsec. (b). Pub. L. 116–283, § 1833(i)(1)(B), (3)(A), (B),
redesignated par. (2) of section 2321(d) of this title as
subsec. (b) of this section, inserted heading, and redes-
ignated subpars. (A) and (B) as pars. (1) and (2), respec-
tively, and realigned margins.
Subsec. (b)(1). Pub. L. 116–283, § 1833(i)(3)(C), sub-
stituted ‘‘subsection (a)’’ for ‘‘paragraph (1)’’ and
‘‘paragraph (2)’’ for ‘‘subparagraph (B)’’ in introductory
provisions and redesignated cls. (i) to (iv) as subpars.
(A) to (D), respectively.
Subsec. (b)(2). Pub. L. 116–283, § 1833(i)(3)(D), sub-
stituted ‘‘paragraph (1)’’ for ‘‘subparagraph (A)’’ in in-
troductory provisions and redesignated cls. (i) and (ii)
as subpars. (A) and (B), respectively.
Subsec. (c). Pub. L. 116–283, § 1833(i)(1)(B), (4)(A)–(C),
redesignated par. (3) of section 2321(d) of this title as
subsec. (c) of this section, inserted heading, substituted
‘‘subsection (a)’’ for ‘‘paragraph (1)’’ in introductory
provisions, and redesignated subpars. (A) to (C) as pars.
(1) to (3), respectively.
Subsec. (c)(3). Pub. L. 116–283, § 1833(i)(4)(D), sub-
stituted ‘‘subsection (d)’’ for ‘‘paragraph (4)’’.
Page 2557
TITLE 10—ARMED FORCES
§ 3784
Subsec. (d). Pub. L. 116–283, § 1833(i)(1)(B), (5)(A)–(C),
redesignated par. (4) of section 2321(d) of this title as
subsec. (d) of this section, inserted heading, substituted
‘‘subsection (a)’’ for ‘‘paragraph (1)’’ in introductory
provisions, and redesignated subparagraphs (A) and (B)
as pars. (1) and (2), respectively.
Subsec. (d)(1). Pub. L. 116–283, § 1833(i)(5)(D), sub-
stituted ‘‘this section’’ for ‘‘this subsection’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section and amendment by Pub. L. 116–283 effective
Jan. 1, 2022, with additional provisions for delayed im-
plementation and applicability of existing law, see sec-
tion 1801(d) of Pub. L. 116–283, set out as an Effective
Date of 2021 Amendment note preceding section 3001 of
this title.
§ 3783. Technical data: time for contractors to
submit justifications
(a) ADDITIONAL
TIME
TO
SUBMIT
JUSTIFICA-
TIONS.—If a contractor or subcontractor assert-
ing a use or release restriction submits to the
contracting officer a written request, showing
the need for additional time to comply with the
requirement to justify the current validity of
the asserted restriction, additional time to ade-
quately permit the submission of such justifica-
tion shall be provided by the contracting officer
as appropriate.
(b) MULTIPLE CHALLENGES; SCHEDULE OF RE-
SPONSES.—If a party asserting a restriction re-
ceives notices of challenges to restrictions on
technical data from more than one contracting
officer, and notifies each contracting officer of
the existence of more than one challenge, the
contracting officer initiating the first in time
challenge, after consultation with the party as-
serting the restriction and the other contracting
officers, shall formulate a schedule of responses
to each of the challenges that will afford the
party asserting the restriction with an equitable
opportunity to respond to each such challenge.
(Added and amended Pub. L. 116–283, div. A, title
XVIII, § 1833(g), (j), Jan. 1, 2021, 134 Stat. 4231,
4232.)
Editorial Notes
CODIFICATION
The text of subsec. (e) of section 2321 of this title,
which was transferred to this section and amended by
Pub. L. 116–283, § 1833(j), was based on Pub. L. 98–525,
title XII, § 1216(a), Oct. 19, 1984, 98 Stat. 2597; Pub. L.
100–26, § 7(a)(5)(A)(i), (B), Apr. 21, 1987, 101 Stat. 276, 277.
PRIOR PROVISIONS
A prior section 3783, act Aug. 10, 1956, ch. 1041, 70A
Stat. 218; Pub. L. 86–616, § 2(a), July 12, 1960, 74 Stat. 387,
provided for boards of review, composed of three or
more officers, to be convened by Secretary of the
Army, at such places as he prescribes, to review records
of cases of officers recommended by boards of inquiry
for removal from active list of Regular Army, prior to
repeal by Pub. L. 96–513, title II, § 213, title VII, § 701,
Dec. 12, 1980, 94 Stat. 2885, 2955, effective Sept. 15, 1981.
