48 U.S.C. § 2213 — Critical Projects
Federal law — U.S. Code and appendices · legal_authorities
Page 382
TITLE 48—TERRITORIES AND INSULAR POSSESSIONS
§ 2213
1 See References in Text note below.
(d) Removal
(1) In general
The Revitalization Coordinator may be re-
moved for any reason, in the Oversight Board’s
discretion.
(2) Termination of position
Upon the termination of the Oversight Board
pursuant to section 2149 of this title, the posi-
tion of the Revitalization Coordinator shall
terminate.
(Pub. L. 114–187, title V, § 502, June 30, 2016, 130
Stat. 597.)
§ 2213. Critical Projects
(a) Identification of projects
(1) Project submission
Any Project Sponsor may submit, so long as
the Oversight Board is in operation, any exist-
ing, ongoing, or proposed project to the Revi-
talization Coordinator. The Revitalization Co-
ordinator shall require such submission to in-
clude—
(A) the impact the project will have on an
emergency;
(B) the availability of immediate private
capital or other funds, including loan guar-
antees, loans, or grants to implement, oper-
ate, or maintain the project;
(C) the cost of the project and amount of
Puerto Rico government funds, if any, nec-
essary to complete and maintain the project;
(D) the environmental and economic bene-
fits provided by the project, including the
number of jobs to be created that will be
held by residents of Puerto Rico and the ex-
pected economic impact, including the im-
pact on ratepayers, if applicable;
(E) the status of the project if it is existing
or ongoing; and
(F) in addition to the requirements found
in subparagraphs (A) through (E), the Revi-
talization Coordinator may require such
submission to include any or all of the fol-
lowing criteria that assess how the project
will—
(i) reduce reliance on oil for electric gen-
eration in Puerto Rico;
(ii) improve performance of energ
Source: Supplied 2024 U.S. Code historical extraction · 48 U.S.C. § 2213
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: f90d2314aa1bb6431b0d77721081872b52ccd4cb3b2a58d8b1233366926d0794. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-045203affe02d0f4e66745bc
Source file: Laws/federal/codes/united-states-code-2024/title-48/section-2213-critical-projects--bbc68bdc62.md
Pages: Not recorded – Not recorded
Passage SHA-256: 2568e9f6b5ad68093f6089aaf35a2dd421e8aa91b872b7872d989c92d12b9863
Source location: USCODE-2024-title48-chap20-subchapV-sec2213.pdf
Stored source content
Page 382
TITLE 48—TERRITORIES AND INSULAR POSSESSIONS
§ 2213
1 See References in Text note below.
(d) Removal
(1) In general
The Revitalization Coordinator may be re-
moved for any reason, in the Oversight Board’s
discretion.
(2) Termination of position
Upon the termination of the Oversight Board
pursuant to section 2149 of this title, the posi-
tion of the Revitalization Coordinator shall
terminate.
(Pub. L. 114–187, title V, § 502, June 30, 2016, 130
Stat. 597.)
§ 2213. Critical Projects
(a) Identification of projects
(1) Project submission
Any Project Sponsor may submit, so long as
the Oversight Board is in operation, any exist-
ing, ongoing, or proposed project to the Revi-
talization Coordinator. The Revitalization Co-
ordinator shall require such submission to in-
clude—
(A) the impact the project will have on an
emergency;
(B) the availability of immediate private
capital or other funds, including loan guar-
antees, loans, or grants to implement, oper-
ate, or maintain the project;
(C) the cost of the project and amount of
Puerto Rico government funds, if any, nec-
essary to complete and maintain the project;
(D) the environmental and economic bene-
fits provided by the project, including the
number of jobs to be created that will be
held by residents of Puerto Rico and the ex-
pected economic impact, including the im-
pact on ratepayers, if applicable;
(E) the status of the project if it is existing
or ongoing; and
(F) in addition to the requirements found
in subparagraphs (A) through (E), the Revi-
talization Coordinator may require such
submission to include any or all of the fol-
lowing criteria that assess how the project
will—
(i) reduce reliance on oil for electric gen-
eration in Puerto Rico;
(ii) improve performance of energy infra-
structure and overall energy efficiency;
(iii) expedite the diversification and con-
version of fuel sources for electric genera-
tion from oil to natural gas and renew-
ables in Puerto Rico as defined under ap-
plicable Puerto Rico laws;
(iv) promote the development and utili-
zation of energy sources found on Puerto
Rico;
(v)
contribute
to
transitioning
to
privatized generation capacities in Puerto
Rico;
(vi) support the Energy Commission of
Puerto Rico in achievement of its goal of
reducing energy costs and ensuring afford-
able energy rates for consumers and busi-
ness; or
(vii) achieve in whole or in part the rec-
ommendations, if feasible, of the study in
section 505(d) of this title 1 to the extent
such study is completed and not incon-
sistent with studies or plans otherwise re-
quired under Puerto Rico laws.
