16 U.S.C. § 824r — Protection of transmission contracts in
Federal law — U.S. Code and appendices · legal_authorities
Page 1434
TITLE 16—CONSERVATION
§ 824r
1 So in original. Probably should be ‘‘this’’.
its system as of January 1, 2005, and the Com-
mission determines that any future allocation
or auction is just, reasonable and not unduly
discriminatory or preferential, provided, how-
ever, that if such a Transmission Organization
never allocated financial transmission rights on
its system that pertained to a period before Jan-
uary 1, 2005, with respect to any application by
such Transmission Organization that would
change its methodology the Commission shall
exercise its authority in a manner consistent
with the 1 chapter and that takes into account
the policies expressed in subsections (b)(1),
(b)(2), and (b)(3) as applied to firm transmission
rights held by a load-serving entity as of Janu-
ary 1, 2005, to the extent the associated genera-
tion ownership or power purchase arrangements
remain in effect.
(d) Certain transmission rights
The Commission may exercise authority under
this chapter to make transmission rights not
used to meet an obligation covered by sub-
section (b) available to other entities in a man-
ner determined by the Commission to be just,
reasonable, and not unduly discriminatory or
preferential.
(e) Obligation to build
Nothing in this chapter relieves a load-serving
entity from any obligation under State or local
law to build transmission or distribution facili-
ties adequate to meet the service obligations of
the load-serving entity.
(f) Contracts
Nothing in this section shall provide a basis
for abrogating any contract or service agree-
ment for firm transmission service or rights in
effect as of August 8, 2005. If an ISO in the West-
ern Interconnection had allocated financial
transmission rights prior to August 8, 2005, but
ha
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 824r
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 96dd94cd4fc359a1f0a24aff303692a551d3751532626c918e8e1a2f6b160f46. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-17a536c4ee1f3bdb114cbc3d
Source file: Laws/federal/codes/united-states-code-2024/title-16/section-824r-protection-of-transmission-contracts-in--ba6308b834.md
Pages: Not recorded – Not recorded
Passage SHA-256: 5bc9ba8c89fb4a22bf79cd8fd80e92da9bb38f8437e142f6b31085375e76cbf5
Source location: USCODE-2024-title16-chap12-subchapII-sec824r.pdf
Stored source content
Page 1434
TITLE 16—CONSERVATION
§ 824r
1 So in original. Probably should be ‘‘this’’.
its system as of January 1, 2005, and the Com-
mission determines that any future allocation
or auction is just, reasonable and not unduly
discriminatory or preferential, provided, how-
ever, that if such a Transmission Organization
never allocated financial transmission rights on
its system that pertained to a period before Jan-
uary 1, 2005, with respect to any application by
such Transmission Organization that would
change its methodology the Commission shall
exercise its authority in a manner consistent
with the 1 chapter and that takes into account
the policies expressed in subsections (b)(1),
(b)(2), and (b)(3) as applied to firm transmission
rights held by a load-serving entity as of Janu-
ary 1, 2005, to the extent the associated genera-
tion ownership or power purchase arrangements
remain in effect.
(d) Certain transmission rights
The Commission may exercise authority under
this chapter to make transmission rights not
used to meet an obligation covered by sub-
section (b) available to other entities in a man-
ner determined by the Commission to be just,
reasonable, and not unduly discriminatory or
preferential.
(e) Obligation to build
Nothing in this chapter relieves a load-serving
entity from any obligation under State or local
law to build transmission or distribution facili-
ties adequate to meet the service obligations of
the load-serving entity.
(f) Contracts
Nothing in this section shall provide a basis
for abrogating any contract or service agree-
ment for firm transmission service or rights in
effect as of August 8, 2005. If an ISO in the West-
ern Interconnection had allocated financial
transmission rights prior to August 8, 2005, but
had not done so with respect to one or more
load-serving entities’ firm transmission rights
held under contracts to which the preceding sen-
tence applies (or held by reason of ownership or
future ownership of transmission facilities),
such load-serving entities may not be required,
without their consent, to convert such firm
transmission rights to tradable or financial
rights, except where the load-serving entity has
voluntarily joined the ISO as a participating
transmission owner (or its successor) in accord-
ance with the ISO tariff.
(g) Water pumping facilities
The Commission shall ensure that any entity
described in section 824(f) of this title that owns
transmission facilities used predominately to
support its own water pumping facilities shall
have, with respect to the facilities, protections
for transmission service comparable to those
provided to load-serving entities pursuant to
this section.
(h) ERCOT
This section shall not apply within the area
referred to in section 824k(k)(2)(A) of this title.
