Browse Arkansas Code titles and sections
33 U.S.C. § 1283 — Plans, specifications, estimates, and pay-
Federal law — U.S. Code and appendices · legal_authorities
Page 419
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1283
trator before October 1, 1984, and which project is under
judicial injunction on such date prohibiting its con-
struction, such project shall be eligible for grants at 75
percent of the cost of construction thereof.’’
Pub. L. 100–4, § 202(c), inserted at end ‘‘Notwith-
standing the first sentence of this paragraph, in the
case of the Wyoming Valley Sanitary Authority project
mandated by judicial order under a proceeding begun
prior to October 1, 1984, and a project for wastewater
treatment for Altoona, Pennsylvania, such projects
shall be eligible for grants at 75 percent of the cost of
construction thereof.’’
Subsec. (a)(3). Pub. L. 100–4, § 202(d), inserted at end
‘‘In addition, the Administrator is authorized to make
a grant to fund all of the costs of the modification or
replacement of biodisc equipment (rotating biological
contactors) in any publicly owned treatment works if
the Administrator finds that such equipment has failed
to meet design performance specifications, unless such
failure is attributable to negligence on the part of any
person, and if such failure has significantly increased
capital or operating and maintenance expenditures.’’
1982—Subsec. (c). Pub. L. 97–357 added subsec. (c).
1981—Subsec. (a)(1). Pub. L. 97–117, § 7, inserted ‘‘and
ending before October 30, 1984,’’ after ‘‘June 30, 1971,’’
and ‘‘and for any fiscal year beginning on or after Octo-
ber 1, 1984, shall be 55 per centum of the cost of con-
struction thereof (as approved by the Administrator),’’
after ‘‘(as approved by the Administrator),’’ and provi-
sion that notwithstanding first sentence of this para-
graph, in any case where primary, secondary, or ad-
vanced waste treatment facility or its related inte
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 1283
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: f8a031f63cd5ec455254665976180baf82a48c627d06164677115b60ab11525e. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-20f1d8faff5659ed6f172191
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-1283-plans-specifications-estimates-and-pay--f1d4079d51.md
Pages: Not recorded – Not recorded
Passage SHA-256: 21acc734a75b2c127c9565c8b8be37d43da5eb80edc4512ace1d8d97df27ea2f
Source location: USCODE-2024-title33-chap26-subchapII-sec1283.pdf
Stored source content
Page 419
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1283
trator before October 1, 1984, and which project is under
judicial injunction on such date prohibiting its con-
struction, such project shall be eligible for grants at 75
percent of the cost of construction thereof.’’
Pub. L. 100–4, § 202(c), inserted at end ‘‘Notwith-
standing the first sentence of this paragraph, in the
case of the Wyoming Valley Sanitary Authority project
mandated by judicial order under a proceeding begun
prior to October 1, 1984, and a project for wastewater
treatment for Altoona, Pennsylvania, such projects
shall be eligible for grants at 75 percent of the cost of
construction thereof.’’
Subsec. (a)(3). Pub. L. 100–4, § 202(d), inserted at end
‘‘In addition, the Administrator is authorized to make
a grant to fund all of the costs of the modification or
replacement of biodisc equipment (rotating biological
contactors) in any publicly owned treatment works if
the Administrator finds that such equipment has failed
to meet design performance specifications, unless such
failure is attributable to negligence on the part of any
person, and if such failure has significantly increased
capital or operating and maintenance expenditures.’’
1982—Subsec. (c). Pub. L. 97–357 added subsec. (c).
1981—Subsec. (a)(1). Pub. L. 97–117, § 7, inserted ‘‘and
ending before October 30, 1984,’’ after ‘‘June 30, 1971,’’
and ‘‘and for any fiscal year beginning on or after Octo-
ber 1, 1984, shall be 55 per centum of the cost of con-
struction thereof (as approved by the Administrator),’’
after ‘‘(as approved by the Administrator),’’ and provi-
sion that notwithstanding first sentence of this para-
graph, in any case where primary, secondary, or ad-
vanced waste treatment facility or its related intercep-
tors or a project for infiltration-in-flow correction has
received a grant for building, acquisition, etc., before
Oct. 1, 1984, all segments and phases be eligible for
grants at 75 per centum of the cost of construction.