(2) Identification of relevant Puerto Rico Agen-
cies
Within 20 days of receiving a project submis-
sion under paragraph (1), the Revitalization
Coordinator shall, in consultation with the
Governor, identify all Puerto Rico Agencies
that will have a role in the permitting, ap-
proval, authorizing, or other activity related
to the development of such project submis-
sion.
(3) Expedited Permitting Process
(A) Submission of Expedited Permitting
Process
Not later than 20 days after receiving a
project submission, each Puerto Rico Agen-
cy identified in paragraph (1) shall submit to
the Revitalization Coordinator the Agency’s
Expedited Permitting Process.
(B) Failure to provide Expedited Permitting
Process
If a Puerto Rico Agency fails to provide an
Expedited Permitting Process within 20 days
of receiving a project submission, the Revi-
talization Coordinator shall consult with the
Governor to develop within 20 days an Expe-
dited Permitting Process for the Agency.
(C) Implementation and prioritization
The Revitalization Coordinator shall re-
quire Puerto Rico Agencies to implement
the Expedited Permitting Process for Crit-
ical Projects. Critical Projects shall be
prioritized to the maximum extent possible
in each Puerto Rico Agency regardless of
any agreements transferring or delegating
permitting authority to any other Terri-
torial Instrumentality or municipality.
(b) Critical Project Report
(1) In general
For each submitted project, the Revitaliza-
tion Coordinator in consultation with the Gov-
ernor and relevant Puerto Rico Agencies iden-
tified in subsection (a)(2) shall develop a Crit-
ical Project Report within 60 days of the
project submission, which shall include:
(A) An assessment of how well the project
meets the criteria in subsection (a)(1).
(B) A recommendation by the Governor
whether the project should be considered a
Critical Project. If the Governor fails to pro-
vide a recommendation during the develop-
ment of the Critical Project Report, the fail-
ure shall constitute a concurrence with the
Revitalization Coordinator’s recommenda-
tion in subparagraph (E).
(C) In the case of a project that may affect
the implementation of Land-Use Plans, as
defined by Puerto Rico Act 550–2004, a deter-
mination by the Planning Board will be re-
quired within the 60-day timeframe. If the
Planning Board determines such project will
be inconsistent with relevant Land-Use
Plans, then the project will be deemed ineli-
gible for Critical Project designation.
(D) In the case of an Energy Project that
will connect with the Puerto Rico Electric
Page 383
TITLE 48—TERRITORIES AND INSULAR POSSESSIONS
§ 2214
2 So in original.
Power Authority’s transmission or distribu-
tion facilities, a recommendation by the En-
ergy Commission of Puerto Rico, if the En-
ergy Commission determines such Energy
Project will affect an approved Integrated
Resource Plan, as defined under Puerto Rico
Act 54–2014. If the Energy Commission deter-
mines the Energy Project will adversely af-
fect an approved Integrated Resource Plan,
then the Energy Commission shall provide
the reasons for such determination and the
Energy Project shall be ineligible for Crit-
ical Project designation, provided that such
determination must be made during the 60-
day timeframe for the development of the
Critical Project Report.
(E) A recommendation by the Revitaliza-
tion Coordinator whether the project should
be considered a Critical Project.
(2) Public involvement
Immediately following the completion of the
Critical Project Report, the Revitalization Co-
ordinator shall make such Critical Project Re-
port public and allow a period of 30 days for
the submission of comments by residents of
Puerto Rico specifically on matters relating
to the designation of a project as a Critical
Project. The Revitalization Coordinator shall
respond to the comments within 30 days of
closing the coming 2 period and make the re-
sponses publicly available.
