10 U.S.C. § 3222 — Independent cost estimate required be-
Federal law — U.S. Code and appendices · legal_authorities
Page 2435
TITLE 10—ARMED FORCES
§ 3223
1701(a)(2) of Pub. L. 117–81, set out in a note preceding
section 3001 of this title and Effective Date note below.
EFFECTIVE DATE
Section and amendment by Pub. L. 116–283 effective
Jan. 1, 2022, with additional provisions for delayed im-
plementation and applicability of existing law, see sec-
tion 1801(d) of Pub. L. 116–283, set out as an Effective
Date of 2021 Amendment note preceding section 3001 of
this title.
§ 3222. Independent cost estimate required be-
fore approval
(a) REQUIREMENT.— A milestone decision au-
thority may not approve entering the engineer-
ing and manufacturing development phase, or
production and deployment phase, of a major de-
fense acquisition program or major subprogram
unless an independent cost estimate has been
conducted or approved by the Director of Cost
Assessment and Program Evaluation and consid-
ered by the milestone decision authority that
includes a cost estimate of the full life-cycle
cost of the program or subprogram.
(b) REGULATIONS.—The regulations governing
the content and submission of independent cost
estimates required by section 3221 of this title
shall require that the independent cost estimate
of the full life-cycle cost of a program or subpro-
gram include—
(1) all costs of development, procurement,
military construction, operations and support,
and trained manpower to operate, maintain,
and support the program or subprogram upon
full operational deployment, without regard to
funding source or management control; and
(2) an analysis to support decisionmaking
that
identifies
and
evaluates
alternative
courses of action that may reduce cost and
risk, and result in more affordable programs
and less costly systems.
(Added and amended Pub. L. 116–283, d
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 3222
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: ccacc1d141ae995bbef20a3170dc052712042732d5f47b31dd927550f4d97b35. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-1b9a569d2ec359465f539b2b
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-3222-independent-cost-estimate-required-be--a158d43dad.md
Pages: Not recorded – Not recorded
Passage SHA-256: e83aca64d919951198c0787db3794a40e3f13f2dbf5dc299222f539f4c54c526
Source location: USCODE-2024-title10-subtitleA-partV-subpartB-chap222-sec3222.pdf
Stored source content
Page 2435
TITLE 10—ARMED FORCES
§ 3223
1701(a)(2) of Pub. L. 117–81, set out in a note preceding
section 3001 of this title and Effective Date note below.
EFFECTIVE DATE
Section and amendment by Pub. L. 116–283 effective
Jan. 1, 2022, with additional provisions for delayed im-
plementation and applicability of existing law, see sec-
tion 1801(d) of Pub. L. 116–283, set out as an Effective
Date of 2021 Amendment note preceding section 3001 of
this title.
§ 3222. Independent cost estimate required be-
fore approval
(a) REQUIREMENT.— A milestone decision au-
thority may not approve entering the engineer-
ing and manufacturing development phase, or
production and deployment phase, of a major de-
fense acquisition program or major subprogram
unless an independent cost estimate has been
conducted or approved by the Director of Cost
Assessment and Program Evaluation and consid-
ered by the milestone decision authority that
includes a cost estimate of the full life-cycle
cost of the program or subprogram.
(b) REGULATIONS.—The regulations governing
the content and submission of independent cost
estimates required by section 3221 of this title
shall require that the independent cost estimate
of the full life-cycle cost of a program or subpro-
gram include—
(1) all costs of development, procurement,
military construction, operations and support,
and trained manpower to operate, maintain,
and support the program or subprogram upon
full operational deployment, without regard to
funding source or management control; and
(2) an analysis to support decisionmaking
that
identifies
and
evaluates
alternative
courses of action that may reduce cost and
risk, and result in more affordable programs
and less costly systems.
(Added and amended Pub. L. 116–283, div. A, title
XVIII, § 1812(a), (c), Jan. 1, 2021, 134 Stat. 4174,
4175; Pub. L. 118–159, div. A, title VIII, § 806(b)(3),
Dec. 23, 2024, 138 Stat. 1974.)
Editorial Notes
CODIFICATION
The text of subsec. (b) of section 2334 of this title,
which was transferred to this section and amended by
Pub. L. 116–283, § 1812(c), was based on Pub. L. 114–328,
div. A, title VIII, § 842(a)(4), Dec. 23, 2016, 130 Stat. 2288.
