30 U.S.C. § 1256 — Permits

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1256 — Permits

Page 276 TITLE 30—MINERAL LANDS AND MINING § 1255 (b) Federal enforcement of State program In the event that a State has a State program for surface coal mining, and is not enforcing any part of such program, the Secretary may pro- vide for the Federal enforcement, under the pro- visions of section 1271 of this title, of that part of the State program not being enforced by such State. (c) Notice and hearing Prior to promulgation and implementation of any proposed Federal program, the Secretary shall give adequate public notice and hold a pub- lic hearing in the affected State. (d) Review of permits Permits issued pursuant to a previously ap- proved State program shall be valid but review- able under a Federal program. Immediately fol- lowing promulgation of a Federal program, the Secretary shall undertake to review such per- mits to determine that the requirements of this chapter are not violated. If the Secretary deter- mines any permit to have been granted contrary to the requirements of this chapter, he shall so advise the permittee and provide him an oppor- tunity for hearing and a reasonable opportunity for submission of a new application and reason- able time, within a time limit prescribed in reg- ulations promulgated pursuant to section 1251(b) of this title, to conform ongoing surface mining and reclamation operations to the requirements of the Federal program. (e) Submission of State program after implemen- tation of Federal program A State which has failed to obtain the ap- proval of a State program prior to implementa- tion of a Federal program may submit a State program at any time after such implementation. Upon the submission of such a program, the Sec- retary shall follow the procedures set forth in section 1253(b) of this title a

Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 1256

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: b3c6c93e7794ded35023f386cb8c2313e26ac574ed73a9352ec0b96d4d73d39b. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-2a6e58beca6f56b227a2dbdc
Source file: Laws/federal/codes/united-states-code-2024/title-30/section-1256-permits--c1220a59cb.md
Pages: Not recorded – Not recorded
Passage SHA-256: e4306b7be7a905b2bb2aee7d49770dd93a445baea8bf387600026228032a12d3