(3) Submission to Oversight Board
Not later than 5 days after the Revitaliza-
tion Coordinator has responded to the com-
ments under paragraph (2), the Revitalization
Coordinator shall submit the Critical Project
Report to the Oversight Board.
(c) Action by the Oversight Board
Not later than 30 days after receiving the Crit-
ical Project Report, the Oversight Board, by ma-
jority vote, shall approve or disapprove the
project as a Critical Project, if the Oversight
Board—
(1) approves the project, the project shall be
deemed a Critical Project; and
(2) disapproves the project, the Oversight
Board shall submit to the Revitalization Coor-
dinator in writing the reasons for disapproval.
(Pub. L. 114–187, title V, § 503, June 30, 2016, 130
Stat. 598.)
Editorial Notes
REFERENCES IN TEXT
Section 505(d) of this title, referred to in subsec.
(a)(1)(F)(vii), is section 505(d) of title V of Pub. L.
114–187, June 30, 2016, 130 Stat. 602, which amended sec-
tion 1492a of this title.
§ 2214. Miscellaneous provisions
(a) Creation of Interagency Environmental Sub-
committee
(1) Establishment
Not later than 60 days after the date on
which the Revitalization Coordinator is ap-
pointed, the Interagency Environmental Sub-
committee shall be established and shall
evaluate environmental documents required
under Puerto Rico law for any Critical Project
within the Expedited Permitting Process es-
tablished by the Revitalization Coordinator
under section 2213(a)(3) of this title.
(2) Composition
The
Interagency
Environmental
Sub-
committee shall consist of the Revitalization
Coordinator, and a representative selected by
the Governor in consultation with the Revital-
ization Coordinator representing each of the
following agencies: The Environmental Qual-
ity Board, the Planning Board, the Puerto
Rico Department of Natural and Environ-
mental Resources, and any other Puerto Rico
Agency determined to be relevant by the Revi-
talization Coordinator.
(b) Length of Expedited Permitting Process
With respect to a Puerto Rico Agency’s activi-
ties related only to a Critical Project, such
Puerto Rico Agency shall operate as if the Gov-
ernor has declared an emergency pursuant to
section 2 of Act 76 (3 L.P.R.A. 1932). Section 12 of
Act 76 (3 L.P.R.A. 1942) shall not be applicable to
Critical
Projects.
Furthermore,
any
trans-
actions, processes, projects, works, or programs
essential to the completion of a Critical Project
shall continue to be processed and completed
under such Expedited Permitting Process re-
gardless of the termination of the Oversight
Board under section 2149 of this title.
(c) Expedited Permitting Process compliance
(1) Written notice
A Critical Project Sponsor may in writing
notify the Oversight Board of the failure of a
Puerto Rico Agency or the Revitalization Co-
ordinator to adhere to the Expedited Permit-
ting Process.
(2) Finding of failure
If the Oversight Board finds either the Puer-
to Rico Agency or Revitalization Coordinator
has failed to adhere to the Expedited Permit-
ting Process, the Oversight Board shall direct
the offending party to comply with the Expe-
dited
Permitting
Process.
The
Oversight
Board may take such enforcement action as
necessary as provided by section 2124(l) of this
title.
(d) Review of Legislature acts
(1) Submission of acts to Oversight Board
Pursuant to section 2144(a) of this title, the
Governor shall submit to the Oversight Board
any law duly enacted during any fiscal year in
which the Oversight Board is in operation that
may affect the Expedited Permitting Process.
(2) Finding of Oversight Board
Upon receipt of a law under paragraph (1),
the Oversight Board shall promptly review
whether the law would adversely impact the
Expedited Permitting Process and, upon such
a finding, the Oversight Board may deem such
law to be significantly inconsistent with the
applicable Fiscal Plan.
(e) Establishment of certain terms and condi-
tions
No Puerto Rico Agency may include in any
certificate, right-of-way, permit, lease, or other
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
Not later than 18 months after June 30, 2016, the Comptroller General shall submit a report to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate describing—
(1) the conditions which led to the level of debt, which should be analyzed, per capita and based upon overall economic activity;
(2) how actions of the territorial government improved or impaired the territory’s financial conditions; and
(3) recommendations on non-fiscal actions, or policies that would not imperil America’s homeland and national security, that could be taken by Congress or the Administration to avert future indebtedness of territories, while respecting sovereignty and constitutional parameters.