Subsec. (a)(2). Pub. L. 97–117, § 8(a), inserted provision
that the amount of any grant made after Sept. 30, 1981,
for any eligible treatment works or unit processes or
techniques, utilizing innovative or alternative waste-
water treatment processes or techniques referred to in
section 1281(g)(5) of this title be a percentage of the
cost of construction equal to 20 per centum greater
than the percentage in effect under par. (1) of this sub-
section, but in no event greater than 85 per centum of
the cost of construction.
Subsec. (a)(4). Pub. L. 97–117, § 8(b), struck out ‘‘in the
fiscal years ending September 30, 1979, September 30,
1980, and September 30, 1981’’ after ‘‘purpose in such
State’’ and provision that excluded from term ‘‘eligible
treatment works’’ collector sewers, interceptors, storm
or sanitary sewers or the separation thereof, or major
sewer rehabilitation.
1980—Subsec. (a)(1). Pub. L. 96–483, § 9(a), inserted pro-
visions relating to modification to a lower percentage
rate by the Governor of the State and issuance of
guidelines by the Administrator for the concurrence in
any such modification.
Subsec. (a)(2). Pub. L. 96–483, § 9(b), inserted provision
relating to the modification by the Governor of the
State to a percentage rate no less than 15 per centum
greater than the modified uniform rate in which the
Administrator has concurred.
1977—Subsec. (a). Pub. L. 95–217 designated existing
provisions as par. (1) and added pars. (2) to (4).
Statutory Notes and Related Subsidiaries
PROMULGATION OF FEDERAL SHARES
Act July 9, 1956, ch. 518, § 4, 70 Stat. 507, authorized
the Surgeon General to promulgate Federal shares
under the Federal Water Pollution Control Grant Pro-
gram as soon as possible after July 9, 1956, in the man-
ner specified in the Water Pollution Control Act, act
June 30, 1948, ch. 758, 62 Stat. 1155, and provided that
such shares were to be conclusive for the purposes of
section 5 of act June 30, 1948.
§ 1283. Plans, specifications, estimates, and pay-
ments
(a) Submission; contractual nature of approval
by Administrator; agreement on eligible
costs; single grant
(1) Each applicant for a grant shall submit to
the Administrator for his approval, plans, speci-
fications, and estimates for each proposed
project for the construction of treatment works
for which a grant is applied for under section
1281(g)(1) of this title from funds allotted to the
State under section 1285 of this title and which
otherwise meets the requirements of this chap-
ter. The Administrator shall act upon such
plans, specifications, and estimates as soon as
practicable after the same have been submitted,
and his approval of any such plans, specifica-
tions, and estimates shall be deemed a contrac-
tual obligation of the United States for the pay-
ment of its proportional contribution to such
project.
(2) AGREEMENT ON ELIGIBLE COSTS.—
(A) LIMITATION
ON
MODIFICATIONS.—Before
taking final action on any plans, specifica-
tions, and estimates submitted under this sub-
section after the 60th day following February
4, 1987, the Administrator shall enter into a
written agreement with the applicant which
establishes and specifies which items of the
proposed project are eligible for Federal pay-
ments under this section. The Administrator
may not later modify such eligibility deter-
minations unless they are found to have been
made in violation of applicable Federal stat-
utes and regulations.
(B) LIMITATION ON EFFECT.—Eligibility deter-
minations under this paragraph shall not pre-
clude the Administrator from auditing a
project pursuant to section 1361 of this title,
or other authority, or from withholding or re-
covering Federal funds for costs which are
found to be unreasonable, unsupported by ade-
quate documentation, or otherwise unallow-
able under applicable Federal cost principles,
or which are incurred on a project which fails
to meet the design specifications or effluent
limitations contained in the grant agreement
and permit pursuant to section 1342 of this
title for such project.