AMENDMENTS
2021—Pub. L. 116–283, § 1833(j), transferred subsec. (e)
of section 2321 of this title to this section, struck out
subsec. (e) designation and heading ‘‘Time for Contrac-
tors to Submit Justifications’’ at beginning, and des-
ignated first and second sentences of existing provi-
sions as subsecs. (a) and (b), respectively, and inserted
headings.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section and amendment by Pub. L. 116–283 effective
Jan. 1, 2022, with additional provisions for delayed im-
plementation and applicability of existing law, see sec-
tion 1801(d) of Pub. L. 116–283, set out as an Effective
Date of 2021 Amendment note preceding section 3001 of
this title.
§ 3784. Technical data under contracts for com-
mercial items: presumption of development
exclusively at private expense
In the case of a challenge to a use or release
restriction that is asserted with respect to tech-
nical data of a contractor or subcontractor
under a contract for commercial products, the
contracting officer shall presume that the con-
tractor or subcontractor has justified the re-
striction on the basis that the commercial prod-
uct was developed exclusively at private ex-
pense, whether or not the contractor or subcon-
tractor submits a justification in response to
the notice provided pursuant to section 3782(c)
of this title. In such a case, the challenge to the
use or release restriction may be sustained only
if information provided by the Department of
Defense demonstrates that the commercial prod-
uct was not developed exclusively at private ex-
pense.
(Added and amended Pub. L. 116–283, div. A, title
XVIII, § 1833(g), (k), Jan. 1, 2021, 134 Stat. 4231,
4233.)
Editorial Notes
CODIFICATION
The text of subsec. (f) of section 2321 of this title,
which was transferred to this section and amended by
Pub. L. 116–283, § 1833(k), was based on Pub. L. 103–355,
title VIII, § 8106(b)(2), Oct. 13, 1994, 108 Stat. 3394; Pub.
L. 109–364, div. A, title VIII, § 802(b), Oct. 17, 2006, 120
Stat. 2313; Pub. L. 110–181, div. A, title VIII, § 815(a)(2),
Jan. 28, 2008, 122 Stat. 223; Pub. L. 113–291, div. A, title
X, § 1071(a)(5), Dec. 19, 2014, 128 Stat. 3504; Pub. L. 114–92,
div. A, title VIII, § 813(a), Nov. 25, 2015, 129 Stat. 891;
Pub. L. 115–232, div. A, title VIII, §§ 836(c)(8), 865, Aug.
13, 2018, 132 Stat. 1866, 1901, as amended by Pub. L.
116–283, div. A, title X, § 1081(d)(4)(B)(ii), Jan. 1, 2021, 134
Stat. 3874; Pub. L. 117–81, div. A, title X, § 1081(a)(28),
Dec. 27, 2021, 135 Stat. 1921.
PRIOR PROVISIONS
A prior section 3784, act Aug. 10, 1956, ch. 1041, 70A
Stat. 219; Pub. L. 86–616, § 2(a), July 12, 1960, 74 Stat. 387,
authorized Secretary of the Army to remove an officer
from active list of Regular Army if his removal is rec-
ommended by a board of review and provided that deci-
sion of Secretary in such a case is final and conclusive,
prior to repeal by Pub. L. 96–513, title II, § 213, title VII,
§ 701, Dec. 12, 1980, 94 Stat. 2885, 2955, effective Sept. 15,
1981. See section 1184 of this title.
AMENDMENTS
2021—Pub. L. 116–283, § 1833(k), transferred subsec. (f)
of section 2321 of this title to this section, struck out
subsec. (f) designation and heading ‘‘Presumption of
Development Exclusively at Private Expense’’ at begin-
ning, and substituted ‘‘section 3782(c) of this title’’ for
‘‘subsection (d)(3)’’.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Challenges by Secretary of Defense.—** The Secretary of Defense may challenge a use or release restriction asserted with respect to technical data by a contractor or subcontractor at any tier under a contract subject to this subchapter if the Secretary finds that—
(1) reasonable grounds exist to question the current validity of the asserted restriction; and
(2) the continued adherence by the United States to the asserted restriction would make it impracticable to procure the item to which the technical data pertain competitively at a later time.
**(b) Time Limit for Challenges; Exceptions.—**
(1) A challenge to a use or release restriction asserted by the contractor in accordance with applicable regulations may not be made under subsection (a) after the end of the six-year period described in paragraph (2) unless the technical data involved—
(A) are publicly available;
(B) have been furnished to the United States without restriction;
(C) have been otherwise made available without restriction; or
(D) are the subject of a fraudulently asserted use or release restriction.
(2) The six-year period referred to in paragraph (1) is the six-year period beginning on the later of—
(A) the date on which final payment is made on the contract under which the technical data are required to be delivered; or
(B) the date on which the technical data are delivered under the contract.
**(c) Written Notice to Contractor or Subcontractor.—** If the Secretary challenges an asserted use or release restriction under subsection (a), the Secretary shall provide written notice of the challenge to the contractor or subcontractor asserting the restriction. Any such notice shall—
(1) state the specific grounds for challenging the asserted restriction;
(2) require a res
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 3782
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.