Browse Arkansas Code titles and sections
42 U.S.C. § 6966a — Increased use of recovered mineral com-
Federal law — U.S. Code and appendices · legal_authorities
Page 7000
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 6966a
use of recovered mineral component in cement
or concrete projects for which recovered min-
eral components historically have not been
used or have been used only minimally.
(3) Federal procurement requirements
The Administrator and each agency head
shall carry out this subsection in accordance
with section 6962 of this title.
(c) Full implementation study
(1) In general
The Administrator, in cooperation with the
Secretary of Transportation and the Secretary
of Energy, shall conduct a study to determine
the extent to which procurement require-
ments, when fully implemented in accordance
with subsection (b), may realize energy sav-
ings and environmental benefits attainable
with substitution of recovered mineral compo-
nent in cement used in cement or concrete
projects.
(2) Matters to be addressed
The study shall—
(A) quantify—
(i) the extent to which recovered mineral
components are being substituted for Port-
land cement, particularly as a result of
procurement requirements; and
(ii) the energy savings and environ-
mental benefits associated with the substi-
tution;
(B) identify all barriers in procurement re-
quirements to greater realization of energy
savings and environmental benefits, includ-
ing barriers resulting from exceptions from
the law; and
(C)(i) identify potential mechanisms to
achieve greater substitution of recovered
mineral component in types of cement or
concrete projects for which recovered min-
eral components historically have not been
used or have been used only minimally;
(ii) evaluate the feasibility of establishing
guidelines or standards for optimized substi-
tution rates of recovered mineral component
in those cement or concrete projects; and
(iii) identif
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 6966a
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: c4c96feb31e11e140e8b26251044b8d807ec5062089a00c124e55d5fbd9a2b8c. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-1e612f4c42bbc3e8b294babc
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-6966a-increased-use-of-recovered-mineral-com--94e05de16f.md
Pages: Not recorded – Not recorded
Passage SHA-256: 7d674bb88f91baacb6a4d941a54f6a82b445010a35fde0012875182cb1139ab0
Source location: USCODE-2024-title42-chap82-subchapVI-sec6966a.pdf
Stored source content
Page 7000
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 6966a
use of recovered mineral component in cement
or concrete projects for which recovered min-
eral components historically have not been
used or have been used only minimally.
(3) Federal procurement requirements
The Administrator and each agency head
shall carry out this subsection in accordance
with section 6962 of this title.
(c) Full implementation study
(1) In general
The Administrator, in cooperation with the
Secretary of Transportation and the Secretary
of Energy, shall conduct a study to determine
the extent to which procurement require-
ments, when fully implemented in accordance
with subsection (b), may realize energy sav-
ings and environmental benefits attainable
with substitution of recovered mineral compo-
nent in cement used in cement or concrete
projects.
(2) Matters to be addressed
The study shall—
(A) quantify—
(i) the extent to which recovered mineral
components are being substituted for Port-
land cement, particularly as a result of
procurement requirements; and
(ii) the energy savings and environ-
mental benefits associated with the substi-
tution;
(B) identify all barriers in procurement re-
quirements to greater realization of energy
savings and environmental benefits, includ-
ing barriers resulting from exceptions from
the law; and
(C)(i) identify potential mechanisms to
achieve greater substitution of recovered
mineral component in types of cement or
concrete projects for which recovered min-
eral components historically have not been
used or have been used only minimally;
(ii) evaluate the feasibility of establishing
guidelines or standards for optimized substi-
tution rates of recovered mineral component
in those cement or concrete projects; and
(iii) identify any potential environmental
or economic effects that may result from
greater substitution of recovered mineral
component in those cement or concrete
projects.
(3) Report
Not later than 30 months after August 8,
2005, the Administrator shall submit to Con-
gress a report on the study.
