42 U.S.C. § 8321 — Temporary exemptions
Federal law — U.S. Code and appendices · legal_authorities
Page 7589
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 8321
1 So in original. Probably should be ‘‘not’’.
(1) has sufficient inherent design character-
istics to permit the addition of equipment (in-
cluding all necessary pollution devices) nec-
essary to render such electric powerplant ca-
pable of using coal or another alternate fuel as
its primary energy source; and
(2) is not physically, structurally, or techno-
logically precluded from using coal or another
alternate fuel as its primary energy source.
Capability to use coal or another alternate fuel
shall not be interpreted to require any such pow-
erplant to be immediately able to use coal or an-
other alternate fuel as its primary energy
source on its initial day of operation.
(c) Applicability to base load powerplants
(1) This section shall apply only to base load
powerplants, and shall not apply to peakload
powerplants or intermediate load powerplants.
(2) For the purposes of this section, hours of
electrical generation pursuant to emergency sit-
uations, as defined by the Secretary and re-
ported to the Secretary, shall not be included in
a determination of whether a powerplant is
being operated as a base load powerplant.
(d) Self-certification
(1) In order to meet the requirement of sub-
section (a), the owner or operator of any new
electric powerplant to be operated as a base load
powerplant proposing to use natural gas or pe-
troleum as its primary energy source shall cer-
tify to the Secretary prior to construction, or
prior to operation as a base load powerplant in
the case of a new electric powerplant operated
as a peakload powerplant or intermediate load
powerplant, that such powerplant has capability
to use coal or another alternate fuel, within the
meaning of subsection (b). Such c
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 8321
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: f8479dc4ba556848e69e2b47e9144bc314c3476bd0ffe43e537c2885445aa312. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-08cbe7f54194802e70bd0423
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-8321-temporary-exemptions--770f767019.md
Pages: Not recorded – Not recorded
Passage SHA-256: facce10b3c93389cf548a9a13cb8abf6cda3ac0396d8c5af86b06427185f77bc
Source location: USCODE-2024-title42-chap92-subchapII-partB-sec8321.pdf
Stored source content
Page 7589
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 8321
1 So in original. Probably should be ‘‘not’’.
(1) has sufficient inherent design character-
istics to permit the addition of equipment (in-
cluding all necessary pollution devices) nec-
essary to render such electric powerplant ca-
pable of using coal or another alternate fuel as
its primary energy source; and
(2) is not physically, structurally, or techno-
logically precluded from using coal or another
alternate fuel as its primary energy source.
Capability to use coal or another alternate fuel
shall not be interpreted to require any such pow-
erplant to be immediately able to use coal or an-
other alternate fuel as its primary energy
source on its initial day of operation.
(c) Applicability to base load powerplants
(1) This section shall apply only to base load
powerplants, and shall not apply to peakload
powerplants or intermediate load powerplants.
(2) For the purposes of this section, hours of
electrical generation pursuant to emergency sit-
uations, as defined by the Secretary and re-
ported to the Secretary, shall not be included in
a determination of whether a powerplant is
being operated as a base load powerplant.
(d) Self-certification
(1) In order to meet the requirement of sub-
section (a), the owner or operator of any new
electric powerplant to be operated as a base load
powerplant proposing to use natural gas or pe-
troleum as its primary energy source shall cer-
tify to the Secretary prior to construction, or
prior to operation as a base load powerplant in
the case of a new electric powerplant operated
as a peakload powerplant or intermediate load
powerplant, that such powerplant has capability
to use coal or another alternate fuel, within the
meaning of subsection (b). Such certification
shall be effective to establish compliance with
the requirement of subsection (a) as of the date
it is filed with the Secretary. Within 15 days
after receipt of a certification submitted pursu-
ant to this paragraph, the Secretary shall pub-
lish in the Federal Register a notice reciting
that the certification has been filed.
(2) The Secretary, within 60 days after the fil-
ing of a certification under paragraph (1), may
require the owner or operator of such power-
plant to provide such supporting documents as
may be necessary to verify the certification.
(Pub. L. 95–620, title II, § 201, Nov. 9, 1978, 92 Stat.
3298; Pub. L. 100–42, § 1(c)(4)(A), May 21, 1987, 101
Stat. 311.)
Editorial Notes
AMENDMENTS
1987—Pub. L. 100–42 substituted ‘‘Coal capability of
new electric powerplants; certification of compliance’’
for ‘‘New electric powerplants’’ in section catchline and
amended text generally. Prior to amendment, text read
as follows: ‘‘Except to such extent as may be author-
ized under part B—
‘‘(1) natural gas or petroleum shall not be used as
a primary energy source in any new electric power-
plant; and
‘‘(2) no new electric powerplant may be constructed
without the capability to use coal or any other alter-
nate fuel as a primary energy source.’’
