Browse Arkansas Code titles and sections
43 U.S.C. § 508 — Costs incurred in the modification of struc-
Federal law — U.S. Code and appendices · legal_authorities
Page 180
TITLE 43—PUBLIC LANDS
§ 506
SUBCHAPTER XI–A—RECLAMATION
SAFETY OF DAMS
§ 506. Authority of Secretary to make modifica-
tions
In order to preserve the structural safety of
Bureau of Reclamation dams and related facili-
ties the Secretary of the Interior is authorized
to perform such modifications as he determines
to be reasonably required. Said performance of
work shall be in accordance with the Federal
reclamation laws (Act of June 17, 1902, 32 Stat.
388, and Acts amendatory or supplementary
thereto).
(Pub. L. 95–578, § 2, Nov. 2, 1978, 92 Stat. 2471.)
Editorial Notes
REFERENCES IN TEXT
Act of June 17, 1902, referred to in text, is popularly
known as the Reclamation Act, which is classified gen-
erally to this chapter. For complete classification of
this Act to the Code, see Short Title note set out under
section 371 of this title and Tables.
Statutory Notes and Related Subsidiaries
SHORT TITLE OF 1984 AMENDMENT
Pub. L. 98–404, § 1, Aug. 28, 1984, 98 Stat. 1481, provided
in part: ‘‘That this Act [amending sections 508 and 509
of this title] may be cited as ‘The Reclamation Safety
of Dams Act Amendments of 1984’.’’
SHORT TITLE OF 1978 AMENDMENT
Pub. L. 95–578, § 1, Nov. 2, 1978, 92 Stat. 2471, provided:
‘‘That this Act [enacting this subchapter and amending
section 1511 of this title] shall be cited as the ‘Reclama-
tion Safety of Dams Act of 1978’.’’
FACILITIES INCLUDED WITHIN SCOPE OF RECLAMATION
SAFETY OF DAMS ACT OF 1978
Pub. L. 95–578, § 12, as added by Pub. L. 98–404, § 1(4),
Aug. 28, 1984, 98 Stat. 1482, provided that: ‘‘Included
within the scope of this Act [this subchapter] are Fish
Lake, Four Mile, Ochoco, Savage Rapids Diversion and
Warm Springs Dams, Oregon; Como Dam, Montana;
Little Wood River Dam, Idaho; and related fa
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 508
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 781df1e4f27a1837b89ee50b72ce9248f32f36bbe53065cff78c97cb5b4a8055. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-14dbb284281ed65b6e58149c
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-508-costs-incurred-in-the-modification-of-struc--569733442e.md
Pages: Not recorded – Not recorded
Passage SHA-256: ea709de656485378c10305a0013ce4ebc847d2897f5e38788c858dd62c8469ce
Source location: USCODE-2024-title43-chap12-subchapXI-A-sec508.pdf
Stored source content
Page 180
TITLE 43—PUBLIC LANDS
§ 506
SUBCHAPTER XI–A—RECLAMATION
SAFETY OF DAMS
§ 506. Authority of Secretary to make modifica-
tions
In order to preserve the structural safety of
Bureau of Reclamation dams and related facili-
ties the Secretary of the Interior is authorized
to perform such modifications as he determines
to be reasonably required. Said performance of
work shall be in accordance with the Federal
reclamation laws (Act of June 17, 1902, 32 Stat.
388, and Acts amendatory or supplementary
thereto).
(Pub. L. 95–578, § 2, Nov. 2, 1978, 92 Stat. 2471.)
Editorial Notes
REFERENCES IN TEXT
Act of June 17, 1902, referred to in text, is popularly
known as the Reclamation Act, which is classified gen-
erally to this chapter. For complete classification of
this Act to the Code, see Short Title note set out under
section 371 of this title and Tables.
Statutory Notes and Related Subsidiaries
SHORT TITLE OF 1984 AMENDMENT
Pub. L. 98–404, § 1, Aug. 28, 1984, 98 Stat. 1481, provided
in part: ‘‘That this Act [amending sections 508 and 509
of this title] may be cited as ‘The Reclamation Safety
of Dams Act Amendments of 1984’.’’
SHORT TITLE OF 1978 AMENDMENT
Pub. L. 95–578, § 1, Nov. 2, 1978, 92 Stat. 2471, provided:
‘‘That this Act [enacting this subchapter and amending
section 1511 of this title] shall be cited as the ‘Reclama-
tion Safety of Dams Act of 1978’.’’
