Browse Arkansas Code titles and sections
16 U.S.C. § 824m — Sales by exempt wholesale generators
Federal law — U.S. Code and appendices · legal_authorities
Page 1423
TITLE 16—CONSERVATION
§ 824o
1 See References in Text note below.
Subsec. (b). Pub. L. 102–486, § 722(1), struck out subsec.
(b) which required applicants for orders to be ready,
willing, and able to reimburse parties subject to such
orders.
Subsec. (e). Pub. L. 102–486, § 722(2), amended subsec.
(e) generally. Prior to amendment, subsec. (e) related
to utilization of interconnection or wheeling authority
in lieu of other authority and limitation of Commission
authority.
Subsecs. (g) to (k). Pub. L. 102–486, § 722(3), added sub-
secs. (g) to (k).
Statutory Notes and Related Subsidiaries
STATE AUTHORITIES; CONSTRUCTION
Nothing in amendment by Pub. L. 102–486 to be con-
strued as affecting or intending to affect, or in any way
to interfere with, authority of any State or local gov-
ernment relating to environmental protection or siting
of facilities, see section 731 of Pub. L. 102–486, set out
as a note under section 796 of this title.
§ 824l. Information requirements
(a) Requests for wholesale transmission services
Whenever any electric utility, Federal power
marketing agency, or any other person gener-
ating electric energy for sale for resale makes a
good faith request to a transmitting utility to
provide wholesale transmission services and re-
quests specific rates and charges, and other
terms and conditions, unless the transmitting
utility agrees to provide such services at rates,
charges, terms and conditions acceptable to
such person, the transmitting utility shall,
within 60 days of its receipt of the request, or
other mutually agreed upon period, provide such
person with a detailed written explanation, with
specific reference to the facts and circumstances
of the request, stating (1) the transmitting util-
ity’s basis for
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 824m
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: a4abff7c404a510a5f8d5c53f62b21d9bb05698a1034a98d71dae6aba1e4ca0b. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-0a0f28de19abe451ef422477
Source file: Laws/federal/codes/united-states-code-2024/title-16/section-824m-sales-by-exempt-wholesale-generators--6a095795f4.md
Pages: Not recorded – Not recorded
Passage SHA-256: ac036b41f1a77d8d02f9edebc019d541a78c048a525e576955dd02027c6c2a98
Source location: USCODE-2024-title16-chap12-subchapII-sec824m.pdf
Stored source content
Page 1423
TITLE 16—CONSERVATION
§ 824o
1 See References in Text note below.
Subsec. (b). Pub. L. 102–486, § 722(1), struck out subsec.
(b) which required applicants for orders to be ready,
willing, and able to reimburse parties subject to such
orders.
Subsec. (e). Pub. L. 102–486, § 722(2), amended subsec.
(e) generally. Prior to amendment, subsec. (e) related
to utilization of interconnection or wheeling authority
in lieu of other authority and limitation of Commission
authority.
Subsecs. (g) to (k). Pub. L. 102–486, § 722(3), added sub-
secs. (g) to (k).
Statutory Notes and Related Subsidiaries
STATE AUTHORITIES; CONSTRUCTION
Nothing in amendment by Pub. L. 102–486 to be con-
strued as affecting or intending to affect, or in any way
to interfere with, authority of any State or local gov-
ernment relating to environmental protection or siting
of facilities, see section 731 of Pub. L. 102–486, set out
as a note under section 796 of this title.
§ 824l. Information requirements
(a) Requests for wholesale transmission services
Whenever any electric utility, Federal power
marketing agency, or any other person gener-
ating electric energy for sale for resale makes a
good faith request to a transmitting utility to
provide wholesale transmission services and re-
quests specific rates and charges, and other
terms and conditions, unless the transmitting
utility agrees to provide such services at rates,
charges, terms and conditions acceptable to
such person, the transmitting utility shall,
within 60 days of its receipt of the request, or
other mutually agreed upon period, provide such
person with a detailed written explanation, with
specific reference to the facts and circumstances
of the request, stating (1) the transmitting util-
ity’s basis for the proposed rates, charges,
terms, and conditions for such services, and (2)
its analysis of any physical or other constraints
affecting the provision of such services.