Source location: USCODE-2024-title30-chap25-subchapV-sec1256.pdf

Stored source content

Page 276 TITLE 30—MINERAL LANDS AND MINING § 1255 (b) Federal enforcement of State program In the event that a State has a State program for surface coal mining, and is not enforcing any part of such program, the Secretary may pro- vide for the Federal enforcement, under the pro- visions of section 1271 of this title, of that part of the State program not being enforced by such State. (c) Notice and hearing Prior to promulgation and implementation of any proposed Federal program, the Secretary shall give adequate public notice and hold a pub- lic hearing in the affected State. (d) Review of permits Permits issued pursuant to a previously ap- proved State program shall be valid but review- able under a Federal program. Immediately fol- lowing promulgation of a Federal program, the Secretary shall undertake to review such per- mits to determine that the requirements of this chapter are not violated. If the Secretary deter- mines any permit to have been granted contrary to the requirements of this chapter, he shall so advise the permittee and provide him an oppor- tunity for hearing and a reasonable opportunity for submission of a new application and reason- able time, within a time limit prescribed in reg- ulations promulgated pursuant to section 1251(b) of this title, to conform ongoing surface mining and reclamation operations to the requirements of the Federal program. (e) Submission of State program after implemen- tation of Federal program A State which has failed to obtain the ap- proval of a State program prior to implementa- tion of a Federal program may submit a State program at any time after such implementation. Upon the submission of such a program, the Sec- retary shall follow the procedures set forth in section 1253(b) of this title and shall approve or disapprove the State program within six months after its submittal. Approval of a State program shall be based on the determination that the State has the capability of carrying out the pro- visions of this chapter and meeting its purposes through the criteria set forth in section 1253(a)(1) through (6) of this title. Until a State program is approved as provided under this sec- tion, the Federal program shall remain in effect and all actions taken by the Secretary pursuant to such Federal program, including the terms and conditions of any permit issued thereunder shall remain in effect. (f) Validity of Federal program permits under su- perseding State program Permits issued pursuant to the Federal pro- gram shall be valid under any superseding State program: Provided, That the Federal permittee shall have the right to apply for a State permit to supersede his Federal permit. The State regu- latory authority may review such permits to de- termine that the requirements of this chapter and the approved State program are not vio- lated. Should the State program contain addi- tional requirements not contained in the Fed- eral program, the permittee will be provided op- portunity for hearing and a reasonable time, within a time limit prescribed in regulations promulgated pursuant to section 1251 of this title, to conform ongoing surface mining and reclamation operations to the additional State requirements. (g) Preemption of State statutes or regulations Whenever a Federal program is promulgated for a State pursuant to this chapter, any stat- utes or regulations of such State which are in effect to regulate surface mining and reclama- tion operations subject to this chapter shall, in- sofar as they interfere with the achievement of the purposes and the requirements of this chap- ter and the Federal program, be preempted and superseded by the Federal program. The Sec- retary shall set forth any State law or regula- tion which is preempted and superseded by the Federal program. (h) Coordination of issuance and review of Fed- eral program permits with any other Federal or State permit process Any Federal program shall include a process for coordinating the review and issuance of per- mits for surface mining and reclamation oper- ations with any other Federal or State permit process applicable to the proposed operation. (Pub. L. 95–87, title V, § 504, Aug. 3, 1977, 91 Stat. 471.) § 1255. State laws (a) No State law or regulation in effect on Au- gust 3, 1977, or which may become effective thereafter, shall be superseded by any provision of this chapter or any regulation issued pursu- ant thereto, except insofar as such State law or regulation is inconsistent with the provisions of this chapter. (b) Any provision of any State law or regula- tion in effect upon August 3, 1977, or which may become effective thereafter, which provides for more stringent land use and environmental con- trols and regulations of surface coal mining and reclamation operation than do the provisions of this chapter or any regulation issued pursuant thereto shall not be construed to be inconsistent with this chapter. The Secretary shall set forth any State law or regulation which is construed to be inconsistent with this chapter. Any provi- sion of any State law or regulation in effect on August 3, 1977, or which may become effective thereafter, which provides for the control and regulation of surface mining and reclamation operations for which no provision is contained in this chapter shall not be construed to be in- consistent with this chapter. (Pub. L. 95–87, title V, § 505, Aug. 3, 1977, 91 Stat. 473.) § 1256. Permits (a) Persons engaged in surface coal mining with- in State; time limit; exception No later than eight months from the date on which a State program is approved by the Sec- retary, pursuant to section 1253 of this title, or no later than eight months from the date on which the Secretary has promulgated a Federal program for a State not having a State program pursuant to section 1254 of this title, no person shall engage in or carry out on lands within a Page 277 TITLE 30—MINERAL LANDS AND MINING § 1257 State any surface coal mining operations unless such person has first obtained a permit issued by such State pursuant to an approved State pro- gram or by the Secretary pursuant to a Federal program; except a person conducting surface coal mining operations under a permit from the State regulatory authority, issued in accordance with the provisions of section 1252 of this title, may conduct such operations beyond such pe- riod if an application for a permit has been filed in accordance with the provisions of this chap- ter, but the initial administrative decision has not been rendered. (b) Term All permits issued pursuant to the require- ments of this chapter shall be issued for a term not to exceed five years: Provided, That if the applicant demonstrates that a specified longer term is reasonably needed to allow the applicant to obtain necessary financing for equipment and the opening of the operation and if the applica- tion is full and complete for such specified longer term, the regulatory authority may grant a permit for such longer term. A successor in interest to a permittee who applies for a new permit within thirty days of succeeding to such interest and who is able to obtain the bond cov- erage of the original permittee may continue surface coal mining and reclamation operations according to the approved mining and reclama- tion plan of the original permittee until such successor’s application is granted or denied. (c) Termination A permit shall terminate if the permittee has not commenced the surface coal mining oper- ations covered by such permit within three years of the issuance of the permit: Provided, That the regulatory authority may grant rea- sonable extensions of time upon a showing that such extensions are necessary by reason of liti- gation precluding such commencement or threatening substantial economic loss to the permittee, or by reason of conditions beyond the control and without the fault or negligence of the permittee: Provided further, That in the case of a coal lease issued under the Federal Mineral Leasing Act, as amended [30 U.S.C. 181 et seq.], extensions of time may not extend beyond the period allowed for diligent development in ac- cordance with section 7 of that Act [30 U.S.C. 207]: Provided further, That with respect to coal to be mined for use in a synthetic fuel facility or specific major electric generating facility, the permittee shall be deemed to have com- menced surface mining operations at such time as the construction of the synthetic fuel or gen- erating facility is initiated. (d) Renewal (1) Any valid permit issued pursuant to this chapter shall carry with it the right of succes- sive renewal upon expiration with respect to areas within the boundaries of the existing per- mit. The holders of the permit may apply for re- newal and such renewal shall be issued (provided that on application for renewal the burden shall be on the opponents of renewal), subsequent to fulfillment of the public notice requirements of sections 1263 and 1264 of this title unless it is es- tablished that and written findings by the regu- latory authority are made that— (A) the terms and conditions of the existing permit are not being satisfactorily met; (B) the present surface coal mining and rec- lamation operation is not in compliance with the environmental protection standards of this chapter and the approved State plan or Federal program pursuant to this chapter; or (C) the renewal requested substantially jeop- ardizes the operator’s continuing responsi- bility on existing permit areas; (D) the operator has not provided evidence that the performance bond in effect for said operation will continue in full force and effect for any renewal requested in such application as well as any additional bond the regulatory authority might require pursuant to section 1259 of this title; or (E) any additional revised or updated infor- mation required by the regulatory authority has not been provided. Prior to the approval of any renewal of permit the regulatory author- ity shall provide notice to the appropriate public authorities. (2) If an application for renewal of a valid per- mit includes a proposal to extend the mining op- eration beyond the boundaries authorized in the existing permit, the portion of the application for renewal of a valid permit which addresses any new land areas shall be subject to the full standards applicable to new applications under this chapter: Provided, however, That if the sur- face coal mining operations authorized by a per- mit issued pursuant to this chapter were not subject to the standards contained in section 1260(b)(5)(A) and (B) of this title by reason of complying with the proviso of section 1260(b)(5) of this title, then the portion of the application for renewal of the permit which addresses any new land areas previously identified in the rec- lamation plan submitted pursuant to section 1258 of this title shall not be subject to the standards contained in section 1260(b)(5)(A) and (B) of this title. (3) Any permit renewal shall be for a term not to exceed the period of the original permit es- tablished by this chapter. Application for permit renewal shall be made at least one hundred and twenty days prior to the expiration of the valid permit. (Pub. L. 95–87, title V, § 506, Aug. 3, 1977, 91 Stat. 473.) Editorial Notes REFERENCES IN TEXT The Federal Mineral Leasing Act, as amended, re- ferred to in subsec. (c), probably means act Feb. 25, 1920, ch. 85, 41 Stat. 437, known as the Mineral Leasing Act, which is classified generally to chapter 3A (§ 181 et seq.) of this title. For complete classification of this Act to the Code, see Short Title note set out under sec- tion 181 of this title and Tables. § 1257. Application requirements (a) Fee Each application for a surface coal mining and reclamation permit pursuant to an approved State program or a Federal program under the provisions of this chapter shall be accompanied by a fee as determined by the regulatory author-