(d) Additional procurement requirements
Unless the study conducted under subsection
(c) identifies any effects or other problems de-
scribed in subsection (c)(2)(C)(iii) that warrant
further review or delay, the Administrator and
each agency head shall, not later than 1 year
after the date on which the report under sub-
section (c)(3) is submitted, take additional ac-
tions under this chapter to establish procure-
ment requirements and incentives that provide
for the use of cement and concrete with in-
creased substitution of recovered mineral com-
ponent in the construction and maintenance of
cement or concrete projects—
(1) to realize more fully the energy savings
and environmental benefits associated with in-
creased substitution; and
(2) to eliminate barriers identified under
subsection (c)(2)(B).
(e) Effect of section
Nothing in this section affects the require-
ments of section 6962 of this title (including the
guidelines and specifications for implementing
those requirements).
(Pub. L. 89–272, title II, § 6005, as added Pub. L.
109–58, title I, § 108(a), Aug. 8, 2005, 119 Stat. 612.)
Editorial Notes
CODIFICATION
Another section 6005 of Pub. L. 89–272 is classified to
section 6966a of this title.
§ 6966a. Increased use of recovered mineral com-
ponent in federally funded projects involving
procurement of cement or concrete
(a) Definitions
In this section:
(1) Agency head
The term ‘‘agency head’’ means—
(A) the Secretary of Transportation; and
(B) the head of each other Federal agency
that on a regular basis procures, or provides
Federal funds to pay or assist in paying the
cost of procuring, material for cement or
concrete projects.
(2) Cement or concrete project
The term ‘‘cement or concrete project’’
means a project for the construction or main-
tenance of a highway or other transportation
facility or a Federal, State, or local govern-
ment building or other public facility that—
(A) involves the procurement of cement or
concrete; and
(B) is carried out in whole or in part using
Federal funds.
(3) Recovered mineral component
The term ‘‘recovered mineral component’’
means—
(A) ground granulated blast furnace slag
other than lead slag;
(B) coal combustion fly ash;
(C) blast furnace slag aggregate other than
lead slag aggregate;
(D) silica fume; and
(E) any other waste material or byproduct
recovered or diverted from solid waste that
the Administrator, in consultation with an
agency head, determines should be treated
as recovered mineral component under this
section for use in cement or concrete
projects paid for, in whole or in part, by the
agency head.
(b) Implementation of requirements
(1) In general
Not later than 1 year after August 10, 2005,
the Administrator and each agency head shall
take such actions as are necessary to imple-
ment fully all procurement requirements and
incentives in effect as of August 10, 2005 (in-
Page 7001
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 6966b
cluding guidelines under section 6962 of this
title) that provide for the use of cement and
concrete
incorporating
recovered
mineral
component in cement or concrete projects.
(2) Priority
In carrying out paragraph (1) an agency head
shall give priority to achieving greater use of
recovered mineral component in cement or
concrete projects for which recovered mineral
components historically have not been used or
have been used only minimally.
(3) Conformance
The Administrator and each agency head
shall carry out this subsection in accordance
with section 6962 of this title.
(c) Full implementation study
(1) In general
The Administrator, in cooperation with the
Secretary of Transportation and the Secretary
of Energy, shall conduct a study to determine
the extent to which current procurement re-
quirements, when fully implemented in ac-
cordance with subsection (b), may realize en-
ergy savings and environmental benefits at-
tainable with substitution of recovered min-
eral component in cement used in cement or
concrete projects.
(2) Matters to be addressed
The study shall—
(A) quantify the extent to which recovered
mineral components are being substituted
for Portland cement, particularly as a result
of current procurement requirements, and
the energy savings and environmental bene-
fits associated with that substitution;
(B) identify all barriers in procurement re-
quirements to greater realization of energy
savings and environmental benefits, includ-
ing barriers resulting from exceptions from
current law; and
(C)(i) identify potential mechanisms to
achieve greater substitution of recovered
mineral component in types of cement or
concrete projects for which recovered min-
eral components historically have not been
used or have been used only minimally;
(ii) evaluate the feasibility of establishing
guidelines or standards for optimized substi-
tution rates of recovered mineral component
in those cement or concrete projects; and
(iii) identify any potential environmental
or economic effects that may result from
greater substitution of recovered mineral
component in those cement or concrete
projects.