FACILITIES INCLUDED WITHIN SCOPE OF RECLAMATION
SAFETY OF DAMS ACT OF 1978
Pub. L. 95–578, § 12, as added by Pub. L. 98–404, § 1(4),
Aug. 28, 1984, 98 Stat. 1482, provided that: ‘‘Included
within the scope of this Act [this subchapter] are Fish
Lake, Four Mile, Ochoco, Savage Rapids Diversion and
Warm Springs Dams, Oregon; Como Dam, Montana;
Little Wood River Dam, Idaho; and related facilities
which have been made a part of a Federal reclamation
project by previous Acts of Congress. Coolidge Dam,
San Carlos Irrigation Project, Arizona, shall also be in-
cluded within the scope of this Act.’’
§ 507. Construction for dam safety
Except as provided in section 509b of this title,
construction authorized by this subchapter shall
be for the purposes of dam safety and not for the
specific purposes of providing additional con-
servation storage capacity or of developing ben-
efits over and above those provided by the origi-
nal dams and reservoirs. Nothing in this sub-
chapter shall be construed to reduce the amount
of project costs allocated to reimbursable pur-
poses heretofore authorized.
(Pub. L. 95–578, § 3, Nov. 2, 1978, 92 Stat. 2471;
Pub. L. 114–113, div. D, title II, § 203(1), Dec. 18,
2015, 129 Stat. 2406.)
Editorial Notes
AMENDMENTS
2015—Pub. L. 114–113 substituted ‘‘Except as provided
in section 509b of this title, construction’’ for ‘‘Con-
struction’’.
§ 508. Costs incurred in the modification of struc-
tures
(a) Costs resulting from age and normal deterio-
ration or lack of maintenance of structures
Costs heretofore or hereafter incurred in the
modification of structures under this sub-
chapter, the cause of which results from age and
normal deterioration of the structure or from
nonperformance of reasonable and normal main-
tenance of the structure by the operating entity
shall be considered as project costs and will be
allocated to the purposes for which the struc-
ture was authorized initially to be constructed
and will be reimbursable as provided by existing
law.
(b) Nonreimbursable costs resulting from new
hydrologic or seismic data or changes in cri-
teria
With respect to the $100,000,000 authorized to
be appropriated in the Reclamation Safety of
Dams Act of 1978 [43 U.S.C. 509], costs heretofore
or hereafter incurred in the modification of
structures under this subchapter, the cause of
which results from new hydrologic or seismic
data or changes in state-of-the-art criteria
deemed necessary for safety purposes shall be
nonreimbursable and nonreturnable under the
Federal Reclamation law.
(c) Reimbursement of certain modification costs
With respect to the additional amounts au-
thorized to be appropriated by section 509 of this
title, costs incurred in the modification of struc-
tures under this subchapter, the cause of which
results from new hydrologic or seismic data or
changes in state-of-the-art criteria deemed nec-
essary for safety purposes, shall be reimbursed
to the extent provided in this subsection.
(1) Fifteen percent of such costs shall be al-
located to the authorized purposes of the
structure, except that in the case of Jackson
Lake Dam, Minidoka Project, Idaho-Wyoming,
such costs shall be allocated in accordance
with the allocation of operation and mainte-
nance charges.
(2) Costs allocated to irrigation water serv-
ice and capable of being repaid by the irriga-
tion water users shall be reimbursed within 50
years of the year in which the work under-
taken pursuant to this subchapter is substan-
tially complete. Costs allocated to irrigation
water service which are beyond the water
users’ ability to pay shall be reimbursed in ac-
cordance with existing law.
(3) Costs allocated to recreation or fish and
wildlife enhancement shall be reimbursed in
accordance with the Federal Water Project
Recreation Act (79 Stat. 213), as amended [16
U.S.C. 460l–12 et seq.].
(4) Costs allocated to the purpose of munic-
ipal, industrial, and miscellaneous water serv-
ice, commercial power, and the portion of
recreation and fish and wildlife enhancement
costs reimbursable under the Federal Water
Project Recreation Act [16 U.S.C. 460l–12 et
seq.], shall be repaid within 50 years with in-
terest. The interest rate used shall be deter-
mined by the Secretary of the Treasury, tak-
ing into consideration average market yields
on outstanding marketable obligations of the
Page 181
TITLE 43—PUBLIC LANDS
§ 509
United States with remaining periods to ma-
turity comparable to the applicable reim-
bursement period during the month preceding
the fiscal year in which the costs are incurred.