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1256 — Permits

**(a) Persons engaged in surface coal mining within State; time limit; exception** No later than eight months from the date on which a State program is approved by the Secretary, pursuant to [section 1253 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1253&num=0&edition=prelim), or no later than eight months from the date on which the Secretary has promulgated a Federal program for a State not having a State program pursuant to [section 1254 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1254&num=0&edition=prelim), no person shall engage in or carry out on lands within a State any surface coal mining operations unless such person has first obtained a permit issued by such State pursuant to an approved State program or by the Secretary pursuant to a Federal program; except a person conducting surface coal mining operations under a permit from the State regulatory authority, issued in accordance with the provisions of [section 1252 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1252&num=0&edition=prelim), may conduct such operations beyond such period if an application for a permit has been filed in accordance with the provisions of this chapter, but the initial administrative decision has not been rendered. **(b) Term** All permits issued pursuant to the requirements of this chapter shall be issued for a term not to exceed five years: Provided, That if the applicant demonstrates that a specified longer term is reasonably needed to allow the applicant to obtain necessary financing for equipment and the opening of the operation and if the application is full and complete for such specified longer term, the regulatory authority may grant a per

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1256

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 181 — Lands subject to disposition; persons entitled to benefits; reciprocal privileges; helium rights reserved

Deposits of coal, phosphate, sodium, potassium, oil, oil shale, gilsonite (including all vein-type solid hydrocarbons), or gas, and lands containing such deposits owned by the United States, including those in national forests, but excluding lands acquired under the Appalachian Forest Act, approved March 1, 1911 (36 Stat. 961), and those in incorporated cities, towns, and villages and in national parks and monuments, those acquired under other Acts subsequent to February 25, 1920, and lands within the naval petroleum and oil-shale reserves, except as hereinafter provided, shall be subject to disposition in the form and manner provided by this chapter to citizens of the United States, or to associations of such citizens, or to any corporation organized under the laws of the United States, or of any State or Territory thereof, or in the case of coal, oil, oil shale, or gas, to municipalities. Citizens of another country, the laws, customs, or regulations of which deny similar or like privileges to citizens or corporations of this country, shall not by stock ownership, stock holding, or stock control, own any interest in any lease acquired under the provisions of this chapter.