(3) In the case of a treatment works that has
an estimated total cost of $8,000,000 or less (as
determined by the Administrator), and the pop-
ulation of the applicant municipality is twenty-
five thousand or less (according to the most re-
cent United States census), upon completion of
an approved facility plan, a single grant may be
awarded for the combined Federal share of the
cost of preparing construction plans and speci-
fications, and the building and erection of the
treatment works.
(b) Periodic payments
The Administrator shall, from time to time as
the work progresses, make payments to the re-
cipient of a grant for costs of construction in-
curred on a project. These payments shall at no
time exceed the Federal share of the cost of con-
struction incurred to the date of the voucher
covering such payment plus the Federal share of
the value of the materials which have been
Page 420
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1283
stockpiled in the vicinity of such construction
in conformity to plans and specifications for the
project.
(c) Final payments
After completion of a project and approval of
the final voucher by the Administrator, he shall
pay out of the appropriate sums the unpaid bal-
ance of the Federal share payable on account of
such project.
(d) Projects eligible
Nothing in this chapter shall be construed to
require, or to authorize the Administrator to re-
quire, that grants under this chapter for con-
struction of treatment works be made only for
projects which are operable units usable for sew-
age collection, transportation, storage, waste
treatment, or for similar purposes without addi-
tional construction.
(e) Technical and legal assistance in administra-
tion and enforcement of contracts; interven-
tion in civil actions
At the request of a grantee under this sub-
chapter, the Administrator is authorized to pro-
vide technical and legal assistance in the admin-
istration and enforcement of any contract in
connection with treatment works assisted under
this subchapter, and to intervene in any civil ac-
tion involving the enforcement of such a con-
tract.
(f) Design/build projects
(1) Agreement
Consistent with State law, an applicant who
proposes to construct waste water treatment
works may enter into an agreement with the
Administrator under this subsection providing
for the preparation of construction plans and
specifications and the erection of such treat-
ment works, in lieu of proceeding under the
other provisions of this section.
(2) Limitation on projects
Agreements under this subsection shall be
limited to projects under an approved facility
plan which projects are—
(A) treatment works that have an esti-
mated total cost of $8,000,000 or less; and
(B) any of the following types of waste
water treatment systems: aerated lagoons,
trickling filters, stabilization ponds, land
application systems, sand filters, and sub-
surface disposal systems.
(3) Required terms
An agreement entered into under this sub-
section shall—
(A) set forth an amount agreed to as the
maximum
Federal
contribution
to
the
project, based upon a competitively bid doc-
ument of basic design data and applicable
standard construction specifications and a
determination of the federally eligible costs
of the project at the applicable Federal
share under section 1282 of this title;
(B) set forth dates for the start and com-
pletion of construction of the treatment
works by the applicant and a schedule of
payments of the Federal contribution to the
project;
(C) contain assurances by the applicant
that (i) engineering and management assist-
ance will be provided to manage the project;
(ii) the proposed treatment works will be an
operable unit and will meet all the require-
ments of this subchapter; and (iii) not later
than 1 year after the date specified as the
date of completion of construction of the
treatment works, the treatment works will
be operating so as to meet the requirements
of any applicable permit for such treatment
works under section 1342 of this title;
(D) require the applicant to obtain a bond
from the contractor in an amount deter-
mined necessary by the Administrator to
protect the Federal interest in the project;
and
(E) contain such other terms and condi-
tions as are necessary to assure compliance
with this subchapter (except as provided in
paragraph (4) of this subsection).
(4) Limitation on application
Subsections (a), (b), and (c) of this section
shall not apply to grants made pursuant to
this subsection.
(5) Reservation to assure compliance
The Administrator shall reserve a portion of
the grant to assure contract compliance until
final project approval as defined by the Ad-
ministrator. If the amount agreed to under
paragraph (3)(A) exceeds the cost of designing
and constructing the treatment works, the Ad-
ministrator shall reallot the amount of the ex-
cess to the State in which such treatment
works are located for the fiscal year in which
such audit is completed.
(6) Limitation on obligations
The Administrator shall not obligate more
than 20 percent of the amount allotted to a
State for a fiscal year under section 1285 of
this title for grants pursuant to this sub-
section.