To the extent that more than one interest rate
is determined pursuant to the preceding sen-
tence, the Secretary of the Treasury shall es-
tablish an interest rate at the weighted aver-
age of the rates so determined.
(d) Contracts for return of costs
The Secretary is authorized to negotiate ap-
propriate contracts with project beneficiaries
providing for the return of reimbursable costs
under this subchapter: Provided, however, That
no contract entered into pursuant to this sub-
chapter shall be deemed to be a new or amended
contract for the purposes of section 390cc(a) of
this title.
(e) Cost containment; modification status
(1) During the construction of the modifica-
tion, the Secretary shall consider cost contain-
ment measures recommended by a project bene-
ficiary that has elected to consult with the Bu-
reau of Reclamation on a modification.
(2) The Secretary shall provide to project
beneficiaries on a periodic basis notice regard-
ing the costs and status of the modification.
(Pub. L. 95–578, § 4, Nov. 2, 1978, 92 Stat. 2471;
Pub. L. 98–404, § 1(1), (2), Aug. 28, 1984, 98 Stat.
1481; Pub. L. 106–377, § 1(a)(2) [title II], Oct. 27,
2000, 114 Stat. 1441, 1441A–67; Pub. L. 107–117, div.
B, § 503(1), Jan. 10, 2002, 115 Stat. 2308; Pub. L.
108–439, §§ 1(a), 2(a), Dec. 3, 2004, 118 Stat. 2627.)
Editorial Notes
REFERENCES IN TEXT
The $100,000,000 authorized to be appropriated in the
Reclamation Safety of Dams Act of 1978, referred to in
subsec. (b), probably refers to the authorization origi-
nally contained in section 509 of this title. See 1984
Amendment note set out under section 509 of this title.
The Federal Reclamation law, referred to in subsec.
(b), probably means act June 17, 1902, ch. 1093, 32 Stat.
388, and Acts amendatory thereof and supplementary
thereto. See section 506 of this title. Act June 17, 1902,
popularly known as the Reclamation Act, is classified
generally to this chapter. For complete classification
of act June 17, 1902, to the Code, see Short Title note
set out under section 371 of this title and Tables.
The Federal Water Project Recreation Act, referred
to in subsec. (c)(3), (4), is Pub. L. 89–72, July 9, 1965, 79
Stat. 213, which is classified principally to part C
(§ 460l–12 et seq.) of subchapter LXIX of chapter 1 of
Title 16, Conservation. For complete classification of
this Act to the Code, see Short Title note set out under
section 460l–12 of Title 16 and Tables.
AMENDMENTS
2004—Subsec. (c). Pub. L. 108–439, § 1(a), inserted ‘‘Re-
imbursement of certain modification costs’’ as heading
and substituted ‘‘With respect to the additional
amounts authorized to be appropriated by section 509 of
this title’’ for ‘‘With respect to the additional
$650,000,000 authorized to be appropriated in The Rec-
lamation Safety of Dams Act Amendments of 1984, and
the additional $95,000,000 further authorized to be ap-
propriated by amendments to that Act in 2000, and the
additional $32,000,000 further authorized to be appro-
priated by amendments to the Act in 2001’’ in introduc-
tory provisions.
Subsec. (e). Pub. L. 108–439, § 2(a), added subsec. (e).
2002—Subsec. (c). Pub. L. 107–117 inserted ‘‘and the ad-
ditional $32,000,000 further authorized to be appro-
priated by amendments to the Act in 2001,’’ after
‘‘2000,’’ in introductory provisions.
2000—Subsec. (c). Pub. L. 106–377 inserted ‘‘and the ad-
ditional $95,000,000 further authorized to be appro-
priated by amendments to that Act in 2000,’’ after
‘‘1984,’’ in introductory provisions.
1984—Subsec. (b). Pub. L. 98–404, § 1(1), substituted
‘‘With respect to the $100,000,000 authorized to be appro-
priated in the Reclamation Safety of Dams Act of 1978,
costs’’ for ‘‘Costs’’.
Subsecs. (c), (d). Pub. L. 98–404, § 1(2), added subsecs.
(c) and (d).