§ 8312. Repealed. Pub. L. 100–42, § 1(a)(1), May 21,
1987, 101 Stat. 310
Section, Pub. L. 95–620, title II, § 202, Nov. 9, 1978, 92
Stat. 3298, prohibited, except to extent authorized
under part B, use of natural gas or petroleum as pri-
mary energy source in new major fuel-burning installa-
tion consisting of a boiler, and authorized Secretary to
prohibit nonboilers from using natural gas or petro-
leum.
PART B—EXEMPTIONS
§ 8321. Temporary exemptions
(a) General exemption due to lack of alternate
fuel supply, site limitations, or environ-
mental requirements
After consideration of a petition (and com-
ments thereon) for an exemption for a power-
plant from the prohibitions of part A, the Sec-
retary shall, by order, grant an exemption under
this subsection for the use of natural gas or pe-
troleum, if he finds that the petitioner has dem-
onstrated that for the period of the proposed ex-
emption, despite diligent good faith efforts—
(1) it is likely that an adequate and reliable
supply of coal or other alternate fuel of the
quality necessary to conform with design and
operational requirements for use as a primary
energy source will not be available to such
powerplant at a cost (taking into account as-
sociated facilities for the transportation and
use of such fuel) which, based upon the best
practicable estimates, does not substantially
exceed the cost, as determined by rule by the
Secretary, of the fuel that would be used as a
primary energy source;
(2) one or more site limitations exist which
would ot 1 permit the location or operation of
such a powerplant using coal or any other al-
ternate fuel as a primary energy source; or
(3) the prohibitions of section 8311 of this
title could not be satisfied without violating
applicable environmental requirements.
(b) Temporary exemption based upon future use
of synthetic fuels
After consideration of a petition (and com-
ments thereon) for an exemption for a power-
plant from the prohibitions of part A, the Sec-
retary shall, by order, grant an exemption under
this subsection for the use of natural gas or pe-
troleum, if he finds that the petitioner has dem-
onstrated that—
(1) the petitioner will comply with the prohi-
bitions of part A by the end of the proposed ex-
emption by the use of a synthetic fuel derived
from coal or another alternate fuel; and
(2) the petitioner is not able to comply with
such prohibitions by the use of such synthetic
fuel until the end of the proposed exemption.
The effectiveness of an exemption under this
subsection is conditioned on the petitioner filing
and maintaining a compliance plan meeting the
requirements of section 8324(b) of this title.
(c), (d) Repealed. Pub. L. 100–42, § 1(c)(5)(E), May
21, 1987, 101 Stat. 312
(e) Duration of temporary exemptions
(1) Except as provided in paragraph (2), exemp-
tions under this section for any powerplant may
Page 7590
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 8322
not exceed, taking into account any extension
or renewal, 5 years.
(2)(A) An exemption under subsection (a)(1)
may be granted for a period of more than 5
years, but may not exceed, taking into account
any extension or renewal, 10 years.
(B) An exemption under subsection (b) may be
extended beyond the 5-year limit under para-
graph (1), but such exemption, so extended, may
not exceed 10 years.
(3) If an exemption is granted for any power-
plant before the powerplant is placed in service,
the period before it is placed in service shall not
be taken into account in computing the 5-year
and the 10-year limitations of paragraphs (1) and
(2).
(Pub. L. 95–620, title II, § 211, Nov. 9, 1978, 92 Stat.
3299; Pub. L. 100–42, § 1(c)(5), May 21, 1987, 101
Stat. 312.)
Editorial Notes
AMENDMENTS
1987—Subsec. (a). Pub. L. 100–42, § 1(c)(5)(A)–(D), sub-
stituted ‘‘from’’ for ‘‘or installation from one or more
of’’ in introductory provisions, substituted ‘‘the fuel
that would be used’’ for ‘‘using imported petroleum’’
and struck out ‘‘or installation’’ after ‘‘powerplant’’ in
par. (1), struck out ‘‘or installation’’ after ‘‘power-
plant’’ in par. (2), and struck out ‘‘or 8312’’ after ‘‘8311’’
in par. (3).
Subsec. (b). Pub. L. 100–42, § 1(c)(5)(A), substituted
‘‘from’’ for ‘‘or installation from one or more of’’.
Subsec. (c). Pub. L. 100–42, § 1(c)(5)(E), struck out sub-
sec. (c) which read as follows: ‘‘After consideration of a
petition (and comments thereon) for an exemption for
a powerplant or installation from one or more of the
prohibitions of part A, the Secretary may, by order,
grant an exemption under this subsection for the use of
natural gas or petroleum, if he finds that the petitioner
has demonstrated that for the period of the proposed
exemption the issuance of such exemption would be in
the public interest and would be consistent with the
purposes of this chapter.’’
Subsec. (d). Pub. L. 100–42, § 1(c)(5)(E), struck out sub-
sec. (d) which read as follows: ‘‘After consideration of
a petition (and comments thereon) for an exemption
from the prohibition of the use of petroleum under sec-
tion 8312 of this title for an installation with a design
capacity of consuming any fuel (or any mixture there-
of) at a fuel heat input rate which does not exceed 300
million Btu’s per hour, the Secretary may, by order,
grant an exemption under this subsection for the use of
petroleum if he finds that the petitioner has dem-
onstrated, by the existence of binding contracts or
other evidence, including appropriate State construc-
tion permits, that he will use coal or another alternate
fuel for at least 75 percent of the annual fuel heat input
rate upon the expiration of such exemption. For provi-
sions relating to authority to receive, consider and
granting (or denying) certain petitons [sic] for an ex-
emption under this subsection, see section 902(b).’’