(7) Allowance
The Administrator shall determine an allow-
ance for facilities planning for projects con-
structed under this subsection in accordance
with section 1281(l) of this title.
(8) Limitation on Federal contributions
In no event shall the Federal contribution
for the cost of preparing construction plans
and specifications and the building and erec-
tion of treatment works pursuant to this sub-
section exceed the amount agreed upon under
paragraph (3).
(9) Recovery action
In any case in which the recipient of a grant
made pursuant to this subsection does not
comply with the terms of the agreement en-
tered into under paragraph (3), the Adminis-
trator is authorized to take such action as
may be necessary to recover the amount of the
Federal contribution to the project.
(10) Prevention of double benefits
A recipient of a grant made pursuant to this
subsection shall not be eligible for any other
grants under this subchapter for the same
project.
(June 30, 1948, ch. 758, title II, § 203, as added
Pub. L. 92–500, § 2, Oct. 18, 1972, 86 Stat. 835;
Page 421
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1284
1 So in original. The period probably should be a semicolon.
amended Pub. L. 93–243, § 2, Jan. 2, 1974, 87 Stat.
1069; Pub. L. 95–217, §§ 18, 19, Dec. 27, 1977, 91 Stat.
1571, 1572; Pub. L. 96–483, § 6, Oct. 21, 1980, 94 Stat.
2362; Pub. L. 97–117, § 9, Dec. 29, 1981, 95 Stat. 1626;
Pub. L. 100–4, title II, §§ 203, 204, Feb. 4, 1987, 101
Stat. 16, 17.)
Editorial Notes
AMENDMENTS
1987—Subsec. (a). Pub. L. 100–4, § 203, designated pro-
vision relating to submission of plans, specifications,
and estimates, and provision relating to contractual
nature of approval by Administrator as par. (1), des-
ignated provision relating to requirements for award-
ing single grant for combined Federal share of cost of
preparing plans and specifications, and building and
erection of treatment works as par. (3), and added par.
(2).
Subsec. (f). Pub. L. 100–4, § 204, added subsec. (f).
1981—Subsec.
(a).
Pub.
L.
97–117
substituted
‘‘$8,000,000’’ for ‘‘$4,000,000’’ and struck out provision
that, if any State is found by the Administrator to
have unusually high costs of construction, the Admin-
istrator may authorize a single grant where the esti-
mated total cost of the treatment works does not ex-
ceed $5,000,000.
1980—Subsec.
(a).
Pub.
L.
96–483
substituted
‘‘$4,000,000’’
and
‘‘$5,000,000’’
for
‘‘$2,000,000’’
and
‘‘$3,000,000’’, respectively.
1977—Subsec. (a). Pub. L. 95–217, § 18, provided that, in
the case of a treatment works that has an estimated
total cost of $2,000,000 or less (as determined by the Ad-
ministrator), and the population of the applicant mu-
nicipality is twenty-five thousand or less (according to
the most recent United States census), upon comple-
tion of an approved facility plan, a single grant may be
awarded for the combined Federal share of the cost of
preparing construction plans and specifications, and
the building and erection of the treatment works, and
that, if any State is found by the Administrator to
have unusually high costs of construction, the Admin-
istrator may authorize a single grant where the esti-
mated total cost of the treatment works does not ex-
ceed $3,000,000.
Subsec. (e). Pub. L. 95–217, § 19, added subsec. (e).
1974—Subsec. (d). Pub. L. 93–243 added subsec. (d).