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 181

Stored review status: release_metadata_unconfirmed. The source passage cites 30 U.S.C. § 181. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 181 — Lands subject to disposition; persons enti-

Page 35 TITLE 30—MINERAL LANDS AND MINING § 181 Sec. SUBCHAPTER V—OIL SHALE 241. Leases of lands. 242. Oil shale claims. SUBCHAPTER VI—ALASKA OIL PROVISO 251. Leases to claimants of withdrawn lands; terms and conditions; acreage; annual rent- als and royalties; fraud of claimants. SUBCHAPTER VII—SODIUM 261. Prospecting permits; lands included; acreage. 262. Leases to permittees; survey of lands; royal- ties and annual rentals. 263. Permits to use or lease of nonmineral lands for camp sites, and other purposes; annual rentals; acreage. SUBCHAPTER VIII—SULPHUR 271. Prospecting permits; lands included; acreage. 272. Leases to permittees; privileges extended to oil and gas permittees. 273. Lease of lands not covered by permits or leases; acreage; rental. 274. Lands containing coal or other minerals. 275. Laws applicable. 276. Application of subchapter to Louisiana and New Mexico only. SUBCHAPTER IX—POTASH 281. Prospecting permits for chlorides, sulphates, carbonates, borates, silicates, or nitrates of potassium; authorization; acreage; lands af- fected. 282. Leases to permittees of lands showing valu- able deposits; royalty. 283. Lands containing valuable deposits not cov- ered by permits or leases; authority to lease; acreage; conditions; renewals; exemp- tions from rentals and royalties; suspension of operations. 284. Lands containing coal or other minerals in addition to potassium deposits; issuance of prospecting permits and leases; covenants in potassium leases. 285. Laws applicable. 286. Disposition of royalties and rents from potas- sium leases. 287. Extension of prospecting permits. SUBCHAPTER I—GENERAL PROVISIONS § 181. Lands subject to disposition; persons enti- tled to benefits; reciprocal privileges; heliu

Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 181

Stored review status: historical_2024_not_currentness_verified. The source passage cites 30 U.S.C. § 181. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 207 — Conditions of lease

**(a) Term of lease; annual rentals; royalties; readjustment of conditions** A coal lease shall be for a term of twenty years and for so long thereafter as coal is produced annually in commercial quantities from that lease. Any lease which is not producing in commercial quantities at the end of ten years shall be terminated. The Secretary shall by regulation prescribe annual rentals on leases. A lease shall require payment of a royalty in such amount as the Secretary shall determine of not less than 12½ percent, except such amount shall be not more than 7 percent during the period that begins on July 4, 2025, and ends September 30, 2034, of the value of coal as defined by regulation, except the Secretary may determine a lesser amount in the case of coal recovered by underground mining operations. The lease shall include such other terms and conditions as the Secretary shall determine. Such rentals and royalties and other terms and conditions of the lease will be subject to readjustment at the end of its primary term of twenty years and at the end of each ten-year period thereafter if the lease is extended. **(b) Diligent development and continued operation; suspension of condition on payment of advance royalties** (1) Each lease shall be subject to the conditions of diligent development and continued operation of the mine or mines, except where operations under the lease are interrupted by strikes, the elements, or casualties not attributable to the lessee. (2) The Secretary of the Interior, upon determining that the public interest will be served thereby, may suspend the condition of continued operation upon the payment of advance royalties. (3) Advance royalties described in paragraph (2) shall be no less than the production royalty which would otherwise be paid a

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 207

Stored review status: release_metadata_unconfirmed. The source passage cites 30 U.S.C. § 207. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 207 — Conditions of lease

Page 67 TITLE 30—MINERAL LANDS AND MINING § 207 paragraph (3), on a finding by the Secretary under para- graph (2), any person’’ for ‘‘Any person’’ and ‘‘secure modifications of the original coal lease by including ad- ditional coal lands or coal deposits contiguous or cor- nering to those embraced in the lease’’ for ‘‘upon a finding by him that it would be in the interest of the United States, secure modifications of the original coal lease by including additional coal lands or coal deposits contiguous or cornering to those embraced in such lease, but in no event shall the total area added by such modifications to an existing coal lease exceed one hun- dred sixty acres, or add acreage larger than that in the original lease’’, added pars. (2) and (3), and designated second and third sentences as subsecs. (b) and (c), re- spectively. 1978—Pub. L. 95–554 authorized modification of leases to include coal lands or coal deposits cornering to those embraced in the leases and inserted provision respect- ing application of production or mining plan require- ments of sections 202a(2) and 207(c) and minimum roy- alty provisions of section 207(a) of this title. 1976—Pub. L. 94–377 struck out the advantage to the lessee as one of the conditions for modification of the original lease, substituted provision prohibiting the ad- dition of total area in excess of 160 acres or adding acreage larger than that in the original lease for provi- sion limiting the total area embraced in such modified lease to an aggregate of 2560 acres, and inserted provi- sion authorizing the Secretary to prescribe terms and conditions consistent with this chapter which shall be applicable to the total acreage in the modified lease. Statutory Notes and Related Subsidiaries EFFECTIVE DATE O

Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 207

Stored review status: historical_2024_not_currentness_verified. The source passage cites 30 U.S.C. § 207. This identifies an authority to review, not proof of applicability.