(i) Jurisdiction
This section does not authorize the Commis-
sion to take any action not otherwise within the
jurisdiction of the Commission.
(j) TVA area
(1) Subject to paragraphs (2) and (3), for pur-
poses of subsection (b)(1)(B), a load-serving enti-
ty that is located within the service area of the
Tennessee Valley Authority and that has a firm
wholesale power supply contract with the Ten-
nessee Valley Authority shall be considered to
hold firm transmission rights for the trans-
mission of the power provided.
(2) Nothing in this subsection affects the re-
quirements of section 824k(j) of this title.
(3) The Commission shall not issue an order on
the basis of this subsection that is contrary to
the purposes of section 824k(j) of this title.
(k) Effect of exercising rights
An entity that to the extent required to meet
its service obligations exercises rights described
in subsection (b) shall not be considered by such
action as engaging in undue discrimination or
preference under this chapter.
(June 10, 1920, ch. 285, pt. II, § 217, as added Pub.
L. 109–58, title XII, § 1233(a), Aug. 8, 2005, 119
Stat. 957.)
Statutory Notes and Related Subsidiaries
FERC RULEMAKING ON LONG-TERM TRANSMISSION
RIGHTS IN ORGANIZED MARKETS
Pub. L. 109–58, title XII, § 1233(b), Aug. 8, 2005, 119
Stat. 960, provided that: ‘‘Within 1 year after the date
of enactment of this section [Aug. 8, 2005] and after no-
tice and an opportunity for comment, the [Federal En-
ergy Regulatory] Commission shall by rule or order,
implement section 217(b)(4) of the Federal Power Act
[16 U.S.C. 824q(b)(4)] in Transmission Organizations, as
defined by that Act [16 U.S.C. 791a et seq.] with orga-
nized electricity markets.’’
§ 824r. Protection of transmission contracts in
the Pacific Northwest
(a) Definition of electric utility or person
In this section, the term ‘‘electric utility or
person’’ means an electric utility or person
that—
(1) as of August 8, 2005, holds firm trans-
mission rights pursuant to contract or by rea-
son of ownership of transmission facilities;
and
(2) is located—
(A) in the Pacific Northwest, as that re-
gion is defined in section 839a of this title; or
(B) in that portion of a State included in
the geographic area proposed for a regional
transmission organization in Commission
Docket Number RT01–35 on the date on
which that docket was opened.
(b) Protection of transmission contracts
Nothing in this chapter confers on the Com-
mission the authority to require an electric util-
ity or person to convert to tradable or financial
rights—
(1) firm transmission rights described in sub-
section (a); or
(2) firm transmission rights obtained by ex-
ercising contract or tariff rights associated
with the firm transmission rights described in
subsection (a).
(June 10, 1920, ch. 285, pt. II, § 218, as added Pub.
L. 109–58, title XII, § 1235, Aug. 8, 2005, 119 Stat.
960.)
Page 1435
TITLE 16—CONSERVATION
§ 824s–1
§ 824s. Transmission infrastructure investment
(a) Rulemaking requirement
Not later than 1 year after August 8, 2005, the
Commission shall establish, by rule, incentive-
based (including performance-based) rate treat-
ments for the transmission of electric energy in
interstate commerce by public utilities for the
purpose of benefitting consumers by ensuring re-
liability and reducing the cost of delivered
power by reducing transmission congestion.
(b) Contents
The rule shall—
(1) promote reliable and economically effi-
cient transmission and generation of elec-
tricity by promoting capital investment in the
enlargement, improvement, maintenance, and
operation of all facilities for the transmission
of electric energy in interstate commerce, re-
gardless of the ownership of the facilities;
(2) provide a return on equity that attracts
new investment in transmission facilities (in-
cluding related transmission technologies);
(3) encourage deployment of transmission
technologies and other measures to increase
the capacity and efficiency of existing trans-
mission facilities and improve the operation of
the facilities; and
(4) allow recovery of—
(A) all prudently incurred costs necessary
to comply with mandatory reliability stand-
ards issued pursuant to section 824o of this
title; and
(B) all prudently incurred costs related to
transmission
infrastructure
development
pursuant to section 824p of this title.
(c) Incentives
In the rule issued under this section, the Com-
mission shall, to the extent within its jurisdic-
tion, provide for incentives to each transmitting
utility or electric utility that joins a Trans-
mission Organization. The Commission shall en-
sure that any costs recoverable pursuant to this
subsection may be recovered by such utility
through the transmission rates charged by such
utility
or
through
the
transmission
rates
charged by the Transmission Organization that
provides transmission service to such utility.