PRIOR PROVISIONS
A prior section 3222, act Aug. 10, 1956, ch. 1041, 70A
Stat. 176; Pub. L. 96–513, title V, § 502(7), Dec. 12, 1980, 94
Stat. 2909, related to authorized strength of Army Re-
serve, exclusive of members on active duty, prior to re-
peal by Pub. L. 103–337, div. A, title XVI, §§ 1662(a)(3),
1691, Oct. 5, 1994, 108 Stat. 2988, 3026, effective Dec. 1,
1994. See section 12002(a) of this title.
AMENDMENTS
2024—Subsec. (a). Pub. L. 118–159, § 806(b)(3)(B), which
directed substitution of ‘‘authority that includes a cost
estimate’’ for ‘‘authority that—’’ in introductory provi-
sions, par. (1), and ‘‘(2) for the for the engineering and
manufacturing development phase, or production and
deployment phase, includes a cost estimate’’, was exe-
cuted by making the substitution for ‘‘authority that—
’’ in introductory provisions, par. (1), and ‘‘(2) for the
engineering and manufacturing development phase, or
production and deployment phase, includes a cost esti-
mate’’, to reflect the probable intent of Congress.
Pub. L. 118–159, § 806(b)(3)(A), substituted ‘‘the engi-
neering and manufacturing development phase, or pro-
duction and deployment phase,’’ for ‘‘a milestone
phase’’ in introductory provisions.
2021—Subsec. (a). Pub. L. 116–283, § 1812(c)(1), (2)(A),
(D), redesignated subsec. (b) of section 2334 of this title
as subsec. (a) of this section, substituted ‘‘Require-
ment’’ for ‘‘Independent Cost Estimate Required Before
Approval’’ in heading, struck out par. (1) designation
before ‘‘A milestone’’, and redesignated subpars. (A)
and (B) as pars. (1) and (2), respectively.
Subsec. (b). Pub. L. 116–283, § 1812(c)(2)(B)–(D), redesig-
nated subsec. (a)(2) as (b), inserted heading, substituted
‘‘section 3221 of this title’’ for ‘‘subsection (a)’’ in intro-
ductory provisions, and redesignated subpars. (A) and
(B) as pars. (1) and (2), respectively.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section and amendment by Pub. L. 116–283 effective
Jan. 1, 2022, with additional provisions for delayed im-
plementation and applicability of existing law, see sec-
tion 1801(d) of Pub. L. 116–283, set out as an Effective
Date of 2021 Amendment note preceding section 3001 of
this title.
§ 3223. Director: review of cost estimates, cost
analyses, and records of the military depart-
ments and Defense Agencies
The Secretary of Defense shall ensure that the
Director of Cost Assessment and Program Eval-
uation—
(1) promptly receives the results of all cost
estimates and cost analyses conducted by the
military departments and Defense Agencies,
and all studies conducted by the military de-
partments and Defense Agencies in connection
with such cost estimates and cost analyses, for
major defense acquisition programs and major
subprograms of the military departments and
Defense Agencies; and
(2) has timely access to any records and data
in the Department of Defense (including the
records and data of each military department
and Defense Agency and including classified
and proprietary information) that the Direc-
tor considers necessary to review in order to
carry out any duties under this chapter.
(Added and amended Pub. L. 116–283, div. A, title
XVIII, § 1812(a), (d), Jan. 1, 2021, 134 Stat. 4174,
4175; Pub. L. 117–81, div. A, title XVII, § 1701(c)(2),
Dec. 27, 2021, 135 Stat. 2136.)
Editorial Notes
CODIFICATION
The text of subsec. (c) of section 2334 of this title,
which was transferred to this section and amended by
Pub. L. 116–283, § 1812(d), was based on Pub. L. 111–23,
title I, § 101(b)(1), May 22, 2009, 123 Stat. 1706; Pub. L.
114–328, div. A, title VIII, § 842(a)(3), (b)(2), Dec. 23, 2016,
130 Stat. 2288, 2289.
PRIOR PROVISIONS
A prior section 3223, act Aug. 10, 1956, ch. 1041, 70A
Stat. 176, related to authorized strength of Army Re-
serve in warrant officers, prior to repeal by Pub. L.
103–337, div. A, title XVI, §§ 1662(a)(3), 1691, Oct. 5, 1994,
108 Stat. 2988, 3026, effective Dec. 1, 1994. See section
12008 of this title.
AMENDMENTS
2021—Pub. L. 116–283, § 1812(d), transferred subsec. (c)
of section 2334 of this title to this section and struck
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Requirement.—** A milestone decision authority may not approve entering the engineering and manufacturing development phase, or production and deployment phase, of a major defense acquisition program or major subprogram unless an independent cost estimate has been conducted or approved by the Director of Cost Assessment and Program Evaluation and considered by the milestone decision authority that includes a cost estimate of the full life-cycle cost of the program or subprogram.
**(b) Regulations.—** The regulations governing the content and submission of independent cost estimates required by [section 3221 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3221&num=0&edition=prelim) shall require that the independent cost estimate of the full life-cycle cost of a program or subprogram include—
(1) all costs of development, procurement, military construction, operations and support, and trained manpower to operate, maintain, and support the program or subprogram upon full operational deployment, without regard to funding source or management control; and
(2) an analysis to support decisionmaking that identifies and evaluates alternative courses of action that may reduce cost and risk, and result in more affordable programs and less costly systems.