(b) Transmission capacity and constraints
Not later than 1 year after October 24, 1992,
the Commission shall promulgate a rule requir-
ing that information be submitted annually to
the Commission by transmitting utilities which
is adequate to inform potential transmission
customers, State regulatory authorities, and the
public of potentially available transmission ca-
pacity and known constraints.
(June 10, 1920, ch. 285, pt. II, § 213, as added Pub.
L. 102–486, title VII, § 723, Oct. 24, 1992, 106 Stat.
2919.)
Statutory Notes and Related Subsidiaries
STATE AUTHORITIES; CONSTRUCTION
Nothing in this section to be construed as affecting
or intending to affect, or in any way to interfere with,
authority of any State or local government relating to
environmental protection or siting of facilities, see sec-
tion 731 of Pub. L. 102–486, set out as a note under sec-
tion 796 of this title.
§ 824m. Sales by exempt wholesale generators
No rate or charge received by an exempt
wholesale generator for the sale of electric en-
ergy shall be lawful under section 824d of this
title if, after notice and opportunity for hearing,
the Commission finds that such rate or charge
results from the receipt of any undue preference
or advantage from an electric utility which is an
associate company or an affiliate of the exempt
wholesale generator. For purposes of this sec-
tion, the terms ‘‘associate company’’ and ‘‘affil-
iate’’ shall have the same meaning as provided
in section 16451 of title 42.1
(June 10, 1920, ch. 285, pt. II, § 214, as added Pub.
L. 102–486, title VII, § 724, Oct. 24, 1992, 106 Stat.
2920;
amended
Pub.
L.
109–58,
title
XII,
§ 1277(b)(2), Aug. 8, 2005, 119 Stat. 978.)
Editorial Notes
REFERENCES IN TEXT
Section 16451 of title 42, referred to in text, was in the
original ‘‘section 2(a) of the Public Utility Holding
Company Act of 2005’’ and was translated as reading
‘‘section 1262’’ of that Act, meaning section 1262 of sub-
title F of title XII of Pub. L. 109–58, to reflect the prob-
able intent of Congress, because subtitle F of title XII
of Pub. L. 109–58 does not contain a section 2 and sec-
tion 1262 of subtitle F of title XII of Pub. L. 109–58 de-
fines terms.
AMENDMENTS
2005—Pub. L. 109–58 substituted ‘‘section 16451 of title
42’’ for ‘‘section 79b(a) of title 15’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2005 AMENDMENT
Amendment by Pub. L. 109–58 effective 6 months after
Aug. 8, 2005, with provisions relating to effect of com-
pliance with certain regulations approved and made ef-
fective prior to such date, see section 1274 of Pub. L.
109–58, set out as an Effective Date note under section
16451 of Title 42, The Public Health and Welfare.
STATE AUTHORITIES; CONSTRUCTION
Nothing in this section to be construed as affecting
or intending to affect, or in any way to interfere with,
authority of any State or local government relating to
environmental protection or siting of facilities, see sec-
tion 731 of Pub. L. 102–486, set out as a note under sec-
tion 796 of this title.
§ 824n. Repealed. Pub. L. 109–58, title XII,
§ 1232(e)(3), Aug. 8, 2005, 119 Stat. 957
Section, Pub. L. 106–377, § 1(a)(2) [title III, § 311], Oct.
27, 2000, 114 Stat. 1441, 1441A–80, related to authority re-
garding formation and operation of regional trans-
mission organizations.
§ 824o. Electric reliability
(a) Definitions
For purposes of this section:
(1) The term ‘‘bulk-power system’’ means—
(A) facilities and control systems nec-
essary for operating an interconnected elec-
tric energy transmission network (or any
portion thereof); and
(B) electric energy from generation facili-
ties needed to maintain transmission system
reliability.
The term does not include facilities used in
the local distribution of electric energy.
(2) The terms ‘‘Electric Reliability Organiza-
tion’’ and ‘‘ERO’’ mean the organization cer-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
No rate or charge received by an exempt wholesale generator for the sale of electric energy shall be lawful under [section 824d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section824d&num=0&edition=prelim) if, after notice and opportunity for hearing, the Commission finds that such rate or charge results from the receipt of any undue preference or advantage from an electric utility which is an associate company or an affiliate of the exempt wholesale generator. For purposes of this section, the terms “associate company” and “affiliate” shall have the same meaning as provided in [section 16451 of title 42](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section16451&num=0&edition=prelim).11 See References in Text note below.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824m
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.