(d) Just and reasonable rates
All rates approved under the rules adopted
pursuant to this section, including any revisions
to the rules, are subject to the requirements of
sections 824d and 824e of this title that all rates,
charges, terms, and conditions be just and rea-
sonable and not unduly discriminatory or pref-
erential.
(June 10, 1920, ch. 285, pt. II, § 219, as added Pub.
L. 109–58, title XII, § 1241, Aug. 8, 2005, 119 Stat.
961.)
§ 824s–1. Incentives for cybersecurity invest-
ments
(a) Definitions
In this section:
(1) Advanced cybersecurity technology
The term ‘‘advanced cybersecurity tech-
nology’’ means any technology, operational
capability, or service, including computer
hardware, software, or a related asset, that en-
hances the security posture of public utilities
through improvements in the ability to pro-
tect against, detect, respond to, or recover
from a cybersecurity threat (as defined in sec-
tion 650 of title 6).
(2) Advanced cybersecurity technology infor-
mation
The term ‘‘advanced cybersecurity tech-
nology information’’ means information relat-
ing to advanced cybersecurity technology or
proposed advanced cybersecurity technology
that is generated by or provided to the Com-
mission or another Federal agency.
(b) Study
Not later than 180 days after November 15,
2021, the Commission, in consultation with the
Secretary of Energy, the North American Elec-
tric Reliability Corporation, the Electricity
Subsector Coordinating Council, and the Na-
tional Association of Regulatory Utility Com-
missioners, shall conduct a study to identify in-
centive-based,
including
performance-based,
rate treatments for the transmission and sale of
electric energy subject to the jurisdiction of the
Commission that could be used to encourage—
(1) investment by public utilities in ad-
vanced cybersecurity technology; and
(2)
participation
by
public
utilities
in
cybersecurity threat information sharing pro-
grams.
(c) Incentive-based rate treatment
Not later than 1 year after the completion of
the study under subsection (b), the Commission
shall establish, by rule, incentive-based, includ-
ing performance-based, rate treatments for the
transmission of electric energy in interstate
commerce and the sale of electric energy at
wholesale in interstate commerce by public util-
ities for the purpose of benefitting consumers by
encouraging—
(1) investments by public utilities in ad-
vanced cybersecurity technology; and
(2)
participation
by
public
utilities
in
cybersecurity threat information sharing pro-
grams.
(d) Factors for consideration
In issuing a rule pursuant to this section, the
Commission may provide additional incentives
beyond those identified in subsection (c) in any
case in which the Commission determines that
an investment in advanced cybersecurity tech-
nology or information sharing program costs
will reduce cybersecurity risks to—
(1) defense critical electric infrastructure (as
defined in section 824o–1(a) of this title) and
other facilities subject to the jurisdiction of
the Commission that are critical to public
safety, national defense, or homeland security,
as determined by the Commission in consulta-
tion with—
(A) the Secretary of Energy;
(B) the Secretary of Homeland Security;
and
(C) other appropriate Federal agencies;
and
(2) facilities of small or medium-sized public
utilities with limited cybersecurity resources,
as determined by the Commission.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
This chapter may be cited as the “Federal Power Act”.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 791a
Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 1364
TITLE 16—CONSERVATION
§ 791
Sec.
Statutory Notes and Related Subsidiaries
FINDINGS
Pub. L. 113–23, § 2, Aug. 9, 2013, 127 Stat. 493, provided
that: ‘‘Congress finds that—
‘‘(1) the hydropower industry currently employs ap-
proximately 300,000 workers across the United States;
‘‘(2) hydropower is the largest source of clean, re-
newable electricity in the United States;
‘‘(3) as of the date of enactment of this Act [Aug. 9,
2013], hydropower resources, including pumped stor-
age facilities, provide—
‘‘(A) nearly 7 percent of the electricity generated
in the United States; and
‘‘(B) approximately 100,000 megawatts of electric
capacity in the United States;
‘‘(4) only 3 percent of the 80,000 dams in the United
States generate electricity, so there is substantial
potential for adding hydropower generation to non-
powered dams; and
‘‘(5) according to one study, by utilizing currently
untapped resources, the United States could add ap-
proximately 60,000 megawatts of new hydropower ca-
pacity by 2025, which could create 700,000 new jobs
over the next 13 years.’’