Subsec. (e)(1), (3). Pub. L. 100–42, § 1(c)(5)(B), struck
out ‘‘or installation’’ after ‘‘powerplant’’ wherever ap-
pearing.
Statutory Notes and Related Subsidiaries
EXEMPTION
FOR CERTAIN ELECTRIC POWERPLANTS
AND
TEMPORARY
EXEMPTION
ISSUED
UNDER
SUBSECTION
(d) AS EFFECTIVE PRIOR TO 180 DAYS AFTER NOVEM-
BER 9, 1978
For effectiveness of exemption for certain electric
powerplants and the temporary exemption issued under
subsec. (d) of this section as prior to 180 days after Nov.
9, 1978, see section 902 of Pub. L. 95–620, set out as a
note under section 8301 of this title.
§ 8322. Permanent exemptions
(a) Permanent exemption due to lack of alter-
nate fuel supply, site limitations, environ-
mental requirements, or adequate capital
(1) After consideration of a petition (and com-
ments thereon) for an exemption for a power-
plant from the prohibitions of part A, the Sec-
retary shall, by order, grant a permanent ex-
emption under this subsection with respect to
natural gas or petroleum, if he finds that the pe-
titioner has demonstrated that despite diligent
good faith efforts—
(A) it is likely that an adequate and reliable
supply of coal or other alternate fuel of the
quality necessary to conform with design and
operational requirements for use as a primary
energy source (i) will not be available within
the first 10 years of the useful life of the pow-
erplant, or (ii) will not be available at a cost
(taking into account associated facilities for
the transportation and use of such fuel) which,
based upon the best practicable estimates,
does not substantially exceed the cost, as de-
termined by rule by the Secretary, of the fuel
that would be used as a primary energy source
during the useful life of the powerplant in-
volved;
(B) one or more site limitations exist which
would not permit the location or operation of
such powerplant using coal or any other alter-
nate fuel as a primary energy source;
(C) the prohibitions of part A could not be
satisfied without violating applicable environ-
mental requirements; or
(D) the required use of coal or any other al-
ternate fuel would not allow the petitioner to
obtain adequate capital for the financing of
such powerplant.
(2) The demonstration required to be made by
a petitioner under paragraph (1) shall be made
with respect to the site of such powerplant and
reasonable alternative sites.
(b) Permanent exemption due to certain State or
local requirements
After consideration of a petition (and com-
ments thereon) for an exemption for a power-
plant from the prohibitions of part A, the Sec-
retary may, by order, grant a permanent exemp-
tion under this subsection with respect to nat-
ural gas or petroleum, if he finds that the peti-
tioner has demonstrated that—
(1) with respect to the proposed site of the
powerplant, the construction or operation of
such a facility using coal or any other alter-
nate fuel is infeasible because of a State or
local requirement (other than a building code
or a nuisance or zoning law);
(2) there is no reasonable alternative site for
such powerplant which meets the criteria set
forth in subsection (a)(1)(A) through (D); and
(3) the granting of the exemption would be
in the public interest and would be consistent
with the purposes of this chapter.
(c) Permanent exemption for cogeneration
After consideration of a petition (and com-
ments thereon) for an exemption from one or
more of the prohibitions of part A for a cogen-
eration facility, the Secretary may, by order,
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) General exemption due to lack of alternate fuel supply, site limitations, or environmental requirements** After consideration of a petition (and comments thereon) for an exemption for a powerplant from the prohibitions of part A, the Secretary shall, by order, grant an exemption under this subsection for the use of natural gas or petroleum, if he finds that the petitioner has demonstrated that for the period of the proposed exemption, despite diligent good faith efforts—
(1) it is likely that an adequate and reliable supply of coal or other alternate fuel of the quality necessary to conform with design and operational requirements for use as a primary energy source will not be available to such powerplant at a cost (taking into account associated facilities for the transportation and use of such fuel) which, based upon the best practicable estimates, does not substantially exceed the cost, as determined by rule by the Secretary, of the fuel that would be used as a primary energy source;
(2) one or more site limitations exist which would ot 11 So in original. Probably should be “not”. permit the location or operation of such a powerplant using coal or any other alternate fuel as a primary energy source; or
(3) the prohibitions of [section 8311 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8311&num=0&edition=prelim) could not be satisfied without violating applicable environmental requirements.
**(b) Temporary exemption based upon future use of synthetic fuels** After consideration of a petition (and comments thereon) for an exemption for a powerplant from the prohibitions of part A, the Secretary shall, by order, grant an exemption under this subsection for the use of natural gas or petroleum, if he finds that the pe