§ 509. Authorization of appropriations; report to
Congress
There are hereby authorized to be appro-
priated for fiscal year 1979 and ensuing fiscal
years such sums as may be necessary and, effec-
tive October 1, 1983, not to exceed an additional
$650,000,000 (October 1, 1983, price levels), and, ef-
fective October 1, 2000, not to exceed an addi-
tional $95,000,000 (October 1, 2000, price levels),
and, effective October 1, 2001, not to exceed an
additional $32,000,000 (October 1, 2001, price lev-
els), and, effective October 1, 2003, not to exceed
an additional $540,000,000 (October 1, 2003, price
levels), and effective October 1, 2015, not to ex-
ceed an additional $1,100,000,000 (October 1, 2003,
price levels), plus or minus such amounts, if
any, as may be justified by reason of ordinary
fluctuations in construction costs as indicated
by engineering cost indexes applicable to the
types of construction involved herein, to carry
out the provisions of this subchapter to remain
available until expended if so provided by the
appropriations Act: Provided, That no funds ex-
ceeding $20,000,000 (October 1, 2003, price levels),
as adjusted to reflect any ordinary fluctuations
in construction costs indicated by applicable en-
gineering cost indexes, shall be obligated for
carrying out actual construction to modify an
existing dam under authority of this subchapter
prior to 30 calendar days from the date that the
Secretary has transmitted a report on such ex-
isting dam to the Committee on Natural Re-
sources of the House of Representatives and the
Committee on Energy and Natural Resources of
the Senate. The report required to be submitted
by this section will consist of a finding by the
Secretary of the Interior to the effect that
modifications are required to be made to insure
the safety of an existing dam. Such finding shall
be accompanied by a technical report containing
information on the need for structural modifica-
tion, the corrective action deemed to be re-
quired, alternative solutions to structural modi-
fication that were considered, the estimated
cost of needed modifications, and environmental
impacts if any resulting from the implementa-
tion of the recommended plan of modification.
For modification expenditures between $1,800,000
and $20,000,000 (October 1, 2015, price levels), the
Secretary of the Interior shall, at least 30 days
before the date on which the funds are expended,
submit written notice of the expenditures to the
Committee on Natural Resources of the House of
Representatives and Committee on Energy and
Natural Resources of the Senate that provides a
summary of the project, the cost of the project,
and any alternatives that were considered.
(Pub. L. 95–578, § 5, Nov. 2, 1978, 92 Stat. 2471;
Pub. L. 98–404, § 1(3), Aug. 28, 1984, 98 Stat. 1482;
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
Section, Pub. L. 88–29, § 1, May 28, 1963, 77 Stat. 49, related to congressional findings and declaration of policy. See [section 200101 of Title 54](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title54-section200101&num=0&edition=prelim), National Park Service and Related Programs.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 460l
Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 460l. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 629
TITLE 16—CONSERVATION
§ 460l–3
(4) carrying out two or more of the purposes
set forth in paragraphs (1) through (3) of this
section, and are adjacent to, or within, the
said conservation areas, except that the acqui-
sition of any land or interest therein pursuant
to this section shall be accomplished only
with such funds as may be appropriated there-
for by the Congress or donated for such pur-
poses, but such property shall not be acquired
with funds obtained from the sale of Federal
migratory bird hunting stamps.
Lands acquired pursuant to this section shall be-
come a part of the particular conservation area
to which they are adjacent.
(Pub. L. 87–714, § 2, Sept. 28, 1962, 76 Stat. 653;
Pub. L. 92–534, Oct. 23, 1972, 86 Stat. 1063; Pub. L.
93–205, § 13(d), Dec. 28, 1973, 87 Stat. 902.)
Editorial Notes
AMENDMENTS
1973—Pub. L. 93–205 inserted references to the acquisi-
tion of interest in land the conservation of endangered
species or threatened species listed by the Secretary
pursuant to section 1533 of this title.
1972—Pub. L. 92–534 substituted provisions author-
izing the Secretary to acquire lands suitable for fish
and wildlife oriented recreational development, or for
the protection of natural resources and adjacent to
conservation areas, for provisions authorizing the Sec-
retary to acquire limited areas of land for recreational
development adjacent to conservation areas in exist-
ence or approved by the Migratory Bird Conservation
Commission as of September 28, 1962.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1973 AMENDMENT
Amendment by Pub. L. 93–205 effective Dec. 28, 1973,
see section 16 of Pub. L. 93–205, set out as a note under
section 1531 of this title.
§ 460k–2. Cooperation with agencies, organiza-
tio
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 460l
Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 460l. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Costs resulting from age and normal deterioration or lack of maintenance of structures** Costs heretofore or hereafter incurred in the modification of structures under this subchapter, the cause of which results from age and normal deterioration of the structure or from nonperformance of reasonable and normal maintenance of the structure by the operating entity shall be considered as project costs and will be allocated to the purposes for which the structure was authorized initially to be constructed and will be reimbursable as provided by existing law.