§ 1284. Limitations and conditions
(a) Determinations by Administrator
Before approving grants for any project for
any treatment works under section 1281(g)(1) of
this title the Administrator shall determine—
(1) that any required areawide waste treat-
ment management plan under section 1288 of
this title (A) is being implemented for such
area and the proposed treatment works are in-
cluded in such plan, or (B) is being developed
for such area and reasonable progress is being
made toward its implementation and the pro-
posed treatment works will be included in
such plan;
(2) that (A) the State in which the project is
to be located (i) is implementing any required
plan under section 1313(e) of this title and the
proposed treatment works are in conformity
with such plan, or (ii) is developing such a
plan and the proposed treatment works will be
in conformity with such plan, and (B) such
State is in compliance with section 1315(b) of
this title;
(3) that such works have been certified by
the appropriate State water pollution control
agency as entitled to priority over such other
works in the State in accordance with any ap-
plicable State plan under section 1313(e) of
this title, except that any priority list devel-
oped pursuant to section 1313(e)(3)(H) of this
title may be modified by such State in accord-
ance with regulations promulgated by the Ad-
ministrator to give higher priority for grants
for the Federal share of the cost of preparing
construction drawings and specifications for
any treatment works utilizing processes and
techniques meeting the guidelines promul-
gated under section 1314(d)(3) of this title and
for grants for the combined Federal share of
the cost of preparing construction drawings
and specifications and the building and erec-
tion of any treatment works meeting the re-
quirements of the next to the last sentence of
section 1283(a) of this title which utilizes proc-
esses and techniques meeting the guidelines
promulgated under section 1314(d)(3) of this
title.1
(4) that the applicant proposing to construct
such works agrees to pay the non-Federal
costs of such works and has made adequate
provisions satisfactory to the Administrator
for assuring proper and efficient operation, in-
cluding the employment of trained manage-
ment and operations personnel, and the main-
tenance of such works in accordance with a
plan of operation approved by the State water
pollution control agency or, as appropriate,
the interstate agency, after construction
thereof;
(5) that the size and capacity of such works
relate directly to the needs to be served by
such works, including sufficient reserve capac-
ity. The amount of reserve capacity provided
shall be approved by the Administrator on the
basis of a comparison of the cost of con-
structing such reserves as a part of the works
to be funded and the anticipated cost of pro-
viding expanded capacity at a date when such
capacity will be required, after taking into ac-
count, in accordance with regulations promul-
gated by the Administrator, efforts to reduce
total flow of sewage and unnecessary water
consumption. The amount of reserve capacity
eligible for a grant under this subchapter shall
be determined by the Administrator taking
into account the projected population and as-
sociated commercial and industrial establish-
ments within the jurisdiction of the applicant
to be served by such treatment works as iden-
tified in an approved facilities plan, an
areawide plan under section 1288 of this title,
or an applicable municipal master plan of de-
velopment. For the purpose of this paragraph,
section 1288 of this title, and any such plan,
projected population shall be determined on
the basis of the latest information available
from the United States Department of Com-
merce or from the States as the Adminis-
trator, by regulation, determines appropriate.
Beginning October 1, 1984, no grant shall be
made under this subchapter to construct that
portion of any treatment works providing re-
serve capacity in excess of existing needs (in-
cluding existing needs of residential, commer-
cial, industrial, and other users) on the date of
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Submission; contractual nature of approval by Administrator; agreement on eligible costs; single grant**
(1) Each applicant for a grant shall submit to the Administrator for his approval, plans, specifications, and estimates for each proposed project for the construction of treatment works for which a grant is applied for under [section 1281(g)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1281/g/1&num=0&edition=prelim) from funds allotted to the State under [section 1285 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1285&num=0&edition=prelim) and which otherwise meets the requirements of this chapter. The Administrator shall act upon such plans, specifications, and estimates as soon as practicable after the same have been submitted, and his approval of any such plans, specifications, and estimates shall be deemed a contractual obligation of the United States for the payment of its proportional contribution to such project.
(2) **Agreement on eligible costs.—**
(A) *Limitation on modifications.—* — Before taking final action on any plans, specifications, and estimates submitted under this subsection after the 60th day following February 4, 1987, the Administrator shall enter into a written agreement with the applicant which establishes and specifies which items of the proposed project are eligible for Federal payments under this section. The Administrator may not later modify such eligibility determinations unless they are found to have been made in violation of applicable Federal statutes and regulations.
(B) *Limitation on effect.—* — Eligibility determinations under this paragraph shall not preclude the Administrator from auditing a project pursuant to [section
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1283
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.