(3) Report
Not later than 30 months after August 10,
2005, the Administrator shall submit to Con-
gress a report on the study.
(d) Additional procurement requirements
Unless the study conducted under subsection
(c) identifies any effects or other problems de-
scribed in subsection (c)(2)(C)(iii) that warrant
further review or delay, the Administrator and
each agency head shall, not later than 1 year
after the release of the report in accordance
with subsection (c)(3), take additional actions
authorized under this chapter to establish pro-
curement requirements and incentives that pro-
vide for the use of cement and concrete with in-
creased substitution of recovered mineral com-
ponent in the construction and maintenance of
cement or concrete projects, so as to—
(1) realize more fully the energy savings and
environmental benefits associated with in-
creased substitution; and
(2) eliminate barriers identified under sub-
section (c).
(e) Effect of section
Nothing in this section affects the require-
ments of section 6962 of this title (including the
guidelines and specifications for implementing
those requirements).
(Pub. L. 89–272, title II, § 6005, as added Pub. L.
109–59, title VI, § 6017(a), Aug. 10, 2005, 119 Stat.
1888.)
Editorial Notes
CODIFICATION
Another section 6005 of Pub. L. 89–272 is classified to
section 6966 of this title.
§ 6966b. Use of granular mine tailings
(a) Mine tailings
(1) In general
Not later than 180 days after August 10, 2005,
the Administrator, in consultation with the
Secretary of Transportation and heads of
other Federal agencies, shall establish criteria
(including an evaluation of whether to estab-
lish a numerical standard for concentration of
lead and other hazardous substances) for the
safe and environmentally protective use of
granular mine tailings from the Tar Creek,
Oklahoma Mining District, known as ‘‘chat’’,
for—
(A) cement or concrete projects; and
(B) transportation construction projects
(including
transportation
construction
projects involving the use of asphalt) that
are carried out, in whole or in part, using
Federal funds.
(2) Requirements
In establishing criteria under paragraph (1),
the Administrator shall consider—
(A) the current and previous uses of granu-
lar mine tailings as an aggregate for as-
phalt; and
(B) any environmental and public health
risks and benefits derived from the removal,
transportation, and use in transportation
projects of granular mine tailings.
(3) Public participation
In establishing the criteria under paragraph
(1), the Administrator shall solicit and con-
sider comments from the public.
(4) Applicability of criteria
On the establishment of the criteria under
paragraph (1), any use of the granular mine
tailings described in paragraph (1) in a trans-
portation project that is carried out, in whole
or in part, using Federal funds, shall meet the
criteria established under paragraph (1).
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definitions** In this section:
(1) **Agency head** — The term “agency head” means—
(A) the Secretary of Transportation; and
(B) the head of each other Federal agency that on a regular basis procures, or provides Federal funds to pay or assist in paying the cost of procuring, material for cement or concrete projects.
(2) **Cement or concrete project** — The term “cement or concrete project” means a project for the construction or maintenance of a highway or other transportation facility or a Federal, State, or local government building or other public facility that—
(A) involves the procurement of cement or concrete; and
(B) is carried out in whole or in part using Federal funds.
(3) **Recovered mineral component** — The term “recovered mineral component” means—
(A) ground granulated blast furnace slag other than lead slag;
(B) coal combustion fly ash;
(C) blast furnace slag aggregate other than lead slag aggregate;
(D) silica fume; and
(E) any other waste material or byproduct recovered or diverted from solid waste that the Administrator, in consultation with an agency head, determines should be treated as recovered mineral component under this section for use in cement or concrete projects paid for, in whole or in part, by the agency head.
**(b) Implementation of requirements**
(1) **In general** — Not later than 1 year after August 10, 2005, the Administrator and each agency head shall take such actions as are necessary to implement fully all procurement requirements and incentives in effect as of August 10, 2005 (including guidelines under [section 6962 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6962&num=0&edition=prelim)) that provide for the use of cement and concrete incorporatin
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 6966a
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.