Browse Arkansas Code titles and sections
42 U.S.C. § 8262j — Energy management requirements for
Federal law — U.S. Code and appendices · legal_authorities
Page 7573
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 8272
1 So in original. Probably should be followed by the word
‘‘out’’.
Resolution No. 6, One Hundred Tenth Congress, Jan. 5,
2007. Committee on Oversight and Government Reform
of House of Representatives changed to Committee on
Oversight and Reform of House of Representatives by
House Resolution No. 6, One Hundred Sixteenth Con-
gress, Jan. 9, 2019. Committee on Oversight and Reform
of House of Representatives changed to Committee on
Oversight and Accountability of House of Representa-
tives by House Resolution No. 5, One Hundred Eight-
eenth Congress, Jan. 9, 2023.
§ 8262j. Energy management requirements for
United States Postal Service
(a) Energy management requirements for postal
facilities
(1) The Postmaster General shall, to the max-
imum extent practicable, ensure that each
United States Postal Service facility meets the
energy management requirements for Federal
buildings and agencies specified in section 8253
of this title.
(2) The Postmaster General may exclude from
the requirements of such section any facility or
collection of facilities, and the associated en-
ergy consumption and gross square footage if
the Postmaster General finds that compliance
with the requirements of such section would be
impracticable. A finding of impracticability
shall be based on the energy intensiveness of ac-
tivities carried out in such facility or collection
of facilities, the type and amount of energy con-
sumed, or the technical feasibility of making
the desired changes. The Postmaster General
shall identify and list in the report required
under section 8262i of this title the facilities des-
ignated by it for such exclusion.
(b) Implementation steps
In carrying 1 subsection (a), the Postmaster
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 8262j
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 5274d7873f8f1e02442fe525c462e4b6fa20781b176c3ba67be8b2d2a3796b69. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-1bf52e76c9551e62c42cc21e
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-8262j-energy-management-requirements-for--4e1ae93830.md
Pages: Not recorded – Not recorded
Passage SHA-256: 861025afe1ddd819109234f6a04494614b9aef5600c8e0378509824938513664
Source location: USCODE-2024-title42-chap91-subchapIII-partB-sec8262j.pdf
Stored source content
Page 7573
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 8272
1 So in original. Probably should be followed by the word
‘‘out’’.
Resolution No. 6, One Hundred Tenth Congress, Jan. 5,
2007. Committee on Oversight and Government Reform
of House of Representatives changed to Committee on
Oversight and Reform of House of Representatives by
House Resolution No. 6, One Hundred Sixteenth Con-
gress, Jan. 9, 2019. Committee on Oversight and Reform
of House of Representatives changed to Committee on
Oversight and Accountability of House of Representa-
tives by House Resolution No. 5, One Hundred Eight-
eenth Congress, Jan. 9, 2023.
§ 8262j. Energy management requirements for
United States Postal Service
(a) Energy management requirements for postal
facilities
(1) The Postmaster General shall, to the max-
imum extent practicable, ensure that each
United States Postal Service facility meets the
energy management requirements for Federal
buildings and agencies specified in section 8253
of this title.
(2) The Postmaster General may exclude from
the requirements of such section any facility or
collection of facilities, and the associated en-
ergy consumption and gross square footage if
the Postmaster General finds that compliance
with the requirements of such section would be
impracticable. A finding of impracticability
shall be based on the energy intensiveness of ac-
tivities carried out in such facility or collection
of facilities, the type and amount of energy con-
sumed, or the technical feasibility of making
the desired changes. The Postmaster General
shall identify and list in the report required
under section 8262i of this title the facilities des-
ignated by it for such exclusion.
(b) Implementation steps
In carrying 1 subsection (a), the Postmaster
General shall—
(1) not later than 1 year after October 24,
1992, prepare or update, as appropriate, a plan
(which may be submitted as part of the first
report submitted under section 8262i of this
title)—
(A) describing how this section will be im-
plemented;
(B) designating personnel primarily re-
sponsible for achieving the requirements of
this section; and
(C) identifying high priority projects;
(2) perform energy surveys of United States
Postal Service facilities as necessary to
achieve the requirements of this section;
(3) install those energy conservation meas-
ures that will attain the requirements of this
section in a cost-effective manner as defined
in section 8254 of this title; and
(4) ensure that the operation and mainte-
nance procedures applied under this section
are continued.