SUBCHAPTER I—REGULATION OF THE DE-
VELOPMENT OF WATER POWER AND RE-
SOURCES
Statutory Notes and Related Subsidiaries
CODIFICATION; CONSTRUCTION
Act Aug. 26, 1935, ch. 687, title II, § 212, 49 Stat. 847,
provided that sections 1 to 29 of the Federal Water
Power Act, as amended (sections 792, 793, 794 to 797, 798
to 818, 819, and 820 to 823 of this title) shall constitute
part I of the act. Said section 212 also repealed sections
25 and 30 of the act (sections 819, 791 of this title). It
also contained a proviso as follows: ‘‘That nothing in
that Act, as amended, shall be construed to repeal or
amend the provisions of the amendment to the Federal
Water Power Act approved March 3, 192
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 791a
Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definitions** In this section:
(1) The term “distribution utility” means an electric utility that has a service obligation to end-users or to a State utility or electric cooperative that, directly or indirectly, through one or more additional State utilities or electric cooperatives, provides electric service to end-users.
(2) The term “load-serving entity” means a distribution utility or an electric utility that has a service obligation.
(3) The term “service obligation” means a requirement applicable to, or the exercise of authority granted to, an electric utility under Federal, State, or local law or under long-term contracts to provide electric service to end-users or to a distribution utility.
(4) The term “State utility” means a State or any political subdivision of a State, or any agency, authority, or instrumentality of any one or more of the foregoing, or a corporation that is wholly owned, directly or indirectly, by any one or more of the foregoing, competent to carry on the business of developing, transmitting, utilizing, or distributing power.
**(b) Meeting service obligations**
(1) Paragraph (2) applies to any load-serving entity that, as of August 8, 2005—
(A) owns generation facilities, markets the output of Federal generation facilities, or holds rights under one or more wholesale contracts to purchase electric energy, for the purpose of meeting a service obligation; and
(B) by reason of ownership of transmission facilities, or one or more contracts or service agreements for firm transmission service, holds firm transmission rights for delivery of the output of the generation facilities or the purchased energy to meet the service obligation.
(2) Any load-serving entity described in paragraph (1) is entitled to use the firm transmission
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824q
Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 824q. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 1433
TITLE 16—CONSERVATION
§ 824q
AMENDMENTS
2021—Subsec. (a)(1). Pub. L. 117–58, § 40105(a)(1), in-
serted ‘‘and Indian Tribes’’ after ‘‘affected States’’ and
‘‘capacity constraints and’’ before ‘‘congestion’’.
Subsec. (a)(2). Pub. L. 117–58, § 40105(a)(2), substituted
‘‘Not less frequently than once every 3 years, the Sec-
retary, after’’ for ‘‘After’’ and ‘‘affected States and In-
dian Tribes), shall issue a report, based on the study
under paragraph (1) or other information relating to
electric transmission capacity constraints and conges-
tion, which may designate as a national interest elec-
tric transmission corridor any geographic area that—’’
for ‘‘affected States), the Secretary shall issue a report,
based on the study, which may designate any geo-
graphic area experiencing electric energy transmission
capacity constraints or congestion that adversely af-
fects consumers as a national interest electric trans-
mission corridor.’’ and added subpars. (i) and (ii).
Subsec. (a)(3). Pub. L. 117–58, § 40105(a)(3), substituted
‘‘Not less frequently than once every 3 years, the Sec-
retary, in conducting the study under paragraph (1) and
issuing the report under paragraph (2), shall consult’’
for ‘‘The Secretary shall conduct the study and issue
the report in consultation’’.
Subsec. (a)(4)(C). Pub. L. 117–58, § 40105(a)(4)(A), in-
serted ‘‘or energy security’’ after ‘‘independence’’.
Subsec.
(a)(4)(F)
to
(H).
Pub.
L.
117–58,
§ 40105(a)(4)(B)–(D), added subpars. (F) to (H).
Subsec. (b)(1)(A)(ii). Pub. L. 117–58, § 40105(b)(1)(A), in-
serted ‘‘or interregional benefits’’ after ‘‘interstate
benefits’’.
Subsec. (b)(1)(C). Pub. L. 117–58, § 40105(b)(1)(B), added
subpar. (C) and struck out former subpar. (C) which re-
lated to State commissio
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 824q
Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 824q. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definition of electric utility or person** In this section, the term “electric utility or person” means an electric utility or person that—
(1) as of August 8, 2005, holds firm transmission rights pursuant to contract or by reason of ownership of transmission facilities; and
(2) is located—
(A) in the Pacific Northwest, as that region is defined in [section 839a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section839a&num=0&edition=prelim); or
(B) in that portion of a State included in the geographic area proposed for a regional transmission organization in Commission Docket Number RT01–35 on the date on which that docket was opened.
**(b) Protection of transmission contracts** Nothing in this chapter confers on the Commission the authority to require an electric utility or person to convert to tradable or financial rights—
(1) firm transmission rights described in subsection (a); or
(2) firm transmission rights obtained by exercising contract or tariff rights associated with the firm transmission rights described in subsection (a).
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824r
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.