**(b) Nonreimbursable costs resulting from new hydrologic or seismic data or changes in criteria** With respect to the $100,000,000 authorized to be appropriated in the Reclamation Safety of Dams Act of 1978 [[43 U.S.C. 509](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section509&num=0&edition=prelim)], costs heretofore or hereafter incurred in the modification of structures under this subchapter, the cause of which results from new hydrologic or seismic data or changes in state-of-the-art criteria deemed necessary for safety purposes shall be nonreimbursable and nonreturnable under the Federal Reclamation law.
**(c) Reimbursement of certain modification costs** With respect to the additional amounts authorized to be appropriated by [section 509 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section509&num=0&edition=prelim), costs incurred in the modification of structures under this subchapter, the cause of which results from new hydrologic or seismic data or changes in state-of-the-art criteria deemed necessary for safety purposes, shall be reimbursed to the extent provided in this subsection.
(1) Fifteen percent of such costs shall be allocated to t
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 508
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
There are hereby authorized to be appropriated for fiscal year 1979 and ensuing fiscal years such sums as may be necessary and, effective October 1, 1983, not to exceed an additional $650,000,000 (October 1, 1983, price levels), and, effective October 1, 2000, not to exceed an additional $95,000,000 (October 1, 2000, price levels), and, effective October 1, 2001, not to exceed an additional $32,000,000 (October 1, 2001, price levels), and, effective October 1, 2003, not to exceed an additional $540,000,000 (October 1, 2003, price levels), and effective October 1, 2015, not to exceed an additional $1,100,000,000 (October 1, 2003, price levels), plus or minus such amounts, if any, as may be justified by reason of ordinary fluctuations in construction costs as indicated by engineering cost indexes applicable to the types of construction involved herein, to carry out the provisions of this subchapter to remain available until expended if so provided by the appropriations Act: Provided, That no funds exceeding $20,000,000 (October 1, 2003, price levels), as adjusted to reflect any ordinary fluctuations in construction costs indicated by applicable engineering cost indexes, shall be obligated for carrying out actual construction to modify an existing dam under authority of this subchapter prior to 30 calendar days from the date that the Secretary has transmitted a report on such existing dam to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate. The report required to be submitted by this section will consist of a finding by the Secretary of the Interior to the effect that modifications are required to be made to insure the safety of an existing dam. Such finding shall be accompanied by a technica
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 509
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 509. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 181
TITLE 43—PUBLIC LANDS
§ 509
United States with remaining periods to ma-
turity comparable to the applicable reim-
bursement period during the month preceding
the fiscal year in which the costs are incurred.
To the extent that more than one interest rate
is determined pursuant to the preceding sen-
tence, the Secretary of the Treasury shall es-
tablish an interest rate at the weighted aver-
age of the rates so determined.
(d) Contracts for return of costs
The Secretary is authorized to negotiate ap-
propriate contracts with project beneficiaries
providing for the return of reimbursable costs
under this subchapter: Provided, however, That
no contract entered into pursuant to this sub-
chapter shall be deemed to be a new or amended
contract for the purposes of section 390cc(a) of
this title.
(e) Cost containment; modification status
(1) During the construction of the modifica-
tion, the Secretary shall consider cost contain-
ment measures recommended by a project bene-
ficiary that has elected to consult with the Bu-
reau of Reclamation on a modification.
(2) The Secretary shall provide to project
beneficiaries on a periodic basis notice regard-
ing the costs and status of the modification.
(Pub. L. 95–578, § 4, Nov. 2, 1978, 92 Stat. 2471;
Pub. L. 98–404, § 1(1), (2), Aug. 28, 1984, 98 Stat.
1481; Pub. L. 106–377, § 1(a)(2) [title II], Oct. 27,
2000, 114 Stat. 1441, 1441A–67; Pub. L. 107–117, div.
B, § 503(1), Jan. 10, 2002, 115 Stat. 2308; Pub. L.
108–439, §§ 1(a), 2(a), Dec. 3, 2004, 118 Stat. 2627.)
Editorial Notes
REFERENCES IN TEXT
The $100,000,000 authorized to be appropriated in the
Reclamation Safety of Dams Act of 1978, referred to in
subsec. (b), probably refers to the authorization origi-
nally contained in section 509 of this t
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 509
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 509. This identifies an authority to review, not proof of applicability.