(Pub. L. 102–486, title I, § 166, Oct. 24, 1992, 106
Stat. 2861.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Energy Policy Act
of 1992, and not as part of the National Energy Con-
servation Policy Act which comprises this chapter.
§ 8262k. Government contract incentives
(a) Establishment of criteria
Each agency, in consultation with the Federal
Acquisition Regulatory Council, shall establish
criteria for the improvement of energy effi-
ciency in Federal facilities operated by Federal
Government contractors or subcontractors.
(b) Purpose of criteria
The criteria established under subsection (a)
shall be used to encourage Federal contractors,
and their subcontractors, which manage and op-
erate federally-owned facilities, to adopt and
utilize energy conservation measures designed
to reduce energy costs in Government-owned
and contractor-operated facilities and which are
ultimately borne by the Federal Government.
(Pub. L. 102–486, title I, § 167, Oct. 24, 1992, 106
Stat. 2862.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Energy Policy Act
of 1992, and not as part of the National Energy Con-
servation Policy Act which comprises this chapter.
PART C—FEDERAL PHOTOVOLTAIC UTILIZATION
§ 8271. ‘‘Federal facility’’ and ‘‘Secretary’’ defined
For purposes of this part—
(1) The term ‘‘Federal facility’’ means any
building, structure, or fixture or part thereof
which is owned by the United States or any
Federal agency or which is held by the United
States or any Federal agency under a lease-ac-
quisition agreement under which the United
States or a Federal agency will receive fee
simple title under the terms of such agree-
ment without further negotiation. Such term
also applies to facilities related to programs
administered by Federal agencies.
(2) The term ‘‘Secretary’’ means the Sec-
retary of Energy.
(Pub. L. 95–619, title V, § 562, Nov. 9, 1978, 92 Stat.
3280; Pub. L. 96–294, title IV, § 407(1), June 30,
1980, 94 Stat. 717.)
Editorial Notes
AMENDMENTS
1980—Par. (1). Pub. L. 96–294 inserted applicability to
facilities related to programs administered by Federal
agencies.
Statutory Notes and Related Subsidiaries
SHORT TITLE
For short title of this part as the ‘‘Federal Photo-
voltaic Utilization Act’’, see section 561 of Pub. L.
95–619, set out as a note under section 8201 of this title.
§ 8272. Photovoltaic energy program
There is hereby established a photovoltaic en-
ergy commercialization program for the acceler-
ated procurement and installation of photo-
voltaic solar electric systems for electric pro-
duction in Federal facilities.
(Pub. L. 95–619, title V, § 563, Nov. 9, 1978, 92 Stat.
3280.)
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Energy management requirements for postal facilities**
(1) The Postmaster General shall, to the maximum extent practicable, ensure that each United States Postal Service facility meets the energy management requirements for Federal buildings and agencies specified in [section 8253 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8253&num=0&edition=prelim).
(2) The Postmaster General may exclude from the requirements of such section any facility or collection of facilities, and the associated energy consumption and gross square footage if the Postmaster General finds that compliance with the requirements of such section would be impracticable. A finding of impracticability shall be based on the energy intensiveness of activities carried out in such facility or collection of facilities, the type and amount of energy consumed, or the technical feasibility of making the desired changes. The Postmaster General shall identify and list in the report required under [section 8262i of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8262i&num=0&edition=prelim) the facilities designated by it for such exclusion.
**(b) Implementation steps** In carrying 11 So in original. Probably should be followed by the word “out”. subsection (a), the Postmaster General shall—
(1) not later than 1 year after October 24, 1992, prepare or update, as appropriate, a plan (which may be submitted as part of the first report submitted under [section 8262i of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8262i&num=0&edition=prelim))—
(A) describing how this section will be implemented;
(B) designating personnel primarily responsible for achieving the requirements of
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 8262j
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.